thyspunt senior seismic hazard analysis committee (sshac ...€¦ · thyspunt senior seismic hazard...

66
Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC) Level 3 Workshop 3 Summary Report September 2012 Compiled by E. Hattingh and A. Graham Contributor: PPRP, TI Leads, J.H.P van der Merwe and F. Delport Council of Geoscience Report Number 2012-0188 Rev. 0 CONFIDENTIAL

Upload: others

Post on 09-Jul-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC) Level 3

Workshop 3 Summary Report September 2012

Compiled by E. Hattingh and A. Graham Contributor: PPRP, TI Leads, J.H.P van der Merwe

and F. Delport

Council of Geoscience Report Number 2012-0188

Rev. 0

CONFIDENTIAL

Page 2: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the authorised database

version

DOCUMENT APPROVAL SHEET

REFERENCE:

CGS REPORT

2012-0188

ESKOM

REVISION

0

COPY No.

Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC) Level 3 Workshop 3 Summary Report - September 2012

DATE OF RELEASE:

11 September 2012

CONFIDENTIAL

AUTHORS

COMPILED BY

REVIEWED BY

REVIEWED BY

ACCEPTED BY:

E. Hattingh J.J. Bommer K.J. Coppersmith N. Keyser

COMPILED BY

AUTHORISED BY:

A Graham G. Botha

REVISION DESCRIPTION OF REVISION DATE MINOR REVISIONS APPROVAL

Page 3: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 1

TABLE OF CONTENTS

1. Introduction ................................................................................................................ 4

2. Workshop Agenda ..................................................................................................... 6

Day 1: Preliminary GMC Model – Simonsberg and Stellenberg Rooms ..................... 9

Day 2: GMC Hazard Feedback – Simonsberg and Stellenberg Rooms ....................10

Day 3: GMC-SSC Interfaces - Simonsberg and Stellenberg Rooms .........................11

Day 4: Preliminary SSC Model - Simonsberg and Stellenberg Rooms ......................12

Day 5: SSC Hazard Feedback - Simonsberg and Stellenberg Rooms ......................13

3. Attendance List .........................................................................................................14

4. Summary of Potential Refinements to Preliminary Models ....................................15

4.1 GMC Model .......................................................................................................15

4.2 SSC Model ........................................................................................................16

5. Participatory Peer Review Panel (PPRP) report ......................................................19

6. TI Leads’ Response...................................................................................................19

7. Presentations ............................................................................................................19

8. Safety .........................................................................................................................19

8.1 Pre-Workshop Safety Checklist .........................................................................20

8.2 Safety Checklist during Workshop .....................................................................23

8.3 Evidence for safety at the hotel and venue ........................................................26

8.3.1 Accessibility ................................................................................................26

8.3.2 Traffic Flow .................................................................................................26

8.3.3 Amenities ....................................................................................................27

8.3.4 Signage ......................................................................................................27

8.3.5 Fire prevention ............................................................................................28

8.3.6 Emergency Procedures ..............................................................................28

8.3.7 First Aid ......................................................................................................29

8.3.8 Electrical .....................................................................................................29

8.3.9 Weather Conditions ....................................................................................30

8.3.10 Security ......................................................................................................30

8.3.11 Safety Presentation ....................................................................................31

8.4 Hotel Health and Safety Talk .............................................................................32

8.4.1 Spier’s Policy entails ...................................................................................32

Page 4: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 2

8.4.2. Emergency Response ................................................................................32

8.4.3 First Aid & Fire ............................................................................................32

8.4.4. Fire Evacuation Procedure .........................................................................32

8.4.5. Evacuation of Individuals with Disabilities ...................................................33

8.4.6. Guests Rest Rooms ....................................................................................33

8.4.7. Smoking Policy ...........................................................................................33

9. Workshop Satisfaction Survey .................................................................................34

9.1 Introduction ........................................................................................................34

9.2 Survey ...............................................................................................................34

9.3 Results ..............................................................................................................35

9.3.1 Pre-workshop arrangements .......................................................................35

9.3.2 Venue .........................................................................................................36

9.3.3 General .......................................................................................................38

9.4 How did we fare? ...............................................................................................39

9.5 Conclusions .......................................................................................................40

10. Lessons Learned ....................................................................................................41

11. Conclusion ..............................................................................................................42

12. References ..............................................................................................................45

Appendix A - Participatory Peer Review Panel’s cover letter and Report .................46

Appendix B - TI Lead’s response to PPRP Report ......................................................47

Appendix C - Workshop satisfaction survey Form ......................................................48

TABLE OF FIGURES

Figure 1: Road and pedestrian routes clearly separated ..................................................26

Figure 2: Signage to venues clearly marked ....................................................................26

Figure 3: Pedestrian and roads clearly separated ............................................................26

Figure 4: Signage to indicate traffic flow...........................................................................26

Figure 5: Ample clean drinking water available in venue for participants ..........................27

Figure 6: Amenities clearly marked ..................................................................................27

Figure 7: Signage to indicate temporary detour................................................................27

Figure 8: Venues clearly marked .....................................................................................27

Figure 9: Warning signs clearly visible .............................................................................27

Figure 10: Caution signs clearly visible ............................................................................27

Page 5: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 3

Figure 11: Fire hydrant maintenance certificates in date ..................................................28

Figure 12: Fire hoses clearly marked ...............................................................................28

Figure 13: Exit signs in conference venue clearly marked ................................................28

Figure 14: Emergency assembly point clearly marked .....................................................28

Figure 15: Emergency exit in rooms clearly marked .........................................................28

Figure 16: Emergency exit at pool clearly marked ............................................................28

Figure 17: First aid station clearly marked at conference venue .......................................29

Figure 18: First aid boxes clearly marked at conference venue ........................................29

Figure 19: Fire blanket clearly marked at conference venue ............................................29

Figure 20: Substation clearly marked ...............................................................................29

Figure 21: Evidence of maintenance being undertaken ....................................................29

Figure 22: Golf carts, with sides can be used in unfavorable conditions ...........................30

Figure 23: Temperature gauge is clearly visible at reception ............................................30

Figure 24: Each room is equipped with an umbrella for unfavorable weather ...................30

Figure 25: CCTV camera overlooking the day participant car park...................................30

Figure 26: Security guard station in the day participant car park ......................................30

Figure 27: Each room is equipped with a safe .................................................................31

Figure 28: Car guard at the hotel car park ........................................................................31

Figure 29: Spier’s safety presentation ..............................................................................31

Figure 30: Satisfaction of pre-workshop arrangements ....................................................35

Figure 31: Satisfaction - venue (satisfied) ........................................................................36

Figure 32: Satisfaction –venue (room for improvement) ...................................................37

Figure 33: Satisfaction –venue (mostly not applicable) ....................................................37

Figure 34: Satisfaction - general ......................................................................................38

Page 6: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 4

1. INTRODUCTION The selected methodology for the Thyspunt Probabilistic Seismic Hazard Analysis (PSHA) will be

consistent with the requirements for a SSHAC Level 3 study (SSHAC, 1997). According to this

process, a minimum of three workshops must be held facilitated by the Technical Integrator (TI)

Leads (NUREG-2117, 2012) and with the participation of the TI Teams, each with the following

purposes:

• Identification of hazard-significant issues and the identification of available data or other

pertinent information that could be used for the assessments;

• Alternative interpretations of available data: this workshop brings together proponents of

alternative points of view in order to understand uncertainties and the range of views within the

informed technical community;

• Feedback: after development of preliminary assessments, a workshop is held to present the

sensitivity of the hazard results to different branches of the logic-tree; the workshop is also an

opportunity for the TI Teams to discuss and debate the assessments and their associated

uncertainties, and for the PPRP to question the TI Teams about the models

The Thyspunt Workshop WS3: Presentation of Models and Hazard Sensitivity Feedback, was held

at Spier Hotel, Stellenbosch, South Africa from 27 to 31 August 2012.

This report is a summary of the third workshop for Thyspunt. The goals of this workshop were:

• For the TI Teams to present the preliminary SSC and GMC models, including a summary of the

evaluation of the available data, methods and models undertaken by the TI Teams and the

technical bases for the logic-trees produced through the integration process

• For the TI Teams to receive and consider feedback on their preliminary models in the form of

hazard sensitivity analyses and comments from the PPRP

• For the PPRP to ask questions of the TI Teams regarding the elements of the preliminary

models, their technical bases, and the degree to which these capture the centre, the body, and

the range of technically-defensible interpretations of the available data; the PPRP may also

question the TI Teams with regard to the degree to which the full range of available data,

methods and models within the broader technical community have been considered

• For the TI Teams to see and discuss hazard sensitivity feedback, to identify the relative

contributions of different elements of the preliminary models to the total hazard estimate and, in

particular, the main contributions to the overall uncertainty

• For the TI Teams to identify those elements of the preliminary models requiring additional

analysis and consideration in order to be refined in the final models to be developed after the

Workshop

• For the TI Teams to identify those elements of the preliminary models that require additional

technical justification and support

Page 7: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 5

• For the TI Teams to identify and discuss critical interface issues between the SSC and GMC

models, and where the models may need refining in view of these interfaces

• To discuss the details of the way that the hazard calculations are executed in the selected

software, and the implications for the SSC and GMC models and their interfaces

• To discuss the path forward for the Thyspunt PSHA project in terms of developing the final

SSC and GMC models and the conduct of the definitive hazard calculations.

The workshop brought together the Project Management Team, TI Leads and Teams, Hazard

Team and the PPRP. Observers from the client were also present.

This report includes:

(1) the meeting agenda;

(2) list of participants and their contact information;

(3) summary of potential refinements to preliminary models;

(4) the Participatory Peer Review Panel (PPRP) report;

(5) the TI Leads’ response;

(6) all presentations given at the workshop;

(7) safety

(8) satisfaction survey

(9) lessons learned

Page 8: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 6

2. WORKSHOP AGENDA

Thyspunt SSHAC Level 3 PSHA

Workshop WS3: Presentation of Models and Hazard Sensitivity Feedback

27-31 August 2012

Spier Hotel, near Stellenbosch, South Africa GOALS of the WORKSHOP This is the final of three Workshops that form key elements of the SSHAC Level 3 Probabilistic

Seismic Hazard Analysis (PSHA) for the Thyspunt Nuclear Siting Project (TNSP). The specific

goals of Workshop WS3 are:

• For the TI Teams to present the preliminary SSC and GMC models, including a summary of the

evaluation of the available data, methods and models undertaken by the TI Teams and the

technical bases for the logic-trees produced through the integration process

• For the TI Teams to receive and consider feedback on their preliminary models in the form of

hazard sensitivity analyses and comments from the PPRP

• For the PPRP to ask questions of the TI Teams regarding the elements of the preliminary

models, their technical bases, and the degree to which these capture the centre, the body, and

the range of technically-defensible interpretations of the available data; the PPRP may also

question the TI Teams with regard to the degree to which the full range of available data,

methods and models within the broader technical community have been considered

• For the TI Teams to see and discuss hazard sensitivity feedback, to identify the relative

contributions of different elements of the preliminary models to the total hazard estimate and, in

particular, the main contributions to the overall uncertainty

• For the TI Teams to identify those elements of the preliminary models requiring additional

analysis and consideration in order to be refined in the final models to be developed after the

Workshop

• For the TI Teams to identify those elements of the preliminary models that require additional

technical justification and support

• For the TI Teams to identify and discuss critical interface issues between the SSC and GMC

models, and where the models may need refining in view of these interfaces

Page 9: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 7

• To discuss the details of the way that the hazard calculations are executed in the selected

software, and the implications for the SSC and GMC models and their interfaces

To discuss the path forward for the Thyspunt PSHA project in terms of developing the final SSC

and GMC models and the conduct of the definitive hazard calculations.

APPROACH

The goals of the workshop will be accomplished by a series of presentations and discussions that

describe the elements of the preliminary SSC and GMC models, examine their technical bases,

and explore their impact on the hazard estimates for the Thyspunt site and the associated

uncertainty. Each of the 2-day workshops dedicated to the GMC and SSC sub-projects has the

same format: the first day is focused on presenting the preliminary model and its technical bases,

and the second day focuses on hazard sensitivity feedback. The former is intended primarily as a

means of obtaining feedback from the PPRP and the latter as a means for the respective TI Team

to receive hazard sensitivity feedback.

On the first days of both the GMC and SSC sessions, the preliminary models will be presented,

and during these sessions the PPRP are encouraged to ask questions regarding the models and

their technical bases to the TI Teams. Whereas at Workshops 1 and 2 the PPRP had observer

status, in order to maintain the required separation between evaluators and reviewers, at

Workshop 3 the PPRP is actively engaged in posing questions to the TI Teams on all aspects of

their preliminary models. The questions posed by the PPRP may explore the degree to which the

full range of views of the appropriate technical communities have been considered in the evaluation

process, the extent to which the preliminary logic-trees capture the centre, the body, and the range

of technically-defensible interpretations, and the validity of any assumptions made in constructing

the preliminary models. The purpose of providing this opportunity for the PPRP to question the TI

Teams on their models at this stage of the project is to receive feedback on the preliminary models

that will lead to improved final models and stronger technical bases. Doing so will pre-empt

comments and criticisms that would otherwise only arise at the very late stage of when the Panel

reviews the draft final report on the PSHA project.

The hazard sensitivity feedback will constitute a presentation of hazard results focusing on the

contributions of different elements of the logic-trees, including the contributions from the various

seismic sources defined in the SSC model. The feedback will mainly focus on the contributions to

the hazard of individual logic-tree branches (and groups of branches with common features) and is

intended to provide the TI Teams with an indication of which elements of the models, and their

associated uncertainty, exert the largest influence on the results, in order to highlight where efforts

should be focused in refining the models for the final PSHA calculations.

Page 10: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 8

The common day in the middle of the week is intended to provide both TI Teams the opportunity to

present and discuss key interface issues. The PPRP will also have the opportunity to pose

questions to the Teams on these issues. This session will also include a discussion of the details of

the way that the hazard calculations are executed in the selected software, and the implications for

the SSC and GMC models and their interfaces.

At the end of each day, an opportunity will be provided for observers (including representatives of

Eskom and NNR) to make comments and to raise questions from the floor.

Page 11: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 9

Day 1 (Monday 27th August): Preliminary GMC Model – Simonsberg and Stellenberg Rooms

Time Presentations Speaker

08:00-08:03 Safety Briefing Head of Security

08:03-08:08 Welcome Erna Hattingh

08:08-08:16 Objectives of GMC Workshop #3:

Presentation of Models and Hazard Sensitivity Feedback

Julian Bommer

08:16-10:00

Summary of Preliminary GMC Model for Bedrock Motions

and Discussion

Julian Bommer,

TI Team & PPRP

10:00-10:30 Coffee Break – Heidelberg Room

10:30-11:00 Summary of Preliminary GMC Model for Bedrock Motions

and Discussion

Julian Bommer,

TI Team & PPRP

11:00-12:00 Overview of GMPEs used in Visualisation Comparisons

and Discussion

Peter Stafford, TI

Team & PPRP

12:00-13:00 Lunch – Heidelberg Room

13:00-13:45 Comparisons of Median GMC Models and Discussion Frank Scherbaum, TI

Team & PPRP

13:45-15:00 Testing of the Preliminary GMC Model using the Intensity

Database and Discussion

Julian Bommer, TI

Team & PPRP

15:00-15:30 Coffee Break – Heidelberg Room

15:30-16:45 Site Amplification Model and Discussion Ellen Rathje, TI Team

& PPRP

16:45-17:00 Vs-kappa correction factors based on an alternative

disaggregation scenario

Frank Scherbaum, TI

Team & PPRP

17:00-17:20 Feedback from observers Julian Bommer

End of formal Workshop Proceedings

18:15-18:45 Closed meeting – Hotel Boardroom:

PPRP, sponsor, PM, TI Leads

19:00 Dinner

Page 12: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 10

Day 2 (Tuesday 28th August): GMC Hazard Feedback – Simonsberg and Stellenberg Rooms

Time Presentations Speaker

08:00-08:45 Preliminary Models for Long-Period Extrapolation of

Response Spectra and V/H Response Spectral Ratios

and Discussion

Julian Bommer, TI

Team and PPRP

08:45-09:20 GMC Model Comparison in Hazard Space and Discussion Frank Scherbaum, TI

Team and PPRP

09:20-10:00 Summary of Preliminary SSC Model and Discussion Kevin Coppersmith,

TI Team and PPRP

10:00-10:30 Coffee Break – Heidelberg Room

10:30–10:50 Summary of preliminary SSC Model and Discussion Kevin Coppersmith,

TI Team and PPRP

10:50-11:50 Hazard Sensitivity to Elements of the Preliminary GMC

Model and Discussion

Julian Bommer, TI

Team and PPRP

12:00-13:00 Lunch – Heidelberg Room

13:00-14:40 Hazard Sensitivity and Disaggregations from Preliminary

SSC and GMC Models and Discussions

J. Bommer, F.

Scherbaum, TI Team

& PPRP

14:40-14:50 Feedback from observers Julian Bommer

14:50 Formal Close of Proceedings

15:45-16:00 Closed meeting – Hotel Boardroom:

PPRP, sponsor, PM, TI Leads

16:15-16:50 Closed PPRP meeting – Manor House PPRP

16:15-18:30 Closed meeting; GMC TI Team Planning for WM4 GMC TI Team

19:00 Dinner

Page 13: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 11

Day 3 (Wednesday 29th August): GMC-SSC Interfaces - Simonsberg and Stellenberg Rooms

Time Presentations Speaker

08:00-08:05 Safety Briefing Head of Security

08:05-09:35 Introduction and SSC-GMC Interface Issues Julian Bommer

09:35-09:40 Explanation of Seismic Hazard software and V&V Julian Bommer

9:40-10:00 Hazard calculations in FRISK88 and Discussion Fleur Strasser, TI

Teams and PPRP

10:00-10:30 Coffee Break - Heidelberg Room

10:30-11:00 Hazard calculations in FRISK88 and Discussion Fleur Strasser, TI

Teams and PPRP

11:00-12:00 Hazard calculations in OpenQuake-engine and Discussion Marco Pagani, TI

Teams and PPRP

12:00-13:00 Lunch - Heidelberg Room

13:00-15:00 TNSP Earthquake Catalogue and Discussion Fleur Strasser, TI

Teams and PPRP

15:00-15:30 Coffee Break - Heidelberg Room

15:30-15:50 TNSP Earthquake Catalogue and Discussion Fleur Strasser, TI

Teams and PPRP

15:50-16:00 Review of GMC Workshop Objectives Kevin Coppersmith

16:00-16:15* Feedback from observers Kevin Coppersmith

16:15-17:00 Objectives of SSC Workshop Kevin Coppersmith

17:00 End of formal Workshop Proceedings

17:10-18:00 Closed meeting – Hotel Boardroom:

PPRP, sponsor, PM, TI Leads

19:00 Dinner

* At this point, members of the GMC TI Team may leave the Workshop to catch evening flights out

of Cape Town

Page 14: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 12

Day 4 (Thursday 30th August): Preliminary SSC Model - Simonsberg and Stellenberg Rooms

Time Presentations Speaker

08:00-10:00 SSC Global Assessments SSC Preliminary Model and

Discussion

Kevin Coppersmith,

TI Team and PPRP

10:00-10:30 Coffee Break - Heidelberg Room

10:30-12:00 Seismic source zones and Discussion:

• Extended Continental Crust zone (ECC)

• Syntaxis zone (SYN)

Johann Neveling,

Ryan Coppersmith,

TI Team and PPRP

12:00-13:00 Lunch - Heidelberg Room

13:00-15:15 Seismic source zones and Discussion:

• Karoo zone (KAR)

• Namaqua zone (NAM)

• Cedarville-Koffiefontein zone (CK)

Fault sources and Discussion:

• Kango fault (KNG)

• Plettenberg fault (PLET)

• Agulhas fault (AFZ)

• Worcester fault (WOR)

• Gamtoos fault (GMT)

Refilwe Shelembe, TI

Teams and PPRP

Kathryn Hanson,

TI Team and PPRP

15:15-15:45 Coffee Break - Heidelberg Room

15:45-16:50 Fault sources (cont’d.)

Kathryn Hanson, TI

Team and PPRP

16:50-17:00 Update on programme for the final day Kevin Coppersmith

17:00-17:15 Feedback from observers Kevin Coppersmith

17:15 End of formal Workshop Proceedings

17:30-18:30 Closed meeting – Hotel Boardroom:

PPRP, sponsor, PM, TI Leads

19:00 Dinner

Page 15: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 13

Day 5 (Friday 31st August): SSC Hazard Feedback - Simonsberg and Stellenberg Rooms

Time Presentations Speaker

8:00-08:45 Faults Assessed as Non-Seismogenic and Discussion Ryan Coppersmith,

TI Team and PPRP

08:45-09:00 SSC Model logic tree Elements and Discussion Kevin Coppersmith,

TI Team and PPRP

09:00-10:00 Recurrence calculations SSC Hazard Sensitivity and

Discussion

Fleur Strasser, TI

Team and PPRP

10:00-10:30 Coffee Break - Heidelberg Room

10:30-10:35 Discussion: Implications of hazard sensitivity analyses to

SSC model elements

Fleur Strasser, TI

Team and PPRP

10:35-11:35 Actions to finalize SSC model and Discussion Kevin Coppersmith,

TI Team and PPRP

11:35-11:45 Review of SSC Workshop Objectives Julian Bommer

11:45-13:00 Lunch - Heidelberg Room

13:00-13:15 Way forward Julian Bommer

13:15-13:30 Feedback from observers Julian Bommer

13:30-13:35 Closing comment from Sponsor Andre Nel

13:35 End of formal Workshop Proceedings

14:15 – 15:00 Closed meeting – Hotel Boardroom:

PPRP, sponsor, PM, TI Leads

15:00 – 17:00 Closed PPRP meeting – Hotel Boardroom PPRP

16:00 – 17:00 Closed meeting; SSC TI Team Planning for WM4

19:00 Dinner

Page 16: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 14

3. ATTENDANCE LIST

PROJECT MANAGEMENT COMMITTEE Graham, Gerhard [email protected] Greg Botha [email protected] Hattingh, Erna [email protected] Keyser, Nico [email protected] Neveling, Johann [email protected] Van der Merwe, Jannie [email protected] Delport, Francois [email protected] PPRP Bungum, Hilmar - Chair [email protected] Richard Quittmeyer Richard [email protected] Cotton, Fabrice [email protected] Musson, Roger [email protected] Toro, Gabriel [email protected] TI LEADS Bommer, Julian [email protected] Coppersmith, Kevin [email protected] TI TEAMS Coppersmith, Ryan [email protected] Hanson, Kathryn [email protected] Mangongolo, Azangi [email protected] Neveling, Johann [email protected] Rodriguez-Marek, Adrian [email protected] Rathje, Ellen [email protected] Scherbaum, Frank [email protected] Shelembe, Refilwe [email protected] Stafford, Peter [email protected] Strasser, Fleur [email protected] GIS SPECIALIST Havenga, Marinda [email protected] HAZARD TEAM Strasser, Fleur [email protected] Midzi, Vunganai [email protected] PROJECT ADMINISTRATOR Gouverneur, Michelle [email protected] Chameney Engelbrecht [email protected] WORKSHOP CO-ORDINATOR/PLANNER Graham, Annabel [email protected] Hazard Software Specialist Marco Pagani [email protected]

A number of sponsor observers also attended.

Page 17: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 15

4. SUMMARY OF POTENTIAL REFINEMENTS TO PRELIMINARY MODELS

4.1 GMC MODEL

GMC Team Action Lead

Preliminary GMC Model in Bedrock:

Three backbone GMPEs remain.

Vs-kappa adjustments: Look into whether K0 of 0.004 and 0.006 plus site response

plus anti-alias filter would still yield the same absence of a corner frequency on

records from ROSN/KROM

Ellen Rathje,

Peter Stafford

Vs-kappa: Produce voxel grids (for 3 stochastic models) showing fluctuations of Vs-

Kappa adjustments with M, R and frequency, possibly using the ‘new’ scenario (M5-

8, 100-0.5 Hz, R: 0-50 km & 0-100 km) – Peter Stafford to provide high-resolution

feature vectors for Drouet, Drouet, Rietbrock & Campbell

Frank Scherbaum

Re-examine disaggregations to infer possible changes in scenario if the ‘leaky

boundaries’ are sealed to keep NAM & CK earthquakes away from Thyspunt

Peter Stafford,

Julian Bommer

Scaling Factors: explore the better intensity data sets looking both at residual trends

and possibly at intensity attenuation equations as well; also combine with exploration

of stress drop values in stochastic models to see if data ‘reject’ any values

Julian Bommer,

Peter Stafford

Scaling Factors: ask Andreas Rietbrock & Stephane Drout the rationale behind their

selected forward modelling stress drops

Peter Stafford

Scaling Factors: look into the extensional regime vs non-extensional ground motions Julian Bommer

Scaling Factors: Will consider widening range in light of voxel showing sensitivity to

M-R scenario for Vs-kappa adjustment

TI Team

Generation of Sammon’s maps for selected M-R-f combinations (relevant to hazard)

to explore degree of coincidence between GMC models and South African stochastic

models

Frank Scherbaum

Non-application of the small-magnitude scaling can be justified in terms of capturing

epistemic uncertainty

TI Team

No distance attenuation correction to be applied because insufficient influence of

distance earthquake contribution

TI Team

Develop proposals for criteria for the selection of appropriate CEUS V/H ratios from

NUREG/CR-6728 (which is based on PGA levels, which are not part of the TNSP

output)

Julian Bommer

Produce some sensitivity plots for long-period extrapolation of the GMRS and

application of V/H ratios

Julian Bommer

Sigma Model:

Explore the 1.15 factor to provide either justification and/or modification

Adrian

Rodriguez-Marek

Page 18: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 16

GMC Team Action Lead

Preliminary GMC Model in Bedrock:

Explore variability of phi-S2S on Vs30 using hard rock data from Kik-NET Adrian

Rodriguez-Marek

Site Response Analysis:

Update Vs model based on final set of PS logging program Ellen Rathje

Explore sensitivity to randomization of different model parameters; Andreas

Rietbrock to provide input on layering model and Ellen Rathje to look into layering

discretized in terms of slowness; Ellen Rathje to check if the randomized velocity

profiles have the same travel time as the backbone model

Ellen Rathje

Establish exact requirements in terms of bedrock hazard (AFEs, response

frequencies, etc) for input to Approach 3 calculations

Ellen Rathje

Look into potential justifications for higher damping values in fractured rock Ellen Rathje

4.2 SSC MODEL

SSC Team Action Lead

Mmax: Examine the basis for the upper part of the prior distribution: do we have the

structures that could support the larger EQS; should we use just SCR events for the

upper truncation? Consider the bias correction, which should be small.

Kevin

Coppersmith

Look at the issue of leaky vs strict boundaries to the NAM and CK source zones Refilwe

Shelembe

Should there be more uncertainty in the depth distribution because it is being used

as an analogue in RSA? Look at whether there are differences in MESE vs NMESE

in the CEUS

Kevin

Coppersmith

Seismogenic thickness: look at the hazard sensitivity to having a deeper seismogenic

thickness;

Fleur Strasser

Is there some probability of a second bulge (depths of 20-30km); Look at analogues

within SCR (western) Africa

Azangi

Mangongolo

Develop the technical basis for the western boundary of ECC (documentation) Johann Neveling

(in final report)

Document the lack of source boundary at the change in fault trends within ECC

(documentation)

Johann Neveling

Look at the fault types distributions; should there be more frequent normal faulting

within ECC?

Kathryn Hanson

Explore the subdivision of the ECC at the boundary of the completeness zone;

should we assume the same rate density in the southern part as the northern part;

perhaps run hazard sensitivity with same rate density throughout ECC

Kevin

Coppersmith,

Fleur Strasser

Page 19: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 17

SSC Team Action Lead

SYN: look at the seismicity prior to the 69 Ceres EQ and see if would identify the

zone as elevated seismicity; also look at rates prior to 69

Marinda Havenga

Can we use the Kijko K-S-B approach to incorporate b-value uncertainty in the

likelihood function for the Bayesian Mmax approach;

Fleur Strasser

Assess the orientation of ruptures in NAM and CK; assess how important the

orientation of ruptures is in NAM and CK; look at the recurrence within those zones\

Refilwe

Shelembe, Fleur

Strasser

Consider the subdivision of NAM based on seismicity differences and structure; may

not be significant to hazard

Refilwe

Shelembe

Characteristic EQ vs. exponential: document the decision based on worldwide data

as well as predict the numbers of events that should have occurred if exponential;

also max moment

Kevin

Coppersmith,

Kathryn Hanson,

Fleur Strasser

Document how the standard deviations were assessed to use with the Leonard 2010

rupture relationships; check the limits from these SDs (documentation)

Kevin

Coppersmith

Plot the recurrence intervals of Mchar with the predicted recurrence that comes from

slip rate and the characteristic size distribution model; might also compare with zone

recurrence

Fleur Strasser

Out of cluster; document the behavior that is assumed during the out-of-cluster

period (e.g., very long recurrence intervals that are 10X the intervals during clusters)

and that it is not zero rate (documentation); consider clustered behavior or not

clustered and use long-term rate

Kathryn Hanson

Consider whether we need a broader range of recurrence for the Plettenberg than

the Kango out-of-cluster rates? Since we know less about this feature?

Kathryn Hanson;

Fleur Strasser will

plot Mchar rates

from RI and slip

rates

Revisit the weights on slip rate and RI for the other faults. Should we have more

weight on slip rate in light of the limitations provided by the marine terrace sequence

Kathryn Hanson

Review analogous ancient oceanic fracture zones to look for any possible analogues;

consider the number and length of ancient transforms to support the argument of low

p(S);Contact Uzellman-Neben and Hayley Cawthra, regarding displacement of

Pliocene deposits

Kathryn Hanson

Look at the predicted numbers of earthquakes for the range of slip rates assessed for

the Agulhas FZ;

Fleur Strasser

Get the DeWet bathmetric dataset to further document the assessment of p(S) for

the Gamtoos, Plettenberg, and Cape St.Francis faults

Marinda Havenga

talk to CGS

Page 20: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 18

SSC Team Action Lead

Document the resolution of the Tg surface relative to possible amounts of fault

displacement; include the assessment of the age of these surfaces and the potential

for seeing cumulative displacements over the age of these surfaces

Ryan

Coppersmith

Look closely at the position taken on p(S) for the Worcester and ensure consistency

in the arguments with that for p(S)=0 faults (documentation)

Kathryn Hanson,

Ryan

Coppersmith

Investigate the use of max likelihood for both counts and the rates and whether they

are negatively correlated; especially for the KAR source; Bob Youngs; ask about

priors on b

Fleur Strasser

send email to Bob

Youngs

Document the basis for not using the N* approach (e.g., not using a consistent

approach to magnitude conversion as was done in CEUS SSC (documentation);

don’t know the behaviour of some of the conversions;

Fleur Strasser (in

final report)

Look at the implied rates of earthquakes at the upper fractiles to see if they are

believable; then focus on the uncertainty in b, Mmax and their implications; consider

other regions and how the 100th percentile is handled

Kevin

Coppersmith talk

to Bob Youngs

Generate simulated catalogues with various b-values to see if matches the observed

catalogue (the entire region); looking at uncertainties in b-value;

Fleur Strasser

Evaluate the change in the b-value on hazard Fleur Strasser

Page 21: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 19

5. PARTICIPATORY PEER REVIEW PANEL (PPRP) REPORT

The PPRP, composed of individuals from several different countries, met on 1 September 2012 at Spier

Hotel, Stellenbosch, to finalize their report (Appendix A).

6. TI LEADS’ RESPONSE

The TI Leads compiled a response to the PPRP report (Appendix B).

7. PRESENTATIONS

All presentations from the workshop are available on the CD/DVD at the back of this report.

8. SAFETY

To adhere to a Safety Culture, all international participants arrived by lunchtime on the day prior to their

participation in the workshop. Safety checklists for selecting the venue and safety during the venue as well

as the hotel’s safety information follows:

Page 22: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 20

8.1 PRE-WORKSHOP SAFETY CHECKLIST

Event Name: Workshop 3 – Spier Hotel Date of Assessment: 25 July 2012 Assessed By: Annabel Graham & Jannie van der Merwe

√ Indoor Event □ Outdoor Event

Checked (Ticked)

Event Safety Item Checked Time / Comment

Access and Egress √ Entry / Exit areas are clear and accessible for

staff and expected attendees Yes, signage is visible

√ Entry / Exit areas are adequate for emergency exit and emergency services

Yes, signage is visible

√ Thoroughfares are well defined and clearly marked

Yes, signage is visible

Traffic Flow √ Clearly defined areas for traffic - separate from

pedestrian traffic Yes, roads & walkways are separate

√ Provisions for safe passage of emergency / other vehicles through pedestrian traffic

Yes

√ Controlled traffic flow and adequate signage for traffic erected

Yes, signage is visible.

√ Adequate parking areas to cater for the expected vehicle numbers attending the event

Yes, large car parks

√ Adequate parking supervision Yes, guards & cameras Amenities

√ Adequate provision of toilets and hand washing facilities

Yes, facilities clearly visible

√ Availability of clean fresh water for staff and attendees

Yes, water fountain available for participants in venue

√ Adequate catering facilities for food preparation and clean up

Yes, kitchen at venue and hotel

Signage √ Adequate signage for entries, exits, toilet

facilities, etc. Yes, signage is visible

√ Adequate signage for any hazardous areas or substances

Yes, erected at hazardous sites

√ Clearly signed First Aid and fire extinguisher locations

Yes

Fire Prevention √ Suitable fire extinguishers (e.g. CO, water,

chemical) and blankets are in appropriate areas, tested and in date

Yes, extinguishers in venue check and in date

√ Personnel are trained in extinguisher and blanket use

Yes, first aid courses recently completed

√ Ignition source areas are kept clear at all times and easily accessible

Yes

Emergency Procedures √ Emergency response plan in place Yes, venue and in rooms √ Emergency response team trained to carry out

plan Yes, intercom system & panic button system in banqueting office

√ Current site maps available to all staff, Part of induction if not familiar with site

Page 23: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 21

emergency services and other relevant parties First Aid

√ First aid stations are suitably located, clearly signed and easily accessible for everyone

Yes, at the venue and reception

√ First aid facilities are adequate for the type of event being held

Yes, trained first aiders are on site

√ Good means of communication provided between personnel and first aid stations

Yes, staff trained annually

Electrical / Backup Power x All portable electrical equipment including leads

are tested No register

√ Adequate protection of the public from electrical shock and any trip hazards from cords are minimised

Yes, electrical cables are taped down

√ All leads, lugs, etc. are protected from weather and other environmental conditions (e.g. water)

Yes, no external leads

√ Evidence of electrical safety can be provided upon request from an authorised person

Yes, available in Facilities Office (spoke to Danie)

√ Backup power is available in venue Yes Lighting

√ Adequate natural light or artificial lighting provided for setting

Yes

√ Portable lighting is tested and in date Yes, generator in place (& maintenance team)

√ Suitable emergency lighting is in place Yes Manual Handling

√ All staff and volunteers are trained to assess each task and use safe technique when lifting or carrying

Yes, monthly H&S meetings & quarterly management meetings

√ Loads are delivered as close as possible to area using vehicle or mechanical aid (e.g. trolleys)

Yes

√ Light, small loads and physical aids (assistance from second person or team lift where needed) are used

Yes, chair & delivery trolley

√ Staff and volunteers are trained in and used the S-M-A-R-T Lifting technique where possible and appropriate □ S – size up the load □ M – move in close □ A – always bend the knees □ R – raise object using your legs □ T – turn using your feet

Yes, from monthly safety meetings

Weather Conditions √ Weather conditions planned for and monitored

e.g. partitions, displays and signage well secured for windy conditions, and shade and sunscreen and water provisions for heat

Yes, umbrellas in rooms & catering indoors

Security √ Appropriate security is available at the venue Yes, security guards visible

Accessibility √ Ramps are in place to provide access to

buildings Yes

√ Parking is available close to the event Yes √ The event is easily accessible (e.g. for patrons

in wheelchairs, with prams, using walking aids, etc.)

Yes

Page 24: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 22

√ Entry / Exit area is easily accessible (e.g. for patrons in wheelchairs, with prams, using walking aids, etc.)

Yes

Reference: SafeWork SA – safe, fair, productive, working lives (www.safework.sa.gov.au)

25 July 2012 A Graham Date TNSP: Workshop Coordinator

J van der Merwe 25 July 2012 TNSP: Project Quality Officer Date

Page 25: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 23

8.2 SAFETY CHECKLIST DURING WORKSHOP

Event Name: Workshop 3 – Spier Hotel

Date of Assessment: 27 August 2012

Assessed By: Francois Delport – TNSP: Project Safety Officer

x Indoor Event □ Outdoor Event

Checked (Ticked)

Event Safety Item Checked Time / Comment

Access and Egress √ Entry / Exit areas are clear and accessible for

staff and expected attendees Clearly and understandable signs are in place to guide participants

√ Entry / Exit areas are adequate for emergency exit and emergency services

Emergency vehicle will be able to get to all areas to attend to emergencies

√ Thoroughfares are well defined and clearly marked

Yes

Traffic Flow √ Clearly defined areas for traffic - separate from

pedestrian traffic Pedestrian walkways and vehicle travel paths are separated (see attached photos)

√ Provisions for safe passage of emergency / other vehicles through pedestrian traffic

In the event of such emergencies, the hotel staff will also take special care to guide emergency vehicles to needed points

√ Controlled traffic flow and adequate signage for traffic erected

Sufficient road marking for vehicles are in place, i.e. parking, stop signs, etc.

√ Adequate parking areas to cater for the expected vehicle numbers attending the event

Yes, see attached photo

√ Adequate parking supervision Parking area is under constant security supervision (CCTV cameras and foot patrol)

Amenities √ Adequate provision of toilets and hand washing

facilities Amenities were also covered during the safety talk of the Hotel safety officer

√ Availability of clean fresh water for staff and attendees

Fresh drinking water were placed on the meeting venue tables in the morning and every tee or lunch break

√ Adequate catering facilities for food preparation and clean up

A kitchen is in close proximity of the workshop venue and proper tables were in place when food was put out for serving – dining venue was always neat and clean.

Signage √ Adequate signage for entries, exits, toilet

facilities, etc. Proper sign are in place and these matters were also dealt with during the safety briefing at the beginning of the workshop and days 3 and 4.

√ Adequate signage for any hazardous areas or substances

Hazardous area is enclosed and restricted signs are displayed.

√ Clearly signed First Aid and fire extinguisher locations

Yes, also see photos taken in venue

Page 26: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 24

Fire Prevention √ Suitable fire extinguishers (e.g. CO, water,

chemical) and blankets are in appropriate areas, tested and in date

See photos taken in the venue regarding the serviceability of these items

√ Personnel are trained in extinguisher and blanket use

√ Ignition source areas are kept clear at all times and easily accessible

The use of burners to keep food warm was limited. In the venues where such facilities were utilised, fire extinguisher are installed in the rooms

Emergency Procedures √ Emergency response plan in place Displayed in venue and in rooms √ Emergency response team trained to carry out

plan This was also covered during the safety briefing on the first day

√ Current site maps available to all staff, emergency services and other relevant parties

Maps are displayed all over the Hotel indicating various locations

First Aid √ First aid stations are suitably located, clearly

signed and easily accessible for everyone These facilities are available at the venue and reception

√ First aid facilities are adequate for the type of event being held

Sufficiently trained first aiders are on site

√ Good means of communication provided between personnel and first aid stations

Training is conducted as legally mandated

Electrical / Backup Power x All portable electrical equipment including leads

are tested None were seen at the venue

√ Adequate protection of the public from electrical shock and any trip hazards from cords are minimised

All power cables is properly installed away from areas where the public may occur

√ All leads, lugs, etc. are protected from weather and other environmental conditions (e.g. water)

The event is mainly an indoor event

√ Evidence of electrical safety can be provided upon request from an authorised person

Electrical certification is available on request

√ Backup power is available in venue Back up diesel generators are on site Lighting

√ Adequate natural light or artificial lighting provided for setting

Artificial light is sufficient in the venue and in the rooms. Partitions can be opened if natural light is needed in the meeting venue

√ Portable lighting is tested and in date Yes √ Suitable emergency lighting is in place The meeting venue has suitable

emergency lighting Manual Handling

√ All staff and volunteers are trained to assess each task and use safe technique when lifting or carrying

Staff used trolleys and other transport measures to move items, i.e. food trolleys, etc.

√ Loads are delivered as close as possible to area using vehicle or mechanical aid (e.g. trolleys)

Access ways also allow for the use of trolleys

√ Light, small loads and physical aids (assistance from second person or team lift where needed) are used

Hotel staff are trained to use the correct methods

√ Staff and volunteers are trained in and used the S-M-A-R-T Lifting technique where possible and appropriate □ S – size up the load □ M – move in close □ A – always bend the knees

As seen above

Page 27: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 25

□ R – raise object using your legs □ T – turn using your feet

Weather Conditions √ Weather conditions planned for and monitored

e.g. partitions, displays and signage well secured for windy conditions, and shade and sunscreen and water provisions for heat

The event was mainly indoors

Security √ Appropriate security is available at the venue CCTV cameras and roaming security

personnel is on the premises Accessibility

√ Ramps are in place to provide access to buildings

These ramps are part of the construction of the building

√ Parking is available close to the event See photos √ The event is easily accessible (e.g. for patrons

in wheelchairs, with prams, using walking aids, etc.)

No patrons would be restricted in their movement

√ Entry / Exit area is easily accessible (e.g. for patrons in wheelchairs, with prams, using walking aids, etc.)

See above

Reference:

SafeWork SA – safe, fair, productive, working lives (www.safework.sa.gov.au)

30 August 2012

F A Delport Date

TNSP: Project Safety Officer

Page 28: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 26

8.3 EVIDENCE FOR SAFETY AT THE HOTEL AND VENUE

8.3.1 Accessibility

Figure 1: Road and pedestrian routes clearly separated

Figure 2: Signage to venues clearly marked

8.3.2 Traffic Flow

Figure 3: Pedestrian and roads clearly separated

Figure 4: Signage to indicate traffic flow

Page 29: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 27

8.3.3 Amenities

Figure 5: Ample clean drinking water available in venue

for participants

Figure 6: Amenities clearly marked

8.3.4 Signage

Figure 7: Signage to indicate temporary detour

Figure 8: Venues clearly marked

Figure 9: Warning signs clearly visible

Figure 10: Caution signs clearly visible

Page 30: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 28

8.3.5 Fire prevention

Figure 11: Fire hydrant maintenance certificates in date

Figure 12: Fire hoses clearly marked

8.3.6 Emergency Procedures

Figure 13: Exit signs in conference venue clearly marked

Figure 14: Emergency assembly point clearly marked

Figure 15: Emergency exit in rooms clearly marked

Figure 16: Emergency exit at pool clearly marked

Page 31: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 29

8.3.7 First Aid

Figure 17: First aid station clearly marked at conference

venue

Figure 18: First aid boxes clearly marked at conference

venue

Figure 19: Fire blanket clearly marked at conference venue

8.3.8 Electrical

Figure 20: Substation clearly marked

Figure 21: Evidence of maintenance being undertaken

Page 32: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 30

8.3.9 Weather Conditions

Figure 22: Golf carts, with sides can be used in

unfavorable conditions

Figure 23: Temperature gauge is clearly visible at

reception

Figure 24: Each room is equipped with an umbrella for unfavorable weather

8.3.10 Security

Figure 25: CCTV camera overlooking the day participant

car park

Figure 26: Security guard station in the day participant car

park

Page 33: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 31

Figure 27: Each room is equipped with a safe

Figure 28: Car guard at the hotel car park

8.3.11 Safety Presentation

Figure 29: Spier’s safety presentation

Page 34: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 32

8.4 HOTEL HEALTH AND SAFETY TALK

Spier’s concern for Health and Safety, Social and Environmental activities, the sustainability of business

ethics and organization integrity form part of our good corporate governance.

8.4.1 Spier’s Policy entails • Our People are, without doubt the most important asset of this Group.

• Strives to maintain safe working conditions which will minimize risk of injury to the individual, and loss of

company property.

• Complying with all applicable laws, through training, awareness and competence.

• Setting of targets to ensure continual improvement.

• Integrating Health and Safety into our day to day activities in order to recognise risk for the future well-

being of the Group and all its employees.

• Client satisfaction at all times.

8.4.2. Emergency Response The objective of the Emergency Evacuation Plan is to ensure that all building occupants evacuate the

building safely in the event of a fire or any other type of emergency.

8.4.3 First Aid & Fire • An automatic fire detection and warning system together with an automatic fire call point system is

installed throughout the venue.

• The fire alarm will activate in the Security Control Room by Smoke detector, Heat detector, Break

Glass Point, or By phone, using the emergency number ext. 1164 (021 809 1164).

• The Security Control Room, which, is staffed 24 hours a day, will be the Control Point in any incident or

emergency and they are responsible for alerting the Emergency Response team and the relevant

Emergency Services.

• The emergency response team are fire and first aid trained.

• First Aid boxes are available at the Banqueting office, Banqueting Kitchen and Security Office.

• Fire Equipment are situated throughout the venue where indicated by safety signage.

8.4.4. Fire Evacuation Procedure • All delegates are asked to abide by the instructions issued over the PA system by Spier Management

and the emergency services.

• It is the responsibility of the Event Organiser to account for all delegates present at the event and to

report at the Assembly Point. The Event Organiser will have a registered list of attendees and/or

delegates available if requested by the Stellenbosch Fire Chief.

Page 35: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 33

• Evacuated personnel shall congregate at the Emergency Evacuation assembly point area and remain

there until a decision is reached to re-occupy the building or to send people home. The Emergency

Evacuation assembly point, unless otherwise stated, is on the Bamoo lawn area next to the river. The

event’s organisers and emergency coordinators will then account for their respective individuals. If

someone is missing, the Fire Department must be notified immediately of the possibility that someone

is still in the building and their likely whereabouts.

8.4.5. Evacuation of Individuals with Disabilities Event organisers are required to submit a list of individuals who have physical disabilities or special medical

conditions to the emergency response team (ERT). Two co-workers should be assigned ahead of time to

assist individuals with disabilities during an evacuation. However, event’s organisers, emergency

coordinators, and the Fire Department may also be required to assist disabled individuals during an

emergency evacuation.

Note: Emergency response at Spier is a concerted effort among the members from Banqueting Management,

Facilities and Security. However, it should be remembered that once The Fire Department personnel are on

the scene, they are in command and their instructions must be followed.

8.4.6. Guests Rest Rooms The ladies and gents rooms are situated as you walk into the conference centre on the left hand side in the

following sequence:-

• Disabled

• Ladies

• Gents

8.4.7. Smoking Policy In accordance with the companies smoking Policy no one will be allowed to smoke in the following areas:

• All internal building areas for guests and visitors.

• All common areas, including staircases, waiting rooms, copier rooms, mailrooms, libraries, store-

rooms, reception areas, customer service areas, public toilets and changing rooms;

• Recreational areas.

Page 36: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 34

9. WORKSHOP SATISFACTION SURVEY

9.1 INTRODUCTION

Thyspunt Workshop 3 was held at Spier Hotel from 27 to 31 August 2012. The workshop was divided into

two sections, each two days long with a central overlap day. A Workshop Satisfaction Survey (Appendix C)

was distributed to all participants at the Workshop. A total of 35 questionnaires were received back from a

total of 49 anticipated participants.

9.2 SURVEY

The Nuclear Geo-hazards Group of the CGS conforms to an Integrated Management System (IMS), which

includes continuous improvement. In order to continually improve the quality of our workshops, we devised

a Workshop Satisfaction Survey which has to be completed at all the workshops. The survey covers a total

of 18 questions divided into three main groups:

• Pre-workshop arrangements (questions 1-4)

1. Were you kept adequately informed regarding the arrangements for the Workshop leading up to the

event?

2. Were the methods of communication adequate (e-mail, newsletters, etc.)?

3. How was your travel arrangements (air ticket and transfers) handled?

4. Upon arrival, how were you received by the organizers and hotel staff?

• Venue (questions 5-14)

5. How would you rate Spier Hotel as a location for the Workshop?

6. If you stayed at Spier Hotel during the Workshop, how would you rate the accommodation?

7. If you live in Cape Town and drove to Spier Hotel, how did you find the parking at the Workshop?

8. On average, how did you find the session room to be in terms of seating and view?

9. How satisfied were you with the technology and multimedia available during the sessions?

10. Were the organizers and hotel staff helpful and courteous throughout the Workshop?

11. How would you rate the venues for the meals?

12. How would you rate the meals and snacks provided during the Workshop?

13. If you had special dietary requirements, were these catered for?

14. Was the safety briefing adequate?

• General (questions 15-18)

15. Was the workshop document pack informative enough?

16. Was the Agenda kept to, and did the sessions begin on time?

17. Were you able to add value to the discussions during the Workshop?

18. Were the objectives you thought should be met, achieved by the Workshop?

Weights were assigned to each question, these are: Excellent = 4; Good = 3; Average = 2; Poor = 1; No

data = 0.

Page 37: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 35

Unfortunately two questionnaires were not completed in full and as such these were assigned weights of

zero.

9.3 RESULTS

Questionnaires were completed by 35 participants and the following results were obtained (percentages).

Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10 Q11 Q12 Q13 Q14 Q15 Q16 Q17 Q18

Excellent 83 86 71 77 74 51 23 60 74 80 49 51 14 37 63 66 34 83

Good 14 14 6 17 23 14 6 34 23 20 49 40 11 54 34 29 40 9

Average 3 0 0 0 0 6 0 6 0 0 3 9 0 3 0 0 6 3

Poor 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 0 0 0

No data 0 0 23 6 3 29 71 0 3 0 0 0 71 6 3 6 20 6

During our analysis of the results from Workshop #1, it became apparent that the results could be grouped

into three categories, viz. satisfied (excellent out weights good); room for improvement (good out weights

excellent) and not applicable. Not applicable does not mean the question is invalid, it means that the

majority of the participants did not respond to the question, these normally pertain to parking for day visitors

and dietary requirements.

9.3.1 Pre-workshop arrangements

Figure 30: Satisfaction of pre-workshop arrangements

From the results it can be seen that the overall satisfaction was excellent.

Page 38: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 36

9.3.2 Venue

9.3.2.1 Satisfied

Figure 31: Satisfaction - venue (satisfied)

From the results it can be seen that the overall satisfaction was excellent. Comments relating to the

questions are follows:

Q6: Rooms were not booked as requested. Maintenance issues with many rooms, e.g. windows did not

open or close; room safe was locked prior to arrival. After heavy rain rooms were flooded and not

checked by housekeeping. Internet is too expensive.

Q8: The chairs are uncomfortable for a five day workshop.

Q11: Although the quality of the food was good the lunch time meals were too heavy for such a

workshop. The banqueting and hotel chefs should interact better concerning the menus. Many meal

items were repetitive.

Page 39: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 37

9.3.2.2 Room for improvement

Figure 32: Satisfaction –venue (room for improvement)

From the results it can be seen that the overall satisfaction was good.

9.3.2.3 Mostly not applicable

Figure 33: Satisfaction –venue (mostly not applicable)

From the few results obtained it can be seen that the overall satisfaction was excellent.

Page 40: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 38

9.3.3 General

Figure 34: Satisfaction - general

From the results it can be seen that the overall satisfaction was excellent. Comments relating to these

questions are follows:

Q16: Presenters demonstrated their high level of expertise and preparedness. One participant suggested

shorter sessions.

Page 41: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 39

9.4 HOW DID WE FARE?

Since continuous improvement and quality go hand in hand it is important for us to compare the results of

all three Thyspunt workshops. The table below lists the comparative results (based only on the excellent

results) between all three workshops (percentage).

Question Workshop #1 Workshop #2 Workshop #3

1 78 82 83

2 76 78 86

3 57 60 71

4 70 78 77

5 43 79 74

6 35 66 51

7 16 15 23

8 24 43 60

9 27 48 74

10 57 81 80

11 51 51 49

12 49 55 51

13 14 16 14

14 30 34 37

15 57 57 63

16 78 87 66

17 19 27 34

18 59 51 83

The question numbers have been assigned a colour code to reflect the level of satisfaction; green =

satisfied; red = improvement; orange = mostly not applicable. The graphic representation gives an

indication of where we have improved, slipped or not changed from Workshop 1 to Workshop 2. Due to

Question 7 and 13 not affecting the larger group these questions will not be analyzed further. Question 17

will also not be analyzed any further because if a participant cannot add value due to lack of knowledge

then the area cannot be improved on from a workshop organization point of view.

Taking the other fifteen questions into consideration we can see that there has been a decrease in

satisfaction from Workshop 2 to Workshop 3.

Page 42: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 40

9.5 CONCLUSIONS

The success of Workshop 3 can mostly be attributed to the venue for the workshop as well as the support

the CGS staff received from the Spier staff. The venue provided a much needed stimulus with its open

space and gardens that the participants needed during such an intense workshop. However, it is important

that communication between the workshop coordinator and the conferencing department is of such a level

that all requests by the CGS are observed.

Page 43: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 41

10. LESSONS LEARNED

Date Reference Description of action

31 August 2012

WS3-1 Ensure that consultants provide their flight information at least 120 days prior to the workshop to avoid penalties. To be included in future contracts.

31 August

2012

WS3-2 All negotiations with the hotel must be done by the CGS even if Eskom is paying directly

31 August

2012

WS3-3 In future, check with TI teams how many roaming microphones are required

31 August

2012

WS3-4 Menu should be provided to the workshop coordinator as least 15 days prior to the commencement of future workshops

31 August

2012

WS3-5 Lunches should be lighter

31 August

2012

WS3-6 During the safety talk (done by the venue) an evacuation plan should be projected

31 August

2012

WS3-7 Consultant contracts to be amended to include spousal expenses at the Workshops

Page 44: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 42

11. CONCLUSION

All objectives for Workshop 3 as set out in the project plan were met as evidenced below:

GMC

Objective Evidence

For the TI Teams to receive and consider feedback on their preliminary models in the form of hazard sensitivity analyses and comments from the PPRP such that the models can be revised, improved, and finalized in light of that feedback.

The purpose of the Workshop was fulfilled through 3 days of presentations and engaged discussions.

For TI Team to present a summary of our evaluation of the available data, methods and models.

The GMC evaluation process was summarised by the TI Lead on Day 1.

For the PPRP to ask questions of the TI Team about the extent to which evaluation considered the full range of data, methods and models within the broader technical community.

The PPRP questioned the TI Team regarding the evaluation process, with all members of the TI Team contributing to the responses.

For the TI Team to present a summary of the technical bases for the integration process through which the preliminary GMC logic-tree for motions in the deeper bedrock was developed.

The development of the preliminary model for medians and sigmas in bedrock was presented on Day 1 by the TI Lead.

For the TI Team to present the preliminary site response and its technical bases.

The development of the preliminary site response model was presented by Ellen Rathje on Day 1.

For the PPRP to ask questions of the TI Team regarding the technical bases of elements of the preliminary GMC model and the degree to which it captures the centre, body and range of technically-defensible interpretations.

The PPRP posed many questions to the TI Team during the first two days of the Workshop, which was followed by extensive discussions between the Panel and the TI Team.

For the TI Team to present the proposed models for extrapolating the response spectra from 2.0 to 10.0 s and for V/H ratios to transform the full horizontal response spectra to vertical component spectra.

The TI Team presented proposals for extrapolating the horizontal spectrum to 10 Hz, and for obtaining the vertical spectrum from V/H ratios.

For the PPRP to question the TI Team on the technical bases for the long-period extrapolation and V/H models.

The PPRP questioned the TI Team regarding some aspects of the decision process by which the Team arrived at these proposals.

For the TI Team to identify those elements of the bedrock motion, site response, long-period extension and V/H model requiring additional technical justification and support.

The GMC TI Team has held a meeting on Day 2, and identified a list of activities ahead of the final working meeting in London in October.

For the TI Team to present and to discuss explorations of the preliminary GMC model for bedrock motions, including testing of the models against intensity data.

Presentations were made comparing the models to other equations including South African stochastic models and CEUS models for scenarios (Peter Stafford) and in ground-motion and hazard space (Frank Scherbaum). The TI Lead also presented comparisons with intensity predictions.

For the TI Team to see and to discuss hazard Hazard sensitivity results were shown that identified

Page 45: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 43

sensitivity feedback (including site response) to identify relative contributions to the total hazard, and also to identify the key GMC contributors to the overall hazard uncertainty.

the influence of individual components of the GMC model and the sources/scenarios that contribute most to the hazard.

For the TI Team to identify those elements of the preliminary model requiring additional analysis and consideration for possible refinement in the development of the final GMC model.

The GMC TI Team has identified the key elements to be explored before building the final model, and work planned to conduct these explorations before WM4.

To discuss details of the way the hazard calculations are executed in the selected software—especially in terms of ‘virtual faults’ in the host source zone—and the possible implications for SSC-GMC interfaces.

Presentations on the modelling of area seismic sources in FRISK88 and OpenQuake were presented, and discussed by the workshop participants, including how both programs calculate the parameters associated with fault ruptures in the host zone.

To identify and discuss critical interface issues between the SSC and GMC models, and in particular to identify elements of the SSC model that may require refinement.

The TI Lead presented an overview of SSC-GMC interface issues and discussed how these have been addressed in the development of the preliminary models.

To discuss the path forward for the Thyspunt PSHA in terms of developing the final GMC model and executing the final hazard calculations.

The GMC TI Team has established a path forward in terms of additional analyses before WM4 to support the development of the final model, and for subsequent activities to produce the documented justification of the final GMC model.

SSC

Objective Evidence

The SSC TI Team to present the preliminary SSC models, including a summary of the evaluation of the available data, methods and models undertaken by the TI Team and the technical bases for the logic-trees produced through the integration process.

The TI Team presented summaries of the various elements of the preliminary SSC model. As part of the presentation, the various data, models, and methods that were evaluated were summarized.

The SSC TI Team to receive and consider feedback on their preliminary models in the form of hazard sensitivity analyses and comments from the PPRP.

Hazard sensitivity results were presented and discussed on Friday. The PPRP provided their comments and perspectives throughout the presentations and during discussion periods.

The PPRP to ask questions of the SSC TI Team regarding the elements of the preliminary models, their technical bases, and the degree to which these capture the centre, the body, and the range of technically-defensible interpretations of the available data.

The PPRP probed and questioned the TI Team regarding the assessments that form the CBR of the TDI as given in the seismic source logic trees. For example, questions were asked regarding whether the range of assessments truly captures the range of epistemic uncertainty in specific parameters.

The PPRP may also question the SSC TI Team with regard to the degree to which the full range of available data, methods and models within the broader technical community have been considered.

The PPRP did, in fact, ask the TI Team regarding whether various methods and approaches had been considered during the Team’s evaluation process.

The SSC TI Team to see and discuss hazard sensitivity feedback, to identify the relative contributions of different elements of the preliminary

Hazard sensitivity was presented in a variety of formats to the TI Team and these analyses provided a basis for extensive discussions regarding the

Page 46: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 44

models to the total hazard estimate and, in particular, the main contributions to the overall uncertainty.

relative importance of various elements of the SSC model and the influence of the assessments of uncertainty for several parameters and models.

The SSC TI Team to identify those elements of the preliminary models requiring additional analysis and consideration in order to be refined in the final models to be developed after the Workshop.

The interactive discussions in response to hazard sensitivity feedback and questions from the PPRP led to the TI Team identifying a series of additional analyses and explorations that the Team will conduct prior to and at WM4.

The SSC TI Team to identify those elements of the preliminary models that require additional technical justification and support.

During the course of interactions the PPRP, technical positions requiring strong technical justification and support were identified.

The SSC TI Team to identify and discuss critical interface issues between the SSC and GMC models, and where the models may need refining in view of these interfaces.

Extensive discussions occurred with the GMC Team at the interface workshop on Wednesday. At that time, all potential interface issues were identified and plans for addressing the issues by the SSC Team were outlined.

To discuss the details of the way that the hazard calculations are executed in the selected software, and the implications for the SSC and GMC models and their interfaces.

Presentations on the modeling of area and fault sources in FRISK88 and OpenQuake were presented, and discussed by the workshop participants, including how both programs calculate the parameters associated with fault ruptures in the host zone.

Page 47: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 45

12. REFERENCES

Senior Seismic Hazard Analysis Committee (SSHAC), 1997, “Recommendations for Probabilistic Seismic

Hazard Analysis: Guidance on Uncertainty and the Use of Experts”, United States Nuclear

Regulatory Commission NUREG/CR 6273, Washington DC.

Practical Implementation Guideline for SSHAC Level 3 and 4 Hazard Studies. 2012. United States Nuclear

Regulatory Commission NUREG-2117, Washington DC.

Page 48: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 46

APPENDIX A PARTICIPATORY PEER REVIEW PANEL’S COVER LETTER AND REPORT

(original on CD/DVD at back of report)

Page 49: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page A1

Page 50: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page A2

Page 51: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page A3

TABLE OF CONTENTS

Introduction .............................................................................................................................................A4

Responsibilities of the PPRP ......................................................................................................................A4

Format of Review Comments ...................................................................................................................A5

Comments on the Project Execution ........................................................................................................A6

Comments on Workshop 3: SSC Sub-project ............................................................................................A7

Comments on Workshop 3: GMC Sub-project ..........................................................................................A8

Concluding Remarks .................................................................................................................................A9

Page 52: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page A4

INTRODUCTION This is the third report of the Participatory Peer Review Panel (PPRP) for the project titled SSHAC Level

3 Probabilistic Seismic Hazard Analysis (PSHA) for the Thyspunt Nuclear Siting Project (TNSP). This

report provides our comments on Workshop 3 (WS3), which was held August 27th through 31th 2012, at

the Spier Hotel and Conference Centre, Stellenbosch, South Africa. The workshop was focused on

presentation of the Technical Integration (TI) Teams’ models and hazard sensitivity feedback based on

those models. This focus is consistent with the guidelines for a Level 3 study as described in U.S.

Nuclear Regulatory Commission (USNRC) NUREG/CR-63721 (also known as the “SSHAC Guidelines”)

and NUREG-21172.

Within the SSHAC process, the general goal of WS3 is to present and discuss the preliminary ground

motion characterization (GMC) and seismic source characterization (SSC) models in a forum that

provides the opportunity for feedback to the TI Teams. Feedback is facilitated through presentation of

hazard sensitivity results based on the preliminary models and also through interactions with the PPRP.

Detailed goals of the workshop are outlined on page 2 of the workshop agenda.

All five members of the PPRP attended the workshop and were able to fully observe all aspects of the

formal sessions. This is a consensus report written immediately following the workshop. The review

contained in the document is based on the presentations and discussions that took place at WS3. This

review is also informed by the project activities to date, including WS1 and WS2 and formal Working

Meetings (WM) of the GMC and SSC TI Teams, which members of the PPRP have attended as

observers. Our review is also informed by interim documentation received from the Project.

The PPRP would like to recognize and thank Dr. Leon Reiter, who retired from the PPRP following WS1,

and Dr. Annie Kammerer, who retired from the PPRP following WS2, for their contributions to the work of

the PPRP.

RESPONSIBILITIES OF THE PPRP The PPRP’s role is focused on two areas: technical review and process review. In terms of technical

review, the PPRP is charged with ensuring that the full range of data, models, and methods have been

duly considered in the assessment, and also that all technical decisions are adequately justified and

documented. The PPRP must assure that the centre, body, and range of the technically defensible

interpretations (CBR of the TDI) are captured. Undertaking process review means ensuring that the

1Senior Seismic Hazard Analysis Committee (SSHAC), 1997, “Recommendations for Probabilistic Seismic Hazard Analysis:

Guidance on Uncertainty and the Use of Experts”, United States Nuclear Regulatory Commission NUREG/CR 6273, Washington

D.C.

2USNRC, 2012, “Practical Implementation Guidelines for SSHAC Level 3 and 4 Hazard Studies,” United States Nuclear Regulatory

Commission, NUREG-2117, Washington, D.C.

Page 53: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page A5

project conforms to the requirements of the selected SSHAC Level 3 process. Collectively, these two

roles imply oversight and assurance that the evaluation and integration aspects of the TI Teams’

assessments have been performed appropriately.

In more detail, the responsibilities include the following:

• to provide clear and timely feedback to the Project Technical Integrator (PTI) and Technical

Integrator (TI) Leads, through the Project Manager (PM)

• to ensure that any technical deficiencies or violations of process are corrected at the earliest

possible stage

• to highlight any data, models, or methods (and their proponents) that should be considered

• to judge adequacy of the justification provided by the TI Teams for the models (included or

excluded), and for the weights applied to the logic-tree branches; but not to judge the specific

values chosen for the logic-tree weights.

To achieve the above, the attributes of the PPRP are defined in collective terms for all of the members of

the panel as a group. Each member of the group should have an understanding of and commitment to

the principles of the SSHAC process. The members of the panel must collectively cover all technical

aspects of building seismic source characterization (SSC) and ground motion characterization (GMC)

models and of conducting a probabilistic seismic hazard analysis (PSHA). Membership of the PPRP is

always on an individual basis and not as an affiliate of any organization; the members represent only

themselves, as experts in the field.

FORMAT OF REVIEW COMMENTS The scope of this report differs from the PPRP Reports following WS1 and WS2 on account of the

different character of WS3. Specifically, the interaction between the PPRP and the TI Teams during WS3

means that most of the technical points of concern to the PPRP have already been raised and have been

noted for action by the TI Teams. The PPRP does not consider it necessary to repeat these points in the

present report.

We have organized our review comments using a numbering scheme as shown in the box below. This is

a simplification of the schemes used in the PPRP Reports from WS1 and WS2. First the comments are

broken into three general categories that follow the organization of the project: Project-wide comments,

SSC-related comments, and GMC-related comments. Each of the comments is given a sequential

number, which has been continued from the WS1 and WS2 PPRP Reports, to avoid confusion.

Page 54: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page A6

COMMENTS ON THE PROJECT EXECUTION PRJ-33 As noted in Comment PRJ-25 from the PPRP Report for WS2, the PPRP finds that observing TI Team

WMs greatly facilitates its understanding of the technical evaluation and integration that takes place

within each team. It also allows the PPRP to better assess that the full range of technically defensible

interpretations and data are being considered. Also, the Project decision to share internal TI Team

working documents and summary sheets with the PPRP in advance of WS3, made it possible for the

PPRP to provide more useful feedback at the workshop.

PRJ-34 In implementing the SSHAC Level 3 process, the TNSP has included the innovation of having the PPRP

formally question and comment on the SSC and GMC preliminary models and hazard sensitivity results

during WS3. The goal of this approach is to ensure that key PPRP concerns are raised, understood, and

discussed prior to finalization of the models. The PPRP found this approach to be highly beneficial and

notes that it was successfully implemented during WS3.

PRJ-35 In the PPRP Report for WS2, Comment PRJ-28 noted that not all SSC TI Team members participated

equally in interactions with the Proponent and Resource Experts to ascertain the technical basis and

limitations of interpretations and data sets. PPRP members observed a similar lack of balance in

discussions during SSC WMs. At WS3, there was a broader participation in the form of presentations of

the preliminary model, but discussions of hazard feedback, and responses to PPRP questions, continued

to be dominated by a few of team members. We note this with respect to inclusion in lessons learned

from the Project.

PRJ-36 WS3 was successful in identifying, from hazard sensitivity studies, problems in the preliminary model

requiring investigation and correction. The PPRP would like to emphasise the issue of unintended

consequences. Hazard models compiled with the best intentions sometimes accidentally include

branches that are unfeasible. Great care should be taken that the final model does not include, by some

combination of factors, behaviour that is physically, geologically or seismologically unrealistic.

Format for Numbered Comments: X-N

Basic Numbering (X-N)

X PRJ (Project-wide)

SSC (Seismic Source Characterization)

GMC (Ground Motion Characterization)

N Sequence Number (1,2,…,n) as continued from Workshops 1 and 2.

Page 55: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page A7

COMMENTS ON WORKSHOP 3: SSC SUB-PROJECT SSC-35 A large number of SSC issues that were raised by the PPRP during WS3 have been noted as actions by

the SSC TI Team. The PPRP do not feel it necessary to itemise these in the present report. We are

confident that these issues will receive adequate attention at SSC WM4 and we expect to see them fully

documented in the final report.

Page 56: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page A8

COMMENTS ON WORKSHOP 3: GMC SUB-PROJECT GMC-27 Following the completion of WS3, the PPRP was provided with an Action Item list developed by the GMC

TI Team. In addition to the points raised on that list, the PPRP would like to draw attention to the issues

contained in the following comments.

GMC-28 In their preliminary model, the GMC TI Team has decided to implement a Vs-kappa correction to ground

motion predictions based on a single scenario earthquake and a given Q model. The PPRP notes that the

project documentation needs to provide sufficient justification that this approximation provides an

adequate representation of the ground motion amplitudes in the magnitude and distance ranges that are

important to hazard.

GMC-29 As noted in Comment GMC-23 from the PPRP Report for WS2, in quantifying epistemic and aleatory

uncertainties in ground motion, it is important to avoid double counting or underestimating uncertainties.

It is important to justify how the logic tree is accounting for different uncertainty contributions. For

example, if a single scaling factor takes into account multiple types of uncertainty (in mean stress drop, in

Vs-kappa adjustment, etc.) it will be difficult to distinguish how each is treated.

GMC-30 Because the single station sigma approach adopted by the TI Team represents the cutting edge in

practice and research, it is important that this phase of the work be documented thoroughly. In particular,

the rationale for the decision not to use distance- or magnitude-and-distance-dependent phi should be

clearly justified.

GMC-31 The PPRP welcomed the use of Sammon’s maps to illustrate the epistemic uncertainty expressed in the

GMC model. It was notable that some of the South African stochastic models fell outside the range of the

GMC model space. The reasons for this should be considered and documented.

GMC-32 At WS3, there was some discussion on the subject of testing the GMC model. The PPRP considers that

tests should have predefined conditions that would constitute success or failure. The PPRP would like to

identify this as a desirable item in the project documentation.

GMC-33 The explorations of the use of the intensity database contained a circularity in that the GMC model was

used to evaluate GM/intensity conversions, that were to be used to evaluate the GMC model. While this

Page 57: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page A9

may be unavoidable, the limitation thus imposed on interpretation of the results should be clearly

indicated in the final report.

GMC-34 The approach for the characterization of uncertainty in site response, as presented at WS3, appears to

include only parametric uncertainty. It is important that modelling uncertainty be also addressed.

GMC-35 In incorporating site response with hazard results for the reference rock condition to obtain results at the

surface, it should be documented that the ground motion range over which site response is calculated is

sufficient to capture the hazard at the surface.

CONCLUDING REMARKS The agenda for the workshop was well developed and covered the necessary and appropriate topics to

meet the workshop objectives. The workshop was well organized and well conducted. The high quality of

the logistical organization of the workshop contributed greatly to its success, and we would like to express

our appreciation to the CGS staff.

The technical quality of the presentations was very high throughout the workshop.

It is the judgment of the PPRP that the workshop was successful in its adherence to principles, goals, and

requirements of a SSHAC Level 3 process.

Page 58: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 47

APPENDIX B - TI LEAD’S RESPONSE TO PPRP REPORT (original on CD/DVD at back of report)

Page 59: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page B1

SSHAC Level 3 PSHA for the Thyspunt Nuclear Siting Project

Workshop 3: Presentation of Models and Hazard Sensitivity Feedback

TI Lead Responses to PPRP Report INTRODUCTION

The TI Leads would like to once again express our gratitude to the five members of the Participatory Peer

Review Panel (PPRP) for their time and effort throughout the Workshop, especially in view of the fact that

this involved 7 full working days for Panel.

The feedback provided to us, both verbally during the Workshop and now in writing in their third report,

continues to be very valuable. In particular, we share the PPRP’s view that the format for Workshop #3,

consistent with the specifications of NUREG-2117, that allowed the members of the Panel to directly

question the TI Teams regarding the preliminary SSC and GMC models, worked very well. Most

significantly, it has enabled many issues and concerns to be raised in time to be taken on board by the TI

Teams during the development of the final models, and in the documentation of the project.

We would also like to note that we are very pleased that the PPRP has once again clearly identified and

confirmed its role and responsibilities in this project, and emphasised the importance of Panel members

participating in their individual capacity.

RESPONSES TO INDIVIDUAL COMMENTs Each comment in the PPRP report is addressed below; these responses are provided by the TI Leads

and will be communicated to the members of the TI Teams, and others as needed. The PPRP does not

appear to have specifically requested written responses to any of the comments in their report, we have

opted to provide brief responses below for completeness and also to establish our plans for taking these

comments into account in the next stages of the project. We use the same numbering system as adopted

by the PPRP in their report.

PRJ-33 We concur with this comment in its entirety, and have also found the experience of having PPRP

observers present at the TI Team Working Meetings very valuable. We are pleased that the

documentation provided ahead of the Workshop was helpful to the PPRP in making preparations for the

meeting.

Page 60: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page B2

PRJ-34 We also concur on this point and believe that the experience of TNSP Workshop #3 vindicates the advice

of NUREG-2117 to allow the PPRP to participate in this final workshop actively rather than maintaining

the status of observers from the previous workshops.

PRJ-35 We agree that the participation in verbal discussions at the workshops has not been evenly divided

across the members of the SSC TI Team. We also agree that a broader range of participation is a goal

toward which the project has strived and has made strides through the course of the working meetings

and workshops. Acknowledging these goals and results, we also note that an issue identified in the

lessons learned from previous SSHAC studies (Hanks et al., 2009, p. 242) is the need to involve young

professionals in each new SSHAC project. It is in this way that the pool of participants in future SSHAC

studies will increase with time, rather than decrease as the current pool moves into retirement. Consistent

with this recommendation, the SSC Team includes young professionals with strong credentials in SSC-

related technical disciplines, but who have relatively lesser experience in SSHAC projects or in similar

studies that involve a high degree of regulatory scrutiny in a public forum. We feel that the technical

contribution of all members of the Team has been strong, especially during the data evaluation and

preliminary SSC model development activities. In addition, the public contribution of the various members

of the Team has improved throughout the course of the project.

We do note that while members of the GMC TI Team have shown greater evidence of participation in the

meetings and workshops, it must be borne in mind that all five members have considerable experience

and as academics are well versed in debate and discussion. The two CGS members who have served on

the GMC TI Team, however, did not manage to attain a level of technical participation consistent with the

SSHAC requirements, and the SSC TI Team has successfully brought in relatively young individuals with

less experience and fully integrated them into the evaluation and integration processes undertaken.

We do agree, however, that the documenting this issue as a lesson learned, from the experience of both

teams, would be of value to future such studies.

PRJ-36 We appreciate and agree with these observations, and would state that the experience of Workshop #3,

in which preliminary, but nonetheless well matured, SSC and GMC models have been used to generate

2 Hanks, T.C., Abrahamson, N.A., Boore, D.M., Coppersmith, K.J. and Knepprath, N.E. (2009). “Implementation of the SSHAC

Guidelines for Level 3 and 4 PSHAs – Experience Gained from Actual Applications”, USGS Open-File Report 2009-1093, US

Geological Survey, Reston VA.

Page 61: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page B3

hazard sensitivity feedback, was extremely valuable. Lessons were learned from this experience, and

hazard sensitivity calculations and other checks will be performed ahead of the Working Meetings in

October, and, as identified in the final presentation of the workshop, when the draft final HID is

implemented in early November, to ensure that there are no unintended or unphysical outcomes.

SSC-35 The list of actions developed by the SSC TI Team includes technical analyses that will be conducted prior

to WM4, as well as a number of issues and assessments that will require complete documentation in the

project report. In many cases, the development of this list was greatly facilitated by the interactions with

the PPRP during the course of the workshop.

GMC-27 We are grateful to the PPRP for taking into account the commitment of the GMC TI Team to undertake a

number of activities following the Workshop, and for providing additional guidance and suggestions.

GMC-28 As noted in the GMC post-WS actions, analyses will be performed prior to GMC WM4 to explore the

sensitivity of approximation of the Vs-kappa adjustments anchored to a single scenario applied to all

magnitude-distance combinations making significant contributions to the hazard. These will be discussed

at WM4, and if necessary the uncertainty bounds on the logic-tree may be adjusted to accommodate the

differences. This aspect of the model will be fully documented and justified in the final report.

GMC-29 The point made by the PPRP regarding clear identification of each element of aleatory variability and

epistemic uncertainty is well taken. The GMC TI Team will ensure that the individual contributions to

overall uncertainty are clearly identified, and care will be taken to ensure that there is neither double-

counting nor negligence of important elements of variability or uncertainty.

With regards to the specific examples cited by the PPRP, however, the scaling factors associated with Vs-

kappa adjustments and with stress drop differences were developed independently, as was clearly

demonstrated in the presentation of the preliminary GMC model on the first day of the Workshop. The

fact that these both lead to scaling factors that are ultimately multiplied does not conceal or confuse the

relative contributions of each source of uncertainty, and this will be clearly laid out in the final

documentation.

GMC-30 The GMC TI Team acknowledges that although the single-station sigma concept is gaining widespread

acceptance, its application to projects still represents an innovation. For this reason, we accept that the

adoption of single-station sigma will require particularly complete justification in the final documentation,

Page 62: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page B4

as will the particular single-station sigma model (with magnitude dependence but not varying with

distance) that has been adopted for the Thyspunt PSHA.

GMC-31 The GMC TI Team fully agrees with this observation, but before documenting possible reasons for this

feature, additional Sammon’s maps will be generated for particular magnitude-distance-frequency

combinations relevant to the hazard to see if the GMC models and the South African stochastic equations

continue to occupy difference ground-motion space.

GMC-32 This point is well taken, and before conducting the final ‘tests’—to the extent that the models can really be

tested with the data available for South Africa—the Team will establish the criteria constituting a positive

or negative test outcome, and these will be fully documented.

GMC-33 The TI Team agrees that there is a degree of circularity in the use of well-observed events to select the

GMICE that is then employed in the comparisons of the GMC model with the intensity database. There

are, however, good reasons to select the chosen GMICE by Dangkua & Cramer (2011), and these will be

carefully documented. The final report will also include the initial comparisons, acknowledging the

inherent circularity, and explain how these initial trials not so much confirmed the choice of the Dangkua

& Cramer (2011) Californian GMICE, but rather showed that neither of the other available models yielded

values that would make any kind of testing viable.

GMC-34 This observation is well taken. We understand modelling uncertainty to represent the misfit between

model predictions and recorded motions from previous earthquakes (Toro et al. 19973, NUREG/CR-

67284). As noted in NUREG/CR-67695, modelling uncertainty for one-dimensional site response

analysis has not been well quantified. Nonetheless, some level of modelling uncertainty should be

included in our site response model and its integration into the hazard calculation. Various approaches to

include modelling uncertainty will be explored for the final hazard calculations. The considered

3 Toro, G.R., Abrahamson, N.A., and Schneider, J.F. (1997). “Models of strong ground motions from earthquakes in central and

eastern North America”, Seismological Research Letters 68(1), 41-57.

4 McGuire, R.K., Silva, W.J., and Costantino, C.J. (2001). “Technical basis for revision of regulatory guidance on design ground

motions: Hazard- and risk-consistent ground motion spectra guidelines”, NUREG/CR-6728, US Nuclear Regulatory Commission,

Washington D.C.

5 McGuire, R.K., Silva, W.J., and Costantino, C.J. (2002). “Technical basis for revision of regulatory guidance on design ground

motions: Hazard- and risk-consistent seismic spectra for two sites”, NUREG/CR-6769, US Nuclear Regulatory Commission,

Washington D.C.

Page 63: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page B5

approaches will take guidance from the NUREG/CR-6728 and NUREG/CR-6769, as well as work

currently taking place at the University of Texas under the direction of Professor Rathje using downhole

data from the KIK-net array in Japan.

GMC-35 The identification of ground-motion amplitudes to be used as input to the site response analyses will be

based on the hazard results in the bedrock target horizon, following standard practice in the application of

NRC Approach 3 consistent with NUREG/CR-6728 and RG 1.208 in terms of the specified response

frequencies and annual frequencies of exceedance. This will ensure adequate coverage of the ground

motion range in a manner consistent with best international practice in the nuclear industry.

CONCLUDING REMARKS

In conclusion, we would like to note our grateful and satisfaction with regards to the overall endorsement

that the PPRP has given for Workshop #3 having been successfully conducted and having conformed to

the principles, goals and requirements of a SSHAC Level 3 process.

We trust that the Panel will be satisfied by the responses recorded in this document, and would ask that

any outstanding concerns be communicated as soon as possible to the Project Manager.

We look forward to the interactions with individual members of the PPRP who will act as observers at our

final Working Meetings in October, and subsequently to the review of our final report. In the meantime, as

agreed at the Workshop, we shall provide documentation to the PPRP as and when it becomes available,

to facilitate the review process.

In closing, we once again thank the PPRP for their energetic commitment to this project, their

encouragement for the work being undertaken, and their willingness to engage in very open and frank

exchanges during the course of Workshop. We continue to benefit considerably from the very valuable,

insightful and constructive comments and suggestions made by the Panel.

Julian J Bommer Kevin J Coppersmith

PTI/GMC TI Lead SSC TI Lead

4 September 2012

Page 64: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page 48

APPENDIX C - WORKSHOP SATISFACTION SURVEY FORM

Page 65: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page C1

Thyspunt Workshop 3:- Presentation of Models and Hazard Sensitivity Feedback

27 – 31 August 2012 Workshop Satisfaction Survey

Pre-Workshop Arrangements

1. Were you kept adequately informed regarding the arrangements for the Workshop leading up to the event?

○ Excellent ○ Good ○ Average ○ Poor

2. Were the methods of communication adequate (e-mail, newsletters, etc.)? ○ Excellent ○ Good ○ Average ○ Poor

3. How was your travel arrangements (air ticket and transfers) handled? ○ Excellent ○ Good ○ Average ○ Poor

4. Upon arrival, how were you received by the organizers and hotel staff? ○ Excellent ○ Good ○ Average ○ Poor

Venue

5. How would you rate Spier Hotel as a location for the Workshop?

○ Excellent ○ Good ○ Average ○ Poor

6. If you stayed at Spier Hotel during the Workshop, how would you rate the accommodation?

○ Excellent ○ Good ○ Average ○ Poor

7. If you live in Cape Town and drove to Spier Hotel, how did you find the parking at the Workshop?

○ Excellent ○ Good ○ Average ○ Poor

8. On average, how did you find the session room to be in terms of seating and view?

○ Excellent ○ Good ○ Average ○ Poor

9. How satisfied were you with the technology and multimedia available during the sessions?

○ Excellent ○ Good ○ Average ○ Poor

10. Were the organizers and hotel staff helpful and courteous throughout the Workshop?

Page 66: Thyspunt Senior Seismic Hazard Analysis Committee (SSHAC ...€¦ · Thyspunt Senior Seismic Hazard . Analysis Committee (SSHAC) Level 3 . Workshop 3 Summary Report . ... Leads (NUREG-2117,

The downloaded document is uncontrolled; therefore the user must ensure that it conforms to the

authorised database version Page C2

○ Excellent ○ Good ○ Average ○ Poor

11. How would you rate the venues for the meals?

○ Excellent ○ Good ○ Average ○ Poor

12. How would you rate the meals and snacks provided during the Workshop?

○ Excellent ○ Good ○ Average ○ Poor

13. If you had special dietary requirements, were these catered for?

○ Excellent ○ Good ○ Average ○ Poor

14. Was the safety briefing adequate?

○ Excellent ○ Good ○ Average ○ Poor

General

15. Was the workshop document pack informative enough?

○ Excellent ○ Good ○ Average ○ Poor

16. Was the Agenda kept to, and did the sessions begin on time?

○ Excellent ○ Good ○ Average ○ Poor

17. Were you able to add value to the discussions during the Workshop?

○ Excellent ○ Good ○ Average ○ Poor

18. Were the objectives you thought should be met, achieved by the Workshop?

○ Excellent ○ Good ○ Average ○ Poor

General comments regarding, or ways on improving the Workshop