The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw. Introduction. Consultation Document, not a Plan Runs to 30 September 2010 Questionnaires to complete and return 33 key questions [email protected] 0131 244 1539 - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw

The Scottish Ferries Review

Consultation Document 2010

Arran - 12 July 2010

Graham Laidlaw

Page 2: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw

Introduction

• Consultation Document, not a Plan• Runs to 30 September 2010• Questionnaires to complete and return• 33 key questions• [email protected]• 0131 244 1539• Documents available on our website

Page 3: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw

Commitment to Ferries

• Essential part of our transport network• Essential for access to vital services• Enable movement of freight• Encourage sustainable and growing

communities• Must provide a safe, sustainable system• Quality employment

Page 4: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw

Summary of the Review:

• Inform a long term Ferries Strategy – to 2022• Influence next round of tendering for services• Investment programme for vessels and ports

and harbours• All publicly funded ferries included – Scottish

Government and local authority funded• No potential routes excluded• Needs of passengers, cars, commercial vehicles

and freight all to be considered

Page 5: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw

Lack of consistency

• Funding services• Funding vessels• Funding harbour infrastructure• Responsibility for delivery• What routes and what level of service• Tendered services• Provision of vessels

Page 6: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw

What we’ve done so far

• Been helped in forming opinions by project groups

• Consultants and CMAL carried out specific pieces of work to inform us

• Public consultation events last year

• Extensive data collection

Page 7: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw

Challenges

• Less money available to invest in and support ferries

• Ageing fleet and need for investment

• Ageing harbour infrastructure and need for investment

• Escalating fuel and crew costs

• Subsidy levels increasing

Page 8: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw

Funding and Procurement• To 2022 need £604m for vessels• To 2022 need £180m for ports and

harbours replacement• To 2022 need £7.5m p.a. annually for

ports and harbours maintenance• The services also need to be funded -

2007/8 cost for all c. £103m, 2008/9 for DML c.£90m

• We are asking you to consider options

Page 9: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw

Funding Options

• The status quo

• CMAL to access funds through alternative structural or financing routes

• Ports and harbours could be self-funding

• Users of the service to pay more

• Open the market up to greater competition

Page 10: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw

Fares Options• Increase all fares• Increase visitor fares• Reduce fares for island/peninsula

residents• Reduce fares for commercial vehicles• RET or other distance based• To manage demand• Mixed approach

Page 11: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw

Fares Questions• Asking you to consider what the rationale

for/purpose of the fares policy should be.

• Should fares differentiate between islanders/residents of peninsular communities and other ferry users?

• One fares policy across Scotland or different policies dependant on needs of communities?

Page 12: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw

What services should be funded?

• We have developed a methodology – based on Summer timetables - for determining what routes and services are needed

• We will now do the same for Winter timetable

Page 13: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw

Other Issues?

• Accessibility

• Environment

Page 14: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw

Current Issues for Arran

• Reliability issues at Ardrossan harbour – during bad weather

• Last sailing to Arran too early in the evening

• Summer capacity and second vessel

Page 15: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw

Arran –Household survey results

• Overall people in Arran who use the ferry most are either quite or highly satisfied with their current services – 74% (Average all network – 73% satisfaction)

Page 16: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw

Routes and Services Methodology

1. Define current and future needs relevant to other communities

2. Define the ferry service required to meet those needs

3. Define current service and current issues4. Define gaps between steps 2 and 35. Consider options to address gaps6. Prioritise future spending

Page 17: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw

Step 1 - Define current needs

• Commuting

• Personal

• Supply chain

• Export/import

• Tourism

Page 18: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw

Results of step 1 – Arran

• Supply Chain and Export/Import are equally important

• Followed by Personal and Tourism then Commuting

Page 19: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw

Defining a service to meet these needs

• Chosen four attributes that largely define a ferry service:1.Crossing time;2.number of sailings per day;3. length of operating day; and, 4. the number of days per week the service runs

• Taken dependencies identified in step 1 andmatched them against these four attributes

Page 20: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw

Results of steps 2 and 3 – Arran

Attribute Proposed Actual

• Crossingtime medium short

(75-180 mins) (less than 75-mins)

• Sailingper day medium medium

(3-6) (3-6)

Page 21: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw

Results of steps 2 and 3

Attribute Proposed Actual

• Oper/day high high(full oper/day) (full oper day)

• Day/wk high high(full week) (full week)

Page 22: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw

Results of Step 4 – initial analysis for Arran

• A longer crossing time• And no change to:

sailings per day;operating day;days per week.

• However sense checking and Steps 5 and 6 yet to be applied

Page 23: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw

Steps 5 and 6• Identify options to address proposed

changes at Step 4

• STAG based appraisal

• Objectives to take account of current issues

• Prioritise future spend across the Scottish ferries network

Page 24: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw

What’s the way forward?• Majority of services will continue to receive

public funding• Responsibility for delivery will continue to be split

between SG and LAs• Must explore ways of bringing additional money

into the system for delivery of ferry services• Need an open and transparent way to determine

what routes and services and level of service should be funded

Page 25: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw

What happens next?

• Public consultation to 30 September 2010• 43 events within this period• Draft Ferries Plan with more detailed Strategic

Environmental Assessment and an Equalities Impact Assessment

• Further minimum 6 week consultation period• Final Ferries Plan