    Thermax Limited Corporate Presentation

    Thermax Limited Corporate Presentation

    1

    IR - CFBC BOILERS TRENDS AND

    DEVELOPMENTS

    IR - CFBC CONFERENCE - 2010, JAIPUR.

    Friday 25th& Saturday 26thJune 2010

    S. P. Ganeshan

  • 8/10/2019 Thermax IR-CFBC

    2/28

    Thermax Limited Corporate Presentation

    Thermax Limited Corporate Presentation

    2

    To be a globally respected high performance

    organization offering sustainable solutions inenergy and environment

    Vision

  • 8/10/2019 Thermax IR-CFBC

    3/28

    Thermax Limited Corporate Presentation

    Thermax Limited Corporate Presentation

    33

    Sustaining Values & Brand Attributes

    Integrity

    Respect

    Fairness

    Excellence Commitment

    Transparent

    Trusted

    Customer focused

    Entrepreneurial

    Innovative

    Socially responsible

    SustainingValues

    BrandAttributes

  • 8/10/2019 Thermax IR-CFBC

    4/28

    Thermax Limited Corporate PresentationThermax Limited Corporate Presentation

    44

    Energy - Environment Offerings

    Raw

    Material

    DesiredProducts

    Heating CoolingPower Water Chemicals

    Hazardous Waste Treatment Waste Water Treatment Air Pollution Control

    Utilities

    Waste Products

  • 8/10/2019 Thermax IR-CFBC

    5/28

    Thermax Limited Corporate PresentationThermax Limited Corporate Presentation

    55

    Manufacturing Plants & Assembly Facilities

    Jiaxing, China

    Pune, India Paudh, India

    Mundra, India

    Savli, India

  • 8/10/2019 Thermax IR-CFBC

    6/28

    Thermax Limited Corporate PresentationThermax Limited Corporate Presentation

    66

    Thermax Group

    Thermax Sustainable Energy Solutions Ltd.

    Thermax Onsite Energy Solutions Ltd.

    Thermax Engineering Construction Co. Ltd.

    Thermax Instrumentation Ltd.

    Thermax International Ltd. (Mauritius)

    Thermax Europe Ltd. (U.K.)

    Thermax Hong Kong Ltd (Hong Kong)

    Thermax do Brasil-Energiae Equipamentos

    Ltd (Brazil)

    Thermax Inc. (U.S.A.)

    Thermax (Zhejiang) Cooling & Heating

    Engineering Co. Ltd. (China)

    Subsidiaries Joint Ventures

    Thermax Limited

    Thermax Babcock & Wilcox

    Thermax SPX Energy Technologies Ltd.

  • 8/10/2019 Thermax IR-CFBC

    7/28

    Thermax Limited Corporate PresentationThermax Limited Corporate Presentation

    7

    BOILER TECHNOLOGY FOR CAPTIVE,COGENRATION & POWER INDUSTRY

    FOR FIRING SOLID FUEL

    GRATEAFBC

    IR - CFBCPC sub / super critical

  • 8/10/2019 Thermax IR-CFBC

    8/28

    Thermax Limited Corporate PresentationThermax Limited Corporate Presentation

    8

    Technology Partnerships for CFBC BOILERS

  • 8/10/2019 Thermax IR-CFBC

    9/28

    Thermax Limited Corporate PresentationThermax Limited Corporate Presentation

    9

    CFBC Relevance

    Energy from Multifuel

    Fossil fuels- Coal, Lignite.

    Industry waste - Petcoke, washery rejects, char, Ashrecycle.

    Biomass - Wood chips, Hog, wood waste, Bark,

    Paper sludge. Environmental friendly

    Disposal of wastes. (WOW wealth out of Waste)

    Lower Sox, Lower Nox,

    Particulate matter

  • 8/10/2019 Thermax IR-CFBC

    10/28

    Thermax Limited Corporate PresentationThermax Limited Corporate Presentation

    10

    TRENDSCUSTOMER EXPECTATIONS

    MULTI -FUEL FLEXIBILITY

    SMALL CAPACITY -------EVEN TO 50 TPH

    HIGHER CAPACITY150 MW+++. HIGHER EFFICIENCY

    ASH DISPOSAL

    HIGHER AVAILABILITY OPERATION MADE SIMPLE

    OPERATION COST LESS (EX.POWER)

    LOWER MAINTENANCE COSTS. ENVIRONMENT FRIENDLY

    HIGHER TURN DOWNW/O SUPPORT FUEL

  • 8/10/2019 Thermax IR-CFBC

    11/28

    Thermax Limited Corporate PresentationThermax Limited Corporate Presentation

    11

    DEVELOPMENTS GENERATION CHANGE

    TECHNOLOGY DEVELOPMENT

    FIRST GENERATION

    SECOND GENERATION

    THIRD GENERATION

    FOURTH GENERATION

    COMPONENTS DEVELOPMENT

  • 8/10/2019 Thermax IR-CFBC

    12/28

    Thermax Limited Corporate PresentationThermax Limited Corporate Presentation

    12

  • 8/10/2019 Thermax IR-CFBC

    13/28

    Thermax Limited Corporate PresentationThermax Limited Corporate Presentation

    13

  • 8/10/2019 Thermax IR-CFBC

    14/28

    Thermax Limited Corporate PresentationThermax Limited Corporate Presentation

    14

    Ebensburg CFB Boiler

  • 8/10/2019 Thermax IR-CFBC

    15/28

    Thermax Limited Corporate PresentationThermax Limited Corporate Presentation

    15

  • 8/10/2019 Thermax IR-CFBC

    16/28

  • 8/10/2019 Thermax IR-CFBC

    17/28

    Thermax Limited Corporate PresentationThermax Limited Corporate Presentation

    17

    Internal Recirculation Circulating Fluidized Bed Boiler (IR-CFB) The Latest Design

  • 8/10/2019 Thermax IR-CFBC

    18/28

    Thermax Limited Corporate PresentationThermax Limited Corporate Presentation

    18

    CYCLONE

    CYCLONE

    RECYCLE

    EVOLUTION OF CFB DESIGN - THE GENERATION GAP

    DESIGNVARIATION FIRST GENERATION SECOND GENERATION THIRD GENERATION

    U - BEAM DESIGN

    BABCOCK &WILCOX

    STUDSVIK

    HOT CYCLONE

    - LURGI- PYROPOWER- TAMPELLA- FOSTERWHEELER

    COLD CYCLONE

    - DEUTSCHEBABCOCK

    GAP

    GAP

    11 ROWS OF EXTERNALU - BEAMS

    2 INTERNAL +7 EXTERNAL U - BEAMS ( 2+3 ) TOTALLY INTERNAL CIRCULATING U - BEAMS

    GAP

    COMPACTDESIGN CFB TAMPELLA CYMIC CFB

    COAL FEED

    INTERNALCIRCULATION

    U-BEAMS U-BEAMS U-BEAMS MDC

  • 8/10/2019 Thermax IR-CFBC

    19/28

    Thermax Limited Corporate PresentationThermax Limited Corporate Presentation

    19

    DEVELOPMENTS - IN THERMAX ON CFBC TECHNOLOGY

    SMALL CAPAITY - < 50 TPH.

    MED.CAPACITY 70< ---< 150 MW non

    reheat.

    HIGHER CAPACITY 150 MW - Reheat

    HIGER CAPACITY < 300 MW

    HIGHER CAPACITY < 600 MW

  • 8/10/2019 Thermax IR-CFBC

    20/28

    Thermax Limited Corporate PresentationThermax Limited Corporate Presentation

    20

    AFBC VS CFBC

    AFBC

    150 TPH / 100 / 540

    Fuel GCV - 3600

    EFFICIENCY 85

    UBC - < 5%

    POWER 1000 KW

    FUEL QTY 29.7 tph Fly ash qty 10.25 tph

    CFBC

    150 TPH / 100 / 540

    Fuel GCV 3600

    EFFICIENCY 87.5

    UBC - < 2%

    POWER 1400 KW

    FUEL QTY 28.9 tph Fly Ash Qty 10.6 tph

    SAVINGS

    Coal 800 Kg/hr- (-) 160 lacs.

    POWER 400 (+) 64 lacs @ 2 ASH 10.6 @200 170 lacs.

    Net savings 266 lacs / year.

  • 8/10/2019 Thermax IR-CFBC

    21/28

    Thermax Limited Corporate PresentationThermax Limited Corporate Presentation

    21

    CFBC VS PC

    CFBC

    100 TPH / 64 / 485

    EFFICIENCY 83.6 UBC - < 4%

    POWER 1130 KW

    FUEL QTY -

    PC

    100 TPH / 64 / 485

    EFFICIENCY 87.5 UBC - < 2%

    POWER 1520 KW

    FUEL QTY SAVINGS

    Coal 3013 Kg/hr- (-) 358 lacs.

    POWER 390 (+) 62 lacs @ 2 ASH 12 @100 95 lacs.

    Net savings 391 lacs / year.

  • 8/10/2019 Thermax IR-CFBC

    22/28

    Thermax Limited Corporate PresentationThermax Limited Corporate Presentation

    22

    Recent CFBC References

    Meenakshi Energy 2 x 495 TPH (2 x 135 MW)

    Jaypee Associates 4 x 250TPH (4 x 60 MW).

    IMFA 2 x 240 TPH (2 x 60 MW)

    My Home cement 1 x 240 TPH (1 x 60 MW)

    Steel Exchange 1 x 210 TPH

    Bajaj infrastructure 4 x 190 TPH (4 x 45 MW)

    Kamatchi 2 x 150 TPH (2 x 35 MW) BILT-Ballarshah 1 x 160 TPH

    Pashupati Acrylon 1 x 50 TPH

    under execution 21 Min 50 TPH / Max 495 TPH (Reheat)

    Under operation 12 units Min 102 TPH Max 160 TPH

    Total 33 units.

  • 8/10/2019 Thermax IR-CFBC

    23/28

    Thermax Limited Corporate PresentationThermax Limited Corporate Presentation

    23.23

    Plant Availability(% of total time available)

    Plant Years reported Plant availability

    Kanoria I 1997 - Feb 2010 90.5(commissioned in 1996)

    Kanoria II 2006 - Feb 2010 93.9

    (commissioned in 2005)

    Indian Rayon 2007 - Feb 2010 96.3(commissioned in 2006)

    Saurashtra Cement 2009 - Feb 2010 93.1(commissioned in 2008)

  • 8/10/2019 Thermax IR-CFBC

    24/28

    Thermax Limited Corporate PresentationThermax Limited Corporate Presentation

    24

    IR-CFB Boiler (110 Tons/Hr) at Kanoria Chemicals,(Renukoot, Uttar Pradesh)

  • 8/10/2019 Thermax IR-CFBC

    25/28

    Thermax Limited Corporate PresentationThermax Limited Corporate Presentation

    25

    IR-CFB Boiler at BILT (Chandrapur, Maharashtra)

  • 8/10/2019 Thermax IR-CFBC

    26/28

    Thermax Limited Corporate PresentationThermax Limited Corporate Presentation

    26

    GA Drawing of 135 MW IR-CFB Boiler for Meenakshi Power

  • 8/10/2019 Thermax IR-CFBC

    27/28

    Thermax Limited Corporate PresentationThermax Limited Corporate Presentation

    27

    IR-CFB Boiler Technology -- Concluding Remarks

    IR-CFBC technology has become popular for anycapacity and any fuel

    IR-CFBC facilitates efficient boiler operation with precise

    process control Two-stage solids separation system with controllable

    secondary recycle facilitates handling of plant loadfluctuations

    Technology has matured for medium-size units; is beingperfected for larger units based on the years of operatingexperience.

    Operational experience, commercial reference list, andtechnical developments illustrate that IR-CFBC is one ofthe best implementations of CFBC boiler technologytoday