TIDE: Integrated Estuarine Managementand Toolkit
Humber Standing Conference, November 2011
Nick Cutts:IECS, University of Hull
Tide | Nick Cutts| TIDE Integrated Estuarine Management & Toolkit
1
25. November 2011
‘TIDE makes integrated management and planning a reality in the Elbe,Weser, Schelde and Humber estuaries’;
‘Management must have the sole aim of maintaining ecosystem serviceswhile delivering societal benefits’
Need to understand, collate and integrate:– the management issues (using e.g. the TIDE estuaries);– the methods used to deliver the management;– the basis and efficacy of management;– the best tools/plans available to meet these needs– lessons learned, gaps in management.
Development of a framework for future management plan integration.
TIDE AIMS - HEADLINES:
Tide | Nick Cutts| TIDE Integrated Estuarine Management & Toolkit
TIDE Structure
•Enhancing knowledge on estuarine functionCollating and enhancing knowledge on basic estuarine functions – corefunctional attributes. Development of Ecosystem Services approach•Integrated management planning / governanceHow are estuaries managed – examples of good practice, issue specificmanagement exemplars. Knowledge transfer, gap filling. How to getsocietal benefits?•Mitigation and compensation measuresWhat measures are undertaken to address issues – context, cost andapplication? Gaps, trends and new techniques available.
Tide | Nick Cutts| TIDE Integrated Estuarine Management & Toolkit 2
25. November 2011
TIDE Deliverables
Simplistically:
Framework for the integrated management of estuaries – to build onknowledge and aim for the better integration of existing sectoralroles/plans and identify gaps, overlaps, best practice etc.
•Develop a ‘toolbox’ to assist in estuarine management
•Collation and agreement of ‘tools’ for the ‘toolbox’
Tide | Nick Cutts| TIDE Integrated Estuarine Management & Toolkit 3
25. November 2011
Tide | Nick Cutts| TIDE Integrated Estuarine Management & Toolkit 4
25. November 2011
Governance Analysis: Core Areas
•Management Drivers – via EU directives but cf. enabled at nationaland estuary level; estuary specific issues and responses;•Management Remit – structure of estuarine management -transnational, state, region issues addressed, statutory vs. non-statutorypowers;•Management Plans – based on the above, what plans are in place tomeet the issues and operated by which organisations;•SWOT Analysis – Strength, Weakness, Opportunities, Threats re. keyissues; good and less-good practice?•Conflict Matrices – are issues similar for all estuaries and zones inthese. Where are issues addressed well, what topics need attention?
Tide | Nick Cutts| TIDE Integrated Estuarine Management & Toolkit 5
25. November 2011
Management Framework Review
Review individual estuary plans - what management drivers, remit andframework for each estuary (e.g. planning context).Management drivers - role, implementation, governance and conflicts ofEU Directives.Impact at an estuary level, where other national and local managementrequirements are also necessary.Cf. primarily sectoral implementation on estuaries but progress to moreintegrated approaches.Ensure an adequate stakeholder buy-in, but many of the integratedimplementation components are on a voluntary rather than statutorybasis.
6
25. November 2011
• High level management drivers are primarily through EU Directives andtheir implementation into national policy and law.
• As such, there should be a degree of international comparability.• However we should also be able to identify differences in national and
regional implementation in some cases.For example....The Wildbirds Directive
Tide | Nick Cutts| TIDE Integrated Estuarine Management & Toolkit
MANAGEMENT REMIT/DRIVERS
Tide | Nick Cutts| TIDE Integrated Estuarine Management & Toolkit 7
25. November 2011EU POLICY DELIVERY – WILDBIRDSDIRECTIVEHumber
Weser
Coastal and marine waters
Guidance document by EU COM“The implementation of the Birds and Habitas
Directives in estuaries”
Integrated Management Plan (Natura 2000)Recommended but non mandatory under the “Habitats Directive”, intended to include WFD River Basin
Management Plan. It is meant to authorize such activities without appropriate assessment according to Article 6(3).
Steering Committee for Elbe, Weser and Ems(State Ministries for Environment and for Economy, Federal Waterways Administration (WSV), Hamburg Port Authority (HPA),
Federal Ministries for Environment and for Economy of Schleswig-Holstein (S-H), Hamburg (HH) , Bremen (HB) and LowerSaxony (NI))
Working GroupWorking representatives from NI, HB, WSV
Planning GroupsLocal stakeholder contributions
(e.g. NGOs, Water Boards, Flood & Coastal Protection,Shipping & Ports, Agriculture, Fishery, Hunting,
Industry & Trade, Tourism, Water Sports)
EstuaryM
anagement Level
River BasinM
anagement Level
LANAGerman Working Group on natureprotection issues of the Federal States andthe Federal Government represented by theFederal Ministry for the Environment,Nature Conservation and Nuclear Safety(BMU)
NationalLevel
Outline measures toreach a favourable
conservation status
Transparent and estuarinespecific objectives
for the management ofthe Natura 2000-sites
has notdealt with
estuaryspecific
questions sofar
EU-KOM- controlling theimplementation of thedirectives
Natura 2000“Habitats Directive” 92/43/EEC“Birds” Directive 79/409/EEC
Federal Ministry for theEnvironment, Nature Conservationand Nuclear Safety (BMU)
with Federal Agency for Nature Conservation(BfN)
BNatSchGFederal Nature
Conservation Act
Tide | Nick Cutts| TIDE Integrated Estuarine Management & Toolkit 8
25. November 2011
Tide | Nick Cutts| TIDE Integrated Estuarine Management & Toolkit 9
25. November 2011
10
25. November 2011
Wildbirds Directive transposed through:• Humber (England): the Conservation of Habitats and Species
Regulations 2010.• Elbe & Weser (Germany): Federal Nature Conservation Act
(BNatSchG).• Schelde (The Netherlands): Nature Conservation Act and the Flora
and Fauna Act.• Schelde (Belgium): Law on Nature Conservation 1973: regional
context by decree/orders for Brussels Capital Region, Flanders andWallonia federal devolution).
Tide | Nick Cutts| TIDE Integrated Estuarine Management & Toolkit
Tide | Nick Cutts| TIDE Integrated Estuarine Management & Toolkit 11
25. November 2011
HumberElbe
WATER FRAMEWORK DIRECTIVE
The WFD - transposed into national law by:Humber (England): The Water Environment (Water FrameworkDirective) (England and Wales) Regulations 2003.Elbe & Weser (Germany): Federal Water Act (WHG) 1996 (asamended) + LAWA has national guidelines to harmonise individualfederal states.Schelde (The Netherlands): ‘Implementation Strategy EG WFD’,altering the ‘National Water Management Law’ & the ‘NationalEnvironmental Management Law’ (Ministry of Justice, 2005).
The Elbe estuary - both an international RBMP (Germany, Poland,Czech Republic and Austria), and a national RBMP for the national(German) programme of measures for the Elbe Estuary.
Tide | Nick Cutts| TIDE Integrated Estuarine Management & Toolkit 12
25. November 2011
Tide | Nick Cutts| TIDE Integrated Estuarine Management & Toolkit 13
25. November 2011
Management DriverMain
Organisation &Their Remit *1
Name of Plan &Spatial planning
Area *2
Focus / Aims of the Plans SWOT
Status
Con
serv
atio
n
Recr
eat
ion
Flo
odPr
ote
ctio
n
Econ
om
ic &
Por
ts
ICZM
STRENGTH (Scope of Plan) WEAKNESS OPPORTUNITIES THREATS
Water FrameworkDirective
Urban Waste WaterTreatment Directive
Department forEnvironment,Food & RuralAffairs (Defra)
NAT
Humber River BasinDistrict Plan
RB
Characterisation, impacts and economics analysesrequired by Article 5 of the Water Framework Directive.Provides plan for implementation by 2015.
Not multi-sectoral –primarily aimed atmeeting WFDrequirements
Integration of a number of WQ& Conservation strands.Framework for futuremanagement targets
Misses full multi-sectoralapproach and soneeds to beintegrated withother plans.
2009 - 2015
Yorkshire Water& Anglian Water
RAs
Asset ManagementPlan (AMP)
RB / EST
Capital Programme identifying ongoing infrastructureimprovements including treatment requirements for theestuary.
Not multi sectoral Framework for futuremanagement needs
Focus on WQassets only
ongoing
Yorkshire Water& Anglian Water
RAs
ResourceManagement Plan(RMP)
RB / EST / COA
Looks at measures to combat the potential effect ofclimate change on water supply and demand in thefuture. Options such as reducing leakage are consideredto ensure that future demand can be met with minimumimpact on the environment.
Not multi sectoral Framework for futuremanagement needs in relationto climate change
Focus on WQassets only
2010/11 -2034/35
Habitats & speciesDirective & Wild BirdsDirective
Habitats and SpeciesConservation
Spp/HabitatProtection &Improvement
Humber EstuaryRelevantAuthoritiesGroup (HERAG)
RA Group
HumberManagementScheme (HMS)
EST
Details the studies and the proposed managementactions required to ensure the conservation featuresremain in favourable condition - the appropriatemanagement action depends on the effect of the activityon the Humber. European Marine Site (EMS)management schemes are informed under Regulation 33advice packages.
Remit focussed onConservation so notfully multi-sectoral.Non-statutory.
Has potential for multi-sectoral planning and strategicview
Sectoralinterests butcurrently notfully integratedinto plan.Powers devolvedback to sectors
2004 -ongoing
EnvironmentAgency, NaturalEngland, EastRiding ofYorkshireCouncil. (allRAs),
RSPB ,LincolnshireWildlife Trust,YorkshireWildlife Trust(NGOs)
Humber EstuaryLocal BiodiversityAction Plans (BAPs)
EST
Ensure local targets for species and habitats Non-statutory andderived without fullstakeholderinvolvement.Difficulties inmaintenance & update
Can deliver local protection tohabitats & species withhierarchical tie-in to nationaltargets.
Possibly in partsuperseded byOHSSCABAP andpossibly a newHumber BAP.
BAPSoriginallywritten in1997 butnew planscould be
Defra NAT
Internal DrainageBoards RA
Ouse & HumberStrategic Sub-catchment AreaBiodiversity ActionPlan
EST - SECT
Ensure local targets for species and habitats Non-statutory andderived without fullstakeholderinvolvement
Can deliver local protection tohabitats & species withhierarchical tie-in to nationaltargets.
Not a full estuarydocument, andcovers only theupper estuary &Ouse
2010-2014
M anag ement Ma in Orga ni sat ion & T hei rRemit *1
N ame o f Pl an &Sp atial planning Ar ea
*2
Focus / ai ms of the plans SW OT
Status
Con
serv
atio
n
Rec
reat
ion
Floo
dP
rote
ction
Eco
nom
y,S
hipp
ing
&P
orts
ICZM Stren gth (Scope o f Plan) Weakn ess Op portunit ie s Th reats
FGG Elbe (Water M anagem en tadministrat ions of th e f ede ralstat es in the ca tchm en t are a o fthe r iver ba sin E lbe) p lus theCze ch R epubl ic, Poland andAust ria
Inte rnat io na l Rive rB asin ManagementP lan 2009
( ) Im provin g the ecological a nd chem ical st atus ofthe w ho le r iver bas in. Overcom es admin istrativeboundar ies.Legal ly bind ing.
N o special focus onthe Tidal r iver Elbe.Vie w on qua l ityp arame ters with outh olistic view on ther iver resp . estua ryfunc tioning .
Importa nt pla n f or thesuccess of the Ma rineStrat egy Direct ive
Ge tting stackedin mon itor ing no tdeveloping ahol istic view onth e r iver resp .estuaryfu nctioning
2009 fina lized– ne xtrevie ws in 20 15 and2021
FGG Elbe W FDNat iona l R ive r BasinM anagement Plan2009 inclu dingnat io na l prog ramme o fm easures for th e El beRiver
( ) Im provin g the ecological a nd chem ical st atus ofthe w ho le r iver bas in. Overcom es admin istrativeboundar ies.Legal bind ing.
N o special focus onthe Tidal r iver Elbe.Vie w on qua l ityp arame ters with outh olistic view on ther iver resp . estua ryfunc tioning .
Importa nt pla n f or thesuccess of the Ma rineStrat egy Direct ive
Ge tting stackedin mon itor ing no tdeveloping ahol istic view onth e r iver resp .estuaryfu nctioning
2009 fina lized– ne xtrevie ws in 20 15 and2021
Wat er Managemen tadministrat ions of th e f ede ralstat es in the ca tchm en t are a o fthe r iver ba sin E lbe andstakeholders
Non binding list ofpossible measure s atthe T idal River Elbe,co l lected by th e W PTidal R iver Elbe (AGTES )
( ) C ollectio n o f a big var iet y of ide as f or me asures atthe Tida l R iver Elbe .
N o le gal bind ing.N o living do cument .N o active wo rkingg ro up.
F ur the r deve lopm en t o f t hisprocess possib le w ithoutpressure on existin g uses l ikeports, shipping andagriculture but integrat io n o fthose in tere sts.
No rea l loca ld river .
Final ise d 2008
U rban Wa steWat er Managemen tadministrat ions of th e 3fed eral st ate s in the cat chmentarea of the Tida l Rive r Elbe
W ate r he at lo adm anagement plan fo rthe T idal River Elbe(Wä rmelastplan f ür dieTideelbe)
Bin ding gu idel ine fo r the 3 wa ter managementadminist ra tions
imp leme ntationdif ficult beca use ofdive rgen t interest s toindustry and powerplants
Redu ct ion of conf l ict sbe tween diff eren t int erests ofecolo gy a nd econom y
Eco nom icint erests haveo fte n h ighe rp rior i tie s; M an ysta keholdersinvo lved
2008
Wat er Managemen tadministrat ion of Hamburg(B SU)
Coo ling wa ter q uantitym anagement plan fo rthe T idal River Elbe (inp rocess butcont ent io us)
Bin ding gu idel ine fo r the H amb urg wa termanagem en t a dmin istra tion
imp leme ntationdif ficult divergentint erests to indu strya nd pow er p lant s
Redu ct ion of conf l ict sbe tween diff eren t int erestsecolo gy a nd econom y
Eco nom icint erests haveo fte n h ighe rp rior i tie s; M an ysta keholdersinvo lved
in proces s
NLW KN Lower Saxony /MLU R , B SU-H H, H PA, W SV
Integrat edM anagement Plan Elbe-N at ura 2 000(In tegr ie r terB ew ir t schaf tungsplanE lbe – I BP)
Im provin g conservat ion st atus Pla n d ivided bya dmin istra tiveb oundar ies,diva ga tingconservat io no bjectives
In tegra ted approach w ithman y w in-win op tions. M orelega l cer ta inties fo r users,excellent stake hold er proce ss
Administra tiveboun dar ies,dif ficult an dexpen si veimp lement ationwith manysta keholdersinvo lved,scien ti ficuncer tai nties
R eady by 2011
SWOT ANALYSIS – ESTUARY PLANSe.g. HUMBER & ELBE (e.g. WFD, HSD)
14
25. November 2011
Interim findings of SWOT:•UK with considerable guidance for Habitats Regulations (cf. PolicyPlanning Statements, Government circulars) - recent revision of the UKConservation Regulations suggested no need for guidance revision.•Germany - KorTel for cross-lander + HPA and Federal Waterways withjoint implementation of the National RBMP at a local level and liaise withthe Tidal River Elbe Working Group•UK - in Humber, EA is the lead CA working with a liaison panel madeup of a variety of groups.Analysis is ongoing.Tide | Nick Cutts| TIDE Integrated Estuarine Management & Toolkit
Tide | Nick Cutts| TIDE Integrated Estuarine Management & Toolkit 15
25. November 2011
Conflict Matrices - are there/where are there problems?
Undertaken for each of the TIDE estuaries through the RWGs.
•Matrix derived for each ‘zone’ in each estuary.
•Level of resource ‘use’ identified for each zone.
•Generic conflict score between each use identified (+ or -).
•Conflict score derived for each activity on each other per zone.
Tide | Nick Cutts| TIDE Integrated Estuarine Management & Toolkit 16
25. November 2011
OutermiddleHumber
Tide | Nick Cutts| TIDE Integrated Estuarine Management & Toolkit 17
25. November 2011
Conflict matrix for the outer middle Humber.
Several specific areas of potential conflict – ports, navigation, flooddefence, industry & recreation impact on conservation and viceversa.Are these conflicts a serious problem or just ‘a fact of life’?
Are existing plans sufficient to cope with these?
Should we be targeting management resources at these areas?
Tide | Nick Cutts| TIDE Integrated Estuarine Management & Toolkit 18
25. November 2011
MiddleElbe
Tide | Nick Cutts| TIDE Integrated Estuarine Management & Toolkit 19
25. November 2011
Conflict matrix for the Middle Elbe.
Again several areas of conflict – navigation, flood defence &recreation impact on conservation etc.
However, high levels of impact are less than for the Humber, andless ports issues seem to be present.
Example of effective conflict management or the lower level ofpotentially conflicting uses in the zone?
Context analysis will be undertaken.
20
25. November 2011
Tide | Nick Cutts| TIDE Integrated Estuarine Management & Toolkit
TIDE Structure/Outcomes
•Enhancing knowledge on estuarine function•Integrated management planning / governance•Mitigation measures
Development of these themes into an Integrated Planning ‘toolbox’
21
25. November 2011
Tide | Nick Cutts| TIDE Integrated Estuarine Management & Toolkit
TIDE outputs:
Series of best practice guidance documents - components of a toolbox;
Inventory list and evaluation of possible actions e.g. an assessment ofpotential mitigation/compensation measures, context, efficacy and costof measures;
Specific tools - e.g. dredge guidance information, mitigation measuresguidance…
Management Framework developed to support these tools.
22
25. November 2011
Tide | Nick Cutts| TIDE Integrated Estuarine Management & Toolkit
TIDE Deliverables: example of a Tool
IECS have been working on the collection of new and collation ofexisting estuarine waterbird disturbance information – both visual andaural stimuli and responses.
This research is in response to a clear information paucity andassociated management need, and has been initially funded by arange of groups (e.g. Humber INCA), but more recently theEnvironment Agency. As part of TIDE this has been taken further withthe Humber ‘pilot study’.
23
25. November 2011
Tide | Nick Cutts| TIDE Integrated Estuarine Management & Toolkit
Bird Disturbance Mitigation Tool
24
25. November 2011
Tide | Nick Cutts| TIDE Integrated Estuarine Management & Toolkit
The document iscurrently in a beta formand uses html links tonavigate.
For instance clickingon the contents tabswill link to backgroundinformation e.g.Clicking on3. Background –Disturbancewill take you to....
25
25. November 2011
Tide | Nick Cutts| TIDE Integrated Estuarine Management & Toolkit
Tide | Nick Cutts| TIDE Integrated Estuarine Management & Toolkit 26
25. November 2011
So by clicking on4. Noise Disturbancewill take you to....
Metres dB(A)
0.67 120 110 100 95 90 85 80 75 70 65 60
1.33 114 104 94 89 84 79 74 69 64 59 54
2.67 108 98 88 83 78 73 68 63 58 53 48
5.33 102 92 82 77 72 67 62 57 52 47 42
10.67 96 86 76 71 66 61 56 51 46 41 36
20.67 90 80 70 65 60 55 50 45 40 35 30
42.67 84 74 64 59 54 49 44 39 34 29 24
85.33 78 68 58 53 48 43 38 33 28 23
170.67 72 62 52 47 42 37 32 27 22
341.33 66 56 46 41 36 31 26 21
682.66 60 50 40 35 30 25 20
1365.32 54 44 34 49 24
In particular, noise impacts and tolerances arepoorly quantified in literature and have been afocus of research. Generic guidance ontolerance levels for waterfowl have thereforebeen tabulated (noise level at receptor).
However further work will beundertaken to both increasethe current dataset, validatefindings and perhaps extenddata to an individual species& activity response level.
Tide | Nick Cutts| TIDE Integrated Estuarine Management & Toolkit 27
25. November 2011
28
25. November 2011
Tide | Nick Cutts| TIDE Integrated Estuarine Management & Toolkit
Similarly clicking on aspecies tab will link toindividual speciesinformation e.g.Clicking on Redshank willtake you to an individualpage.
Redshank
29
25. November 2011
Tide | Nick Cutts| TIDE Integrated Estuarine Management & Toolkit
Bird disturbance ‘toolkit’ allows planners and developers to identify thegeneral sensitivity of an area, based on sensitivity descriptors for thetype of habitats present + likely level of generic impact of an activity ona waterfowl assemblage.
This impact sensitivity can be fine tuned with species-specific toleranceinformation (noise and visuals), as well as an indication of theirimportance within national and international legislation.
A suite of mitigation measures are then suggested, including an initialreview of seasonal sensitivity (e.g. basic works timing), and anindication of applicability specific measures such as screening,technique/plant modification, restricted working times etc.
Tide | Nick Cutts| TIDE Integrated Estuarine Management & Toolkit 30
25. November 2011
The bird disturbance tool is currently in beta format and will bedeveloped further over the next 6 months both in terms of dataset,content and interface.
It is out intention to also develop the tool as a smart phone app, inaddition to the current basic html version.
Tide | Nick Cutts| TIDE Integrated Estuarine Management & Toolkit 31
25. November 2011
In addition there will be a number of specific tools such as the birddisturbance mitigation tool and ones associated with dredging & EIAs.
An EPSS to operate on an HTML basis with links to guidancedocuments, decision support schematics, and a series of menu-drivenlists outlining aspects such as the ecosystem services characterisation(WP3) and potential mitigation/compensation measures (WP5).
These final TIDE outputs are currently at the early development stages!
In addition – experience transfer through Tide on Tour seminars & film.
Tide | Nick Cutts| TIDE Integrated Estuarine Management & Toolkit 32
25. November 2011
TIDE Deliverables Development
Tide | Nick Cutts| TIDE Integrated Estuarine Management & Toolkit 33
25. November 2011
TIDE Deliverables Framework: EPSS
Stages and ‘So What?’:What management framework is appropriate?What is best practice?What are the repercussions of not/following best practice?Are there conflicts between uses/users and management/policy tools- if so where (areas and users)?Are the conflicts important - do they interfere with the provision ofecosystem services and societal benefits?Would resolving conflicts enhance/hinder delivery of ES&SB?Will measures enhance/hinder delivery of ES&SB?Do we have the right tools for the management of these?Ensure TIDE management toolbox will aid integrated estuarinemanagement and enhance delivery of ecosystem services andsocietal benefits.
Tide | Nick Cutts| TIDE Integrated Estuarine Management & Toolkit 34
25. November 2011
For more information:
http://www.tide-project.eu/
Thank you & Questions
Tide | Nick Cutts| TIDE Integrated Estuarine Management & Toolkit 35
25. November 2011