thomas degner -de- beta session 4b: integration of res+dg barcelona 12-15 may 2003 1 dispower...
TRANSCRIPT
1Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG
Barcelona 12-15 May 2003
DISPOWERDistributed Generation with High Penetration of
Renewable Energy Sources
Thomas DegnerISET e.V.
Königstor 59, D-34131 KasselTel. +49 561 7294 232 Fax +49 561 7294 200Email: [email protected]
2Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG
Barcelona 12-15 May 2003
Future grids with Decentralised Power Production
3Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG
Barcelona 12-15 May 2003
Objective and ApproachMain objective:• Preparation of a new distributed generation structure of
power supply in regional, local and island grids
Approach• Investigation on basic solutions for technical problems
expected from more decentralised generation in distribution networks
• Demonstration of exemplary technical solutions in test centres and at selected sites
• Restriction on medium and low voltage grids
4Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG
Barcelona 12-15 May 2003
DISPOWER
• 37 partners from 11 European countries
• 17 mio Euro overall budget• Project duration Jan 2001 – Dec 2005• Work divided into 11 work packages
5Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG
Barcelona 12-15 May 2003
DISPOWERConsortium
37 partners from 11 European countries:
• utilities
• power industry and service companies
• research centres and universities
6Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG
Barcelona 12-15 May 2003
DISPOWER – research areasGrid stability and control• Stable operation of networks with very high penetration of DG• Control of DG and storage plant• Hardware and control strategies for load management• Advanced communication and metering
Power quality and safety• Power quality of LV connected DG• Development of a power quality and management system for DG in
LV networks• Concepts and solutions for preventing unintended islanding• Protection against overload and short circuits in DG networks• Identification of requirements for new standards for DG
7Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG
Barcelona 12-15 May 2003
DISPOWER – research areas(continued)
Socio-economic issues• Evaluate the potential of the users as “controllable” load • Influence of ICT and innovative distribution networks on the
penetration of DG• Effect of institutional changes in the electricity markets and strategic
behaviour of incumbent utilities on the position of DG
8Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG
Barcelona 12-15 May 2003
DISPOWER – research areas(continued)
Planning, trading and operation tools• Adaptation of a simulation tool for load flow calculations in DG
networks with wind power plants• Development of software tools for optimisation of grid connection
of wind farms• SCADA system for DG and controllable loads• Training facilities and programme for grid operator personal
Information, communication, and electricity trading• Standardised data structures and data bases for information services• Wind power prediction tool for wind farms in UK to improve
energy trading
9Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG
Barcelona 12-15 May 2003
DISPOWER – research areas(continued)
Test facilities for grid stability, control and power quality • Test facility for power quality at CESI, Milano (transient and energy
flow analysis)• Test facility for grid stability and control at ISET, Kassel (test of
DG units, setup of laboratory DG grid)
10Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG
Barcelona 12-15 May 2003
Test facility for grid stability and control at ISET
11Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG
Barcelona 12-15 May 2003
DISPOWER – research areas(continued)
Implementation of DG technology in regional power supply systems
• Case studies for DG in European interconnected networks• Case studies for DG in European islands and weak grid
Pilot installations and monitoring of DG in low voltage grids• Solar Settlement Querdeich (PV/ micro turbine / battery storage)• Technology Demonstration Centre San Agustin del Guadalix (PV/
Wind/ Battery)• Stadtwerke Karlsruhe (Fuel cell, battery storage)
12Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG
Barcelona 12-15 May 2003
DISPOWER – document management system
13Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG
Barcelona 12-15 May 2003
DISPOWER: CIRED 2003 contributions
UOG_Massucco_A1. Stefano Massucco (University of Genova) “Electrical energy distribution networks: actual situation and perspectives for distributed generation”
ISE_Degner_A1. Thomas Degner (ISET) ”Effect of renewable energy sources on power quality -Recent research activities”
UMI_Bopp_A1. Thomas Bopp (UMIST)“Commercial and technical integration of distributed generation into distribution networks”
UMI_Chilvers_A1. Ian Chilvers (UMIST) “Development of distribution network protection schemes to maximise the connection of distributed generation”