the timorese team

19
THE EAST TIMORESE ROWING TEAM Once upon a time there was an East Timorese rowing team Timor-Leste

Upload: watukarbau

Post on 18-Jul-2015

61 views

Category:

Business


0 download

TRANSCRIPT

Page 1: The Timorese Team

THE EAST TIMORESE

ROWING TEAM

Once upon a time there was an East Timorese rowing team

Timor-Leste

Page 2: The Timorese Team

East Timor (Timor-Leste) and Japan agreed to do an annual

rowing race. Each team should contain 8 men.

Page 3: The Timorese Team

After months of intensive training,

the maiden race was finally flagged off!

Page 4: The Timorese Team

FINISH

Result:

The Japanese won by 1 km!

Page 5: The Timorese Team

The Timorese team felt deeply humiliated by the result, but they

were determinated to win the race next year.

The manager (Diretor Geral) was furious and stablished a panel of

Timorese experts to analyze the situation and unearth the root

cause of the problem.

Page 6: The Timorese Team

After several weeks, some comparative

studies and travels to Japan (and per diem$),

the Timorese panel could find only one

difference: the Japanese had 7 rowers and

1 captain…

Page 7: The Timorese Team

… and the East Timorese team had 7

captains and 1 rower!

Page 8: The Timorese Team

Facing such scenario the management showed an unexpected

decision: they hired an Indonesian consulting company to

restructure the East Timorese team.

Page 9: The Timorese Team

After several months the consultants came up with the conclusion

that there were too many captains and too few rowers in the East

Timorese team. A solution was proposed based on this analysis:

the structure of the Timorese team has to be changed!

Dollar

Timor Timur

bagus!

Page 10: The Timorese Team

Based on the Indonesian consulting company and after some

travels to Indonesia (and per diem$), the manager decided to

follow the recommendations.

… other recommendation:

The team should travel to

Indonesia to learn how the

Indonesians do.

Page 11: The Timorese Team

Thenceforth the new set-up would be:

• 4 captains (brothers of the Diretor Geral),

• 2 directors of department (brothers in law of the Diretor Geral)

• 1 chief of section (cousin of the Diretor Geral)

• and 1 rower.

Page 12: The Timorese Team

Besides that, they suggested to improve

the rower’s working environment and to

give him higher competences

Page 13: The Timorese Team

FINISH

Next year the

Japanese team won

by 2 km!

Page 14: The Timorese Team

The East Timorese Team upper management immediatly fired the

rower, blaming him for the latest disastrous result.

Page 15: The Timorese Team

A bonus was paid to the captains, directors and chief for the

strong leadership and motivation they showed during

preparations phase and as incentive for them to find a better

rower for the next race.

Page 16: The Timorese Team

The Indonesian consulting company prepared a new

analysis of the restructuring activity, wich showed

that:• the strategy was good,

• the motivation was great,

• The restructuring was executed correctly,

• But the the tool used (which was not included in the original

data) was sub-standard and had to be improved.

Currently the East Timorese will buy a new

boat from a Indonesian company in a

partnership with a Timorese company (the veteran uncle of the manager is the owner)

xxxxxxx

xxxxxxx

xxxxxxx

xxx

Page 17: The Timorese Team

After purchase it was found that:

•The boat cost twice the market price,

•the boat was not new,

•had a hole.

$$ TERIMA KASIH TIMOR TIMUR $$

Page 18: The Timorese Team

To solve the problem, the manager is considering

contracting a uncle's company to repair the boat...

$$ TERIMA KASIH TIMOR TIMUR $$

Page 19: The Timorese Team