tianjin jiuwei formwork co.,ltd...fully meet the standard of green construction. aluminum formwork...
TRANSCRIPT
Tianjin Jiuwei Formwork
Co.,Ltd
JIUWEI HOLDING
JIUWEI HOLDING
Web: www.hi-lite-systems.com
Hi-Lite Systems1680 Bonhill Rd. Mississauga, Ontario, Canada L5T 1C8E-mail: [email protected]
JIUWEI HOLDING
JIUWEI HOLDING 02JIUWEI HOLDING01
Company Introduction
Production Capacity
Product Advantage
Product Introduction
Installation & Disassembly
Schematic Diagram
Detail processing
Engineering Case
CONTENTS
JIUWEI HOLDINGCorporate Culture
Enterprise Culture
ABOUT Joy&Sun
Tianjin Joy & Sun Environmental Friendly Friendly Product Co., Ltd is a subsidiary company of Beijing
Jiuwei Holding Co., Ltd. It is a diversified subsidiary company specialized in designing, product
development, production, sales, leasing and construction of the construction formwork system and
supporting system. The business competely covers the engineering templates and the whole series of
supporting system products and provide one-stop whole industry chain products and services.
Company Introduction
JIUWEI HOLDING 04JIUWEI HOLDING03
The company is committed to promoting green and environment friendly building
construction and in commercial buildings, residential buildings, civil areas to provide
environmentally friendly, innovative concrete formwork products, especially focus on the new-
type aluminum alloy template engineering program development and template production, to
provide you with the most appropriate solutions, to make the construction being more secure,
more environmentally friendly and healthier.
JIUWEI HOLDINGJIUWEI HOLDING
Production Strength
JIUWEI HOLDING 06JIUWEI HOLDING05
PRODUCTION STRENGTH
JIUWEI HOLDING
PRODUCTION STRENGTH
Product Advantage
JIUWEI HOLDING 08JIUWEI HOLDING07
Advantages of aluminium alloy formwork
High construction efficiency
and short period
Reusable - low cost
Product Advantage
Construction Safety - a
wide range of applications
Less Support - Convenient access
High recovery rate high salvage value
Good stability and
high bearing capacity
Excellent quality assurance
Perfect technical service
Professional chemical plant construction
Construction is more convenient
JIUWEI HOLDING
Aluminum alloy formwork is a new building template in recent years, There are more application in many
countries all over the world. There are more advantages over traditional template including material,
construction results, cost budget, cost and other aspects , They can also reduce the project cost, improve
project quality, accelerate the construction period for customer.Avoid human error in the process of
construction, no residual waste dismantling engineering board, provide safe and civilized construction
environment.
As Quick dismantling template system, It can be removed in 12 hours , It can achieve 3 days of ash to ash layer in the normal construction. thus greatly shorten the construction period.
All accessories can be reused, using the whole extrusion forming aluminum alloy profiles as raw materials, It can be used over 200 times, Reducing cost to a great extent.
After stripping there without any garbage, no rust, no fire hazard, the installation site without nails and other construction debris, fully meet the standard of green construction. Aluminum formwork system applies to all building components, such as load-bearing walls, columns, beams, floors, staircases, balconies, etc., can be completed by pouring cement.
We adopts aluminum template assembled system, after the completion of assembly, forming an overall framework, has good stability, bearing capacity can reach 60KN per square meter, up accident won’t appear.
There are steel support in the template bottom , the average distance are 1.2 meters, large operating space, Convenient access, material handling can be smoothly, easy removal of steel support , on-site easy management.
Aluminum Alloy material has been recycled scrap. For the waste disposal system, with high residual value. All materials are renewable materials, in line with national requirements for building projects energy conservation, environmental protection, low-carbon, emission reduction, in line with the sustainable development of industrial policies.
Once the concrete is poured, the aluminum formwork system is made
up of several independent systems, such as wall formwork, top die
and support, etc., once the formwork is assembled completely, the
concrete can be poured once.
We deepening design and factory test after assembled to the site
according to the construction drawings , all possible problems are
solved in the factory, and the construction speed and the accuracy is
greatly improved.
We have strict quality management system, from raw materials to
finished products shipped to the site, We serious at every segment.
We are more focused on the user's custom design and technical
services, and constantly improve their production and management
level, regularly provide consulting services to users.
Our aluminum formwork system is designed by people who with rich
field experience and know-how carefully based on the accumulation of
faith. No matter what the user needs, we can provide the most
suitable, the most satisfactory answer, With strong R & D strength,
constantly updated, better products, which is why we always maintain
the leading position in the field of Aluminum Alloy template system.
Product Introduction
JIUWEI HOLDING 10JIUWEI HOLDING09
Support the weight of concrete
when pouring concrete
Flat Aluminum support frameconnect with support head,Support the
weight of concrete when pouring concrete
End beam
Support the weight of concrete when
pouring concrete
Wall end plate cover
connect with support head or flat,support flat
Floor Bottomconnect with Wall end plate、beam、Wall plate connection,
The formation of doors and windowsconnect with wall plate and
end of wall plate
Inner cornerAt the end of the wal
Wall end plateconnect with floor bottom and
wall end plate
Beam plate Beam plateAttached to the bottom of the
wall plate,The basic top is 50 mm
Model
龙骨(铝梁)
Specifications (Standard plate mm)
ZX-01
ZX-02
ZX-03
ZX-04
ZX-05
ZX-06
ZX-07
ZX-08
ZX-09
ZX-10
U600 2600,2500,1200,1000,900,800;
2600,2500,1200,1000,900,800;
2600,2500,1200,1000,900,800;
2600,2500,1200,1000,900,800;
2600,2500,1200,1000,900,800;
2600,2500,1200,1000,900,800;
2600,2500,1200,1000,900,800;
2600,2500,1200,1000,900,800;
150x200
150x1000
U400
U350
U300
U250
U200
U150
U100
早拆头
commodity
Aluminum System
JIUWEI HOLDING
JIUWEI HOLDING 12JIUWEI HOLDING11
inner corner of flat plateConnecting wall plate and inner plate
Outer corner of flat plateConnecting wall plate and outer plate
middle beamConnection between support head and support head,
In order to form a ceiling,used to support a flat plate.
connecting barConnection with support head, middle beam or end beam
Support headBetween two middle beams or one middle beam and one end beam, acting on the connection between the beam and the support
Floor BottomConnecting wall panels and panels
Plastic casingPrevent buried in concrete,plastic pipe inserted flat iron
Bolt, nut, washerused to support bracket
Lifting bracket
To install work on scaffolding system platform, first remove the wall panels and flat iron, then various brackets are installed on the concrete surface.
Wedge pin and pin
For connecting templates and templates
Flat ironUsed to support two templates,
according to the template spacing can be adjusted
Plate bracket Wall bracket
Long pin and wedge pin
Supporting middle beam and supporting head
Bracket bolt and nutDevice on the surface of concrete,
used to support bracket
hookPrevent wall bending,
Insert the steel bar and the fixed
Aluminum products series Aluminum formwork system accessories
JIUWEI HOLDINGProduct Introduction
Schematic Diagram
JIUWEI HOLDING 14JIUWEI HOLDING13
INSTALLATION SCHEMATIC DIAGRAM FOR ROOF FORM
1、Install floor internal cornor film 2、Install beam mode
3、Detailed installation diagram for beam mode 4、Install roof form
REMOVE SCHEMATIC DIAGRAM FOR ROOF FORM
1、Remove spigot and wedge pin 2、Remove beam mode
3、Remove roof form 4、Remove roof C wall
JIUWEI HOLDING
JIUWEI HOLDING 16JIUWEI HOLDING15
Detail processingJIUWEI HOLDING
Detail processing Detail processing
Node Processing
JIUWEI HOLDING 18JIUWEI HOLDING17
▲ Floor Roof ▲ Bay Window ▲ External Cornor Reinforcement
▲ Stair Case
▲ Window Hole ▲ Elevator Shaft ▲ Roof Drop Board
▲ Beam & Plate Node
▲ External Wall light Well ▲ Wall Beams & Roof
▲ External Wall K Board & Pin ▲ Inner Cornor of Beam Bottom ▲ Back Arris Reinforcement
▲ Independent Support
▲ Roof Reserved Hole ▲ Treatment for Higher part of Staircase ▲ Position of Descending Board
▲ Support System ▲ Cornor Window
▲ Roof Support ▲ Under Suspended Beam Node
▲ Wall Demoding ▲ Effect After Demoding
▲ Transmission Hole
Node Processing
JIUWEI HOLDING
Node Processing
Engineering Case
JIUWEI HOLDING 20JIUWEI HOLDING19
JIUWEI HOLDING
Engineering Case
JIUWEI HOLDING 22JIUWEI HOLDING21
JIUWEI HOLDING
Engineering Case
JIUWEI HOLDING 24JIUWEI HOLDING23
JIUWEI HOLDING
Engineering Case
JIUWEI HOLDING 26JIUWEI HOLDING25
JIUWEI HOLDING
Engineering Case
JIUWEI HOLDING 28JIUWEI HOLDING27
JIUWEI HOLDING
JIUWEI HOLDING