thesis questionnaire

3
Section A: Background information (Please type X in the relevant box) This section reviews the participant’s professional background and attributes. 1.0 Professional Field: Architecture Project management Quantity Surveying Structural/Civil Engineering Mechanical Engineering Electrical Engineering X 2.0 Categorization of role in the organization: Director Managing Partner Senior Management Mid-level Management X Others 3.0 Professional Experience: 5-10 years X 11-15years 16-20 years >20 years 4.0 Number of Construction projects actively involved in during the last 10 years: <5 5-10 11-15 16-20 >20 X 5.0 Have you been involved in value management sessions for construction projects? Yes X No

Upload: fabien-musoke

Post on 11-Apr-2016

5 views

Category:

Documents


0 download

DESCRIPTION

Field research guide

TRANSCRIPT

Page 1: Thesis Questionnaire

Section A: Background information (Please type X in the relevant box)

This section reviews the participant’s professional background and attributes.

1.0 Professional Field:

Architecture

Project management

Quantity Surveying

Structural/Civil Engineering

Mechanical Engineering

Electrical Engineering X

2.0 Categorization of role in the organization:

Director

Managing Partner

Senior Management

Mid-level Management X

Others

3.0 Professional Experience:

5-10 years X

11-15years

16-20 years

>20 years

4.0 Number of Construction projects actively involved in during the last 10 years:

<5

5-10

11-15

16-20

>20 X

5.0 Have you been involved in value management sessions for construction projects?

Yes X

No

Page 2: Thesis Questionnaire

The following sections explore your views on the value management (VM) concept that involves

processes linked to ensuring achievement of maximization of functional requirements of the

client at a minimal cost without comprising quality. It is intended to gather consensus on

effectiveness of existing value management practices in influencing achievement of expected

project performance from a view point of construction professionals as applied to our local

construction industry within the private sector.

Please respond to the questions below as per the following instructions.

Please use the 5-point scale shown below to indicate your view (by typing X) on each of the

following statements, placing your rating in the box to the right hand side of each statement.

Scale:- Strongly Disagree

(SD)

Disagree

(D)

Neutral

(N)

Agree

(A)

Strongly Agree

(SA)

Section B-Perceptions and opinions of value management adoption

1. The following are the opinions/beliefs of value management on construction projects.

SD D N A SA

Cost cutting exercise X

Time consuming exercise X

Design improvement exercise X

Is the Qs and Architect’s responsibility X

Value enhancing exercise X

2. The main importance of implementing value management on construction projects

SD D N A SA

Confirming project brief: client requirements, project

objectives as well as project stakeholder requirements

X

Achieve reduction in project budget X

Achievement of value for money for funds invested X

Section C -Value management practices adopted in local construction industry

1. At what stage of a project life is value management executed

SD D N A SA

Inception stage- project briefing X

Feasibility stage X

Concept design X

Scheme design X

Page 3: Thesis Questionnaire

Detailed design & BOQ X

Tender stage X

Construction stage X

Defects/maintenance period X

Throughout the entire project X

2. The value management team comprise of the following stakeholders:

SD D N A SA

Client X

Financiers X

Design team ( Architect, engineers, QS) X

Project manager/ team leader X

Facilitator X

Others/Specify X

3. The selection of project alternatives during value management is influenced by the following

factors:

SD D N A SA

Risk factors X

Cost factors X

Quality factors X

Time related factors X

Safety and environmental factors X