thyssenkrupp greenfield project – status overview gccuc june 24, 2008 thomas woelker, vp &...
DESCRIPTION
ThyssenKrupp Greenfield Project – Status Overview GCCUC June 24, 2008 Thomas Woelker, VP & CPO. ThyssenKrupp Group 2006/2007. ThyssenKrupp AG Sales: $80.4 bn 2006/2007 • Employees 191,000 Group figures consolidated. Services. Steel. Stainless. Technologies. Elevator. Sales: $20.5 bn - PowerPoint PPT PresentationTRANSCRIPT
Thyss
enK
rupp
A Companyof ThyssenKrupp
SteelThyssenKrupp Steel USA, LLC
ThyssenKrupp Greenfield Project June 24, 2008 1
ThyssenKrupp Greenfield Project – Status OverviewGCCUC June 24, 2008
Thomas Woelker, VP & CPO
Thyss
enK
rupp
ThyssenKrupp Steel USA, LLC
ThyssenKrupp Greenfield Project June 24, 2008 2
A Companyof ThyssenKrupp
Steel
ThyssenKrupp Group 2006/2007
StainlessSteel
• Steelmaking • Industry • Auto• Processing
Sales: $20.5 bnEmployees: 40,000
Services
• Materials Services International• Materials Services North America• Industrial Services• Special Products
Sales: $26 bnEmployees: 43,000
Technologies
•Plant Technology
•Marine Systems•Mechanical Components
•Automotive Solutions
•Transrapid
Sales: $17.9 bnEmployees: 55,000
• 4 regional Business Units• Escalators/Passenger Boarding Bridges• Accessibility
Sales: $7.3 bnEmployees: 40,000
Elevator
Sales: $13.5 bnEmployees: 12,000
• Nirosta • Acciai Speciali Terni • Mexinox• Shanghai Krupp Stainless• Stainless International• VDM
ThyssenKrupp AGSales: $80.4 bn 2006/2007 • Employees 191,000
Group figures consolidated
Steel ServicesCapital Goods
Thyss
enK
rupp
ThyssenKrupp Steel USA, LLC
ThyssenKrupp Greenfield Project June 24, 2008 3
A Companyof ThyssenKrupp
Steel
170-year U.S. history Delivered U.S. coin minting machine prototypes in 1837 Stainless steel sheet panels used in the construction of the Chrysler Building (1929) and the Empire State Building (1931)
For several decades the USA has been by far the largest foreign
market
Operations in every state
70 business entities representing all 5 business segments/400 U.S.
locations
More than 25,000 employees – one of the largest multinational
employers
Environmental steward
Strong community citizen
Annual sales of $9.7 billion
18% of total ThyssenKrupp sales
THYSSENKRUPP IN THE US – HIGH IMPORTANCE FOR THE GROUP
Thyss
enK
rupp
ThyssenKrupp Steel USA, LLC
ThyssenKrupp Greenfield Project June 24, 2008 4
A Companyof ThyssenKrupp
Steel
Selected Site Selection Criterias
Site ready for construction
Proximity to supply chain from Brazil
Proximity to customers
Strong workforce
Competitive operating and energy costs
Competitive site specific capital expenditures
Strength of team Alabama
Selected from 67 sites in 20 U.S. states
SITE AND TEMPORARY OFFICE
Site
Temp. Office
Thyss
enK
rupp
ThyssenKrupp Steel USA, LLC
ThyssenKrupp Greenfield Project June 24, 2008 5
A Companyof ThyssenKrupp
Steel
HDGs
CRM
HSM
Slabyard
Terminal
Stainless Meltshop
Stainless Cold Rolling Mill
Finished products in mio t/a:
Carbon Steel: 4.1Stainless: 0.8-1.0
PLANT LAYOUT
May 2008
Thyss
enK
rupp
ThyssenKrupp Steel USA, LLC
ThyssenKrupp Greenfield Project June 24, 2008 6
A Companyof ThyssenKrupp
Steel
Main Facts I
Site located approximately 30 miles north of the city of Mobile, Alabama
Facility Site on the Tombigbee River in northern Mobile County and southern Washington County
Site covers approximately 3,600 acres of land and approximately 7 million square feet of building space
Facility will operate 24 hours per day and 365 days per year
SITE LOCATED IN SOUTHERN ALABAMA NORTH OF MOBILE
Thyss
enK
rupp
ThyssenKrupp Steel USA, LLC
ThyssenKrupp Greenfield Project June 24, 2008 7
A Companyof ThyssenKrupp
Steel
Main Facts II
Utilities
Electric: Two 230-kV trans. Lines; 300 MW service; 1.37 TWH/yr.
Equivalent to the energy consumption of a city of 130,000 peopleElectrical service can be provided from two generating plants in the area
Natural gas: 1.2 million MCF per month (4.37 TWH/yr. Equivalent to the energy consumption of a city of 500,000 people)
Water supply: 10 million gallons per day (Atlantic City consumption is 15,000,000 gallons per day)
Transportation / Access
Norfolk Southern rail service; 580 rail cars per week
> 4 million metric tons slabs inbound to site via sea vessel, barge, rail
~ 5 million metric tons finished products (coils) outbound via rail, barge, truck
SITE LOCATED IN SOUTHERN ALABAMA NORTH OF MOBILE
Thyss
enK
rupp
ThyssenKrupp Steel USA, LLC
ThyssenKrupp Greenfield Project June 24, 2008 8
A Companyof ThyssenKrupp
Steel
JOBS
2,700 jobs when fully operational in 2010 (Steel and Stainless)
Construction phase expected to generate approximately 29,000 jobs in 3 years
Over 20-year period, the facility expected to yield 38,000 to 52,000 indirect jobs
Management Teams on board
Recruiting in plan: TKS USA and TKL USA approx. 120 employees
Actual more than 8,000 applications for professional and more than 8,700 applications for operations and maintentaince
Close cooperation with AIDT (Alabama Industrial Development & Training)
Cooperation with Colleges and Universities started
SITE LOCATED IN SOUTHERN ALABAMA NORTH OF MOBILE
Thyss
enK
rupp
ThyssenKrupp Steel USA, LLC
ThyssenKrupp Greenfield Project June 24, 2008 9
A Companyof ThyssenKrupp
Steel
Phase I until October 2007
Site Preparation (Priority 1-2)
Geotechnical Exploration Construction Permitting
Process
PRODUCTION START IS SCHEDULED FOR THE 1. QUARTER OF 2010
Phase II: November 2007- December 2009
Continuation of the Site Preparation(Priority 3-6)
Engineering of the Infrastructure,Pilings and Foundations
Sourcing process for Site Management
Engineering and Construction of the TerminalPhase III: February 2008 - December 2010
Construction of bays and foundations
Construction of the infrastructure
Installation of the Equipment Commissioning, Testing
Phase IV: March 2010
Start of Production Main ramp up starts
Thyss
enK
rupp
ThyssenKrupp Steel USA, LLC
ThyssenKrupp Greenfield Project June 24, 2008 10
A Companyof ThyssenKrupp
Steel
CONSTRUCTION PHASE WILL GENERATE THOUSANDS OF JOBS IN SEVERAL CRAFTS UNTIL MID 2011
Boilermaker
Carpenter
Cement Finisher
Painter
Sheetmetal
Laborer
Electrical
Heavy Equipment Operator
Ironworker
Main Crafts
Insulator
Millwright
Pipe Fitter
Welder Pipe
Welder Tube
Welder Structural
*
Crafts Development During Construction
Thyss
enK
rupp
ThyssenKrupp Steel USA, LLC
ThyssenKrupp Greenfield Project June 24, 2008 11
A Companyof ThyssenKrupp
Steel
Initial Site Status- May 2007
Thyss
enK
rupp
ThyssenKrupp Steel USA, LLC
ThyssenKrupp Greenfield Project June 24, 2008 12
A Companyof ThyssenKrupp
Steel
Site Preparation - May 2008
Thyss
enK
rupp
ThyssenKrupp Steel USA, LLC
ThyssenKrupp Greenfield Project June 24, 2008 13
A Companyof ThyssenKrupp
Steel
OVERVIEW HSM EXCAVATION AND SHEET PILING BETWEEN HSM AND CRM
Thyss
enK
rupp
ThyssenKrupp Steel USA, LLC
ThyssenKrupp Greenfield Project June 24, 2008 14
A Companyof ThyssenKrupp
Steel
PILING RIGGS IN THE FURNACE AREA OF THE HOT STRIP MILL
Piling Riggs in HSM area
Thyss
enK
rupp
ThyssenKrupp Steel USA, LLC
ThyssenKrupp Greenfield Project June 24, 2008 15
A Companyof ThyssenKrupp
Steel
PRODUCTION PILING IN PROGRESS
Production Piling
Production Piling
Thyss
enK
rupp
ThyssenKrupp Steel USA, LLC
ThyssenKrupp Greenfield Project June 24, 2008 16
A Companyof ThyssenKrupp
Steel
Main Power Substation
Construction Road
INFRASTRUCTURE DEVELOPMENT I
Thyss
enK
rupp
ThyssenKrupp Steel USA, LLC
ThyssenKrupp Greenfield Project June 24, 2008 17
A Companyof ThyssenKrupp
Steel
Concrete Batch Plant Site
INFRASTRUCTURE DEVELOPMENT II
Paul Bayou Access Road
Thyss
enK
rupp
ThyssenKrupp Steel USA, LLC
ThyssenKrupp Greenfield Project June 24, 2008 18
A Companyof ThyssenKrupp
Steel
South Berm /Rail Yard
South Berm/Rail Yard
SOUTH BERM CONSTRUCTION FINISHED
Thyss
enK
rupp
ThyssenKrupp Steel USA, LLC
ThyssenKrupp Greenfield Project June 24, 2008 19
A Companyof ThyssenKrupp
Steel
OVERPASS CONSTRUCTION BY ALABAMA DEPARTMENT OF TRANSPORTATION ONGOING
Fly-Over
Fly-Over
Thyss
enK
rupp
ThyssenKrupp Steel USA, LLC
ThyssenKrupp Greenfield Project June 24, 2008 20
A Companyof ThyssenKrupp
Steel
WATER INTAKE FROM THE TOMBIGBEE AGAINST DUST ON THE SITE
Non-Potable Water Tanks
Non-Potable Water Pump Suction
Thyss
enK
rupp
ThyssenKrupp Steel USA, LLC
ThyssenKrupp Greenfield Project June 24, 2008 21
A Companyof ThyssenKrupp
Steel
DEEP BLUEWATER TERMINAL CONSTRUCTION BY ALABAMA STATE PORT
Thyss
enK
rupp
ThyssenKrupp Steel USA, LLC
ThyssenKrupp Greenfield Project June 24, 2008 22
A Companyof ThyssenKrupp
Steel
Sweet
Home!