the work is supported by the hungarian scientific research fund otka t 026178, t034910, t 043145
DESCRIPTION
Calibration of the position monitoring elements on the barrel muon chambers for the CMS experiment: First experience. The Barrel muon Alignment Collaboration:. Institute of Nuclear Research, ATOMKI, Debrecen, Hungary European Laboratory for Particle Physics CERN, Geneva, Switzerland - PowerPoint PPT PresentationTRANSCRIPT
9 April 2003, J Mocholí Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 1
Chamber Calibration Bench StatusBarrel MuonAlignment
Group
Calibration of the position monitoring elements on the Calibration of the position monitoring elements on the barrel muon chambers for the CMS experiment:barrel muon chambers for the CMS experiment:
First experienceFirst experience
The work is supported by The Hungarian Scientific Research Fund OTKA T 026178, T034910, T 043145
The Barrel muon Alignment Collaboration:
Institute of Nuclear Research, ATOMKI, Debrecen, Hungary
European Laboratory for Particle Physics CERN,
Geneva, Switzerland
Institute of Experimental Physics of Debrecen University,Debrecen, Hungary
Institute for High Energy Physics,
Vienna, Austria
9 April 2003, J Mocholí Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 2
Chamber Calibration Bench StatusBarrel MuonAlignment
Group
Activities carried out Activities carried out for the period of 24for the period of 24thth Jan to 4th Apr 2003 Jan to 4th Apr 2003
on the Benchon the Bench
ACTION PERFORMED DATE. TIMEBENCH CALIBRATION:
LTD, stability measurement, full bench photogrammetry
24th Jan (stability: Jan 23)
stability measurements January 27,29,31 February 04, 06 Mach 01, 20
Chamber ID:351030100500004 MB2
Photogrammetry
Camera measurement
April 01
April 02 10:32
Chamber ID:351020100900006 MB3 Photogrammetry
Camera measurementsApril 02
April 02. 18:06
Stability measurement April 03. 09:25
Chamber ID:351010100100010 MB1
Photogrammetry
Camera measurements
April 03
April 03. 12:21
Stability measurement April 04. 10:24
Chamber ID:351030100500004 MB2
Photogrammetry
Camera measurements
April 04
April 04. 13:05
The same MB2 chamber(for repeatibility test)
9 April 2003, J Mocholí Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 3
Chamber Calibration Bench StatusBarrel MuonAlignment
Group
LTD CalibrationLTD Calibration
Calibration platesequipped with optical fibers
9 April 2003, J Mocholí Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 4
Chamber Calibration Bench StatusBarrel MuonAlignment
Group
Chambers on the benchChambers on the bench
MB1
MB2
MB3
9 April 2003, J Mocholí Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 5
Chamber Calibration Bench StatusBarrel MuonAlignment
Group
Taking photogrammetry pictures (31 March – 4 April 2003)Taking photogrammetry pictures (31 March – 4 April 2003)
The corner blocks equipped with targets
The plate equippedwith targets
9 April 2003, J Mocholí Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 6
Chamber Calibration Bench StatusBarrel MuonAlignment
GroupStability measurementsStability measurements
1.Every camera on a plate is facing the LEDs on the opposite plate of the bench.2.Automatic measurement of the centroids of the images of the LEDs on the
opposite side by each camera. 3.The data is recorded in the database with date, time, temperature, amounting to
112 measurements altogether.
Measurement of the stability of the bench:
9 April 2003, J Mocholí Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 7
Chamber Calibration Bench StatusBarrel MuonAlignment
Group
Stability measurements: the bench is remarkably stable!Stability measurements: the bench is remarkably stable!DISPLACEMENTS OF A PLATE IN X
198.14
198.16
198.18
198.2
198.22
198.24
198.26
198.28
198.3
1 2 3 4 5 6 7 8 9 10
Measurements along a three months period
X a
vera
ged
( in
pixe
ls)
DISPLACEMENT OF A PLATE IN Y
133.375
133.425
133.475
133.525
133.575
1 2 3 4 5 6 7 8 9 10
Measurements along a three months period
Y a
vera
ged
(in p
ixel
s)
The Bench has shown a remarkable stability along the three month period.
>The displacements in X ~ 0.02 pixel
>The displacements in Y ~ 0.03 pixel
Within the resolution of the measurement
Line 0 plate 1 Line 0 plate 1
9 April 2003, J Mocholí Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 8
Chamber Calibration Bench StatusBarrel MuonAlignment
Group
ReflectionsReflections
One LED “ON” on the “6” side
All LEDs “ON” on the “6” side
One LED “ON” on the “4” side
All LEDs “ON” on the “4” side
The camera imageAfter processing:
The correct spot found
The problem is solved.
�
9 April 2003, J Mocholí Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 9
Chamber Calibration Bench StatusBarrel MuonAlignment
Group
Chamber measurement: summary of the first experienceChamber measurement: summary of the first experience
1. Time needed: crane + feet operation: ~2 hours, 4 people needed for the operation. Photogrammetry + camera measurement: 2 hours.
2. Repeatability of a fork installation (repositioning error): within the error of the camera measurement less than about 0.03 pixel.
3. Repeatability of a chamber calibration: the MB2 chamber has been measured twice, the data is still to be analyzed.
5. Several problems have been detected.
4. Repeatability of the positioning of the chamber is OK with the present feet idea (about 1 or 2 mm).
9 April 2003, J Mocholí Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 10
Chamber Calibration Bench StatusBarrel MuonAlignment
GroupProblems (I)Problems (I)
1. Feet: the principle is OK but a new design is needed to ease the operation (to be discussed). 2. Corner blocks: the hole diameter (nominally L=11 mm Ø8 H7) is often short and/or tight). A temporary solution was found by asking for shorter photogrammetry targets to be made. 3. Pins: In some chambers the pins where the forks are to be fixed are missing.
9 April 2003, J Mocholí Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 11
Chamber Calibration Bench StatusBarrel MuonAlignment
Group
Problems (II)Problems (II)
4. Labels:a) Sometimes not readable by the barcode reader.b) Double labels (A and B type) on the same chamber
5. Cabling: The available information is not enough to allow us to define the length of the cable.
9 April 2003, J Mocholí Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 12
Chamber Calibration Bench StatusBarrel MuonAlignment
Group
Status - summaryStatus - summary
1. The calibration measurement is done for 1 chamber (out of 250).
2. MB1, MB2 and MB3 chambers have been tested on the bench.
3. The bench is ready to make measurements (stability, camera and photogrammetry and store the data in the database).
4. The analysis program for the reconstruction of the geometry is being finished.