LaBarge Field & Shute Creek Facility Skip Thomas, CO 2 /Helium Sales Manager June 24, 2009 The Wyoming Enhanced Oil Recovery Institute 3RD Annual Wyoming CO 2 Conference

Upload: lediep

Post on 18-Mar-2018

219 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: The Wyoming Enhanced Oil Recovery Institute thomas exxonmobil...3 LaBarge • History • 1981: Exxon drilled exploration wells • 1984: Shute Creek construction • 1986: First production

LaBarge Field & Shute Creek Facility

Skip Thomas, CO2/Helium Sales ManagerJune 24, 2009

The Wyoming Enhanced Oil Recovery Institute3RD Annual Wyoming CO2 Conference

Page 2: The Wyoming Enhanced Oil Recovery Institute thomas exxonmobil...3 LaBarge • History • 1981: Exxon drilled exploration wells • 1984: Shute Creek construction • 1986: First production

22

Agenda

• Gas Process Facilities

• Carbon Dioxide Sales Pipeline Infrastructure

• New Investments

• Shute Creek Compressor Expansion Project Status

Page 3: The Wyoming Enhanced Oil Recovery Institute thomas exxonmobil...3 LaBarge • History • 1981: Exxon drilled exploration wells • 1984: Shute Creek construction • 1986: First production

33

LaBarge

• History• 1981: Exxon drilled exploration

wells• 1984: Shute Creek

construction• 1986: First production

• Raw gas stream• Produced from the LaBarge

Madison reservoir• Average well produces 45

MMCFD• Gathered to the Black Canyon

Processing Facility• Transported 40 miles to the

Shute Creek Treating Facility

3030

Sweetwater County

Sublette County

Big Piney

LaBarge

Lincoln County

Kemmerer

Opal

Green River

Rock Springs

80

189

Shute Creek Facility

LaBargeField Marbleton

189

189

372

Black CanyonFacility

Page 4: The Wyoming Enhanced Oil Recovery Institute thomas exxonmobil...3 LaBarge • History • 1981: Exxon drilled exploration wells • 1984: Shute Creek construction • 1986: First production

44

Shute Creek Treating FacilityInlet Gas

• Capacity: 700 MMCFD

• Composition: 66% CO221% Methane 7% Nitrogen 5% Hydrogen Sulfide 0.6% Helium

AGI

• 2005 startup

• Re-injects naturally occurring hydrogen sulfide (35 MMCFD) and CO2 (25 MMCFD)

Co-Generation

• 2004 startup

• 108 MW

Helium Sales

• 4 MMCFD liquid & gaseous truck sales

Hydrogen Sulfide

Removal

Carbon Dioxide Removal

Inlet Gas

NitrogenRejection

Methane Sales (Pipeline)LNG Sales (Truck)

AGI

Helium Extraction

Carbon Dioxide Sales

CoGen Electricity Own Use/Sales

Helium Sales

Page 5: The Wyoming Enhanced Oil Recovery Institute thomas exxonmobil...3 LaBarge • History • 1981: Exxon drilled exploration wells • 1984: Shute Creek construction • 1986: First production

55

Shute Creek Sales Compressors

Page 6: The Wyoming Enhanced Oil Recovery Institute thomas exxonmobil...3 LaBarge • History • 1981: Exxon drilled exploration wells • 1984: Shute Creek construction • 1986: First production

66

Black Canyon and Shute Creek

Black Canyon

Shute CreekTreating Facility

Page 7: The Wyoming Enhanced Oil Recovery Institute thomas exxonmobil...3 LaBarge • History • 1981: Exxon drilled exploration wells • 1984: Shute Creek construction • 1986: First production

77

Shute Creek CO2 HandlingGlobal Industry Bests…

• World’s largest Selexol plant • World’s largest helium recovery plant• Longest and largest sour gas pipeline in the US

Page 8: The Wyoming Enhanced Oil Recovery Institute thomas exxonmobil...3 LaBarge • History • 1981: Exxon drilled exploration wells • 1984: Shute Creek construction • 1986: First production

88

Carbon Dioxide Sales

Colorado

Unita

Sweetwater

Lincoln

Sublette

Fremont

Carbon

Natrona

Converse Niobrara

Goshen

Platte

Albany

LaramieRock Springs

Rawlins

Laramie

Cheyenne

Bairoil

Casper

ShuteCreek

8080

2525

20”

24”

MM

MMMM

MM

MMMM

MM

MM

MM

CO2 Meters

28”LaBarge

MM

Wyoming

ExxonMobil CO2 Pipeline

ExxonMobil Custody Transfer Meter

Current Capacity: 230 MMCFDShute Creek to Rock Springs: 48 mile, 24 inch pipeline24/20 Interconnect to Bairoil: 112 mile, 20 inch pipelineDelivery Pressure: 1750 psiQuality: >95% CO2 by volumeRemotely operated meter stationsSupplying enhanced oil recovery and industrial users

Page 9: The Wyoming Enhanced Oil Recovery Institute thomas exxonmobil...3 LaBarge • History • 1981: Exxon drilled exploration wells • 1984: Shute Creek construction • 1986: First production

99

Investing for the Future…CFZTM Test Facility - $100 Million• CFZTM, or Controlled Freeze ZoneTM, technology could make carbon

capture and storage more affordable and significantly reduce Greenhouse Gas Emissions

• ExxonMobil is in the process of constructing a commercial demonstration plant at LaBarge

CO2 Sales Expansion - $72 Million• It is our goal to safely and efficiently extract additional CO2 for sales as

market conditions warrant• Project will increase sales capacity by nearly 50% and significantly reduce

overall emissions

Carbon Capture and Sequestration Project•

ExxonMobil partnering with the University of Wyoming in CCS project funded by the Department of Energy

Project in scoping phase with a $1.6 million grant from the DOE

Page 10: The Wyoming Enhanced Oil Recovery Institute thomas exxonmobil...3 LaBarge • History • 1981: Exxon drilled exploration wells • 1984: Shute Creek construction • 1986: First production

1010

Shute Creek CO2 Sales Gas Expansion ProjectProject Purpose• Install 23,000 hp of CO2 compression (capacity increase of 110 Mmcfd)• Fully utilize the capacity of the CO2 pipeline network departing the Shute Creek Facility

Multi-disciplinary Engineering Design Team• ExxonMobil Operations, Engineering, and Project Management team • Contract detail design engineering team

What the Team Accomplished• Project fully funded at $72 Million November 2007 ($55M committed as of June, 2009) • Detail design effort initiated November 2007 (95% complete)• Began receiving major equipment and materials in the field February 2008• Initiated field construction activities July 2008

Next StepsCompleted Phase 1 civil construction activities May 2009Begin remaining construction activities June 2009Completion erection of MP/HP and LP Pre-Engineered Metal Buildings (PEMB)Receive and set compressor units July-August 2009Start-up scheduled 2nd Quarter 2010

Page 11: The Wyoming Enhanced Oil Recovery Institute thomas exxonmobil...3 LaBarge • History • 1981: Exxon drilled exploration wells • 1984: Shute Creek construction • 1986: First production

1111

Shute Creek CO2 Sales Gas Expansion Schematic

#2 MP CO2 FLASH (2 trains)

#3 MP CO2 FLASH (2 trains)

LP5,000 HP

LP3,000 HP

MP/HP11,000 HP

MP/HP20,000 HP

MP VENT

LP VENT

LAB

AR

GE

(B 3

1.3)

DO

T 19

5

FOUR EXISTING MP/HP COMPS.

SINGLE EXISTING LP COMP.

SALES EXPANSION LP COMP.

SALES EXPANSION MP/HP COMP.

SHUTE CREEK TREATING FACILITY

60 #

2550 #200 #

TO SALES

SHUTE CREEK CO2 SALES

#2 MP CO2 FLASH (2 trains)

#3 MP CO2 FLASH (2 trains)

LP5,000 HP

LP3,000 HP

MP/HP11,000 HP

MP/HP20,000 HP

MP VENT

LP VENT

LAB

AR

GE

(B 3

1.3)

DO

T 19

5

FOUR EXISTING MP/HP COMPS.

SINGLE EXISTING LP COMP.

SALES EXPANSION LP COMP.

SALES EXPANSION MP/HP COMP.

SHUTE CREEK TREATING FACILITY

60 #

2550 #200 #

TO SALES#2 MP CO2

FLASH (2 trains)#2 MP CO2

FLASH (2 trains)

#3 MP CO2 FLASH (2 trains)

#3 MP CO2 FLASH (2 trains)

LP5,000 HP

LP3,000 HP

MP/HP11,000 HP

MP/HP20,000 HP

MP VENT

LP VENT

LAB

AR

GE

(B 3

1.3)

DO

T 19

5

FOUR EXISTING MP/HP COMPS.

SINGLE EXISTING LP COMP.

SALES EXPANSION LP COMP.

SALES EXPANSION MP/HP COMP.

SHUTE CREEK TREATING FACILITY

60 #

2550 #200 #

TO SALES

SHUTE CREEK CO2 SALES

Page 12: The Wyoming Enhanced Oil Recovery Institute thomas exxonmobil...3 LaBarge • History • 1981: Exxon drilled exploration wells • 1984: Shute Creek construction • 1986: First production

1212

Jim Muschalik – Manager Americas Gas Marketing

• 713-656-8303 [email protected]

Skip Thomas – Manager CO2 and Helium Business

• 713-656-8126 [email protected]

Betty Becker – Logistics

• 713-656-9338 [email protected]

Lindsey Gannaway – Sales

• 713-656-8698 [email protected]

Glen Lyons – Sales

• 713-656-7143 [email protected]

Carbon Dioxide Sales Organization

Page 13: The Wyoming Enhanced Oil Recovery Institute thomas exxonmobil...3 LaBarge • History • 1981: Exxon drilled exploration wells • 1984: Shute Creek construction • 1986: First production