the right time for the right tool

53

Upload: aveva-group-plc

Post on 22-Mar-2017

75 views

Category:

Software


0 download

TRANSCRIPT

Page 1: The Right Time for the Right Tool
Page 2: The Right Time for the Right Tool
Page 3: The Right Time for the Right Tool
Page 4: The Right Time for the Right Tool

Page 5: The Right Time for the Right Tool
Page 6: The Right Time for the Right Tool

Substation& T-Line

Switchyard& T-Line

Page 7: The Right Time for the Right Tool

Page 8: The Right Time for the Right Tool

“Hurdles to Transformation”

3D IS PART OF OUR DNA

Page 9: The Right Time for the Right Tool
Page 10: The Right Time for the Right Tool
Page 11: The Right Time for the Right Tool

How can this be done better?

Why do I need to change what’s

working?

Page 12: The Right Time for the Right Tool
Page 13: The Right Time for the Right Tool

Document Centric - Dying Progress

2D Works WellWhy Should

I Change?

This is “The Way” we

have always done it!

Page 14: The Right Time for the Right Tool
Page 15: The Right Time for the Right Tool

Page 16: The Right Time for the Right Tool

“Content… Content… Content”

3D IS PART OF OUR DNA

Page 17: The Right Time for the Right Tool

•1000’s of Transformers

•Manufactures per Styles per Voltage Class per Configurations (Mostly Custom)

•500+ Breakers

•Manufactures per Styles per Voltage Class per Current Rating per Type (Oil/Gas) per Current Production

•1000’s of Circuit Switches, Disconnect Switches, CCVTs, Surge Arresters

•Manufactures per Styles, Voltage Class and Configurations

•10,000’s (Endless) of Support Structures

•Manufactures per types available, and Most has to be Customized on a per Item Basis

•10,000’s of Fittings

•Strung Bus/Ridged Bus/Wire & Cable Fittings per Manufactures per Styles per Types by Application

10,000’s + 10,000’s + 1000’s + 500 + 1000’s = 22,500 min.

Average Part 30 minutes = (5.4 Man Years)…Now that is a lot!!!

Dea

th Z

on

e

You are Here

Time?

Page 18: The Right Time for the Right Tool

•Tranformers

•0 per project

•BREAKER, 230KV, 3000A, GAS, 40KA, DEAD TANK

•1 per project, used in 3 places with 1 future

• 1 SWITCH, 230KV, 3000 A, CTR SIDE BRK, 3PST used 5 places

• 1 SWITCH, 230KV, 3000A, CTR SIDE BRK W/GRD, 3PST, 900BIL used 3 places

• 1 ARRESTER, 192KV/152MCOV used 9 places, 1 CVT, 230/245KV, 1200/2000:1 12 places, 1 TRANSMISSION STATION SERVICE,

• Steel

• 4-STRUCTURE, DE, 60‘, 7' 11-3/4", 230KV, 1 PHASE, 10" SQUARE TUBE STEEL, 9-RITZ/TRENCH 230KV 2000A, CVT SUPPORT, 1-STRUCTURE, SSVT, 230kV, 16-STRUCTURE, BUS SUP, 13' 5-1/2", 230KV, 6-STRUCTURE, BUS SUP, 22' 11-1/2", 230KV, 12-STRUCTURE, SW SUP, 12' 0-7/16, 12-STRUCTURE, SW SUP, 12' 0-7/16

• Components can vary per project

• 39 Bus Fittings/Jumper Fittings used multiple places

• Built on a per conductor size basis

• Components can be used in multiple voltage classes

Dea

th Z

on

e

You are Here 85 Unique Parts

Average Part 90 minutes = (127.5 Man Hours)…Now that is a lot more Manageable!!!

1.14%

Page 19: The Right Time for the Right Tool

Dea

th Z

on

e

You are Here

No Problem!

Quality, Efficiencies and Confidence compounds!!!

•1000’s of Transformers

•Manufactures per Styles per Voltage Class per Configurations (Mostly Custom)

•500+ Breakers

•Manufactures per Styles per Voltage Class per Current Rating per Type (Oil/Gas) per Current Production

•1000’s of Circuit Switches, Disconnect Switches, CCVTs, Surge Arresters

•Manufactures per Styles, Voltage Class and Configurations

•10,000’s (Endless) of Support Structures

•Manufactures per types available, and Most has to be Customized on a per Item Basis

•10,000’s of Fittings

•Strung Bus/Ridged Bus/Wire & Cable Fittings per Manufactures per Styles per Types by Application

Page 20: The Right Time for the Right Tool

“Transformation Through Integration”

3D IS PART OF OUR DNA

Page 21: The Right Time for the Right Tool
Page 22: The Right Time for the Right Tool
Page 23: The Right Time for the Right Tool
Page 24: The Right Time for the Right Tool

230 kV Switch Yard

Page 25: The Right Time for the Right Tool
Page 26: The Right Time for the Right Tool

230 kV Switch Yard

Page 27: The Right Time for the Right Tool

230 kV Switch Yard

Page 28: The Right Time for the Right Tool
Page 29: The Right Time for the Right Tool
Page 30: The Right Time for the Right Tool

230 kV Switch Yard

Page 31: The Right Time for the Right Tool
Page 32: The Right Time for the Right Tool
Page 33: The Right Time for the Right Tool
Page 34: The Right Time for the Right Tool
Page 35: The Right Time for the Right Tool
Page 36: The Right Time for the Right Tool
Page 37: The Right Time for the Right Tool
Page 38: The Right Time for the Right Tool
Page 39: The Right Time for the Right Tool
Page 40: The Right Time for the Right Tool
Page 41: The Right Time for the Right Tool

Page 42: The Right Time for the Right Tool

“Transformation From Document Centric to Asset Centric

P&C”

3D IS PART OF OUR DNA

Page 43: The Right Time for the Right Tool
Page 44: The Right Time for the Right Tool
Page 45: The Right Time for the Right Tool
Page 46: The Right Time for the Right Tool
Page 47: The Right Time for the Right Tool
Page 48: The Right Time for the Right Tool
Page 49: The Right Time for the Right Tool
Page 50: The Right Time for the Right Tool

• Few people have the opportunity to influence an industry

• Being part of NAUM can maximize our impact to the power industry

• Thank you for allowing Ampirical to be a part of NAUM

Page 53: The Right Time for the Right Tool

Thank you!