the sizewell c project · volume 4, chapter 4 noise and vibration, figures 4.1 – 4.7 . pond t r a...

9
May 2020 Planning Act 2008 Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 The Sizewell C Project 6.5 Revision: 1.0 Applicable Regulation: Regulation 5(2)(a) PINS Reference Number: EN010012 Volume 4 Southern Park and Ride Chapter 4 Noise and Vibration Figures 4.1 - 4.7

Upload: others

Post on 18-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The Sizewell C Project · VOLUME 4, CHAPTER 4 NOISE AND VIBRATION, FIGURES 4.1 – 4.7 . Pond T r a c k Wel Co tage Reservoir Fo rd D e f R H Lim e Tr e Barn T r a c k R i v e r O

May 2020

Planning Act 2008 Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009

The Sizewell C Project

6.5

Revision: 1.0

Applicable Regulation: Regulation 5(2)(a)

PINS Reference Number: EN010012

Volume 4 Southern Park and RideChapter 4 Noise and VibrationFigures 4.1 - 4.7

Page 2: The Sizewell C Project · VOLUME 4, CHAPTER 4 NOISE AND VIBRATION, FIGURES 4.1 – 4.7 . Pond T r a c k Wel Co tage Reservoir Fo rd D e f R H Lim e Tr e Barn T r a c k R i v e r O

SIZEWELL C PROJECT – ENVIRONMENTAL STATEMENT

NOT PROTECTIVELY MARKED

NOT PROTECTIVELY MARKED

Volume 4 Chapter 4 Noise and Vibration |

VOLUME 4, CHAPTER 4 NOISE AND VIBRATION, FIGURES 4.1 – 4.7

Page 3: The Sizewell C Project · VOLUME 4, CHAPTER 4 NOISE AND VIBRATION, FIGURES 4.1 – 4.7 . Pond T r a c k Wel Co tage Reservoir Fo rd D e f R H Lim e Tr e Barn T r a c k R i v e r O

Pond

Trac

k Well Cottage

Reservoir

Ford

Def

RH

Lime Tree Barn

Track

River Ore

FORD ROAD

Dra in

FB

ETL

Track

Ford Gatehouse

Dra in

MAIN ROAD

FB

Ppg S ta

FB

Ppg S ta

CRED

& W

ard

Bdy

191a191

183a

187

219

Pond

Rivers Edge

248

15

B 1078

Dra in

Dra in

Deben

224

217

246

5

ROAD

Sluice

12

203

238

209

Dra in

242

211

Drai

n

Dra in

197

Coal Yard

ASH

Dra in

207

Bridge

Trac

k

6

Mills

Dra in

Da m

Farm

14.7 m

Mill Stream

193

Bridge FarmCottages

11 .6m

Dra in

Dra in

11 .0m

Bridge

14

3

Gallows Hill

Wickham

Mill Leat

Reservoirs

FarmChurch

Path (um)

The Granary

31.0 m

B 11

16

Rookery Farm

Pond

Track

Trac k

GP

Pit

(disus ed)

Gallows Hi ll

Pit

Chris Covert

Track

Track

EASTON ROAD

(disus ed)

Coltford Grove

LodgeThe

Beryll's Wood

Path (u

m)

GP

Mike's Wood

MAIN ROAD

MAIN ROAD

1.22m

RH

De f

Co Cons t, ED & Ward Bdy

Und

1.22 m RH

Und

Def

De f

Und

1.22 m RH

Pond

ETL

Bric k K iln

32

Drain

Cotta ge s

Drai

n

33

1

(site of)

1

Dra in

ETL

17

B 1078

Lay-b

y

FIVEWAYS

17

21

B 1078

12.8 m

2

1

Shelter

Bottle & Glass Cottages

37

Ash View

Path (um)

Settlement

El Sub Sta

El Ps

Dra in

36

ASH ROAD

Dra in

18

20

2

B 1078

22

24

Cornerways

Pond

Limetree Farm

Long Acre

Dra in

Dra in

Holm View

B 1116

16

Lower Hacheston

10.7 m

Path (um)

Dra in

Hillside

2

25

ASH ROAD

18

FB

Trac

k

RH

Def

De f

Und

De f

RH

Def

Pond

Trac k

The Smithy

11 .6m

28

Trac

k

1

21.9 m

29

Farm

A 12

MS

Wonder Grove

Trac k

Dra in

Pond

Pond

Pond

Pond

Trac

k

29.0 m

Track

Whin Belt

B 1116

A 12

23.0 m B 1078

Track

Path (um)

Und

CR

Co Cons t, ED & Ward Bdy

De f

CR

Goat Cottage

Cottage

LB

Lime Tree Farm

1

The Hedges

Ivy House

Pond

House

Drain

Station

CottagesFB

Dra in

El Ps

11 .7m

El P

22.4 m

25.0 m

11 .2m

Trac k

Drai

n

22.9 m

Shell

Ivy House

2

Station

2

ETL

Dra in

Marlesford

10.5 m

Lime Cottage

FB

Path (um)

!(!(

!(

!(

AB

C

D

SIZEWELL CENVIRONMENTAL STATEMENTVOLUME 4CHAPTER 4NOISE AND VIBRATION

FIGURE 4.1

0 50 100 150 200 250M

DOCUMENT:

DRAWING TITLE:

DRAWING NO:

DATE: DRAWN: SCALE :JAN 2020 J.W.SCALE BAR

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

1:6,500 @A3

SOUTHERN PARK AND RIDEDEVELOPMENT SITE BOUNDARYSTUDY AREA

!( NOISE RECEPTOR LOCATION

KEY

NOTES

PLAN SHOWING LOCATIONS OF RECEPTORS

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

COPYRIGHTNOT PROTECTIVELY MARKED

Page 4: The Sizewell C Project · VOLUME 4, CHAPTER 4 NOISE AND VIBRATION, FIGURES 4.1 – 4.7 . Pond T r a c k Wel Co tage Reservoir Fo rd D e f R H Lim e Tr e Barn T r a c k R i v e r O

Pon d

Reservoir

Ford

Und

Def

RH

Boot House

Lime Tre e Barn

Pipp in Co ttage

3

Track

Oremea d

River Ore

Rose

East View Co ttages

Terrace

FORD ROAD

Drain

FB

FB

ETL

2

1

Holly

Track

Mea dow Cottages

Ford Gatehouse

Drain

FB

Ppg Sta

CRED

& W

ard B

dy

15

B 1078

Drain

Deben

Sluice

12

Drain

Trac

k

Dam

14.7m

Drain

Drain

14

Gallows Hill

Mill Leat

Reservoirs

Track

The Granary

29

Track

House

Ingle nook

31.0m

Reds ton

B 11

16

Rookery Farm

30

Pon d

Track

GP

Pit

Gallows H ill

Chris Covert

Track

Track

EAS TON ROAD

(d isused)

Coltford Grove

LodgeThe

Path (u

m)

GP

Mike's Wood

MAIN ROAD

MAIN ROAD

1.22m

RH

Def

Co Const, ED & Ward Bdy

Und

1.22m RH

Und

Def

Pon d

ETL

Brick Kiln32

Drain

33

(si te of)

1

ETL

17

B 1078

Lay-by

FIVEWAYS

B 1078

2

Shelter

Bottle & G lass Cotta ges

Ash Vi ew

Settlemen t

18

B 1078

Cornerway s

B 1116

18

FB

Trac

k

RH

Def

Def

Und

Def

RH

Def

Pon d

Track

The Smithy

11.6m

28

Trac

k

1

21.9m

29

Farm

A 12

MS

Wonder Grove

Track

Drain

Pon d

Pon d

Pon d

Pon d

Trac

k29.0m

Track

Whin Belt

B 1116

A 12

23.0m B 1078

Track

Path (um)

Und

Co Const, ED & Ward Bdy

Def

CR

Goa t Cottage

LOW ROAD

1

4

3

Lime Tre e Farm

The Hedges

Ivy House

Drain

FB

Drain

El Ps

11.7m

El P

22.4m

25.0m

11.2m

Track

Drain

22.9m

Ivy House

2

ETL

Drain

1

Walke rs Cottage

CottageThe Street

Quoit House

1

2

Marlesford

Holly tree House

3

Ford

10.5m

Lime Cotta ge

School Cotta ge

FB

Path (um)

Cottage

LB

PRS3

PRS2

PRS1

RT14

SIZEWELL CENVIRONMENTAL STATEMENTVOLUME 4CHAPTER 4NOISE AND VIBRATION

FIGURE 4.2

0 50 100 150 200 250M

DOCUMENT:

DRAWING TITLE:

DRAWING NO:

DATE: DRAWN: SCALE :JAN 2020 J.W.SCALE BAR

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

1:6,000 @A3

SOUTHERN PARK AND RIDEDEVELOPMENT SITE BOUNDARYNOISE MONITORING LOCATION

KEY

NOTES

NOISE MONITORING SURVEY LOCATIONS

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

COPYRIGHTNOT PROTECTIVELY MARKED

Page 5: The Sizewell C Project · VOLUME 4, CHAPTER 4 NOISE AND VIBRATION, FIGURES 4.1 – 4.7 . Pond T r a c k Wel Co tage Reservoir Fo rd D e f R H Lim e Tr e Barn T r a c k R i v e r O

Pond

Reservoir

Def

RH

Lime Tree Barn

Track

ETL

Track

Ford Gatehouse

15

B 107814.7m

14

B 11

16

Rookery Farm

Pond

GPGP

MAIN ROAD

MAIN ROAD

1.22m

RH

Def

Co Const, ED & Ward Bdy

1.22m RH

Und

Def

Pond

ETL

Drain

(site of)

1

ETL

17

B 1078

Lay-by

FIVEWAYS

B 1078

2

Shelter

Bottle & Glass Cottages

Ash View

Settlement

18

B 1078

B 1116

18

FB

Track

RH

Def

Def

Und

Def

RH

Def

Pond

Track

The Smithy

11.6m

28

Track

1

21.9m

29

Farm

A 12

MS

Wonder Grove

Track

Drain

Pond

Pond

Pond

Pond

Track

29.0m

Track

Whin Belt

B 1116

A 12

23.0m B 1078

Track

Und

Def

CR

Goat Cottage

Lime Tree Farm

The Hedges

Ivy House

FB

Drain

El Ps

11.7m

El P

22.4m

11.2m

Track

Drain

22.9m

Ivy House

2

ETL

Lime Cottage

FB

Path (um)

SIZEWELL CENVIRONMENTAL STATEMENTVOLUME 4CHAPTER 4NOISE AND VIBRATION

FIGURE 4.3

0 50 100 150 200 250M

DOCUMENT:

DRAWING TITLE:

DRAWING NO:

DATE: DRAWN: SCALE :JAN 2020 J.W.SCALE BAR

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

1:5,000 @A3

BUILDINGNOISE LEVEL LAeq(T) (dB)

<= 30> 30 TO <= 35> 35 TO <= 40> 40 TO <= 45> 45 TO <= 50> 50 TO <= 55> 55 TO <= 60> 60 TO <= 65> 65

KEY

NOTES

EXISTING DAYTIME ROAD TRAFFIC NOISE

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

COPYRIGHTNOT PROTECTIVELY MARKED

Page 6: The Sizewell C Project · VOLUME 4, CHAPTER 4 NOISE AND VIBRATION, FIGURES 4.1 – 4.7 . Pond T r a c k Wel Co tage Reservoir Fo rd D e f R H Lim e Tr e Barn T r a c k R i v e r O

Pond

Reservoir

Def

RH

Lime Tree Barn

Track

ETL

Track

Ford Gatehouse

15

B 107814.7m

14

B 11

16

Rookery Farm

Pond

GPGP

MAIN ROAD

MAIN ROAD

1.22m

RH

Def

Co Const, ED & Ward Bdy

1.22m RH

Und

Def

Pond

ETL

Drain

(site of)

1

ETL

17

B 1078

Lay-by

FIVEWAYS

B 1078

2

Shelter

Bottle & Glass Cottages

Ash View

Settlement

18

B 1078

B 1116

18

FB

Track

RH

Def

Def

Und

Def

RH

Def

Pond

Track

The Smithy

11.6m

28

Track

1

21.9m

29

Farm

A 12

MS

Wonder Grove

Track

Drain

Pond

Pond

Pond

Pond

Track

29.0m

Track

Whin Belt

B 1116

A 12

23.0m B 1078

Track

Und

Def

CR

Goat Cottage

Lime Tree Farm

The Hedges

Ivy House

FB

Drain

El Ps

11.7m

El P

22.4m

11.2m

Track

Drain

22.9m

Ivy House

2

ETL

Lime Cottage

FB

Path (um)

SIZEWELL CENVIRONMENTAL STATEMENTVOLUME 4CHAPTER 4NOISE AND VIBRATION

FIGURE 4.4

0 50 100 150 200 250M

DOCUMENT:

DRAWING TITLE:

DRAWING NO:

DATE: DRAWN: SCALE :JAN 2020 J.W.SCALE BAR

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

1:5,000 @A3

BUILDINGNOISE LEVEL LAeq(T) (dB)

<= 30> 30 TO <= 35> 35 TO <= 40> 40 TO <= 45> 45 TO <= 50> 50 TO <= 55> 55 TO <= 60> 60 TO <= 65> 65

KEY

NOTES

EXISTING NIGHT TIME ROAD TRAFFIC NOISE

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

COPYRIGHTNOT PROTECTIVELY MARKED

Page 7: The Sizewell C Project · VOLUME 4, CHAPTER 4 NOISE AND VIBRATION, FIGURES 4.1 – 4.7 . Pond T r a c k Wel Co tage Reservoir Fo rd D e f R H Lim e Tr e Barn T r a c k R i v e r O

Pond

Reservoir

Def

RH

Lime Tree Barn

Track

ETL

Track

Ford Gatehouse

15

B 107814.7m

14

B 11

16

Rookery Farm

Pond

GPGP

MAIN ROAD

MAIN ROAD

1.22m

RH

Def

Co Const, ED & Ward Bdy

1.22m RH

Und

Def

Pond

ETL

Drain

(site of)

1

ETL

17

B 1078

Lay-by

FIVEWAYS

B 1078

2

Shelter

Bottle & Glass Cottages

Ash View

Settlement

18

B 1078

B 1116

18

FB

Track

RH

Def

Def

Und

Def

RH

Def

Pond

Track

The Smithy

11.6m

28

Track

1

21.9m

29

Farm

A 12

MS

Wonder Grove

Track

Drain

Pond

Pond

Pond

Pond

Track

29.0m

Track

Whin Belt

B 1116

A 12

23.0m B 1078

Track

Und

Def

CR

Goat Cottage

Lime Tree Farm

The Hedges

Ivy House

FB

Drain

El Ps

11.7m

El P

22.4m

11.2m

Track

Drain

22.9m

Ivy House

2

ETL

Lime Cottage

FB

Path (um)

SIZEWELL CENVIRONMENTAL STATEMENTVOLUME 4CHAPTER 4NOISE AND VIBRATION

FIGURE 4.5

0 50 100 150 200 250M

DOCUMENT:

DRAWING TITLE:

DRAWING NO:

DATE: DRAWN: SCALE :JAN 2020 J.W.SCALE BAR

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

1:5,000 @A3

BUILDINGNOISE LEVEL LAeq(T) (dB)

<= 30> 30 TO <= 35> 35 TO <= 40> 40 TO <= 45> 45 TO <= 50> 50 TO <= 55> 55 TO <= 60> 60 TO <= 65> 65

KEY

NOTES

PREDICTED DAY TIME LAeq NOISE LEVELFROM SITE OPERATIONS

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

COPYRIGHTNOT PROTECTIVELY MARKED

Page 8: The Sizewell C Project · VOLUME 4, CHAPTER 4 NOISE AND VIBRATION, FIGURES 4.1 – 4.7 . Pond T r a c k Wel Co tage Reservoir Fo rd D e f R H Lim e Tr e Barn T r a c k R i v e r O

Pond

Reservoir

Def

RH

Lime Tree Barn

Track

ETL

Track

Ford Gatehouse

15

B 107814.7m

14

B 11

16

Rookery Farm

Pond

GPGP

MAIN ROAD

MAIN ROAD

1.22m

RH

Def

Co Const, ED & Ward Bdy

1.22m RH

Und

Def

Pond

ETL

Drain

(site of)

1

ETL

17

B 1078

Lay-by

FIVEWAYS

B 1078

2

Shelter

Bottle & Glass Cottages

Ash View

Settlement

18

B 1078

B 1116

18

FB

Track

RH

Def

Def

Und

Def

RH

Def

Pond

Track

The Smithy

11.6m

28

Track

1

21.9m

29

Farm

A 12

MS

Wonder Grove

Track

Drain

Pond

Pond

Pond

Pond

Track

29.0m

Track

Whin Belt

B 1116

A 12

23.0m B 1078

Track

Und

Def

CR

Goat Cottage

Lime Tree Farm

The Hedges

Ivy House

FB

Drain

El Ps

11.7m

El P

22.4m

11.2m

Track

Drain

22.9m

Ivy House

2

ETL

Lime Cottage

FB

Path (um)

SIZEWELL CENVIRONMENTAL STATEMENTVOLUME 4CHAPTER 4NOISE AND VIBRATION

FIGURE 4.6

0 50 100 150 200 250M

DOCUMENT:

DRAWING TITLE:

DRAWING NO:

DATE: DRAWN: SCALE :JAN 2020 J.W.SCALE BAR

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

1:5,000 @A3

BUILDINGNOISE LEVEL LAeq(T) (dB)

<= 30> 30 TO <= 35> 35 TO <= 40> 40 TO <= 45> 45 TO <= 50> 50 TO <= 55> 55 TO <= 60> 60 TO <= 65> 65

KEY

NOTES

PREDICTED NIGHT TIME LAeq NOISE LEVELFROM SITE OPERATIONS

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

COPYRIGHTNOT PROTECTIVELY MARKED

Page 9: The Sizewell C Project · VOLUME 4, CHAPTER 4 NOISE AND VIBRATION, FIGURES 4.1 – 4.7 . Pond T r a c k Wel Co tage Reservoir Fo rd D e f R H Lim e Tr e Barn T r a c k R i v e r O

Pond

Reservoir

Def

RH

Lime Tree Barn

Track

ETL

Track

Ford Gatehouse

15

B 107814.7m

14

B 11

16

Rookery Farm

Pond

GPGP

MAIN ROAD

MAIN ROAD

1.22m

RH

Def

Co Const, ED & Ward Bdy

1.22m RH

Und

Def

Pond

ETL

Drain

(site of)

1

ETL

17

B 1078

Lay-by

FIVEWAYS

B 1078

2

Shelter

Bottle & Glass Cottages

Ash View

Settlement

18

B 1078

B 1116

18

FB

Track

RH

Def

Def

Und

Def

RH

Def

Pond

Track

The Smithy

11.6m

28

Track

1

21.9m

29

Farm

A 12

MS

Wonder Grove

Track

Drain

Pond

Pond

Pond

Pond

Track

29.0m

Track

Whin Belt

B 1116

A 12

23.0m B 1078

Track

Und

Def

CR

Goat Cottage

Lime Tree Farm

The Hedges

Ivy House

FB

Drain

El Ps

11.7m

El P

22.4m

11.2m

Track

Drain

22.9m

Ivy House

2

ETL

Lime Cottage

FB

Path (um)

SIZEWELL CENVIRONMENTAL STATEMENTVOLUME 4CHAPTER 4NOISE AND VIBRATION

FIGURE 4.7

0 50 100 150 200 250M

DOCUMENT:

DRAWING TITLE:

DRAWING NO:

DATE: DRAWN: SCALE :JAN 2020 J.W.SCALE BAR

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

1:5,000 @A3

BUILDINGLAmax (dB)

<= 40> 40 TO <= 45> 45 TO <= 50> 50 TO <= 55> 55 TO <= 60> 60 TO <= 65> 65 TO <= 70> 70

KEY

NOTES

PREDICTED NIGHT TIME LAmax NOISE LEVELFROM SITE OPERATIONS

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

COPYRIGHTNOT PROTECTIVELY MARKED