the reverse osmosis seawater desalination container concept present
TRANSCRIPT
The Reverse Osmosis Seawater Desalination
“CONTAINER CONCEPT”
present
Containerized
The Energy Efficient – Low Maintenance
Reverse Osmosis Seawater Desalination Plants
Containerized SWRO
The Containerized Solution
- takes the expenses and mystery out of seawater
RO Desalination and brings it DOWN-TO-EARTH
- by making pre-designed module sized plants,
fully assembled in standard 20-ft and 40-ft containers
and install them right where the potable water is needed.
THE “CONTAINER CONCEPT”
“No” need for expensive buildings
“No” time consuming and costly civil works
“No” advanced calculations and projecting procedures
- but reduced costs
-due to an extremely short installation, commissioning and training schedule of only 1 week – compared to a 3-4 month installation
time for a conventional “NON” containerized plant.
THIS MEANS:
– inside the container, fully tested before shipping, ready to produce
high-quality potable water within days of delivery.
All what the clients need to do is to arrange for the Seawater supply
and the Electricity, and a foundation for the container
It’s all there:
The Container Concept includes:
for clean seawater from beach well for seawater requiring pre filtration
250m³/day – One (1) 20-ft container
300m³/day – One (1) 20-ft container
500m³/day – One (1) 40-ft container
1000m³/day – One (1) 40-ft container
250m³/day – One (1) 40-ft container
300m³/day – One (1) 40-ft container
500m³/day – Two (2) 40-ft containers
1000m³/day – Two (2) 40-ft containers
- and as the example on the following page
A 300 m³/day plant like this!
Installed in a 20-ft container
Produce all the potable water requirements for this resort
Installation Procedure:
The following is a presentation of the installation of a
HOH Standard Containerized SWRO Desalination Plant,
with a capacity of 300m³/day, producing potable water
with a TDS of less than 500 ppm, as recommended by
the WHO (World Health Organization).
The feed water source is clean seawater from
a seawater well with a TDS of 36,000 ppm.
The Playa Roca Resort, Lanzarote, Canary Islands, Spain where the installation took place - Aug.11, 2003
Installation site prepared by local contractor with power supply and connection pipes to feed water well, product water
reservoir and brine disposal injection well.
The 300 m³/day plant fully assembled in 20-ft container arrives at Resort at 8:00 AM
A local crane contractor prepare to remove the containerized plant from the truck - 8:15 AM
Crane contractor moving the containerized plant from the truck towards it's permanent location – 9:00AM
Plant at installation site – 9:15 AM
- and lowered into position – 9:25 AM
Containerized plant at permanent location - 9:50 AM
- ready for the HOH technician to commission and to perform training of the local operator and maintenance technicians
Close-up view of the plant with a capacity of 300 m³/day producing high quality potable water at $0.70/m³
Inside view of 250 m³/day containerized plant installed at another Island Resort
Inside view of 300 m³/day containerized plant installed at International Hotel & Beach Resort, Spain
Thank you for viewing this presentation of the
HOH Container Concept
- and our Containerized SWRO Plants
For additional information, please visit our website
www.HOHUSA.net
Phone: 706 694 8869 – Facsimile: 706 694 4124 - Email: [email protected]
Gunnar A. Axelsen,Gunnar A. Axelsen,President
Contact: