Thomas W. Burrows NSDD 2007, St. Petersburg June 11-15, 2007 Status of the ENSDF Analysis & Utility Codes Thomas W. Burrows* National Nuclear Data Center Brookhaven National Laboratory Presented by Jagdish K. Tuli *Email: [email protected] Brookhaven Science Associates

Upload: martina-edwards

Post on 02-Jan-2016

213 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Thomas W. Burrows NSDD 2007, St. Petersburg June 11-15, 2007 Status of the ENSDF Analysis & Utility Codes Thomas W. Burrows* National Nuclear Data Center

Thomas W. Burrows NSDD 2007, St. Petersburg June 11-15, 2007

Status of the ENSDF Analysis & Utility Codes

Thomas W. Burrows*National Nuclear Data Center

Brookhaven National LaboratoryPresented by Jagdish K. Tuli

*Email: [email protected]

Brookhaven Science Associates

Page 2: Thomas W. Burrows NSDD 2007, St. Petersburg June 11-15, 2007 Status of the ENSDF Analysis & Utility Codes Thomas W. Burrows* National Nuclear Data Center

2Thomas W. Burrows NSDD 2007, St. Petersburg June 11-15, 2007

Status of the ENSDF Analysis & Utility CodesChanges Since the Last NSDD Meeting

• All programs converted to FORTRAN 95 (C.L. Dunford)– In addition to NSDFLIB and RULER,

ALPHAD, ComTrans, FMTCHK, ENSDAT, GTOL, and PANDORA have been distributed

– In-house testing needed before distribution of remaining

Page 3: Thomas W. Burrows NSDD 2007, St. Petersburg June 11-15, 2007 Status of the ENSDF Analysis & Utility Codes Thomas W. Burrows* National Nuclear Data Center

3Thomas W. Burrows NSDD 2007, St. Petersburg June 11-15, 2007

Status of the ENSDF Analysis & Utility CodesChanges Since the Last NSDD Meeting (cont.)

• Program updates (See http://www.nndc.bnl.gov/nndcscr/ensdf_pgm/code_status.html for additional updates)

– BrIcc 2.0 (Band-Raman Internal Conversion Coefficients using the "frozen orbitals" hole approximation) distributed.

– FMTCHK: Implemented several checks based on an error report from PNPI in May 2005, including checking the residual calculated from the target and reaction against the NUCID.

Page 4: Thomas W. Burrows NSDD 2007, St. Petersburg June 11-15, 2007 Status of the ENSDF Analysis & Utility Codes Thomas W. Burrows* National Nuclear Data Center

4Thomas W. Burrows NSDD 2007, St. Petersburg June 11-15, 2007

Status of the ENSDF Analysis & Utility CodesChanges Since the Last NSDD Meeting (cont.)

– GTOL:• Converted to double precision.• Added tables comparing input level energies to

calculated level energies and comparing input transition energies to calculated energies with 2's.

• Added a comparison of the normalized 2 to the critical 2.

– RULER: Corrected a problem caused in porting from F77 to F95 which sometimes caused the program to skip calculations.

Page 5: Thomas W. Burrows NSDD 2007, St. Petersburg June 11-15, 2007 Status of the ENSDF Analysis & Utility Codes Thomas W. Burrows* National Nuclear Data Center

5Thomas W. Burrows NSDD 2007, St. Petersburg June 11-15, 2007

Status of the ENSDF Analysis & Utility CodesIn Progress and Future Plans

• BrIcc: To be discussed by Tibor Kibédi.• Added since May 15, 2007:

– GTOL: Investigate possible compiler dependent problems in output to the report file and add additional checks for fatal format errors.

– RULER: Add appropriate coding to handle problems noted by Balraj Singh for resonance states when the total is not equal to .

Page 6: Thomas W. Burrows NSDD 2007, St. Petersburg June 11-15, 2007 Status of the ENSDF Analysis & Utility Codes Thomas W. Burrows* National Nuclear Data Center

6Thomas W. Burrows NSDD 2007, St. Petersburg June 11-15, 2007

RULER Upgrades

• RULER must be upgraded to properly handle gamma transitions from states where there is competition between gamma decay and particle emission (e.g., proton or neutron emission)

Page 7: Thomas W. Burrows NSDD 2007, St. Petersburg June 11-15, 2007 Status of the ENSDF Analysis & Utility Codes Thomas W. Burrows* National Nuclear Data Center

7Thomas W. Burrows NSDD 2007, St. Petersburg June 11-15, 2007

RULER Upgrades (cont.)

• The following will be done:– If WIDTHG given on Gamma continuation record, use

for calculation– Else if WIDTHG given on Level continuation record,

use for calculation• Also check for and, if possible, use WIDTHG0, WIDTHG1,

etc.

– Else if other partial widths (e.g., p or n) given on Level continuation record, derive from and i

– Else if %IT or %G given on Level continuation record, use for calculation (%IT is currently checked for)

Page 8: Thomas W. Burrows NSDD 2007, St. Petersburg June 11-15, 2007 Status of the ENSDF Analysis & Utility Codes Thomas W. Burrows* National Nuclear Data Center

8Thomas W. Burrows NSDD 2007, St. Petersburg June 11-15, 2007

RULER Upgrades (cont.)

– If none of the above are given and T1/2 on Level record indicates a width (eV, keV, or MeV) or is very short (10-18 sec), do one of the following:

• Treat as if the -branching is 100% and do all calculations and creation of new Gamma continuation records. Output a warning that this has been done both in the report file and the terminal output.

• Treat as if the -branching is 100% and do all calculations but do not create new Gamma continuation records. Output a warning that this has been done both in the report file and the terminal output.

• Do not do any calculations and indicate that this has been done both in the report file and the terminal output.

Page 9: Thomas W. Burrows NSDD 2007, St. Petersburg June 11-15, 2007 Status of the ENSDF Analysis & Utility Codes Thomas W. Burrows* National Nuclear Data Center

9Thomas W. Burrows NSDD 2007, St. Petersburg June 11-15, 2007

RULER Upgrades (cont.)

– If the evaluator has entered the data correctly, this seems to be the best procedure to avoid correlations in the uncertainties (e.g., between T1/2 and %).