Transportation Impact Study The Residences at 130 Cambridgepark Drive Cambridge, Massachusetts Technical Appendix /Vanasse Hangen Brustlin, Inc. February 15, 2013

Upload: buinhan

Post on 19-May-2018

219 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Transportation Impact Study

The Residences at 130 Cambridgepark Drive

Cambridge, Massachusetts

Technical Appendix

/Vanasse Hangen Brustlin, Inc.

February 15, 2013

Page 2: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

This Page Left Blank Intentionally

Page 3: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

130 Cambridgepark Drive Transportation Impact Study

Technical Appendix

Scoping Letter Traffic Counts

Automatic Traffic Recorder Counts Turning Movement Counts

Synchro Results Existing Conditions

Build Conditions Future Conditions

Crash Data Reports

Page 4: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

This Page Left Blank Intentionally

Page 5: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Scoping Letter

Page 6: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

This Page Left Blank Intentionally

Page 7: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

 

  

 

January 25, 2013  Ms. Susan Clippinger, Director City of Cambridge, Traffic, Parking and Transportation Department 344 Broadway  Cambridge, MA 02139  Re: Proposed Residential Development, 130 Cambridgepark Drive, Cambridge, MA Request for Transportation Impact Study (TIS) Scoping Determination   Dear Ms.  Clippinger,  

BRE/CPD, LLC, an Equity Office affiliate, and The McKinnon Company (the current site owner and developer, respectively) have retained VHB to prepare a Transportation Impact Study (TIS) for a proposed residential development on Cambridgepark Drive in Cambridge, MA.

The proposed project comprises a multi-family residential development with 200 units in a single building, supported by approximately 200 vehicle parking spaces and parking for 200 bicycles (the “Project”). The Project site is located on the south side of the 125 and 150 Cambridgepark Drive parcels. VHB proposes the following Scope for the TIS for your consideration:

The TIS will comply with the Cambridge, Traffic, Parking and Transportation Department’s TIS Guidelines.

AM and PM peak hour traffic, pedestrian and bicycle turning movements counts (TMCs) have been collected on December 6, 2012 at the following proposed study area intersections:

1. Alewife Brook Parkway at Route 2/16

2. Alewife Brook Parkway at Cambridgepark Drive

3. Alewife Brook Parkway at Rindge Avenue

4. Cambridgepark Drive at Alewife Station Access Road

5. Alewife Station Access Road and the Route 2 westbound access ramp

In addition, 48-hour automatic traffic recorder (ATR) counts in 15-minute and 1-hour increments have been performed at the following locations:

A. Cambridgepark Drive, west of Alewife Station Access Road

B. Alewife Brook Parkway, north of Cambridgepark Drive

Page 8: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

 

      

The Existing (2013) conditions analysis will be based on the un-adjusted December 2012 counts.

The ITE Land Use Code 220 (Apartments) average rate will be used for the trip generation analysis.

The national Average Vehicle Occupancy (AVO) of 1.08 will be used to convert ITE vehicle trips to person trips and a local AVO of 1.10 will be used to convert the adjusted person trips to vehicle trips for the trip generation analysis.

The mode split assumptions will be based on 2000 US Census Data for Census Tract 3549 provided by the City of Cambridge website, as shown below:

2000 Census Data

(City of Cambridge Website)

Mode Percentage Drive Alone 42.8% Transit 36.8% Rideshare 8.3% Bike 3.4% Walk 7.1% Other 0.0%

Work at Home 1.6%

The Project Generated trips associated with the Project will be assigned to the study area network based on 2000 Journey to Work Census Data for Tract 3549, as incorporated in the analysis for the Certified TIS for the 160 Cambridgepark Drive project.

The 2018 Future traffic analysis will include a general background growth rate of 0.5% per year over a five year horizon and specific projects planned or under construction in the area, as follows:

1. Residences at Route 2 2. 70 Fawcett Street 3. 160 Cambridgepark Drive 4. Concord/Wheeler Mixed Use Project 5. 70 Fawcett Street 6. 165 Cambridgepark Drive 7. Tyler Green

A parking analysis will be performed to identify existing parking on the Project site, replacement of existing parking spaces eliminated by the Project, and parking supply to support the new residential use. The analysis will explore the opportunity for shared parking between the new residential use and the use of existing parking by nearby office buildings.

The TIS will include crash data for the three most recent years available at the study area intersections.

Page 9: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

 

      

We will be pleased to provide additional information or answer any questions you might have, and we look forward to receiving your confirmation of the scope for the TIS analysis.

 Thank you for your assistance.  Very truly yours,  VANASSE HANGEN BRUSTLIN, INC.  

  R. David Black, Senior Project Manager   Cc:  John Conley,  Equity Office   Paul Filtzer,  Equity Office   Rich McKinnon,   The McKinnon Company   Kevin Renna,  Goulston & Storrs 

Page 10: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route
Page 11: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Traffic Counts

Page 12: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

This Page Left Blank Intentionally

Page 13: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Automatic Traffic Recorder Counts

Page 14: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

This Page Left Blank Intentionally

Page 15: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Page 1 Location : Alewife Brook ParkwayLocation : North of Cambridge Park DriveCity/State: Cambridge, MA

Accurate Counts978-664-2565

Start 05-Dec-12 NB Hour Totals SB Hour Totals Combined TotalsTime Wed Morning Afternoon Morning Afternoon Morning Afternoon Morning Afternoon Morning Afternoon

12:00 * 309 * 35612:15 * 324 * 32512:30 * 328 * 33712:45 * 319 0 1280 * 303 0 1321 0 260101:00 * 307 * 30201:15 * 344 * 29701:30 * 335 * 29101:45 * 349 0 1335 * 270 0 1160 0 249502:00 * 430 * 28202:15 * 395 * 30202:30 * 429 * 27602:45 * 436 0 1690 * 298 0 1158 0 284803:00 * 502 * 29803:15 * 490 * 28203:30 * 502 * 32903:45 * 453 0 1947 * 288 0 1197 0 314404:00 * 492 * 29604:15 * 475 * 28304:30 * 479 * 32604:45 * 464 0 1910 * 277 0 1182 0 309205:00 36 450 80 26205:15 34 467 129 25705:30 51 482 219 34305:45 60 472 181 1871 276 225 704 1087 885 295806:00 87 452 364 25806:15 102 475 460 23706:30 182 468 461 26406:45 247 457 618 1852 329 258 1614 1017 2232 286907:00 315 314 365 30707:15 317 297 326 28307:30 357 306 337 21707:45 328 281 1317 1198 295 197 1323 1004 2640 220208:00 344 315 349 19708:15 318 312 336 22708:30 355 285 320 16708:45 265 298 1282 1210 302 152 1307 743 2589 195309:00 303 268 395 15109:15 270 258 354 14709:30 297 257 380 12109:45 271 242 1141 1025 325 117 1454 536 2595 156110:00 259 253 371 11510:15 255 194 388 10410:30 261 215 362 11310:45 247 178 1022 840 346 98 1467 430 2489 127011:00 268 177 312 6411:15 292 133 318 5011:30 278 120 357 3911:45 299 105 1137 535 315 34 1302 187 2439 722Total 6698 16693 9171 11022 15869 27715

Percent 28.6% 71.4% 45.4% 54.6% 36.4% 63.6%

Page 16: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Page 2 Location : Alewife Brook ParkwayLocation : North of Cambridge Park DriveCity/State: Cambridge, MA

Accurate Counts978-664-2565

Start 06-Dec-12 NB Hour Totals SB Hour Totals Combined TotalsTime Thu Morning Afternoon Morning Afternoon Morning Afternoon Morning Afternoon Morning Afternoon

12:00 104 321 28 28512:15 67 328 28 32012:30 49 316 20 31912:45 40 344 260 1309 9 295 85 1219 345 252801:00 39 320 12 28501:15 28 358 20 29101:30 23 349 12 29401:45 23 349 113 1376 6 298 50 1168 163 254402:00 4 359 14 30302:15 13 395 10 26702:30 12 436 11 31002:45 8 453 37 1643 12 314 47 1194 84 283703:00 18 458 8 31303:15 11 439 17 31303:30 12 499 11 29703:45 15 457 56 1853 20 292 56 1215 112 306804:00 16 475 18 32904:15 17 471 21 31704:30 15 477 47 35204:45 22 473 70 1896 56 299 142 1297 212 319305:00 28 495 77 31305:15 34 491 152 32805:30 46 485 202 36605:45 74 467 182 1938 302 280 733 1287 915 322506:00 106 448 352 30406:15 113 439 459 34706:30 200 442 438 28806:45 233 384 652 1713 369 324 1618 1263 2270 297607:00 289 337 408 31207:15 322 325 273 28007:30 344 323 311 25307:45 321 297 1276 1282 260 203 1252 1048 2528 233008:00 345 326 304 18808:15 314 302 214 18508:30 352 319 292 18008:45 303 318 1314 1265 318 164 1128 717 2442 198209:00 289 298 324 16909:15 279 338 309 17409:30 265 306 357 15109:45 266 244 1099 1186 333 144 1323 638 2422 182410:00 242 240 391 12410:15 249 220 373 11610:30 290 216 344 10110:45 303 190 1084 866 361 91 1469 432 2553 129811:00 267 138 320 7211:15 298 161 315 6311:30 320 128 327 6611:45 312 143 1197 570 311 32 1273 233 2470 803Total 7340 16897 9176 11711 16516 28608

Percent 30.3% 69.7% 43.9% 56.1% 36.6% 63.4%

Page 17: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Page 3 Location : Alewife Brook ParkwayLocation : North of Cambridge Park DriveCity/State: Cambridge, MA

Accurate Counts978-664-2565

Start 07-Dec-12 NB Hour Totals SB Hour Totals Combined TotalsTime Fri Morning Afternoon Morning Afternoon Morning Afternoon Morning Afternoon Morning Afternoon

12:00 127 * 37 *12:15 114 * 24 *12:30 68 * 26 *12:45 54 * 363 0 19 * 106 0 469 001:00 39 * 22 *01:15 38 * 19 *01:30 37 * 15 *01:45 19 * 133 0 20 * 76 0 209 002:00 29 * 12 *02:15 27 * 11 *02:30 16 * 19 *02:45 20 * 92 0 15 * 57 0 149 003:00 14 * 11 *03:15 18 * 13 *03:30 17 * 22 *03:45 19 * 68 0 33 * 79 0 147 004:00 15 * 14 *04:15 9 * 25 *04:30 12 * 40 *04:45 19 * 55 0 58 * 137 0 192 005:00 * * * * * * * * * *05:15 * * * * * * * * * *05:30 * * * * * * * * * *05:45 * * * * * * * * * *06:00 * * * * * * * * * *06:15 * * * * * * * * * *06:30 * * * * * * * * * *06:45 * * * * * * * * * *07:00 * * * * * * * * * *07:15 * * * * * * * * * *07:30 * * * * * * * * * *07:45 * * * * * * * * * *08:00 * * * * * * * * * *08:15 * * * * * * * * * *08:30 * * * * * * * * * *08:45 * * * * * * * * * *09:00 * * * * * * * * * *09:15 * * * * * * * * * *09:30 * * * * * * * * * *09:45 * * * * * * * * * *10:00 * * * * * * * * * *10:15 * * * * * * * * * *10:30 * * * * * * * * * *10:45 * * * * * * * * * *11:00 * * * * * * * * * *11:15 * * * * * * * * * *11:30 * * * * * * * * * *11:45 * * * * * * * * * *Total 711 0 455 0 1166 0

Percent 100.0% 0.0% 100.0% 0.0% 100.0% 0.0%GrandTotal

14749 33590 18802 22733 33551 56323

Percent 30.5% 69.5% 45.3% 54.7% 37.3% 62.7%

ADT ADT 44,938 AADT 44,938

Page 18: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Pag

e 1

Loc

atio

n :

Ale

wif

e B

rook

Par

kway

Loc

atio

n :

Nor

th o

f C

ambr

idge

Par

k D

rive

Cit

y/S

tate

: C

ambr

idge

, MA

Accu

rate

Co

un

ts978-6

64-2

565

S

tart

03

-De

c-1

2T

ue

We

dT

hu

Fri

Sa

tS

un

We

ek A

ve

rag

eT

ime

NB

SB

NB

SB

NB

SB

NB

SB

NB

SB

NB

SB

NB

SB

NB

SB

12

:00

AM

**

**

**

26

08

5363

10

6*

**

*3

12

96

01

:00

**

**

**

11

35

01

33

76

**

**

12

36

30

2:0

0*

**

**

*3

74

79

25

7*

**

*6

45

20

3:0

0*

**

**

*5

65

66

87

9*

**

*6

26

80

4:0

0*

**

**

*7

01

42

55

137

**

**

62

14

00

5:0

0*

**

*1

81

70

41

82

73

3*

**

**

*1

82

71

80

6:0

0*

**

*6

18

1614

65

21618

**

**

**

63

51616

07

:00

**

**

1317

13

23

12

76

12

52

**

**

**

12

96

12

88

08

:00

**

**

12

82

13

07

1314

11

28

**

**

**

1298

12

18

09

:00

**

**

11

41

14

54

10

99

13

23

**

**

**

11

20

13

88

10

:00

**

**

10

22

14

67

10

84

14

69

**

**

**

10

53

14

68

11

:00

**

**

11

37

13

02

11

97

12

73

**

**

**

11

67

12

88

12

:00

PM

**

**

12

80

1321

13

09

12

19

**

**

**

12

94

1270

01

:00

**

**

13

35

11

60

13

76

11

68

**

**

**

13

56

11

64

02

:00

**

**

16

90

11

58

16

43

11

94

**

**

**

16

66

11

76

03

:00

**

**

1947

11

97

18

53

12

15

**

**

**

19

00

12

06

04

:00

**

**

19

10

11

82

18

96

1297

**

**

**

19

03

12

40

05

:00

**

**

18

71

10

87

1938

12

87

**

**

**

1904

11

87

06

:00

**

**

18

52

10

17

17

13

12

63

**

**

**

17

82

11

40

07

:00

**

**

11

98

10

04

12

82

10

48

**

**

**

12

40

10

26

08

:00

**

**

12

10

74

31

26

57

17

**

**

**

12

38

73

00

9:0

0*

**

*1

02

55

36

11

86

63

8*

**

**

*1

10

65

87

10

:00

**

**

84

04

30

86

64

32

**

**

**

85

34

31

11

:00

**

**

53

51

87

57

02

33

**

**

**

55

22

10

La

ne

00

00

23

39

12

01

93

24

23

72

08

87

71

14

55

00

00

24

16

82

07

70

Da

y0

04

35

84

45

12

41

16

60

04

49

38

AM

Pe

ak

--

--

07

:00

06

:00

08

:00

06

:00

00

:00

04

:00

--

--

08

:00

06

:00

Vo

l.-

--

-1

31

71

61

41

31

41

61

83

63

13

7-

--

-1

29

81

61

6P

M P

ea

k-

--

-1

5:0

01

2:0

01

7:0

01

6:0

0-

--

--

-1

7:0

01

2:0

0V

ol.

--

--

19

47

13

21

19

38

12

97

--

--

--

19

04

12

70

Co

mb

.T

ota

l0

04

35

84

45

12

41

16

60

04

49

38

AD

TA

DT

44

,93

8A

AD

T 4

4,9

38

Page 19: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Page 1 Location : Cambridge Park DriveLocation : West of 'T' Access RoadCity/State: Cambridge, MA

Accurate Counts978-664-2565

Start 05-Dec-12 WB Hour Totals EB Hour Totals Combined TotalsTime Wed Morning Afternoon Morning Afternoon Morning Afternoon Morning Afternoon Morning Afternoon

12:00 * 26 * 4812:15 * 37 * 3312:30 * 17 * 2712:45 * 35 0 115 * 21 0 129 0 24401:00 * 33 * 3501:15 * 22 * 3301:30 * 40 * 2701:45 * 23 0 118 * 29 0 124 0 24202:00 * 30 * 3902:15 * 31 * 2102:30 * 16 * 3002:45 * 29 0 106 * 22 0 112 0 21803:00 * 33 * 4403:15 * 24 * 4703:30 * 6 * 5403:45 * 6 0 69 * 76 0 221 0 29004:00 * 18 * 6704:15 * 20 * 4104:30 * 13 * 7704:45 * 44 0 95 * 55 0 240 0 33505:00 6 17 3 9205:15 9 11 2 8105:30 7 26 3 6905:45 16 27 38 81 1 61 9 303 47 38406:00 26 5 4 7206:15 26 6 6 5606:30 64 40 9 4206:45 55 7 171 58 16 58 35 228 206 28607:00 52 3 20 3607:15 58 7 18 3407:30 70 21 27 1507:45 78 9 258 40 26 24 91 109 349 14908:00 102 8 31 2308:15 106 7 18 1408:30 106 2 49 1108:45 104 6 418 23 32 8 130 56 548 7909:00 98 5 20 1009:15 74 5 19 1109:30 73 1 12 909:45 75 6 320 17 19 2 70 32 390 4910:00 53 6 20 910:15 53 2 23 510:30 46 2 11 510:45 36 9 188 19 9 3 63 22 251 4111:00 29 1 25 411:15 26 2 28 311:30 34 1 31 511:45 27 1 116 5 31 0 115 12 231 17Total 1509 746 513 1588 2022 2334

Percent 66.9% 33.1% 24.4% 75.6% 46.4% 53.6%

Page 20: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Page 2 Location : Cambridge Park DriveLocation : West of 'T' Access RoadCity/State: Cambridge, MA

Accurate Counts978-664-2565

Start 06-Dec-12 WB Hour Totals EB Hour Totals Combined TotalsTime Thu Morning Afternoon Morning Afternoon Morning Afternoon Morning Afternoon Morning Afternoon

12:00 2 31 1 4112:15 3 40 4 3212:30 1 21 0 2212:45 1 39 7 131 1 25 6 120 13 25101:00 2 35 3 2901:15 1 40 1 3701:30 0 39 0 3501:45 0 25 3 139 1 28 5 129 8 26802:00 0 23 0 3902:15 0 22 0 3102:30 0 32 1 4702:45 0 19 0 96 2 28 3 145 3 24103:00 0 30 4 3903:15 0 18 0 5803:30 0 23 0 5903:45 3 19 3 90 1 54 5 210 8 30004:00 7 29 0 5404:15 0 21 1 4704:30 10 30 2 6504:45 5 27 22 107 2 66 5 232 27 33905:00 2 23 2 8405:15 4 12 0 7105:30 9 27 1 6805:45 14 38 29 100 6 52 9 275 38 37506:00 16 25 1 6506:15 24 12 7 4906:30 31 15 20 4906:45 55 19 126 71 9 30 37 193 163 26407:00 79 4 17 3307:15 57 10 15 2207:30 50 13 20 2707:45 57 1 243 28 23 22 75 104 318 13208:00 75 5 15 1508:15 73 4 38 1508:30 71 7 44 508:45 92 6 311 22 38 5 135 40 446 6209:00 97 4 34 309:15 104 8 21 909:30 75 2 24 1309:45 78 5 354 19 14 8 93 33 447 5210:00 50 3 18 1010:15 46 5 12 210:30 39 3 20 410:45 45 2 180 13 17 3 67 19 247 3211:00 26 1 21 211:15 34 4 23 011:30 21 5 21 111:45 31 3 112 13 22 5 87 8 199 21Total 1390 829 527 1508 1917 2337

Percent 62.6% 37.4% 25.9% 74.1% 45.1% 54.9%

Page 21: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Page 3 Location : Cambridge Park DriveLocation : West of 'T' Access RoadCity/State: Cambridge, MA

Accurate Counts978-664-2565

Start 07-Dec-12 WB Hour Totals EB Hour Totals Combined TotalsTime Fri Morning Afternoon Morning Afternoon Morning Afternoon Morning Afternoon Morning Afternoon

12:00 2 * 0 *12:15 1 * 1 *12:30 1 * 2 *12:45 1 * 5 0 0 * 3 0 8 001:00 0 * 1 *01:15 0 * 1 *01:30 0 * 0 *01:45 0 * 0 0 0 * 2 0 2 002:00 0 * 0 *02:15 0 * 0 *02:30 1 * 2 *02:45 1 * 2 0 2 * 4 0 6 003:00 0 * 3 *03:15 3 * 0 *03:30 1 * 0 *03:45 2 * 6 0 1 * 4 0 10 004:00 4 * 1 *04:15 6 * 3 *04:30 4 * 2 *04:45 8 * 22 0 1 * 7 0 29 005:00 * * * * * * * * * *05:15 * * * * * * * * * *05:30 * * * * * * * * * *05:45 * * * * * * * * * *06:00 * * * * * * * * * *06:15 * * * * * * * * * *06:30 * * * * * * * * * *06:45 * * * * * * * * * *07:00 * * * * * * * * * *07:15 * * * * * * * * * *07:30 * * * * * * * * * *07:45 * * * * * * * * * *08:00 * * * * * * * * * *08:15 * * * * * * * * * *08:30 * * * * * * * * * *08:45 * * * * * * * * * *09:00 * * * * * * * * * *09:15 * * * * * * * * * *09:30 * * * * * * * * * *09:45 * * * * * * * * * *10:00 * * * * * * * * * *10:15 * * * * * * * * * *10:30 * * * * * * * * * *10:45 * * * * * * * * * *11:00 * * * * * * * * * *11:15 * * * * * * * * * *11:30 * * * * * * * * * *11:45 * * * * * * * * * *Total 35 0 20 0 55 0

Percent 100.0% 0.0% 100.0% 0.0% 100.0% 0.0%GrandTotal

2934 1575 1060 3096 3994 4671

Percent 65.1% 34.9% 25.5% 74.5% 46.1% 53.9%

ADT ADT 4,332 AADT 4,332

Page 22: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Pag

e 1

Loc

atio

n :

Cam

brid

ge P

ark

Dri

veL

ocat

ion

: W

est

of 'T

' Acc

ess

Roa

dC

ity/

Sta

te:

Cam

brid

ge, M

A

Accu

rate

Co

un

ts978-6

64-2

565

S

tart

03

-De

c-1

2T

ue

We

dT

hu

Fri

Sa

tS

un

We

ek A

ve

rag

eT

ime

WB

EB

WB

EB

WB

EB

WB

EB

WB

EB

WB

EB

WB

EB

WB

EB

12

:00

AM

**

**

**

76

53

**

**

64

01

:00

**

**

**

35

02

**

**

24

02

:00

**

**

**

03

24

**

**

14

03

:00

**

**

**

35

64

**

**

44

04

:00

**

**

**

22

522

7*

**

*2

26

05

:00

**

**

38

92

99

**

**

**

34

90

6:0

0*

**

*1

71

35

12

63

7*

**

**

*1

48

36

07

:00

**

**

25

89

12

43

75

**

**

**

25

08

30

8:0

0*

**

*418

130

31

1135

**

**

**

364

132

09

:00

**

**

32

07

0354

93

**

**

**

33

78

21

0:0

0*

**

*1

88

63

18

06

7*

**

**

*1

84

65

11

:00

**

**

11

61

15

11

28

7*

**

**

*1

14

10

11

2:0

0 P

M*

**

*1

15

12

91

31

12

0*

**

**

*1

23

12

40

1:0

0*

**

*118

12

4139

12

9*

**

**

*128

12

60

2:0

0*

**

*1

06

11

29

61

45

**

**

**

10

11

28

03

:00

**

**

69

22

19

02

10

**

**

**

80

21

60

4:0

0*

**

*9

52

40

10

72

32

**

**

**

10

12

36

05

:00

**

**

81

303

10

0275

**

**

**

90

289

06

:00

**

**

58

22

87

11

93

**

**

**

64

21

00

7:0

0*

**

*4

01

09

28

10

4*

**

**

*3

41

06

08

:00

**

**

23

56

22

40

**

**

**

22

48

09

:00

**

**

17

32

19

33

**

**

**

18

32

10

:00

**

**

19

22

13

19

**

**

**

16

20

11

:00

**

**

51

21

38

**

**

**

91

0L

an

e0

00

02

25

52

10

12

21

92

03

53

52

00

00

02

25

22

07

5D

ay

00

43

56

42

54

55

00

43

27

AM

Pe

ak

--

--

08

:00

08

:00

09

:00

08

:00

04

:00

04

:00

--

--

08

:00

08

:00

Vo

l.-

--

-4

18

13

03

54

13

52

27

--

--

36

41

32

PM

Pe

ak

--

--

13

:00

17

:00

13

:00

17

:00

--

--

--

13

:00

17

:00

Vo

l.-

--

-1

18

30

31

39

27

5-

--

--

-1

28

28

9

C

om

b.

To

tal

00

43

56

42

54

55

00

43

27

AD

TA

DT

4,3

32

AA

DT

4,3

32

Page 23: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Turning Movement Counts

Page 24: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

This Page Left Blank Intentionally

Page 25: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Nam

e: 11810001

Site Code

: 11810001Start D

ate: 12/6/2012

Page No

: 1

N/S Street : A

lewife B

rook Parkway

E/W Street: R

oute 2 / 'T' ExitC

ity/State : Cam

bridge, MA

Weather : C

lear

Groups Printed- C

ars - Trucks - B

usesA

lewife B

rook Pkwy

From N

orth'T

' Exit

From E

astA

lewife B

rook Pkwy

From South

Route 2

From W

estStart Tim

eLeft

ThruR

ightLeft

ThruR

ightLeft

ThruR

ightLeft

ThruR

ightInt. Total

07:30 AM

054

1930

4323

31241

098

0290

105407:45 A

M0

70334

047

24294

560

1180

2481191

Total0

124527

090

47606

970

2160

5382245

08:00 AM

078

2550

3726

30148

0108

0261

111408:15 A

M0

62247

030

16275

460

1100

185971

08:30 AM

087

2150

3720

30448

091

0242

104408:45 A

M0

74230

029

22270

570

1070

2811070

Total0

301947

0133

841150

1990

4160

9694199

09:00 AM

098

2000

2322

22059

0103

0252

97709:15 A

M0

84171

023

24195

720

1780

2711018

Grand Total

0607

18450

269177

2171427

0913

02030

8439A

pprch %0

24.875.2

060.3

39.783.6

16.40

310

69Total %

07.2

21.90

3.22.1

25.75.1

010.8

024.1

Cars

0586

18300

232169

2111420

0897

01997

8242%

Cars

096.5

99.20

86.295.5

97.298.4

098.2

098.4

97.7Trucks

011

140

30

435

015

028

119%

Trucks0

1.80.8

01.1

02

1.20

1.60

1.41.4

Buses

010

10

348

172

01

05

78%

Buses

01.6

0.10

12.64.5

0.80.5

00.1

00.2

0.9

Alew

ife Brook Pkw

yFrom

North

'T' E

xitFrom

East

Alew

ife Brook Pkw

yFrom

SouthR

oute 2From

West

Start Time

LeftThru

Right

App. Total

LeftThru

Right

App. Total

LeftThru

Right

App. Total

LeftThru

Right

App. Total

Int. TotalPeak H

our Analysis From

07:30 AM

to 09:15 AM

- Peak 1 of 1Peak H

our for Entire Intersection Begins at 07:30 A

M07:30 A

M0

54193

2470

4323

66312

410

35398

0290

3881054

07:45 AM

070

334404

047

2471

29456

0350

1180

248366

119108:00 A

M0

78255

3330

3726

63301

480

349108

0261

3691114

08:15 AM

062

247309

030

1646

27546

0321

1100

185295

971Total V

olume

0264

10291293

0157

89246

1182191

01373

4340

9841418

4330%

App. Total

020.4

79.60

63.836.2

86.113.9

030.6

069.4

PHF

.000.846

.770.800

.000.835

.856.866

.947.853

.000.972

.919.000

.848.914

.909C

ars0

2541022

12760

13985

2241156

1880

1344427

0964

13914235

% C

ars0

96.299.3

98.70

88.595.5

91.197.8

98.40

97.998.4

098.0

98.197.8

Trucks0

46

100

30

315

20

176

018

2454

% Trucks

01.5

0.60.8

01.9

01.2

1.31.0

01.2

1.40

1.81.7

1.2B

uses0

61

70

154

1911

10

121

02

341

% B

uses0

2.30.1

0.50

9.64.5

7.70.9

0.50

0.90.2

00.2

0.20.9

Accurate C

ounts978-664-2565

File Nam

e: 11810001

Site Code

: 11810001Start D

ate: 12/6/2012

Page No

: 2

N/S Street : A

lewife B

rook Parkway

E/W Street: R

oute 2 / 'T' ExitC

ity/State : Cam

bridge, MA

Weather : C

lear

Alew

ife Brook P

kwy

Route 2 'T' Exit

Alew

ife Brook P

kwy

Right

1022611029

Thru

25446264

Left 0000

InO

utT

otal700

12761976

810

186

713

7142007

1293

Right

8504

89Thru

1393

15157

Left

0000

OutTotal In0224224033019190246 246

Left1156

15111182

Thru18821191

Right0000

Out

Total

In

12181344

256222

1739

812

201248

26211373

Left

42761

434Thru

0000

Right

96418

2984

TotalOut In2317 1391 3708

24 24 4827 3 30

2368 37861418

Peak H

our Begins at 07:30 A

M

Cars

Trucks

Buses

Peak H

our Data

North

Peak Hour A

nalysis From 07:30 A

M to 09:15 A

M - Peak 1 of 1

Peak Hour for Each A

pproach Begins at:

07:45 AM

07:30 AM

07:30 AM

08:30 AM

+0 mins.

070

334404

043

2366

31241

0353

910

242333

+15 mins.

078

255333

047

2471

29456

0350

1070

281388

+30 mins.

062

247309

037

2663

30148

0349

1030

252355

+45 mins.

087

215302

030

1646

27546

0321

1780

271449

Total Volum

e0

2971051

13480

15789

2461182

1910

1373479

01046

1525%

App. Total

022

780

63.836.2

86.113.9

031.4

068.6

PHF

.000.853

.787.834

.000.835

.856.866

.947.853

.000.972

.673.000

.931.849

Cars

0288

10451333

0139

85224

1156188

01344

4700

10331503

% C

ars0

9799.4

98.90

88.595.5

91.197.8

98.40

97.998.1

098.8

98.6Trucks

02

68

03

03

152

017

90

1019

Accurate C

ounts978-664-2565

Page 26: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Buses

07

07

015

419

111

012

00

33

% B

uses0

2.40

0.50

9.64.5

7.70.9

0.50

0.90

00.3

0.2 A

lewife B

rook Pkw

y

Route 2 'T' Exit

Alew

ife Brook P

kwy

Right

1045601051

Thru

28827297

Left 0000

In - Peak H

our: 07:45 AM

1333871348

Right

8504

89Thru

1393

15157

Left

0000

In - Peak Hour: 07:30 AM224

319

246

Left1156

15111182

Thru18821191

Right0000

In - Peak H

our: 07:30 AM

13441712

1373

Left

47090

479Thru

0000

Right

1033103

1046

In - Peak Hour: 08:30 AM1503

193

1525

Cars

Trucks

Buses

Peak H

our Data

North

Accurate C

ounts978-664-2565

File Nam

e: 11810001

Site Code

: 11810001Start D

ate: 12/6/2012

Page No

: 1

N/S Street : A

lewife B

rook Parkway

E/W Street: R

oute 2 / 'T' ExitC

ity/State : Cam

bridge, MA

Weather : C

lear

Groups Printed- B

usesA

lewife B

rook Pkwy

From N

orth'T

' Exit

From E

astA

lewife B

rook Pkwy

From South

Route 2

From W

estStart Tim

eLeft

ThruR

ightLeft

ThruR

ightLeft

ThruR

ightLeft

ThruR

ightInt. Total

07:30 AM

01

10

01

50

00

01

907:45 A

M0

30

06

01

10

00

011

Total0

41

06

16

10

00

120

08:00 AM

01

00

62

10

00

01

1108:15 A

M0

10

03

14

00

10

010

08:30 AM

02

00

40

30

00

01

1008:45 A

M0

10

04

21

00

00

19

Total0

50

017

59

00

10

340

09:00 AM

01

00

71

10

00

00

1009:15 A

M0

00

04

11

10

00

18

Grand Total

010

10

348

172

01

05

78A

pprch %0

90.99.1

081

1989.5

10.50

16.70

83.3Total %

012.8

1.30

43.610.3

21.82.6

01.3

06.4

Alew

ife Brook Pkw

yFrom

North

'T' E

xitFrom

East

Alew

ife Brook Pkw

yFrom

SouthR

oute 2From

West

Start Time

LeftThru

Right

App. Total

LeftThru

Right

App. Total

LeftThru

Right

App. Total

LeftThru

Right

App. Total

Int. TotalPeak H

our Analysis From

07:30 AM

to 09:15 AM

- Peak 1 of 1Peak H

our for Entire Intersection Begins at 07:45 A

M07:45 A

M0

30

30

60

61

10

20

00

011

08:00 AM

01

01

06

28

10

01

00

11

1108:15 A

M0

10

10

31

44

00

41

00

110

08:30 AM

02

02

04

04

30

03

00

11

10Total V

olume

07

07

019

322

91

010

10

23

42%

App. Total

0100

00

86.413.6

9010

033.3

066.7

PHF

.000.583

.000.583

.000.792

.375.688

.563.250

.000.625

.250.000

.500.750

.955

Accurate C

ounts978-664-2565

Page 27: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Nam

e: 11810001

Site Code

: 11810001Start D

ate: 12/6/2012

Page No

: 2

N/S Street : A

lewife B

rook Parkway

E/W Street: R

oute 2 / 'T' ExitC

ity/State : Cam

bridge, MA

Weather : C

lear

Alew

ife Brook P

kwy

Route 2 'T' Exit

Alew

ife Brook P

kwy

Right 0

Thru 7

Left 0

InO

utT

otal5

712

Right3

Thru19

Left0

OutTotal In02222

Left9T

hru1R

ight0

Out

Total

In9

1019

Left1

Thru0

Right2

TotalOut In28 3 31

Peak H

our Begins at 07:45 A

M

Buses

Peak H

our Data

North

Peak Hour A

nalysis From 07:30 A

M to 09:15 A

M - Peak 1 of 1

Peak Hour for Each A

pproach Begins at:

07:30 AM

08:30 AM

07:30 AM

08:00 AM

+0 mins.

01

12

04

04

50

05

00

11

+15 mins.

03

03

04

26

11

02

10

01

+30 mins.

01

01

07

18

10

01

00

11

+45 mins.

01

01

04

15

40

04

00

11

Total Volum

e0

61

70

194

2311

10

121

03

4%

App. Total

085.7

14.30

82.617.4

91.78.3

025

075

PHF

.000.500

.250.583

.000.679

.500.719

.550.250

.000.600

.250.000

.7501.000

Accurate C

ounts978-664-2565

File Nam

e: 11810001

Site Code

: 11810001Start D

ate: 12/6/2012

Page No

: 3

N/S Street : A

lewife B

rook Parkway

E/W Street: R

oute 2 / 'T' ExitC

ity/State : Cam

bridge, MA

Weather : C

lear

Alew

ife Brook P

kwy

Route 2 'T' Exit

Alew

ife Brook P

kwy

Right 1

Thru 6

Left 0

In - Peak H

our: 07:30 AM

7

Right4

Thru19

Left0

In - Peak Hour: 08:30 AM23

Left11T

hru1R

ight0

In - Peak H

our: 07:30 AM

12

Left1

Thru0

Right3

In - Peak Hour: 08:00 AM4

Buses

Peak H

our Data

North

Accurate C

ounts978-664-2565

Page 28: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Nam

e: 11810001

Site Code

: 11810001Start D

ate: 12/6/2012

Page No

: 1

N/S Street : A

lewife B

rook Parkway

E/W Street: R

oute 2 / 'T' ExitC

ity/State : Cam

bridge, MA

Weather : C

lear

Groups Printed- C

arsA

lewife B

rook Pkwy

From N

orth'T

' Exit

From E

astA

lewife B

rook Pkwy

From South

Route 2

From W

estStart Tim

eLeft

ThruR

ightLeft

ThruR

ightLeft

ThruR

ightLeft

ThruR

ightInt. Total

07:30 AM

051

1910

4122

30241

097

0287

103207:45 A

M0

65333

041

24291

530

1160

2411164

Total0

116524

082

46593

940

2130

5282196

08:00 AM

077

2550

3124

29648

0107

0255

109308:15 A

M0

61243

026

15267

460

1070

181946

08:30 AM

085

2140

3320

29547

091

0238

102308:45 A

M0

71226

025

20263

570

1010

2791042

Total0

294938

0115

791121

1980

4060

9534104

09:00 AM

094

2000

1621

21157

0101

0249

94909:15 A

M0

82168

019

23186

710

1770

267993

Grand Total

0586

18300

232169

2111420

0897

01997

8242A

pprch %0

24.375.7

057.9

42.183.4

16.60

310

69Total %

07.1

22.20

2.82.1

25.65.1

010.9

024.2

Alew

ife Brook Pkw

yFrom

North

'T' E

xitFrom

East

Alew

ife Brook Pkw

yFrom

SouthR

oute 2From

West

Start Time

LeftThru

Right

App. Total

LeftThru

Right

App. Total

LeftThru

Right

App. Total

LeftThru

Right

App. Total

Int. TotalPeak H

our Analysis From

07:30 AM

to 09:15 AM

- Peak 1 of 1Peak H

our for Entire Intersection Begins at 07:30 A

M07:30 A

M0

51191

2420

4122

63302

410

34397

0287

3841032

07:45 AM

065

333398

041

2465

29153

0344

1160

241357

116408:00 A

M0

77255

3320

3124

55296

480

344107

0255

3621093

08:15 AM

061

243304

026

1541

26746

0313

1070

181288

946Total V

olume

0254

10221276

0139

85224

1156188

01344

4270

9641391

4235%

App. Total

019.9

80.10

62.137.9

8614

030.7

069.3

PHF

.000.825

.767.802

.000.848

.885.862

.957.887

.000.977

.920.000

.840.906

.910

Accurate C

ounts978-664-2565

File Nam

e: 11810001

Site Code

: 11810001Start D

ate: 12/6/2012

Page No

: 2

N/S Street : A

lewife B

rook Parkway

E/W Street: R

oute 2 / 'T' ExitC

ity/State : Cam

bridge, MA

Weather : C

lear

Alew

ife Brook P

kwy

Route 2 'T' Exit

Alew

ife Brook P

kwy

Right

1022T

hru254

Left 0

InO

utT

otal700

12761976

Right85

Thru139

Left0

OutTotal In0224224

Left1156

Thru188

Right0

Out

Total

In1218

13442562

Left427

Thru0

Right964

TotalOut In2317 1391 3708

Peak H

our Begins at 07:30 A

M

Cars

Peak H

our Data

North

Peak Hour A

nalysis From 07:30 A

M to 09:15 A

M - Peak 1 of 1

Peak Hour for Each A

pproach Begins at:

07:45 AM

07:30 AM

07:30 AM

08:30 AM

+0 mins.

065

333398

041

2263

30241

0343

910

238329

+15 mins.

077

255332

041

2465

29153

0344

1010

279380

+30 mins.

061

243304

031

2455

29648

0344

1010

249350

+45 mins.

085

214299

026

1541

26746

0313

1770

267444

Total Volum

e0

2881045

13330

13985

2241156

1880

1344470

01033

1503%

App. Total

021.6

78.40

62.137.9

8614

031.3

068.7

PHF

.000.847

.785.837

.000.848

.885.862

.957.887

.000.977

.664.000

.926.846

Accurate C

ounts978-664-2565

Page 29: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Nam

e: 11810001

Site Code

: 11810001Start D

ate: 12/6/2012

Page No

: 3

N/S Street : A

lewife B

rook Parkway

E/W Street: R

oute 2 / 'T' ExitC

ity/State : Cam

bridge, MA

Weather : C

lear

Alew

ife Brook P

kwy

Route 2 'T' Exit

Alew

ife Brook P

kwy

Right

1045T

hru288

Left 0

In - Peak H

our: 07:45 AM

1333

Right85

Thru139

Left0

In - Peak Hour: 07:30 AM224

Left1156

Thru188

Right0

In - Peak H

our: 07:30 AM

1344

Left470

Thru0

Right1033

In - Peak Hour: 08:30 AM1503

Cars

Peak H

our Data

North

Accurate C

ounts978-664-2565

File Nam

e: 11810001

Site Code

: 11810001Start D

ate: 12/6/2012

Page No

: 1

N/S Street : A

lewife B

rook Parkway

E/W Street: R

oute 2 / 'T' ExitC

ity/State : Cam

bridge, MA

Weather : C

lear

Groups Printed- T

rucksA

lewife B

rook Pkwy

From N

orth'T

' Exit

From E

astA

lewife B

rook Pkwy

From South

Route 2

From W

estStart Tim

eLeft

ThruR

ightLeft

ThruR

ightLeft

ThruR

ightLeft

ThruR

ightInt. Total

07:30 AM

02

10

20

50

01

02

1307:45 A

M0

21

00

02

20

20

716

Total0

42

02

07

20

30

929

08:00 AM

00

00

00

40

01

05

1008:15 A

M0

04

01

04

00

20

415

08:30 AM

00

10

00

61

00

03

1108:45 A

M0

24

00

06

00

60

119

Total0

29

01

020

10

90

1355

09:00 AM

03

00

00

82

02

03

1809:15 A

M0

23

00

08

00

10

317

Grand Total

011

140

30

435

015

028

119A

pprch %0

4456

0100

089.6

10.40

34.90

65.1Total %

09.2

11.80

2.50

36.14.2

012.6

023.5

Alew

ife Brook Pkw

yFrom

North

'T' E

xitFrom

East

Alew

ife Brook Pkw

yFrom

SouthR

oute 2From

West

Start Time

LeftThru

Right

App. Total

LeftThru

Right

App. Total

LeftThru

Right

App. Total

LeftThru

Right

App. Total

Int. TotalPeak H

our Analysis From

07:30 AM

to 09:15 AM

- Peak 1 of 1Peak H

our for Entire Intersection Begins at 08:30 A

M08:30 A

M0

01

10

00

06

10

70

03

311

08:45 AM

02

46

00

00

60

06

60

17

1909:00 A

M0

30

30

00

08

20

102

03

518

09:15 AM

02

35

00

00

80

08

10

34

17Total V

olume

07

815

00

00

283

031

90

1019

65%

App. Total

046.7

53.30

00

90.39.7

047.4

052.6

PHF

.000.583

.500.625

.000.000

.000.000

.875.375

.000.775

.375.000

.833.679

.855

Accurate C

ounts978-664-2565

Page 30: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Nam

e: 11810001

Site Code

: 11810001Start D

ate: 12/6/2012

Page No

: 2

N/S Street : A

lewife B

rook Parkway

E/W Street: R

oute 2 / 'T' ExitC

ity/State : Cam

bridge, MA

Weather : C

lear

Alew

ife Brook P

kwy

Route 2 'T' Exit

Alew

ife Brook P

kwy

Right 8

Thru 7

Left 0

InO

utT

otal12

1527

Right0

Thru0

Left0

OutTotal In000

Left28T

hru3R

ight0

Out

Total

In17

3148

Left9

Thru0

Right10

TotalOut In36 19 55

Peak H

our Begins at 08:30 A

M

Trucks

Peak H

our Data

North

Peak Hour A

nalysis From 07:30 A

M to 09:15 A

M - Peak 1 of 1

Peak Hour for Each A

pproach Begins at:

08:30 AM

07:30 AM

08:30 AM

07:30 AM

+0 mins.

00

11

02

02

61

07

10

23

+15 mins.

02

46

00

00

60

06

20

79

+30 mins.

03

03

00

00

82

010

10

56

+45 mins.

02

35

01

01

80

08

20

46

Total Volum

e0

78

150

30

328

30

316

018

24%

App. Total

046.7

53.30

1000

90.39.7

025

075

PHF

.000.583

.500.625

.000.375

.000.375

.875.375

.000.775

.750.000

.643.667

Accurate C

ounts978-664-2565

File Nam

e: 11810001

Site Code

: 11810001Start D

ate: 12/6/2012

Page No

: 3

N/S Street : A

lewife B

rook Parkway

E/W Street: R

oute 2 / 'T' ExitC

ity/State : Cam

bridge, MA

Weather : C

lear

Alew

ife Brook P

kwy

Route 2 'T' Exit

Alew

ife Brook P

kwy

Right 8

Thru 7

Left 0

In - Peak H

our: 08:30 AM

15

Right0

Thru3

Left0

In - Peak Hour: 07:30 AM3

Left28T

hru3R

ight0

In - Peak H

our: 08:30 AM

31

Left6

Thru0

Right18

In - Peak Hour: 07:30 AM24

Trucks

Peak H

our Data

North

Accurate C

ounts978-664-2565

Page 31: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Nam

e: 11810001

Site Code

: 11810001Start D

ate: 12/6/2012

Page No

: 1

N/S Street : A

lewife B

rook Parkway

E/W Street: R

oute 2 / 'T' ExitC

ity/State : Cam

bridge, MA

Weather : C

lear

Groups Printed- Peds

'T' E

xitFrom

East

Start Time

SBN

BInt. Total

07:30 AM

00

007:45 A

M1

01

Total1

01

08:00 AM

00

008:15 A

M1

01

08:30 AM

10

108:45 A

M1

01

Total3

03

09:00 AM

00

009:15 A

M0

00

Grand Total

40

4A

pprch %100

0Total %

1000

From N

orth'T

' Exit

From E

astFrom

SouthFrom

West

Start Time

App. Total

SBN

BA

pp. TotalA

pp. TotalA

pp. TotalInt. Total

Peak Hour A

nalysis From 07:30 A

M to 09:15 A

M - Peak 1 of 1

Peak Hour for Entire Intersection B

egins at 07:45 AM

07:45 AM

01

01

00

108:00 A

M0

00

00

00

08:15 AM

01

01

00

108:30 A

M0

10

10

01

Total Volum

e0

30

30

03

% A

pp. Total100

0PH

F.000

.750.000

.750.000

.000.750

Accurate C

ounts978-664-2565

File Nam

e: 11810001

Site Code

: 11810001Start D

ate: 12/6/2012

Page No

: 2

N/S Street : A

lewife B

rook Parkway

E/W Street: R

oute 2 / 'T' ExitC

ity/State : Cam

bridge, MA

Weather : C

lear

Alew

ife Brook P

kwy

Route 2 'T' Exit

Alew

ife Brook P

kwy

InO

utT

otal0

00

Right0

Left3

OutTotal In033

Out

Total

In3

03

TotalOut In0 0 0

Peak H

our Begins at 07:45 A

M

Peds

Peak H

our Data

North

Peak Hour A

nalysis From 07:30 A

M to 09:15 A

M - Peak 1 of 1

Peak Hour for Each A

pproach Begins at:

07:30 AM

07:45 AM

07:30 AM

07:30 AM

+0 mins.

01

01

00

+15 mins.

00

00

00

+30 mins.

01

01

00

+45 mins.

01

01

00

Total Volum

e0

30

30

0%

App. Total

1000

PHF

.000.750

.000.750

.000.000

Accurate C

ounts978-664-2565

Page 32: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File

Nam

e: 1

1810

001

Site

Cod

e: 1

1810

001

Star

t Dat

e: 1

2/6/

2012

Page

No

: 3

N/S

Stre

et :

Ale

wife

Bro

ok P

arkw

ayE/

W S

treet

: Rou

te 2

/ 'T

' Exi

tC

ity/S

tate

: C

ambr

idge

, MA

Wea

ther

:

Cle

ar

Ale

wife

Bro

ok P

kwy

Route 2 'T' Exit

Ale

wife

Bro

ok P

kwy

In -

Pea

k H

our:

07:

30 A

M0

Right0

Left3

In - Peak Hour: 07:45 AM3

In -

Pea

k H

our:

07:

30 A

M0

In - Peak Hour: 07:30 AM0

Ped

s

Pea

k H

our

Dat

a

Nor

th

Acc

urat

e C

ount

s97

8-66

4-25

65

File Name : 11810001Site Code : 11810001Start Date : 12/6/2012Page No : 1

N/S Street : Alewife Brook ParkwayE/W Street: Route 2 / 'T' ExitCity/State : Cambridge, MAWeather : Clear

Groups Printed- Cars - Trucks - BusesAlewife Brook Pkwy

From North'T' Exit

From EastAlewife Brook Pkwy

From SouthRoute 2

From WestStart Time Left Thru Right Left Thru Right Left Thru Right Left Thru Right Int. Total04:30 PM 0 83 219 0 112 83 367 84 0 162 0 255 136504:45 PM 0 65 187 0 122 73 410 76 0 135 0 237 1305

Total 0 148 406 0 234 156 777 160 0 297 0 492 2670

05:00 PM 0 86 198 0 111 102 406 71 0 157 0 235 136605:15 PM 0 88 199 0 111 79 453 76 0 140 0 229 137505:30 PM 0 94 205 0 122 89 394 79 0 141 0 309 143305:45 PM 0 89 191 0 136 104 445 80 0 110 0 209 1364

Total 0 357 793 0 480 374 1698 306 0 548 0 982 5538

06:00 PM 0 84 220 0 132 70 358 79 0 143 0 244 133006:15 PM 0 84 158 0 119 87 402 71 0 120 0 280 1321

Grand Total 0 673 1577 0 965 687 3235 616 0 1108 0 1998 10859Apprch % 0 29.9 70.1 0 58.4 41.6 84 16 0 35.7 0 64.3

Total % 0 6.2 14.5 0 8.9 6.3 29.8 5.7 0 10.2 0 18.4Cars 0 663 1573 0 945 678 3191 607 0 1104 0 1990 10751

% Cars 0 98.5 99.7 0 97.9 98.7 98.6 98.5 0 99.6 0 99.6 99Trucks 0 1 3 0 0 0 10 4 0 4 0 4 26

% Trucks 0 0.1 0.2 0 0 0 0.3 0.6 0 0.4 0 0.2 0.2Buses 0 9 1 0 20 9 34 5 0 0 0 4 82

% Buses 0 1.3 0.1 0 2.1 1.3 1.1 0.8 0 0 0 0.2 0.8

Alewife Brook PkwyFrom North

'T' ExitFrom East

Alewife Brook PkwyFrom South

Route 2From West

Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. TotalPeak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 05:00 PM

05:00 PM 0 86 198 284 0 111 102 213 406 71 0 477 157 0 235 392 136605:15 PM 0 88 199 287 0 111 79 190 453 76 0 529 140 0 229 369 137505:30 PM 0 94 205 299 0 122 89 211 394 79 0 473 141 0 309 450 143305:45 PM 0 89 191 280 0 136 104 240 445 80 0 525 110 0 209 319 1364

Total Volume 0 357 793 1150 0 480 374 854 1698 306 0 2004 548 0 982 1530 5538% App. Total 0 31 69 0 56.2 43.8 84.7 15.3 0 35.8 0 64.2

PHF .000 .949 .967 .962 .000 .882 .899 .890 .937 .956 .000 .947 .873 .000 .794 .850 .966Cars 0 354 792 1146 0 473 370 843 1677 300 0 1977 547 0 979 1526 5492

% Cars 0 99.2 99.9 99.7 0 98.5 98.9 98.7 98.8 98.0 0 98.7 99.8 0 99.7 99.7 99.2Trucks 0 0 0 0 0 0 0 0 4 2 0 6 1 0 1 2 8

% Trucks 0 0 0 0 0 0 0 0 0.2 0.7 0 0.3 0.2 0 0.1 0.1 0.1Buses 0 3 1 4 0 7 4 11 17 4 0 21 0 0 2 2 38

% Buses 0 0.8 0.1 0.3 0 1.5 1.1 1.3 1.0 1.3 0 1.0 0 0 0.2 0.1 0.7

Accurate Counts978-664-2565

Page 33: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810001Site Code : 11810001Start Date : 12/6/2012Page No : 2

N/S Street : Alewife Brook ParkwayE/W Street: Route 2 / 'T' ExitCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pkwy

Rou

te 2

'T' E

xit

Alewife Brook Pkwy

Right

79201

793Thru

35403

357Left

0000

InOut Total1217 1146 2363

3 0 38 4 12

1228 23781150

Right

37004374

Thru

47307480

Left 0000

Out

Total

In0

843843

00

00

1111

0854

854

Left1677

417

1698

Thru300

24

306

Right0000

Out TotalIn

1333 1977 33101 6 75 21 26

1339 33432004

Left

547 1 0

548

Thr

u0 0 0 0R

ight

979 1 2

982

Tot

alO

utIn

2942

1526

4468

42

625

227

2971

4501

1530 Peak Hour Begins at 05:00 PM

CarsTrucksBuses

Peak Hour Data

North

Peak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Each Approach Begins at:

05:15 PM 05:30 PM 05:00 PM 04:45 PM+0 mins. 0 88 199 287 0 122 89 211 406 71 0 477 135 0 237 372

+15 mins. 0 94 205 299 0 136 104 240 453 76 0 529 157 0 235 392+30 mins. 0 89 191 280 0 132 70 202 394 79 0 473 140 0 229 369+45 mins. 0 84 220 304 0 119 87 206 445 80 0 525 141 0 309 450

Total Volume 0 355 815 1170 0 509 350 859 1698 306 0 2004 573 0 1010 1583% App. Total 0 30.3 69.7 0 59.3 40.7 84.7 15.3 0 36.2 0 63.8

PHF .000 .944 .926 .962 .000 .936 .841 .895 .937 .956 .000 .947 .912 .000 .817 .879Cars 0 350 813 1163 0 499 345 844 1677 300 0 1977 570 0 1007 1577

% Cars 0 98.6 99.8 99.4 0 98 98.6 98.3 98.8 98 0 98.7 99.5 0 99.7 99.6Trucks 0 0 1 1 0 0 0 0 4 2 0 6 3 0 2 5

% Trucks 0 0 0.1 0.1 0 0 0 0 0.2 0.7 0 0.3 0.5 0 0.2 0.3Buses 0 5 1 6 0 10 5 15 17 4 0 21 0 0 1 1

% Buses 0 1.4 0.1 0.5 0 2 1.4 1.7 1 1.3 0 1 0 0 0.1 0.1

Accurate Counts978-664-2565

File Name : 11810001Site Code : 11810001Start Date : 12/6/2012Page No : 3

N/S Street : Alewife Brook ParkwayE/W Street: Route 2 / 'T' ExitCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pkwy

Rou

te 2

'T' E

xit

Alewife Brook Pkwy

Right

81311

815Thru

35005

355Left

0000

In - Peak Hour: 05:15 PM1163

16

1170R

ight

34505350

Thru

499010

509Left 0000

In - Peak H

our: 05:30 PM

844015

859

Left1677

417

1698

Thru300

24

306

Right0000

In - Peak Hour: 05:00 PM

19776

212004

Left

570 3 0

573

Thr

u0 0 0 0R

ight

1007

2 110

10

In -

Pea

k H

our:

04:

45 P

M15

775 1

1583 Cars

TrucksBuses

Peak Hour Data

North

Accurate Counts978-664-2565

Page 34: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810001Site Code : 11810001Start Date : 12/6/2012Page No : 1

N/S Street : Alewife Brook ParkwayE/W Street: Route 2 / 'T' ExitCity/State : Cambridge, MAWeather : Clear

Groups Printed- BusesAlewife Brook Pkwy

From North'T' Exit

From EastAlewife Brook Pkwy

From SouthRoute 2

From WestStart Time Left Thru Right Left Thru Right Left Thru Right Left Thru Right Int. Total04:30 PM 0 2 0 0 3 0 4 0 0 0 0 2 1104:45 PM 0 1 0 0 3 2 1 0 0 0 0 0 7

Total 0 3 0 0 6 2 5 0 0 0 0 2 18

05:00 PM 0 1 0 0 4 1 4 1 0 0 0 0 1105:15 PM 0 1 0 0 0 1 5 2 0 0 0 1 1005:30 PM 0 1 0 0 1 1 5 0 0 0 0 0 805:45 PM 0 0 1 0 2 1 3 1 0 0 0 1 9

Total 0 3 1 0 7 4 17 4 0 0 0 2 38

06:00 PM 0 3 0 0 2 1 6 0 0 0 0 0 1206:15 PM 0 0 0 0 5 2 6 1 0 0 0 0 14

Grand Total 0 9 1 0 20 9 34 5 0 0 0 4 82Apprch % 0 90 10 0 69 31 87.2 12.8 0 0 0 100

Total % 0 11 1.2 0 24.4 11 41.5 6.1 0 0 0 4.9

Alewife Brook PkwyFrom North

'T' ExitFrom East

Alewife Brook PkwyFrom South

Route 2From West

Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. TotalPeak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 05:30 PM

05:30 PM 0 1 0 1 0 1 1 2 5 0 0 5 0 0 0 0 805:45 PM 0 0 1 1 0 2 1 3 3 1 0 4 0 0 1 1 906:00 PM 0 3 0 3 0 2 1 3 6 0 0 6 0 0 0 0 1206:15 PM 0 0 0 0 0 5 2 7 6 1 0 7 0 0 0 0 14

Total Volume 0 4 1 5 0 10 5 15 20 2 0 22 0 0 1 1 43% App. Total 0 80 20 0 66.7 33.3 90.9 9.1 0 0 0 100

PHF .000 .333 .250 .417 .000 .500 .625 .536 .833 .500 .000 .786 .000 .000 .250 .250 .768

Accurate Counts978-664-2565

File Name : 11810001Site Code : 11810001Start Date : 12/6/2012Page No : 2

N/S Street : Alewife Brook ParkwayE/W Street: Route 2 / 'T' ExitCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pkwy

Rou

te 2

'T' E

xit

Alewife Brook Pkwy

Right1

Thru4

Left0

InOut Total7 5 12

Right 5

Thru 10

Left 0

Out

Total

In0

1515

Left20

Thru2

Right0

Out TotalIn5 22 27

Left

0T

hru0

Rig

ht1

Tot

alO

utIn

311

32

Peak Hour Begins at 05:30 PM

Buses

Peak Hour Data

North

Peak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Each Approach Begins at:

05:15 PM 05:30 PM 05:15 PM 04:30 PM+0 mins. 0 1 0 1 0 1 1 2 5 2 0 7 0 0 2 2

+15 mins. 0 1 0 1 0 2 1 3 5 0 0 5 0 0 0 0+30 mins. 0 0 1 1 0 2 1 3 3 1 0 4 0 0 0 0+45 mins. 0 3 0 3 0 5 2 7 6 0 0 6 0 0 1 1

Total Volume 0 5 1 6 0 10 5 15 19 3 0 22 0 0 3 3% App. Total 0 83.3 16.7 0 66.7 33.3 86.4 13.6 0 0 0 100

PHF .000 .417 .250 .500 .000 .500 .625 .536 .792 .375 .000 .786 .000 .000 .375 .375

Accurate Counts978-664-2565

Page 35: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810001Site Code : 11810001Start Date : 12/6/2012Page No : 3

N/S Street : Alewife Brook ParkwayE/W Street: Route 2 / 'T' ExitCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pkwy

Rou

te 2

'T' E

xit

Alewife Brook Pkwy

Right1

Thru5

Left0

In - Peak Hour: 05:15 PM6

Right 5

Thru 10

Left 0

In - Peak H

our: 05:30 PM

15

Left19

Thru3

Right0

In - Peak Hour: 05:15 PM22

Left

0T

hru0

Rig

ht3

In -

Pea

k H

our:

04:

30 P

M3

Buses

Peak Hour Data

North

Accurate Counts978-664-2565

File Name : 11810001Site Code : 11810001Start Date : 12/6/2012Page No : 1

N/S Street : Alewife Brook ParkwayE/W Street: Route 2 / 'T' ExitCity/State : Cambridge, MAWeather : Clear

Groups Printed- CarsAlewife Brook Pkwy

From North'T' Exit

From EastAlewife Brook Pkwy

From SouthRoute 2

From WestStart Time Left Thru Right Left Thru Right Left Thru Right Left Thru Right Int. Total04:30 PM 0 80 218 0 109 83 362 83 0 162 0 251 134804:45 PM 0 64 186 0 119 71 407 75 0 133 0 236 1291

Total 0 144 404 0 228 154 769 158 0 295 0 487 2639

05:00 PM 0 85 198 0 107 101 402 70 0 157 0 234 135405:15 PM 0 87 199 0 111 78 445 73 0 139 0 228 136005:30 PM 0 93 205 0 121 88 389 79 0 141 0 309 142505:45 PM 0 89 190 0 134 103 441 78 0 110 0 208 1353

Total 0 354 792 0 473 370 1677 300 0 547 0 979 5492

06:00 PM 0 81 219 0 130 69 351 79 0 142 0 244 131506:15 PM 0 84 158 0 114 85 394 70 0 120 0 280 1305

Grand Total 0 663 1573 0 945 678 3191 607 0 1104 0 1990 10751Apprch % 0 29.7 70.3 0 58.2 41.8 84 16 0 35.7 0 64.3

Total % 0 6.2 14.6 0 8.8 6.3 29.7 5.6 0 10.3 0 18.5

Alewife Brook PkwyFrom North

'T' ExitFrom East

Alewife Brook PkwyFrom South

Route 2From West

Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. TotalPeak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 05:00 PM

05:00 PM 0 85 198 283 0 107 101 208 402 70 0 472 157 0 234 391 135405:15 PM 0 87 199 286 0 111 78 189 445 73 0 518 139 0 228 367 136005:30 PM 0 93 205 298 0 121 88 209 389 79 0 468 141 0 309 450 142505:45 PM 0 89 190 279 0 134 103 237 441 78 0 519 110 0 208 318 1353

Total Volume 0 354 792 1146 0 473 370 843 1677 300 0 1977 547 0 979 1526 5492% App. Total 0 30.9 69.1 0 56.1 43.9 84.8 15.2 0 35.8 0 64.2

PHF .000 .952 .966 .961 .000 .882 .898 .889 .942 .949 .000 .952 .871 .000 .792 .848 .964

Accurate Counts978-664-2565

Page 36: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810001Site Code : 11810001Start Date : 12/6/2012Page No : 2

N/S Street : Alewife Brook ParkwayE/W Street: Route 2 / 'T' ExitCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pkwy

Rou

te 2

'T' E

xit

Alewife Brook Pkwy

Right792

Thru354

Left0

InOut Total1217 1146 2363

Right370

Thru473

Left 0

Out

Total

In0

843843

Left1677

Thru300

Right0

Out TotalIn1333 1977 3310

Left

547

Thr

u0R

ight

979

Tot

alO

utIn

2942

1526

4468

Peak Hour Begins at 05:00 PM

Cars

Peak Hour Data

North

Peak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Each Approach Begins at:

05:15 PM 05:30 PM 05:00 PM 04:45 PM+0 mins. 0 87 199 286 0 121 88 209 402 70 0 472 133 0 236 369

+15 mins. 0 93 205 298 0 134 103 237 445 73 0 518 157 0 234 391+30 mins. 0 89 190 279 0 130 69 199 389 79 0 468 139 0 228 367+45 mins. 0 81 219 300 0 114 85 199 441 78 0 519 141 0 309 450

Total Volume 0 350 813 1163 0 499 345 844 1677 300 0 1977 570 0 1007 1577% App. Total 0 30.1 69.9 0 59.1 40.9 84.8 15.2 0 36.1 0 63.9

PHF .000 .941 .928 .969 .000 .931 .837 .890 .942 .949 .000 .952 .908 .000 .815 .876

Accurate Counts978-664-2565

File Name : 11810001Site Code : 11810001Start Date : 12/6/2012Page No : 3

N/S Street : Alewife Brook ParkwayE/W Street: Route 2 / 'T' ExitCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pkwy

Rou

te 2

'T' E

xit

Alewife Brook Pkwy

Right813

Thru350

Left0

In - Peak Hour: 05:15 PM1163

Right345

Thru499

Left 0

In - Peak H

our: 05:30 PM

844

Left1677

Thru300

Right0

In - Peak Hour: 05:00 PM1977

Left

570

Thr

u0R

ight

1007

In -

Pea

k H

our:

04:

45 P

M15

77

Cars

Peak Hour Data

North

Accurate Counts978-664-2565

Page 37: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810001Site Code : 11810001Start Date : 12/6/2012Page No : 1

N/S Street : Alewife Brook ParkwayE/W Street: Route 2 / 'T' ExitCity/State : Cambridge, MAWeather : Clear

Groups Printed- TrucksAlewife Brook Pkwy

From North'T' Exit

From EastAlewife Brook Pkwy

From SouthRoute 2

From WestStart Time Left Thru Right Left Thru Right Left Thru Right Left Thru Right Int. Total04:30 PM 0 1 1 0 0 0 1 1 0 0 0 2 604:45 PM 0 0 1 0 0 0 2 1 0 2 0 1 7

Total 0 1 2 0 0 0 3 2 0 2 0 3 13

05:00 PM 0 0 0 0 0 0 0 0 0 0 0 1 105:15 PM 0 0 0 0 0 0 3 1 0 1 0 0 505:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 005:45 PM 0 0 0 0 0 0 1 1 0 0 0 0 2

Total 0 0 0 0 0 0 4 2 0 1 0 1 8

06:00 PM 0 0 1 0 0 0 1 0 0 1 0 0 306:15 PM 0 0 0 0 0 0 2 0 0 0 0 0 2

Grand Total 0 1 3 0 0 0 10 4 0 4 0 4 26Apprch % 0 25 75 0 0 0 71.4 28.6 0 50 0 50

Total % 0 3.8 11.5 0 0 0 38.5 15.4 0 15.4 0 15.4

Alewife Brook PkwyFrom North

'T' ExitFrom East

Alewife Brook PkwyFrom South

Route 2From West

Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. TotalPeak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 04:30 PM

04:30 PM 0 1 1 2 0 0 0 0 1 1 0 2 0 0 2 2 604:45 PM 0 0 1 1 0 0 0 0 2 1 0 3 2 0 1 3 705:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 105:15 PM 0 0 0 0 0 0 0 0 3 1 0 4 1 0 0 1 5

Total Volume 0 1 2 3 0 0 0 0 6 3 0 9 3 0 4 7 19% App. Total 0 33.3 66.7 0 0 0 66.7 33.3 0 42.9 0 57.1

PHF .000 .250 .500 .375 .000 .000 .000 .000 .500 .750 .000 .563 .375 .000 .500 .583 .679

Accurate Counts978-664-2565

File Name : 11810001Site Code : 11810001Start Date : 12/6/2012Page No : 2

N/S Street : Alewife Brook ParkwayE/W Street: Route 2 / 'T' ExitCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pkwy

Rou

te 2

'T' E

xit

Alewife Brook Pkwy

Right2

Thru1

Left0

InOut Total6 3 9

Right 0

Thru 0

Left 0

Out

Total

In0

00

Left6

Thru3

Right0

Out TotalIn5 9 14

Left

3T

hru0

Rig

ht4

Tot

alO

utIn

87

15

Peak Hour Begins at 04:30 PM

Trucks

Peak Hour Data

North

Peak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Each Approach Begins at:

04:30 PM 04:30 PM 04:30 PM 04:30 PM+0 mins. 0 1 1 2 0 0 0 0 1 1 0 2 0 0 2 2

+15 mins. 0 0 1 1 0 0 0 0 2 1 0 3 2 0 1 3+30 mins. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1+45 mins. 0 0 0 0 0 0 0 0 3 1 0 4 1 0 0 1

Total Volume 0 1 2 3 0 0 0 0 6 3 0 9 3 0 4 7% App. Total 0 33.3 66.7 0 0 0 66.7 33.3 0 42.9 0 57.1

PHF .000 .250 .500 .375 .000 .000 .000 .000 .500 .750 .000 .563 .375 .000 .500 .583

Accurate Counts978-664-2565

Page 38: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810001Site Code : 11810001Start Date : 12/6/2012Page No : 3

N/S Street : Alewife Brook ParkwayE/W Street: Route 2 / 'T' ExitCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pkwy

Rou

te 2

'T' E

xit

Alewife Brook Pkwy

Right2

Thru1

Left0

In - Peak Hour: 04:30 PM3

Right 0

Thru 0

Left 0

In - Peak H

our: 04:30 PM

0

Left6

Thru3

Right0

In - Peak Hour: 04:30 PM9

Left

3T

hru0

Rig

ht4

In -

Pea

k H

our:

04:

30 P

M7

Trucks

Peak Hour Data

North

Accurate Counts978-664-2565

File

Nam

e: 1

1810

001

Site

Cod

e: 1

1810

001

Star

t Dat

e: 1

2/6/

2012

Page

No

: 1

N/S

Stre

et :

Ale

wife

Bro

ok P

arkw

ayE/

W S

treet

: Rou

te 2

/ 'T

' Exi

tC

ity/S

tate

: C

ambr

idge

, MA

Wea

ther

:

Cle

ar

Gro

ups P

rint

ed- P

eds

'T' E

xit

From

Eas

tSt

art T

ime

SBN

BIn

t. To

tal

04:3

0 PM

10

104

:45

PM0

00

Tota

l1

01

05:0

0 PM

00

005

:15

PM0

00

05:3

0 PM

00

005

:45

PM0

00

Tota

l0

00

06:0

0 PM

00

006

:15

PM0

11

Gra

nd T

otal

11

2A

pprc

h %

5050

Tota

l %50

50

From

Nor

th'T

' Exi

tFr

om E

ast

From

Sou

thFr

om W

est

Star

t Tim

eA

pp. T

otal

SBN

BA

pp. T

otal

App

. Tot

alA

pp. T

otal

Int.

Tota

lPe

ak H

our A

naly

sis F

rom

04:

30 P

M to

06:

15 P

M -

Peak

1 o

f 1Pe

ak H

our f

or E

ntire

Inte

rsec

tion

Beg

ins a

t 04:

30 P

M04

:30

PM0

10

10

01

04:4

5 PM

00

00

00

005

:00

PM0

00

00

00

05:1

5 PM

00

00

00

0To

tal V

olum

e0

10

10

01

% A

pp. T

otal

100

0PH

F.0

00.2

50.0

00.2

50.0

00.0

00.2

50

Acc

urat

e C

ount

s97

8-66

4-25

65

Page 39: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File

Nam

e: 1

1810

001

Site

Cod

e: 1

1810

001

Star

t Dat

e: 1

2/6/

2012

Page

No

: 2

N/S

Stre

et :

Ale

wife

Bro

ok P

arkw

ayE/

W S

treet

: Rou

te 2

/ 'T

' Exi

tC

ity/S

tate

: C

ambr

idge

, MA

Wea

ther

:

Cle

ar

Ale

wife

Bro

ok P

kwy

Route 2 'T' Exit

Ale

wife

Bro

ok P

kwy

InO

utT

otal

00

0

Right0

Left1

Out TotalIn0 1 1

Out

Tot

alIn

10

1

Total OutIn000

Pea

k H

our

Beg

ins

at 0

4:30

PM

Ped

s

Pea

k H

our

Dat

a

Nor

th

Peak

Hou

r Ana

lysi

s Fro

m 0

4:30

PM

to 0

6:15

PM

- Pe

ak 1

of 1

Peak

Hou

r for

Eac

h A

ppro

ach

Beg

ins a

t:04

:30

PM04

:30

PM04

:30

PM04

:30

PM+0

min

s.0

10

10

0+1

5 m

ins.

00

00

00

+30

min

s.0

00

00

0+4

5 m

ins.

00

00

00

Tota

l Vol

ume

01

01

00

% A

pp. T

otal

100

0PH

F.0

00.2

50.0

00.2

50.0

00.0

00

Acc

urat

e C

ount

s97

8-66

4-25

65

File

Nam

e: 1

1810

001

Site

Cod

e: 1

1810

001

Star

t Dat

e: 1

2/6/

2012

Page

No

: 3

N/S

Stre

et :

Ale

wife

Bro

ok P

arkw

ayE/

W S

treet

: Rou

te 2

/ 'T

' Exi

tC

ity/S

tate

: C

ambr

idge

, MA

Wea

ther

:

Cle

ar

Ale

wife

Bro

ok P

kwy

Route 2 'T' Exit

Ale

wife

Bro

ok P

kwy

In -

Pea

k H

our:

04:

30 P

M0

Right0

Left1

In - Peak Hour: 04:30 PM1

In -

Pea

k H

our:

04:

30 P

M0

In - Peak Hour: 04:30 PM0

Ped

s

Pea

k H

our

Dat

a

Nor

th

Acc

urat

e C

ount

s97

8-66

4-25

65

Page 40: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 1

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Groups Printed- Cars - Trucks - BusesAlewife Brook Pkwy

From NorthAlewife Brook Pkwy

From SouthCambridge Park Dr

From WestStart Time Thru Right Left Thru Left Right Int. Total07:30 AM 345 8 48 364 9 130 90407:45 AM 287 23 57 337 7 96 807

Total 632 31 105 701 16 226 1711

08:00 AM 323 13 77 349 7 96 86508:15 AM 238 15 61 313 8 86 72108:30 AM 302 21 75 356 8 93 85508:45 AM 334 29 63 274 8 108 816

Total 1197 78 276 1292 31 383 3257

09:00 AM 334 21 78 287 10 130 86009:15 AM 339 15 40 282 6 128 810

Grand Total 2502 145 499 2562 63 867 6638Apprch % 94.5 5.5 16.3 83.7 6.8 93.2

Total % 37.7 2.2 7.5 38.6 0.9 13.1Cars 2464 134 496 2514 50 850 6508

% Cars 98.5 92.4 99.4 98.1 79.4 98 98Trucks 33 3 2 44 1 10 93

% Trucks 1.3 2.1 0.4 1.7 1.6 1.2 1.4Buses 5 8 1 4 12 7 37

% Buses 0.2 5.5 0.2 0.2 19 0.8 0.6

Alewife Brook PkwyFrom North From East

Alewife Brook PkwyFrom South

Cambridge Park DrFrom West

Start Time Thru Right App. Total App. Total Left Thru App. Total Left Right App. Total Int. TotalPeak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 08:30 AM

08:30 AM 302 21 323 0 75 356 431 8 93 101 85508:45 AM 334 29 363 0 63 274 337 8 108 116 81609:00 AM 334 21 355 0 78 287 365 10 130 140 86009:15 AM 339 15 354 0 40 282 322 6 128 134 810

Total Volume 1309 86 1395 0 256 1199 1455 32 459 491 3341% App. Total 93.8 6.2 17.6 82.4 6.5 93.5

PHF .965 .741 .961 .000 .821 .842 .844 .800 .883 .877 .971Cars 1288 81 1369 0 255 1173 1428 26 449 475 3272

% Cars 98.4 94.2 98.1 0 99.6 97.8 98.1 81.3 97.8 96.7 97.9Trucks 18 2 20 0 1 25 26 1 6 7 53

% Trucks 1.4 2.3 1.4 0 0.4 2.1 1.8 3.1 1.3 1.4 1.6Buses 3 3 6 0 0 1 1 5 4 9 16

% Buses 0.2 3.5 0.4 0 0 0.1 0.1 15.6 0.9 1.8 0.5

Accurate Counts978-664-2565

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 2

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pkwy

Cam

brid

ge P

ark

Dr

Alewife Brook Pkwy

Right

8123

86Thru

1288183

1309

InOut Total1199 1369 2568

26 20 466 6 12

1231 26261395

Out

Total

In0

00

00

00

00

00

0

Left255

10

256

Thru1173

251

1199

Out TotalIn

1737 1428 316524 26 507 1 8

1768 32231455

Left26

1 532

Rig

ht

449 6 4

459

Tot

alO

utIn

336

475

811

37

103

912

342

833

491 Peak Hour Begins at 08:30 AM

CarsTrucksBuses

Peak Hour Data

North

Peak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Each Approach Begins at:

08:30 AM 07:30 AM 07:45 AM 08:30 AM+0 mins. 302 21 323 0 57 337 394 8 93 101

+15 mins. 334 29 363 0 77 349 426 8 108 116+30 mins. 334 21 355 0 61 313 374 10 130 140+45 mins. 339 15 354 0 75 356 431 6 128 134

Total Volume 1309 86 1395 0 270 1355 1625 32 459 491% App. Total 93.8 6.2 16.6 83.4 6.5 93.5

PHF .965 .741 .961 .000 .877 .952 .943 .800 .883 .877Cars 1288 81 1369 0 268 1334 1602 26 449 475

% Cars 98.4 94.2 98.1 0 99.3 98.5 98.6 81.2 97.8 96.7Trucks 18 2 20 0 1 17 18 1 6 7

% Trucks 1.4 2.3 1.4 0 0.4 1.3 1.1 3.1 1.3 1.4Buses 3 3 6 0 1 4 5 5 4 9

% Buses 0.2 3.5 0.4 0 0.4 0.3 0.3 15.6 0.9 1.8

Accurate Counts978-664-2565

Page 41: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 3

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pkwy

Cam

brid

ge P

ark

Dr

Alewife Brook Pkwy

Right

8123

86Thru

1288183

1309

In - Peak Hour: 08:30 AM1369

206

1395

In - Peak H

our: 07:30 AM

0000

Left268

11

270

Thru1334

174

1355

In - Peak Hour: 07:45 AM

1602185

1625

Left26

1 532

Rig

ht

449 6 4

459

In -

Pea

k H

our:

08:

30 A

M47

5 7 949

1 CarsTrucksBuses

Peak Hour Data

North

Accurate Counts978-664-2565

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 1

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Groups Printed- BusesAlewife Brook Pkwy

From NorthAlewife Brook Pkwy

From SouthCambridge Park Dr

From WestStart Time Thru Right Left Thru Left Right Int. Total07:30 AM 0 1 0 0 5 1 707:45 AM 0 1 1 2 0 0 4

Total 0 2 1 2 5 1 11

08:00 AM 1 2 0 0 1 0 408:15 AM 1 1 0 1 1 2 608:30 AM 1 0 0 1 2 1 508:45 AM 0 2 0 0 2 2 6

Total 3 5 0 2 6 5 21

09:00 AM 1 1 0 0 1 1 409:15 AM 1 0 0 0 0 0 1

Grand Total 5 8 1 4 12 7 37Apprch % 38.5 61.5 20 80 63.2 36.8

Total % 13.5 21.6 2.7 10.8 32.4 18.9

Alewife Brook PkwyFrom North From East

Alewife Brook PkwyFrom South

Cambridge Park DrFrom West

Start Time Thru Right App. Total App. Total Left Thru App. Total Left Right App. Total Int. TotalPeak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 07:30 AM

07:30 AM 0 1 1 0 0 0 0 5 1 6 707:45 AM 0 1 1 0 1 2 3 0 0 0 408:00 AM 1 2 3 0 0 0 0 1 0 1 408:15 AM 1 1 2 0 0 1 1 1 2 3 6

Total Volume 2 5 7 0 1 3 4 7 3 10 21% App. Total 28.6 71.4 25 75 70 30

PHF .500 .625 .583 .000 .250 .375 .333 .350 .375 .417 .750

Accurate Counts978-664-2565

Page 42: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 2

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pkwy

Cam

brid

ge P

ark

Dr

Alewife Brook Pkwy

Right5

Thru2

InOut Total10 7 17

Out

Total

In0

00

Left1

Thru3

Out TotalIn5 4 9

Left

7R

ight3

Tot

alO

utIn

610

16

Peak Hour Begins at 07:30 AM

Buses

Peak Hour Data

North

Peak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Each Approach Begins at:

08:00 AM 07:30 AM 07:45 AM 08:15 AM+0 mins. 1 2 3 0 1 2 3 1 2 3

+15 mins. 1 1 2 0 0 0 0 2 1 3+30 mins. 1 0 1 0 0 1 1 2 2 4+45 mins. 0 2 2 0 0 1 1 1 1 2

Total Volume 3 5 8 0 1 4 5 6 6 12% App. Total 37.5 62.5 20 80 50 50

PHF .750 .625 .667 .000 .250 .500 .417 .750 .750 .750

Accurate Counts978-664-2565

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 3

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pkwy

Cam

brid

ge P

ark

Dr

Alewife Brook Pkwy

Right5

Thru3

In - Peak Hour: 08:00 AM8

In - Peak H

our: 07:30 AM

0

Left1

Thru4

In - Peak Hour: 07:45 AM5

Left

6R

ight6

In -

Pea

k H

our:

08:

15 A

M12

Buses

Peak Hour Data

North

Accurate Counts978-664-2565

Page 43: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 1

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Groups Printed- CarsAlewife Brook Pkwy

From NorthAlewife Brook Pkwy

From SouthCambridge Park Dr

From WestStart Time Thru Right Left Thru Left Right Int. Total07:30 AM 342 7 48 357 4 129 88707:45 AM 280 21 56 330 7 93 787

Total 622 28 104 687 11 222 1674

08:00 AM 317 11 77 349 6 95 85508:15 AM 237 14 60 305 7 84 70708:30 AM 295 21 75 350 6 91 83808:45 AM 330 27 62 269 6 105 799

Total 1179 73 274 1273 25 375 3199

09:00 AM 328 19 78 279 8 128 84009:15 AM 335 14 40 275 6 125 795

Grand Total 2464 134 496 2514 50 850 6508Apprch % 94.8 5.2 16.5 83.5 5.6 94.4

Total % 37.9 2.1 7.6 38.6 0.8 13.1

Alewife Brook PkwyFrom North From East

Alewife Brook PkwyFrom South

Cambridge Park DrFrom West

Start Time Thru Right App. Total App. Total Left Thru App. Total Left Right App. Total Int. TotalPeak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 08:30 AM

08:30 AM 295 21 316 0 75 350 425 6 91 97 83808:45 AM 330 27 357 0 62 269 331 6 105 111 79909:00 AM 328 19 347 0 78 279 357 8 128 136 84009:15 AM 335 14 349 0 40 275 315 6 125 131 795

Total Volume 1288 81 1369 0 255 1173 1428 26 449 475 3272% App. Total 94.1 5.9 17.9 82.1 5.5 94.5

PHF .961 .750 .959 .000 .817 .838 .840 .813 .877 .873 .974

Accurate Counts978-664-2565

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 2

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pkwy

Cam

brid

ge P

ark

Dr

Alewife Brook Pkwy

Right81

Thru1288

InOut Total1199 1369 2568

Out

Total

In0

00

Left255

Thru1173

Out TotalIn1737 1428 3165

Left26

Rig

ht44

9

Tot

alO

utIn

336

475

811

Peak Hour Begins at 08:30 AM

Cars

Peak Hour Data

North

Peak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Each Approach Begins at:

08:30 AM 07:30 AM 07:45 AM 08:30 AM+0 mins. 295 21 316 0 56 330 386 6 91 97

+15 mins. 330 27 357 0 77 349 426 6 105 111+30 mins. 328 19 347 0 60 305 365 8 128 136+45 mins. 335 14 349 0 75 350 425 6 125 131

Total Volume 1288 81 1369 0 268 1334 1602 26 449 475% App. Total 94.1 5.9 16.7 83.3 5.5 94.5

PHF .961 .750 .959 .000 .870 .953 .940 .813 .877 .873

Accurate Counts978-664-2565

Page 44: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 3

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pkwy

Cam

brid

ge P

ark

Dr

Alewife Brook Pkwy

Right81

Thru1288

In - Peak Hour: 08:30 AM1369

In - Peak H

our: 07:30 AM

0

Left268

Thru1334

In - Peak Hour: 07:45 AM1602

Left26

Rig

ht44

9

In -

Pea

k H

our:

08:

30 A

M47

5

Cars

Peak Hour Data

North

Accurate Counts978-664-2565

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 1

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Groups Printed- TrucksAlewife Brook Pkwy

From NorthAlewife Brook Pkwy

From SouthCambridge Park Dr

From WestStart Time Thru Right Left Thru Left Right Int. Total07:30 AM 3 0 0 7 0 0 1007:45 AM 7 1 0 5 0 3 16

Total 10 1 0 12 0 3 26

08:00 AM 5 0 0 0 0 1 608:15 AM 0 0 1 7 0 0 808:30 AM 6 0 0 5 0 1 1208:45 AM 4 0 1 5 0 1 11

Total 15 0 2 17 0 3 37

09:00 AM 5 1 0 8 1 1 1609:15 AM 3 1 0 7 0 3 14

Grand Total 33 3 2 44 1 10 93Apprch % 91.7 8.3 4.3 95.7 9.1 90.9

Total % 35.5 3.2 2.2 47.3 1.1 10.8

Alewife Brook PkwyFrom North From East

Alewife Brook PkwyFrom South

Cambridge Park DrFrom West

Start Time Thru Right App. Total App. Total Left Thru App. Total Left Right App. Total Int. TotalPeak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 08:30 AM

08:30 AM 6 0 6 0 0 5 5 0 1 1 1208:45 AM 4 0 4 0 1 5 6 0 1 1 1109:00 AM 5 1 6 0 0 8 8 1 1 2 1609:15 AM 3 1 4 0 0 7 7 0 3 3 14

Total Volume 18 2 20 0 1 25 26 1 6 7 53% App. Total 90 10 3.8 96.2 14.3 85.7

PHF .750 .500 .833 .000 .250 .781 .813 .250 .500 .583 .828

Accurate Counts978-664-2565

Page 45: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 2

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pkwy

Cam

brid

ge P

ark

Dr

Alewife Brook Pkwy

Right2

Thru18

InOut Total26 20 46

Out

Total

In0

00

Left1

Thru25

Out TotalIn24 26 50

Left

1R

ight6

Tot

alO

utIn

37

10

Peak Hour Begins at 08:30 AM

Trucks

Peak Hour Data

North

Peak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Each Approach Begins at:

08:30 AM 07:30 AM 08:15 AM 08:30 AM+0 mins. 6 0 6 0 1 7 8 0 1 1

+15 mins. 4 0 4 0 0 5 5 0 1 1+30 mins. 5 1 6 0 1 5 6 1 1 2+45 mins. 3 1 4 0 0 8 8 0 3 3

Total Volume 18 2 20 0 2 25 27 1 6 7% App. Total 90 10 7.4 92.6 14.3 85.7

PHF .750 .500 .833 .000 .500 .781 .844 .250 .500 .583

Accurate Counts978-664-2565

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 3

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pkwy

Cam

brid

ge P

ark

Dr

Alewife Brook Pkwy

Right2

Thru18

In - Peak Hour: 08:30 AM20

In - Peak H

our: 07:30 AM

0

Left2

Thru25

In - Peak Hour: 08:15 AM27

Left

1R

ight6

In -

Pea

k H

our:

08:

30 A

M7

Trucks

Peak Hour Data

North

Accurate Counts978-664-2565

Page 46: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 1

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Groups Printed- PedsAlewife Brook Pkwy

From North From EastAlewife Brook Pkwy

From SouthCambridge Park Dr

From WestStart Time EB WB SB NB WB EB NB SB Int. Total07:30 AM 0 0 0 4 0 0 0 0 407:45 AM 0 0 4 3 0 0 0 0 7

Total 0 0 4 7 0 0 0 0 11

08:00 AM 0 0 5 5 0 0 0 0 1008:15 AM 0 0 7 3 0 0 0 0 1008:30 AM 0 0 4 3 0 0 0 0 708:45 AM 0 1 2 8 0 1 0 0 12

Total 0 1 18 19 0 1 0 0 39

09:00 AM 0 0 5 1 0 0 0 0 609:15 AM 0 0 3 2 0 0 0 0 5

Grand Total 0 1 30 29 0 1 0 0 61Apprch % 0 100 50.8 49.2 0 100 0 0

Total % 0 1.6 49.2 47.5 0 1.6 0 0

Alewife Brook PkwyFrom North From East

Alewife Brook PkwyFrom South

Cambridge Park DrFrom West

Start Time EB WB App. Total SB NB App. Total WB EB App. Total NB SB App. Total Int. TotalPeak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 08:00 AM

08:00 AM 0 0 0 5 5 10 0 0 0 0 0 0 1008:15 AM 0 0 0 7 3 10 0 0 0 0 0 0 1008:30 AM 0 0 0 4 3 7 0 0 0 0 0 0 708:45 AM 0 1 1 2 8 10 0 1 1 0 0 0 12

Total Volume 0 1 1 18 19 37 0 1 1 0 0 0 39% App. Total 0 100 48.6 51.4 0 100 0 0

PHF .000 .250 .250 .643 .594 .925 .000 .250 .250 .000 .000 .000 .813

Accurate Counts978-664-2565

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 2

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pkwy

Cam

brid

ge P

ark

Dr

Alewife Brook Pkwy

Right1

Left0

InOut Total19 1 20

Right

19Left 18

Out

Total

In1

3738

Left0

Right1

Out TotalIn18 1 19

Left

0R

ight0

Tot

alO

utIn

10

1

Peak Hour Begins at 08:00 AM

Peds

Peak Hour Data

North

Peak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Each Approach Begins at:

08:00 AM 08:00 AM 08:00 AM 07:30 AM+0 mins. 0 0 0 5 5 10 0 0 0 0 0 0

+15 mins. 0 0 0 7 3 10 0 0 0 0 0 0+30 mins. 0 0 0 4 3 7 0 0 0 0 0 0+45 mins. 0 1 1 2 8 10 0 1 1 0 0 0

Total Volume 0 1 1 18 19 37 0 1 1 0 0 0% App. Total 0 100 48.6 51.4 0 100 0 0

PHF .000 .250 .250 .643 .594 .925 .000 .250 .250 .000 .000 .000

Accurate Counts978-664-2565

Page 47: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 3

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pkwy

Cam

brid

ge P

ark

Dr

Alewife Brook Pkwy

Right1

Left0

In - Peak Hour: 08:00 AM1

Right

19Left 18

In - Peak H

our: 08:00 AM

37

Left0

Right1

In - Peak Hour: 08:00 AM1

Left

0R

ight0

In -

Pea

k H

our:

07:

30 A

M0

Peds

Peak Hour Data

North

Accurate Counts978-664-2565

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 1

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Groups Printed- Bikes StreetAlewife Brook Pkwy

From NorthAlewife Brook Pkwy

From SouthCambridge Park Dr

From WestStart Time Thru Right Left Thru Left Right Int. Total07:30 AM 0 0 0 0 0 0 007:45 AM 0 0 0 0 0 0 0

Total 0 0 0 0 0 0 0

08:00 AM 0 0 0 0 0 0 008:15 AM 0 0 1 0 1 0 208:30 AM 0 0 0 0 0 1 108:45 AM 0 0 1 0 0 0 1

Total 0 0 2 0 1 1 4

09:00 AM 0 0 0 0 0 1 109:15 AM 0 0 0 0 1 0 1

Grand Total 0 0 2 0 2 2 6Apprch % 0 0 100 0 50 50

Total % 0 0 33.3 0 33.3 33.3

Alewife Brook PkwyFrom North From East

Alewife Brook PkwyFrom South

Cambridge Park DrFrom West

Start Time Thru Right App. Total App. Total Left Thru App. Total Left Right App. Total Int. TotalPeak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 08:15 AM

08:15 AM 0 0 0 0 1 0 1 1 0 1 208:30 AM 0 0 0 0 0 0 0 0 1 1 108:45 AM 0 0 0 0 1 0 1 0 0 0 109:00 AM 0 0 0 0 0 0 0 0 1 1 1

Total Volume 0 0 0 0 2 0 2 1 2 3 5% App. Total 0 0 100 0 33.3 66.7

PHF .000 .000 .000 .000 .500 .000 .500 .250 .500 .750 .625

Accurate Counts978-664-2565

Page 48: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 2

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pkwy

Cam

brid

ge P

ark

Dr

Alewife Brook Pkwy

Right0

Thru0

InOut Total1 0 1

Out

Total

In0

00

Left2

Thru0

Out TotalIn2 2 4

Left

1R

ight2

Tot

alO

utIn

23

5

Peak Hour Begins at 08:15 AM

Bikes Street

Peak Hour Data

North

Peak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Each Approach Begins at:

07:30 AM 07:30 AM 08:00 AM 08:15 AM+0 mins. 0 0 0 0 0 0 0 1 0 1

+15 mins. 0 0 0 0 1 0 1 0 1 1+30 mins. 0 0 0 0 0 0 0 0 0 0+45 mins. 0 0 0 0 1 0 1 0 1 1

Total Volume 0 0 0 0 2 0 2 1 2 3% App. Total 0 0 100 0 33.3 66.7

PHF .000 .000 .000 .000 .500 .000 .500 .250 .500 .750

Accurate Counts978-664-2565

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 3

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pkwy

Cam

brid

ge P

ark

Dr

Alewife Brook Pkwy

Right0

Thru0

In - Peak Hour: 07:30 AM0

In - Peak H

our: 07:30 AM

0

Left2

Thru0

In - Peak Hour: 08:00 AM2

Left

1R

ight2

In -

Pea

k H

our:

08:

15 A

M3

Bikes Street

Peak Hour Data

North

Accurate Counts978-664-2565

Page 49: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 1

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Groups Printed- Bikes SWAlewife Brook Pkwy

From NorthAlewife Brook Pkwy

From SouthCambridge Park Dr

From WestStart Time Thru Right Left Thru Left Right Int. Total07:30 AM 0 0 0 0 0 0 007:45 AM 0 0 0 0 0 0 0

Total 0 0 0 0 0 0 0

08:00 AM 0 0 0 0 0 0 008:15 AM 0 0 0 0 0 0 008:30 AM 0 0 0 0 0 0 008:45 AM 0 0 1 0 0 1 2

Total 0 0 1 0 0 1 2

09:00 AM 0 0 0 0 0 0 009:15 AM 0 0 0 0 0 1 1

Grand Total 0 0 1 0 0 2 3Apprch % 0 0 100 0 0 100

Total % 0 0 33.3 0 0 66.7

Alewife Brook PkwyFrom North From East

Alewife Brook PkwyFrom South

Cambridge Park DrFrom West

Start Time Thru Right App. Total App. Total Left Thru App. Total Left Right App. Total Int. TotalPeak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 08:30 AM

08:30 AM 0 0 0 0 0 0 0 0 0 0 008:45 AM 0 0 0 0 1 0 1 0 1 1 209:00 AM 0 0 0 0 0 0 0 0 0 0 009:15 AM 0 0 0 0 0 0 0 0 1 1 1

Total Volume 0 0 0 0 1 0 1 0 2 2 3% App. Total 0 0 100 0 0 100

PHF .000 .000 .000 .000 .250 .000 .250 .000 .500 .500 .375

Accurate Counts978-664-2565

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 2

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pkwy

Cam

brid

ge P

ark

Dr

Alewife Brook Pkwy

Right0

Thru0

InOut Total0 0 0

Out

Total

In0

00

Left1

Thru0

Out TotalIn2 1 3

Left

0R

ight2

Tot

alO

utIn

12

3

Peak Hour Begins at 08:30 AM

Bikes SW

Peak Hour Data

North

Peak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Each Approach Begins at:

07:30 AM 07:30 AM 08:00 AM 08:30 AM+0 mins. 0 0 0 0 0 0 0 0 0 0

+15 mins. 0 0 0 0 0 0 0 0 1 1+30 mins. 0 0 0 0 0 0 0 0 0 0+45 mins. 0 0 0 0 1 0 1 0 1 1

Total Volume 0 0 0 0 1 0 1 0 2 2% App. Total 0 0 100 0 0 100

PHF .000 .000 .000 .000 .250 .000 .250 .000 .500 .500

Accurate Counts978-664-2565

Page 50: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 3

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pkwy

Cam

brid

ge P

ark

Dr

Alewife Brook Pkwy

Right0

Thru0

In - Peak Hour: 07:30 AM0

In - Peak H

our: 07:30 AM

0

Left1

Thru0

In - Peak Hour: 08:00 AM1

Left

0R

ight2

In -

Pea

k H

our:

08:

30 A

M2

Bikes SW

Peak Hour Data

North

Accurate Counts978-664-2565

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 1

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Groups Printed- Cars - Trucks - BusesAlewife Brook Pkwy

From NorthAlewife Brook Pkwy

From SouthCambridge Park Dr

From WestStart Time Thru Right Left Thru Left Right Int. Total04:30 PM 315 6 24 371 65 102 88304:45 PM 296 16 25 400 77 94 908

Total 611 22 49 771 142 196 1791

05:00 PM 315 11 33 448 96 164 106705:15 PM 292 9 24 359 108 168 96005:30 PM 389 11 36 442 92 147 111705:45 PM 305 9 29 355 103 112 913

Total 1301 40 122 1604 399 591 4057

06:00 PM 305 11 32 358 101 178 98506:15 PM 347 9 31 348 86 170 991

Grand Total 2564 82 234 3081 728 1135 7824Apprch % 96.9 3.1 7.1 92.9 39.1 60.9

Total % 32.8 1 3 39.4 9.3 14.5Cars 2557 77 229 3076 706 1129 7774

% Cars 99.7 93.9 97.9 99.8 97 99.5 99.4Trucks 6 0 1 4 4 1 16

% Trucks 0.2 0 0.4 0.1 0.5 0.1 0.2Buses 1 5 4 1 18 5 34

% Buses 0 6.1 1.7 0 2.5 0.4 0.4

Alewife Brook PkwyFrom North From East

Alewife Brook PkwyFrom South

Cambridge Park DrFrom West

Start Time Thru Right App. Total App. Total Left Thru App. Total Left Right App. Total Int. TotalPeak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 05:00 PM

05:00 PM 315 11 326 0 33 448 481 96 164 260 106705:15 PM 292 9 301 0 24 359 383 108 168 276 96005:30 PM 389 11 400 0 36 442 478 92 147 239 111705:45 PM 305 9 314 0 29 355 384 103 112 215 913

Total Volume 1301 40 1341 0 122 1604 1726 399 591 990 4057% App. Total 97 3 7.1 92.9 40.3 59.7

PHF .836 .909 .838 .000 .847 .895 .897 .924 .879 .897 .908Cars 1295 36 1331 0 118 1601 1719 385 587 972 4022

% Cars 99.5 90.0 99.3 0 96.7 99.8 99.6 96.5 99.3 98.2 99.1Trucks 6 0 6 0 1 2 3 4 1 5 14

% Trucks 0.5 0 0.4 0 0.8 0.1 0.2 1.0 0.2 0.5 0.3Buses 0 4 4 0 3 1 4 10 3 13 21

% Buses 0 10.0 0.3 0 2.5 0.1 0.2 2.5 0.5 1.3 0.5

Accurate Counts978-664-2565

Page 51: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 2

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pkwy

Cam

brid

ge P

ark

Dr

Alewife Brook Pkwy

Right

3604

40Thru

129560

1301

InOut Total1986 1331 3317

6 6 1211 4 15

2003 33441341

Out

Total

In0

00

00

00

00

00

0

Left118

13

122

Thru1601

21

1604

Out TotalIn

1882 1719 36017 3 103 4 7

1892 36181726

Left

385 4

1039

9R

ight

587 1 3

591

Tot

alO

utIn

154

972

1126

15

67

1320

162

1152

990 Peak Hour Begins at 05:00 PM

CarsTrucksBuses

Peak Hour Data

North

Peak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Each Approach Begins at:

05:30 PM 04:30 PM 04:45 PM 05:15 PM+0 mins. 389 11 400 0 25 400 425 108 168 276

+15 mins. 305 9 314 0 33 448 481 92 147 239+30 mins. 305 11 316 0 24 359 383 103 112 215+45 mins. 347 9 356 0 36 442 478 101 178 279

Total Volume 1346 40 1386 0 118 1649 1767 404 605 1009% App. Total 97.1 2.9 6.7 93.3 40 60

PHF .865 .909 .866 .000 .819 .920 .918 .935 .850 .904Cars 1343 37 1380 0 114 1647 1761 388 603 991

% Cars 99.8 92.5 99.6 0 96.6 99.9 99.7 96 99.7 98.2Trucks 2 0 2 0 1 1 2 2 0 2

% Trucks 0.1 0 0.1 0 0.8 0.1 0.1 0.5 0 0.2Buses 1 3 4 0 3 1 4 14 2 16

% Buses 0.1 7.5 0.3 0 2.5 0.1 0.2 3.5 0.3 1.6

Accurate Counts978-664-2565

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 3

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pkwy

Cam

brid

ge P

ark

Dr

Alewife Brook Pkwy

Right

3703

40Thru

134321

1346

In - Peak Hour: 05:30 PM1380

24

1386

In - Peak H

our: 04:30 PM

0000

Left114

13

118

Thru1647

11

1649

In - Peak Hour: 04:45 PM

176124

1767

Left

388 2

1440

4R

ight

603 0 2

605

In -

Pea

k H

our:

05:

15 P

M99

1 216

1009 Cars

TrucksBuses

Peak Hour Data

North

Accurate Counts978-664-2565

Page 52: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 1

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Groups Printed- BusesAlewife Brook Pkwy

From NorthAlewife Brook Pkwy

From SouthCambridge Park Dr

From WestStart Time Thru Right Left Thru Left Right Int. Total04:30 PM 0 0 0 0 0 0 004:45 PM 0 0 0 0 0 0 0

Total 0 0 0 0 0 0 0

05:00 PM 0 1 1 1 2 1 605:15 PM 0 1 2 0 2 1 605:30 PM 0 1 0 0 3 0 405:45 PM 0 1 0 0 3 1 5

Total 0 4 3 1 10 3 21

06:00 PM 1 1 1 0 6 0 906:15 PM 0 0 0 0 2 2 4

Grand Total 1 5 4 1 18 5 34Apprch % 16.7 83.3 80 20 78.3 21.7

Total % 2.9 14.7 11.8 2.9 52.9 14.7

Alewife Brook PkwyFrom North From East

Alewife Brook PkwyFrom South

Cambridge Park DrFrom West

Start Time Thru Right App. Total App. Total Left Thru App. Total Left Right App. Total Int. TotalPeak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 05:15 PM

05:15 PM 0 1 1 0 2 0 2 2 1 3 605:30 PM 0 1 1 0 0 0 0 3 0 3 405:45 PM 0 1 1 0 0 0 0 3 1 4 506:00 PM 1 1 2 0 1 0 1 6 0 6 9

Total Volume 1 4 5 0 3 0 3 14 2 16 24% App. Total 20 80 100 0 87.5 12.5

PHF .250 1.00 .625 .000 .375 .000 .375 .583 .500 .667 .667

Accurate Counts978-664-2565

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 2

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pkwy

Cam

brid

ge P

ark

Dr

Alewife Brook Pkwy

Right4

Thru1

InOut Total14 5 19

Out

Total

In0

00

Left3

Thru0

Out TotalIn3 3 6

Left14

Rig

ht2

Tot

alO

utIn

716

23

Peak Hour Begins at 05:15 PM

Buses

Peak Hour Data

North

Peak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Each Approach Begins at:

05:15 PM 04:30 PM 04:30 PM 05:30 PM+0 mins. 0 1 1 0 0 0 0 3 0 3

+15 mins. 0 1 1 0 0 0 0 3 1 4+30 mins. 0 1 1 0 1 1 2 6 0 6+45 mins. 1 1 2 0 2 0 2 2 2 4

Total Volume 1 4 5 0 3 1 4 14 3 17% App. Total 20 80 75 25 82.4 17.6

PHF .250 1.000 .625 .000 .375 .250 .500 .583 .375 .708

Accurate Counts978-664-2565

Page 53: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 3

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pkwy

Cam

brid

ge P

ark

Dr

Alewife Brook Pkwy

Right4

Thru1

In - Peak Hour: 05:15 PM5

In - Peak H

our: 04:30 PM

0

Left3

Thru1

In - Peak Hour: 04:30 PM4

Left14

Rig

ht3

In -

Pea

k H

our:

05:

30 P

M17

Buses

Peak Hour Data

North

Accurate Counts978-664-2565

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 1

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Groups Printed- CarsAlewife Brook Pkwy

From NorthAlewife Brook Pkwy

From SouthCambridge Park Dr

From WestStart Time Thru Right Left Thru Left Right Int. Total04:30 PM 315 6 24 371 65 102 88304:45 PM 296 16 25 400 77 94 908

Total 611 22 49 771 142 196 1791

05:00 PM 312 10 32 447 92 162 105505:15 PM 291 8 21 358 106 167 95105:30 PM 387 10 36 442 87 147 110905:45 PM 305 8 29 354 100 111 907

Total 1295 36 118 1601 385 587 4022

06:00 PM 304 10 31 358 95 178 97606:15 PM 347 9 31 346 84 168 985

Grand Total 2557 77 229 3076 706 1129 7774Apprch % 97.1 2.9 6.9 93.1 38.5 61.5

Total % 32.9 1 2.9 39.6 9.1 14.5

Alewife Brook PkwyFrom North From East

Alewife Brook PkwyFrom South

Cambridge Park DrFrom West

Start Time Thru Right App. Total App. Total Left Thru App. Total Left Right App. Total Int. TotalPeak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 04:45 PM

04:45 PM 296 16 312 0 25 400 425 77 94 171 90805:00 PM 312 10 322 0 32 447 479 92 162 254 105505:15 PM 291 8 299 0 21 358 379 106 167 273 95105:30 PM 387 10 397 0 36 442 478 87 147 234 1109

Total Volume 1286 44 1330 0 114 1647 1761 362 570 932 4023% App. Total 96.7 3.3 6.5 93.5 38.8 61.2

PHF .831 .688 .838 .000 .792 .921 .919 .854 .853 .853 .907

Accurate Counts978-664-2565

Page 54: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 2

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pkwy

Cam

brid

ge P

ark

Dr

Alewife Brook Pkwy

Right44

Thru1286

InOut Total2009 1330 3339

Out

Total

In0

00

Left114

Thru1647

Out TotalIn1856 1761 3617

Left

362

Rig

ht57

0

Tot

alO

utIn

158

932

1090

Peak Hour Begins at 04:45 PM

Cars

Peak Hour Data

North

Peak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Each Approach Begins at:

05:30 PM 04:30 PM 04:45 PM 05:15 PM+0 mins. 387 10 397 0 25 400 425 106 167 273

+15 mins. 305 8 313 0 32 447 479 87 147 234+30 mins. 304 10 314 0 21 358 379 100 111 211+45 mins. 347 9 356 0 36 442 478 95 178 273

Total Volume 1343 37 1380 0 114 1647 1761 388 603 991% App. Total 97.3 2.7 6.5 93.5 39.2 60.8

PHF .868 .925 .869 .000 .792 .921 .919 .915 .847 .908

Accurate Counts978-664-2565

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 3

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pkwy

Cam

brid

ge P

ark

Dr

Alewife Brook Pkwy

Right37

Thru1343

In - Peak Hour: 05:30 PM1380

In - Peak H

our: 04:30 PM

0

Left114

Thru1647

In - Peak Hour: 04:45 PM1761

Left

388

Rig

ht60

3

In -

Pea

k H

our:

05:

15 P

M99

1

Cars

Peak Hour Data

North

Accurate Counts978-664-2565

Page 55: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 1

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Groups Printed- TrucksAlewife Brook Pkwy

From NorthAlewife Brook Pkwy

From SouthCambridge Park Dr

From WestStart Time Thru Right Left Thru Left Right Int. Total04:30 PM 0 0 0 0 0 0 004:45 PM 0 0 0 0 0 0 0

Total 0 0 0 0 0 0 0

05:00 PM 3 0 0 0 2 1 605:15 PM 1 0 1 1 0 0 305:30 PM 2 0 0 0 2 0 405:45 PM 0 0 0 1 0 0 1

Total 6 0 1 2 4 1 14

06:00 PM 0 0 0 0 0 0 006:15 PM 0 0 0 2 0 0 2

Grand Total 6 0 1 4 4 1 16Apprch % 100 0 20 80 80 20

Total % 37.5 0 6.2 25 25 6.2

Alewife Brook PkwyFrom North From East

Alewife Brook PkwyFrom South

Cambridge Park DrFrom West

Start Time Thru Right App. Total App. Total Left Thru App. Total Left Right App. Total Int. TotalPeak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 05:00 PM

05:00 PM 3 0 3 0 0 0 0 2 1 3 605:15 PM 1 0 1 0 1 1 2 0 0 0 305:30 PM 2 0 2 0 0 0 0 2 0 2 405:45 PM 0 0 0 0 0 1 1 0 0 0 1

Total Volume 6 0 6 0 1 2 3 4 1 5 14% App. Total 100 0 33.3 66.7 80 20

PHF .500 .000 .500 .000 .250 .500 .375 .500 .250 .417 .583

Accurate Counts978-664-2565

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 2

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pkwy

Cam

brid

ge P

ark

Dr

Alewife Brook Pkwy

Right0

Thru6

InOut Total6 6 12

Out

Total

In0

00

Left1

Thru2

Out TotalIn7 3 10

Left

4R

ight1

Tot

alO

utIn

15

6

Peak Hour Begins at 05:00 PM

Trucks

Peak Hour Data

North

Peak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Each Approach Begins at:

04:45 PM 04:30 PM 05:00 PM 04:45 PM+0 mins. 0 0 0 0 0 0 0 0 0 0

+15 mins. 3 0 3 0 1 1 2 2 1 3+30 mins. 1 0 1 0 0 0 0 0 0 0+45 mins. 2 0 2 0 0 1 1 2 0 2

Total Volume 6 0 6 0 1 2 3 4 1 5% App. Total 100 0 33.3 66.7 80 20

PHF .500 .000 .500 .000 .250 .500 .375 .500 .250 .417

Accurate Counts978-664-2565

Page 56: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 3

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pkwy

Cam

brid

ge P

ark

Dr

Alewife Brook Pkwy

Right0

Thru6

In - Peak Hour: 04:45 PM6

In - Peak H

our: 04:30 PM

0

Left1

Thru2

In - Peak Hour: 05:00 PM3

Left

4R

ight1

In -

Pea

k H

our:

04:

45 P

M5

Trucks

Peak Hour Data

North

Accurate Counts978-664-2565

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 1

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Groups Printed- PedsAlewife Brook Pkwy

From North From EastAlewife Brook Pkwy

From SouthCambridge Park Dr

From WestStart Time EB WB SB NB WB EB NB SB Int. Total04:30 PM 0 0 0 0 0 0 0 0 004:45 PM 0 0 0 0 0 0 0 0 0

Total 0 0 0 0 0 0 0 0 0

05:00 PM 0 0 1 2 0 0 0 0 305:15 PM 0 0 1 3 0 0 0 0 405:30 PM 0 0 4 4 0 0 0 0 805:45 PM 0 0 5 1 0 0 0 0 6

Total 0 0 11 10 0 0 0 0 21

06:00 PM 0 0 1 0 0 0 0 0 106:15 PM 0 0 3 1 0 0 0 0 4

Grand Total 0 0 15 11 0 0 0 0 26Apprch % 0 0 57.7 42.3 0 0 0 0

Total % 0 0 57.7 42.3 0 0 0 0

Alewife Brook PkwyFrom North From East

Alewife Brook PkwyFrom South

Cambridge Park DrFrom West

Start Time EB WB App. Total SB NB App. Total WB EB App. Total NB SB App. Total Int. TotalPeak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 05:00 PM

05:00 PM 0 0 0 1 2 3 0 0 0 0 0 0 305:15 PM 0 0 0 1 3 4 0 0 0 0 0 0 405:30 PM 0 0 0 4 4 8 0 0 0 0 0 0 805:45 PM 0 0 0 5 1 6 0 0 0 0 0 0 6

Total Volume 0 0 0 11 10 21 0 0 0 0 0 0 21% App. Total 0 0 52.4 47.6 0 0 0 0

PHF .000 .000 .000 .550 .625 .656 .000 .000 .000 .000 .000 .000 .656

Accurate Counts978-664-2565

Page 57: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 2

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pkwy

Cam

brid

ge P

ark

Dr

Alewife Brook Pkwy

Right0

Left0

InOut Total10 0 10

Right

10Left 11

Out

Total

In0

2121

Left0

Right0

Out TotalIn11 0 11

Left

0R

ight0

Tot

alO

utIn

00

0

Peak Hour Begins at 05:00 PM

Peds

Peak Hour Data

North

Peak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Each Approach Begins at:

04:30 PM 05:00 PM 04:30 PM 04:30 PM+0 mins. 0 0 0 1 2 3 0 0 0 0 0 0

+15 mins. 0 0 0 1 3 4 0 0 0 0 0 0+30 mins. 0 0 0 4 4 8 0 0 0 0 0 0+45 mins. 0 0 0 5 1 6 0 0 0 0 0 0

Total Volume 0 0 0 11 10 21 0 0 0 0 0 0% App. Total 0 0 52.4 47.6 0 0 0 0

PHF .000 .000 .000 .550 .625 .656 .000 .000 .000 .000 .000 .000

Accurate Counts978-664-2565

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 3

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pkwy

Cam

brid

ge P

ark

Dr

Alewife Brook Pkwy

Right0

Left0

In - Peak Hour: 04:30 PM0

Right

10Left 11

In - Peak H

our: 05:00 PM

21

Left0

Right0

In - Peak Hour: 04:30 PM0

Left

0R

ight0

In -

Pea

k H

our:

04:

30 P

M0

Peds

Peak Hour Data

North

Accurate Counts978-664-2565

Page 58: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 1

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Groups Printed- Bikes StreetAlewife Brook Pkwy

From NorthAlewife Brook Pkwy

From SouthCambridge Park Dr

From WestStart Time Thru Right Left Thru Left Right Int. Total04:30 PM 0 0 0 0 0 0 004:45 PM 0 0 0 0 0 0 0

Total 0 0 0 0 0 0 0

05:00 PM 0 0 0 0 0 0 005:15 PM 0 0 0 0 0 0 005:30 PM 0 0 0 0 0 0 005:45 PM 0 0 0 0 0 0 0

Total 0 0 0 0 0 0 0

06:00 PM 0 0 0 0 0 0 006:15 PM 0 0 1 0 0 0 1

Grand Total 0 0 1 0 0 0 1Apprch % 0 0 100 0 0 0

Total % 0 0 100 0 0 0

Alewife Brook PkwyFrom North From East

Alewife Brook PkwyFrom South

Cambridge Park DrFrom West

Start Time Thru Right App. Total App. Total Left Thru App. Total Left Right App. Total Int. TotalPeak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 05:30 PM

05:30 PM 0 0 0 0 0 0 0 0 0 0 005:45 PM 0 0 0 0 0 0 0 0 0 0 006:00 PM 0 0 0 0 0 0 0 0 0 0 006:15 PM 0 0 0 0 1 0 1 0 0 0 1

Total Volume 0 0 0 0 1 0 1 0 0 0 1% App. Total 0 0 100 0 0 0

PHF .000 .000 .000 .000 .250 .000 .250 .000 .000 .000 .250

Accurate Counts978-664-2565

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 2

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pkwy

Cam

brid

ge P

ark

Dr

Alewife Brook Pkwy

Right0

Thru0

InOut Total0 0 0

Out

Total

In0

00

Left1

Thru0

Out TotalIn0 1 1

Left

0R

ight0

Tot

alO

utIn

10

1

Peak Hour Begins at 05:30 PM

Bikes Street

Peak Hour Data

North

Peak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Each Approach Begins at:

04:30 PM 04:30 PM 05:30 PM 04:30 PM+0 mins. 0 0 0 0 0 0 0 0 0 0

+15 mins. 0 0 0 0 0 0 0 0 0 0+30 mins. 0 0 0 0 0 0 0 0 0 0+45 mins. 0 0 0 0 1 0 1 0 0 0

Total Volume 0 0 0 0 1 0 1 0 0 0% App. Total 0 0 100 0 0 0

PHF .000 .000 .000 .000 .250 .000 .250 .000 .000 .000

Accurate Counts978-664-2565

Page 59: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 3

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pkwy

Cam

brid

ge P

ark

Dr

Alewife Brook Pkwy

Right0

Thru0

In - Peak Hour: 04:30 PM0

In - Peak H

our: 04:30 PM

0

Left1

Thru0

In - Peak Hour: 05:30 PM1

Left

0R

ight0

In -

Pea

k H

our:

04:

30 P

M0

Bikes Street

Peak Hour Data

North

Accurate Counts978-664-2565

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 1

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Groups Printed- Bikes SWAlewife Brook Pkwy

From NorthAlewife Brook Pkwy

From SouthCambridge Park Dr

From WestStart Time Thru Right Left Thru Left Right Int. Total04:30 PM 0 0 0 0 0 0 004:45 PM 0 0 0 0 0 0 0

Total 0 0 0 0 0 0 0

05:00 PM 0 0 0 0 0 0 005:15 PM 0 0 0 0 0 0 005:30 PM 0 0 0 0 0 0 005:45 PM 0 0 0 0 0 0 0

Total 0 0 0 0 0 0 0

06:00 PM 0 0 0 0 0 0 006:15 PM 0 0 0 0 0 0 0

Grand Total 0 0 0 0 0 0 0Apprch % 0 0 0 0 0 0

Total %

Alewife Brook PkwyFrom North From East

Alewife Brook PkwyFrom South

Cambridge Park DrFrom West

Start Time Thru Right App. Total App. Total Left Thru App. Total Left Right App. Total Int. TotalPeak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 04:30 PM

04:30 PM 0 0 0 0 0 0 0 0 0 0 004:45 PM 0 0 0 0 0 0 0 0 0 0 005:00 PM 0 0 0 0 0 0 0 0 0 0 005:15 PM 0 0 0 0 0 0 0 0 0 0 0

Total Volume 0 0 0 0 0 0 0 0 0 0 0% App. Total 0 0 0 0 0 0

PHF .000 .000 .000 .000 .000 .000 .000 .000 .000 .000 .000

Accurate Counts978-664-2565

Page 60: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 2

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pkwy

Cam

brid

ge P

ark

Dr

Alewife Brook Pkwy

Right0

Thru0

InOut Total0 0 0

Out

Total

In0

00

Left0

Thru0

Out TotalIn0 0 0

Left

0R

ight0

Tot

alO

utIn

00

0

Peak Hour Begins at 04:30 PM

Bikes SW

Peak Hour Data

North

Peak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Each Approach Begins at:

04:30 PM 04:30 PM 04:30 PM 04:30 PM+0 mins. 0 0 0 0 0 0 0 0 0 0

+15 mins. 0 0 0 0 0 0 0 0 0 0+30 mins. 0 0 0 0 0 0 0 0 0 0+45 mins. 0 0 0 0 0 0 0 0 0 0

Total Volume 0 0 0 0 0 0 0 0 0 0% App. Total 0 0 0 0 0 0

PHF .000 .000 .000 .000 .000 .000 .000 .000 .000 .000

Accurate Counts978-664-2565

File Name : 11810002Site Code : 11810002Start Date : 12/6/2012Page No : 3

N/S Street : Alewife Brook ParkwayE/W Street : Cambridge Park DriveCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pkwy

Cam

brid

ge P

ark

Dr

Alewife Brook Pkwy

Right0

Thru0

In - Peak Hour: 04:30 PM0

In - Peak H

our: 04:30 PM

0

Left0

Thru0

In - Peak Hour: 04:30 PM0

Left

0R

ight0

In -

Pea

k H

our:

04:

30 P

M0

Bikes SW

Peak Hour Data

North

Accurate Counts978-664-2565

Page 61: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 1

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Groups Printed- Cars - Trucks - BusesAlewife Brook Pwwy

From NorthRindge AveFrom East

Alewife Brook PwwyFrom South

Start Time Left Thru Left Right Thru Right Int. Total07:30 AM 0 468 51 108 312 23 96207:45 AM 0 397 57 126 264 18 862

Total 0 865 108 234 576 41 1824

08:00 AM 0 405 43 118 304 32 90208:15 AM 0 344 54 131 255 19 80308:30 AM 0 381 50 111 315 21 87808:45 AM 0 436 54 116 217 33 856

Total 0 1566 201 476 1091 105 3439

09:00 AM 0 471 56 93 286 36 94209:15 AM 0 459 37 67 250 36 849

Grand Total 0 3361 402 870 2203 218 7054Apprch % 0 100 31.6 68.4 91 9

Total % 0 47.6 5.7 12.3 31.2 3.1Cars 0 3307 400 869 2154 209 6939

% Cars 0 98.4 99.5 99.9 97.8 95.9 98.4Trucks 0 42 0 1 44 1 88

% Trucks 0 1.2 0 0.1 2 0.5 1.2Buses 0 12 2 0 5 8 27

% Buses 0 0.4 0.5 0 0.2 3.7 0.4

Alewife Brook PwwyFrom North

Rindge AveFrom East

Alewife Brook PwwyFrom South From West

Start Time Left Thru App. Total Left Right App. Total Thru Right App. Total App. Total Int. TotalPeak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 07:30 AM

07:30 AM 0 468 468 51 108 159 312 23 335 0 96207:45 AM 0 397 397 57 126 183 264 18 282 0 86208:00 AM 0 405 405 43 118 161 304 32 336 0 90208:15 AM 0 344 344 54 131 185 255 19 274 0 803

Total Volume 0 1614 1614 205 483 688 1135 92 1227 0 3529% App. Total 0 100 29.8 70.2 92.5 7.5

PHF .000 .862 .862 .899 .922 .930 .909 .719 .913 .000 .917Cars 0 1591 1591 203 482 685 1114 86 1200 0 3476

% Cars 0 98.6 98.6 99.0 99.8 99.6 98.1 93.5 97.8 0 98.5Trucks 0 18 18 0 1 1 17 1 18 0 37

% Trucks 0 1.1 1.1 0 0.2 0.1 1.5 1.1 1.5 0 1.0Buses 0 5 5 2 0 2 4 5 9 0 16

% Buses 0 0.3 0.3 1.0 0 0.3 0.4 5.4 0.7 0 0.5

Accurate Counts978-664-2565

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 2

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pwwy

Rindge A

ve

Alewife Brook Pwwy

Thru

1591185

1614Left

0000

InOut Total1596 1591 3187

18 18 364 5 9

1618 32321614R

ight

48210483

Left

20302205

Out

Total

In86

685771

11

25

27

92780

688

Thru1114

174

1135

Right8615

92

Out TotalIn

1794 1200 299418 18 367 9 16

1819 30461227

Tot

alO

utIn

00

00

00

00

00

00 Peak Hour Begins at 07:30 AM

CarsTrucksBuses

Peak Hour Data

North

Peak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Each Approach Begins at:

08:30 AM 07:45 AM 07:45 AM 07:30 AM+0 mins. 0 381 381 57 126 183 264 18 282 0

+15 mins. 0 436 436 43 118 161 304 32 336 0+30 mins. 0 471 471 54 131 185 255 19 274 0+45 mins. 0 459 459 50 111 161 315 21 336 0

Total Volume 0 1747 1747 204 486 690 1138 90 1228 0% App. Total 0 100 29.6 70.4 92.7 7.3

PHF .000 .927 .927 .895 .927 .932 .903 .703 .914 .000Cars 0 1716 1716 202 485 687 1116 86 1202 0

% Cars 0 98.2 98.2 99 99.8 99.6 98.1 95.6 97.9 0Trucks 0 24 24 0 1 1 17 1 18 0

% Trucks 0 1.4 1.4 0 0.2 0.1 1.5 1.1 1.5 0Buses 0 7 7 2 0 2 5 3 8 0

% Buses 0 0.4 0.4 1 0 0.3 0.4 3.3 0.7 0

Accurate Counts978-664-2565

Page 62: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 3

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pwwy

Rindge A

ve

Alewife Brook Pwwy

Thru

1716247

1747Left

0000

In - Peak Hour: 08:30 AM1716

247

1747

Right

48510486

Left

20202204

In - Peak H

our: 07:45 AM

68712690

Thru1116

175

1138

Right8613

90

In - Peak Hour: 07:45 AM

1202188

1228

In -

Pea

k H

our:

07:

30 A

M0 0 0 0 Cars

TrucksBuses

Peak Hour Data

North

Accurate Counts978-664-2565

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 1

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Groups Printed- BusesAlewife Brook Pwwy

From NorthRindge AveFrom East

Alewife Brook PwwyFrom South

Start Time Left Thru Left Right Thru Right Int. Total07:30 AM 0 1 0 0 0 2 307:45 AM 0 0 1 0 2 1 4

Total 0 1 1 0 2 3 7

08:00 AM 0 1 0 0 1 1 308:15 AM 0 3 1 0 1 1 608:30 AM 0 2 0 0 1 0 308:45 AM 0 2 0 0 0 1 3

Total 0 8 1 0 3 3 15

09:00 AM 0 2 0 0 0 1 309:15 AM 0 1 0 0 0 1 2

Grand Total 0 12 2 0 5 8 27Apprch % 0 100 100 0 38.5 61.5

Total % 0 44.4 7.4 0 18.5 29.6

Alewife Brook PwwyFrom North

Rindge AveFrom East

Alewife Brook PwwyFrom South From West

Start Time Left Thru App. Total Left Right App. Total Thru Right App. Total App. Total Int. TotalPeak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 07:30 AM

07:30 AM 0 1 1 0 0 0 0 2 2 0 307:45 AM 0 0 0 1 0 1 2 1 3 0 408:00 AM 0 1 1 0 0 0 1 1 2 0 308:15 AM 0 3 3 1 0 1 1 1 2 0 6

Total Volume 0 5 5 2 0 2 4 5 9 0 16% App. Total 0 100 100 0 44.4 55.6

PHF .000 .417 .417 .500 .000 .500 .500 .625 .750 .000 .667

Accurate Counts978-664-2565

Page 63: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 2

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pwwy

Rindge A

ve

Alewife Brook Pwwy

Thru5

Left0

InOut Total4 5 9

Right 0

Left 2

Out

Total

In5

27

Thru4

Right5

Out TotalIn7 9 16

Tot

alO

utIn

00

0

Peak Hour Begins at 07:30 AM

Buses

Peak Hour Data

North

Peak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Each Approach Begins at:

08:15 AM 07:30 AM 07:30 AM 07:30 AM+0 mins. 0 3 3 0 0 0 0 2 2 0

+15 mins. 0 2 2 1 0 1 2 1 3 0+30 mins. 0 2 2 0 0 0 1 1 2 0+45 mins. 0 2 2 1 0 1 1 1 2 0

Total Volume 0 9 9 2 0 2 4 5 9 0% App. Total 0 100 100 0 44.4 55.6

PHF .000 .750 .750 .500 .000 .500 .500 .625 .750 .000

Accurate Counts978-664-2565

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 3

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pwwy

Rindge A

ve

Alewife Brook Pwwy

Thru9

Left0

In - Peak Hour: 08:15 AM9

Right 0

Left 2

In - Peak H

our: 07:30 AM

2

Thru4

Right5

In - Peak Hour: 07:30 AM9

In -

Pea

k H

our:

07:

30 A

M0

Buses

Peak Hour Data

North

Accurate Counts978-664-2565

Page 64: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 1

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Groups Printed- CarsAlewife Brook Pwwy

From NorthRindge AveFrom East

Alewife Brook PwwyFrom South

Start Time Left Thru Left Right Thru Right Int. Total07:30 AM 0 464 51 108 306 21 95007:45 AM 0 389 56 125 259 17 846

Total 0 853 107 233 565 38 1796

08:00 AM 0 398 43 118 302 30 89108:15 AM 0 340 53 131 247 18 78908:30 AM 0 372 50 111 308 21 86208:45 AM 0 429 54 116 211 32 842

Total 0 1539 200 476 1068 101 3384

09:00 AM 0 463 56 93 278 35 92509:15 AM 0 452 37 67 243 35 834

Grand Total 0 3307 400 869 2154 209 6939Apprch % 0 100 31.5 68.5 91.2 8.8

Total % 0 47.7 5.8 12.5 31 3

Alewife Brook PwwyFrom North

Rindge AveFrom East

Alewife Brook PwwyFrom South From West

Start Time Left Thru App. Total Left Right App. Total Thru Right App. Total App. Total Int. TotalPeak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 07:30 AM

07:30 AM 0 464 464 51 108 159 306 21 327 0 95007:45 AM 0 389 389 56 125 181 259 17 276 0 84608:00 AM 0 398 398 43 118 161 302 30 332 0 89108:15 AM 0 340 340 53 131 184 247 18 265 0 789

Total Volume 0 1591 1591 203 482 685 1114 86 1200 0 3476% App. Total 0 100 29.6 70.4 92.8 7.2

PHF .000 .857 .857 .906 .920 .931 .910 .717 .904 .000 .915

Accurate Counts978-664-2565

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 2

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pwwy

Rindge A

ve

Alewife Brook Pwwy

Thru1591

Left0

InOut Total1596 1591 3187

Right482

Left203

Out

Total

In86

685771

Thru1114

Right86

Out TotalIn1794 1200 2994

Tot

alO

utIn

00

0

Peak Hour Begins at 07:30 AM

Cars

Peak Hour Data

North

Peak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Each Approach Begins at:

08:30 AM 07:45 AM 07:45 AM 07:30 AM+0 mins. 0 372 372 56 125 181 259 17 276 0

+15 mins. 0 429 429 43 118 161 302 30 332 0+30 mins. 0 463 463 53 131 184 247 18 265 0+45 mins. 0 452 452 50 111 161 308 21 329 0

Total Volume 0 1716 1716 202 485 687 1116 86 1202 0% App. Total 0 100 29.4 70.6 92.8 7.2

PHF .000 .927 .927 .902 .926 .933 .906 .717 .905 .000

Accurate Counts978-664-2565

Page 65: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 3

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pwwy

Rindge A

ve

Alewife Brook Pwwy

Thru1716

Left0

In - Peak Hour: 08:30 AM1716

Right485

Left202

In - Peak H

our: 07:45 AM

687

Thru1116

Right86

In - Peak Hour: 07:45 AM1202

In -

Pea

k H

our:

07:

30 A

M0

Cars

Peak Hour Data

North

Accurate Counts978-664-2565

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 1

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Groups Printed- TrucksAlewife Brook Pwwy

From NorthRindge AveFrom East

Alewife Brook PwwyFrom South

Start Time Left Thru Left Right Thru Right Int. Total07:30 AM 0 3 0 0 6 0 907:45 AM 0 8 0 1 3 0 12

Total 0 11 0 1 9 0 21

08:00 AM 0 6 0 0 1 1 808:15 AM 0 1 0 0 7 0 808:30 AM 0 7 0 0 6 0 1308:45 AM 0 5 0 0 6 0 11

Total 0 19 0 0 20 1 40

09:00 AM 0 6 0 0 8 0 1409:15 AM 0 6 0 0 7 0 13

Grand Total 0 42 0 1 44 1 88Apprch % 0 100 0 100 97.8 2.2

Total % 0 47.7 0 1.1 50 1.1

Alewife Brook PwwyFrom North

Rindge AveFrom East

Alewife Brook PwwyFrom South From West

Start Time Left Thru App. Total Left Right App. Total Thru Right App. Total App. Total Int. TotalPeak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 08:30 AM

08:30 AM 0 7 7 0 0 0 6 0 6 0 1308:45 AM 0 5 5 0 0 0 6 0 6 0 1109:00 AM 0 6 6 0 0 0 8 0 8 0 1409:15 AM 0 6 6 0 0 0 7 0 7 0 13

Total Volume 0 24 24 0 0 0 27 0 27 0 51% App. Total 0 100 0 0 100 0

PHF .000 .857 .857 .000 .000 .000 .844 .000 .844 .000 .911

Accurate Counts978-664-2565

Page 66: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 2

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pwwy

Rindge A

ve

Alewife Brook Pwwy

Thru24

Left0

InOut Total27 24 51

Right 0

Left 0

Out

Total

In0

00

Thru27

Right0

Out TotalIn24 27 51

Tot

alO

utIn

00

0

Peak Hour Begins at 08:30 AM

Trucks

Peak Hour Data

North

Peak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Each Approach Begins at:

08:30 AM 07:30 AM 08:15 AM 07:30 AM+0 mins. 0 7 7 0 0 0 7 0 7 0

+15 mins. 0 5 5 0 1 1 6 0 6 0+30 mins. 0 6 6 0 0 0 6 0 6 0+45 mins. 0 6 6 0 0 0 8 0 8 0

Total Volume 0 24 24 0 1 1 27 0 27 0% App. Total 0 100 0 100 100 0

PHF .000 .857 .857 .000 .250 .250 .844 .000 .844 .000

Accurate Counts978-664-2565

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 3

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pwwy

Rindge A

ve

Alewife Brook Pwwy

Thru24

Left0

In - Peak Hour: 08:30 AM24

Right 1

Left 0

In - Peak H

our: 07:30 AM

1

Thru27

Right0

In - Peak Hour: 08:15 AM27

In -

Pea

k H

our:

07:

30 A

M0

Trucks

Peak Hour Data

North

Accurate Counts978-664-2565

Page 67: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 1

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Groups Printed- PedsAlewife Brook Pwwy

From NorthRindge AveFrom East

Alewife Brook PwwyFrom South From West

Start Time EB WB SB NB WB EB SB NB Int. Total07:30 AM 0 0 1 1 21 2 5 6 3607:45 AM 0 1 2 0 11 6 2 11 33

Total 0 1 3 1 32 8 7 17 69

08:00 AM 0 0 1 1 23 9 5 10 4908:15 AM 0 0 8 0 17 27 5 15 7208:30 AM 0 0 1 0 25 8 3 9 4608:45 AM 0 0 2 2 10 19 13 24 70

Total 0 0 12 3 75 63 26 58 237

09:00 AM 0 0 4 0 18 5 9 11 4709:15 AM 0 0 0 1 7 6 4 10 28

Grand Total 0 1 19 5 132 82 46 96 381Apprch % 0 100 79.2 20.8 61.7 38.3 32.4 67.6

Total % 0 0.3 5 1.3 34.6 21.5 12.1 25.2

Alewife Brook PwwyFrom North

Rindge AveFrom East

Alewife Brook PwwyFrom South From West

Start Time EB WB App. Total SB NB App. Total WB EB App. Total SB NB App. Total Int. TotalPeak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 08:00 AM

08:00 AM 0 0 0 1 1 2 23 9 32 5 10 15 4908:15 AM 0 0 0 8 0 8 17 27 44 5 15 20 7208:30 AM 0 0 0 1 0 1 25 8 33 3 9 12 4608:45 AM 0 0 0 2 2 4 10 19 29 13 24 37 70

Total Volume 0 0 0 12 3 15 75 63 138 26 58 84 237% App. Total 0 0 80 20 54.3 45.7 31 69

PHF .000 .000 .000 .375 .375 .469 .750 .583 .784 .500 .604 .568 .823

Accurate Counts978-664-2565

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 2

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pwwy

Rindge A

ve

Alewife Brook Pwwy

Right0

Left0

InOut Total29 0 29

Right 3

Left 12

Out

Total

In63

1578

Left75

Right63

Out TotalIn70 138 208

Left26

Rig

ht58

Tot

alO

utIn

7584

159

Peak Hour Begins at 08:00 AM

Peds

Peak Hour Data

North

Peak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Each Approach Begins at:

07:30 AM 08:15 AM 08:00 AM 08:15 AM+0 mins. 0 0 0 8 0 8 23 9 32 5 15 20

+15 mins. 0 1 1 1 0 1 17 27 44 3 9 12+30 mins. 0 0 0 2 2 4 25 8 33 13 24 37+45 mins. 0 0 0 4 0 4 10 19 29 9 11 20

Total Volume 0 1 1 15 2 17 75 63 138 30 59 89% App. Total 0 100 88.2 11.8 54.3 45.7 33.7 66.3

PHF .000 .250 .250 .469 .250 .531 .750 .583 .784 .577 .615 .601

Accurate Counts978-664-2565

Page 68: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 3

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pwwy

Rindge A

ve

Alewife Brook Pwwy

Right1

Left0

In - Peak Hour: 07:30 AM1

Right 2

Left 15

In - Peak H

our: 08:15 AM

17

Left75

Right63

In - Peak Hour: 08:00 AM138

Left30

Rig

ht59

In -

Pea

k H

our:

08:

15 A

M89

Peds

Peak Hour Data

North

Accurate Counts978-664-2565

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 1

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Groups Printed- Bikes StreetAlewife Brook Pwwy

From NorthRindge AveFrom East

Alewife Brook PwwyFrom South

Start Time Left Thru Left Right Thru Right Int. Total07:30 AM 0 0 0 0 0 0 007:45 AM 0 0 0 0 0 0 0

Total 0 0 0 0 0 0 0

08:00 AM 0 1 0 0 0 0 108:15 AM 0 0 0 1 0 0 108:30 AM 0 1 0 0 0 0 108:45 AM 0 0 0 2 0 0 2

Total 0 2 0 3 0 0 5

09:00 AM 0 0 0 0 0 0 009:15 AM 0 0 0 0 0 1 1

Grand Total 0 2 0 3 0 1 6Apprch % 0 100 0 100 0 100

Total % 0 33.3 0 50 0 16.7

Alewife Brook PwwyFrom North

Rindge AveFrom East

Alewife Brook PwwyFrom South From West

Start Time Left Thru App. Total Left Right App. Total Thru Right App. Total App. Total Int. TotalPeak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 08:00 AM

08:00 AM 0 1 1 0 0 0 0 0 0 0 108:15 AM 0 0 0 0 1 1 0 0 0 0 108:30 AM 0 1 1 0 0 0 0 0 0 0 108:45 AM 0 0 0 0 2 2 0 0 0 0 2

Total Volume 0 2 2 0 3 3 0 0 0 0 5% App. Total 0 100 0 100 0 0

PHF .000 .500 .500 .000 .375 .375 .000 .000 .000 .000 .625

Accurate Counts978-664-2565

Page 69: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 2

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pwwy

Rindge A

ve

Alewife Brook Pwwy

Thru2

Left0

InOut Total3 2 5

Right 3

Left 0

Out

Total

In0

33

Thru0

Right0

Out TotalIn2 0 2

Tot

alO

utIn

00

0

Peak Hour Begins at 08:00 AM

Bikes Street

Peak Hour Data

North

Peak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Each Approach Begins at:

07:45 AM 08:00 AM 08:30 AM 07:30 AM+0 mins. 0 0 0 0 0 0 0 0 0 0

+15 mins. 0 1 1 0 1 1 0 0 0 0+30 mins. 0 0 0 0 0 0 0 0 0 0+45 mins. 0 1 1 0 2 2 0 1 1 0

Total Volume 0 2 2 0 3 3 0 1 1 0% App. Total 0 100 0 100 0 100

PHF .000 .500 .500 .000 .375 .375 .000 .250 .250 .000

Accurate Counts978-664-2565

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 3

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pwwy

Rindge A

ve

Alewife Brook Pwwy

Thru2

Left0

In - Peak Hour: 07:45 AM2

Right 3

Left 0

In - Peak H

our: 08:00 AM

3

Thru0

Right1

In - Peak Hour: 08:30 AM1

In -

Pea

k H

our:

07:

30 A

M0

Bikes Street

Peak Hour Data

North

Accurate Counts978-664-2565

Page 70: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 1

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Groups Printed- Bikes SWAlewife Brook Pwwy

From NorthRindge AveFrom East

Alewife Brook PwwyFrom South

Start Time Left Thru Left Right Thru Right Int. Total07:30 AM 0 2 0 0 6 0 807:45 AM 0 5 0 0 1 0 6

Total 0 7 0 0 7 0 14

08:00 AM 0 12 0 0 1 0 1308:15 AM 0 5 0 0 2 0 708:30 AM 1 4 0 0 0 0 508:45 AM 0 4 0 0 1 0 5

Total 1 25 0 0 4 0 30

09:00 AM 0 7 0 0 2 0 909:15 AM 0 1 0 0 1 0 2

Grand Total 1 40 0 0 14 0 55Apprch % 2.4 97.6 0 0 100 0

Total % 1.8 72.7 0 0 25.5 0

Alewife Brook PwwyFrom North

Rindge AveFrom East

Alewife Brook PwwyFrom South From West

Start Time Left Thru App. Total Left Right App. Total Thru Right App. Total App. Total Int. TotalPeak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 07:30 AM

07:30 AM 0 2 2 0 0 0 6 0 6 0 807:45 AM 0 5 5 0 0 0 1 0 1 0 608:00 AM 0 12 12 0 0 0 1 0 1 0 1308:15 AM 0 5 5 0 0 0 2 0 2 0 7

Total Volume 0 24 24 0 0 0 10 0 10 0 34% App. Total 0 100 0 0 100 0

PHF .000 .500 .500 .000 .000 .000 .417 .000 .417 .000 .654

Accurate Counts978-664-2565

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 2

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pwwy

Rindge A

ve

Alewife Brook Pwwy

Thru24

Left0

InOut Total10 24 34

Right 0

Left 0

Out

Total

In0

00

Thru10

Right0

Out TotalIn24 10 34

Tot

alO

utIn

00

0

Peak Hour Begins at 07:30 AM

Bikes SW

Peak Hour Data

North

Peak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Each Approach Begins at:

07:45 AM 07:30 AM 07:30 AM 07:30 AM+0 mins. 0 5 5 0 0 0 6 0 6 0

+15 mins. 0 12 12 0 0 0 1 0 1 0+30 mins. 0 5 5 0 0 0 1 0 1 0+45 mins. 1 4 5 0 0 0 2 0 2 0

Total Volume 1 26 27 0 0 0 10 0 10 0% App. Total 3.7 96.3 0 0 100 0

PHF .250 .542 .563 .000 .000 .000 .417 .000 .417 .000

Accurate Counts978-664-2565

Page 71: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 3

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pwwy

Rindge A

ve

Alewife Brook Pwwy

Thru26

Left1

In - Peak Hour: 07:45 AM27

Right 0

Left 0

In - Peak H

our: 07:30 AM

0

Thru10

Right0

In - Peak Hour: 07:30 AM10

In -

Pea

k H

our:

07:

30 A

M0

Bikes SW

Peak Hour Data

North

Accurate Counts978-664-2565

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 1

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Groups Printed- Cars - Trucks - BusesAlewife Brook Pwwy

From NorthRindge AveFrom East

Alewife Brook PwwyFrom South

Start Time Left Thru Left Right Thru Right Int. Total04:30 PM 0 401 41 87 314 65 90804:45 PM 0 403 38 85 336 76 938

Total 0 804 79 172 650 141 1846

05:00 PM 0 467 37 84 387 63 103805:15 PM 0 464 52 95 299 55 96505:30 PM 0 511 38 76 394 60 107905:45 PM 0 439 44 92 304 65 944

Total 0 1881 171 347 1384 243 4026

06:00 PM 0 487 41 87 313 58 98606:15 PM 0 504 35 89 281 69 978

Grand Total 0 3676 326 695 2628 511 7836Apprch % 0 100 31.9 68.1 83.7 16.3

Total % 0 46.9 4.2 8.9 33.5 6.5Cars 0 3663 321 690 2621 509 7804

% Cars 0 99.6 98.5 99.3 99.7 99.6 99.6Trucks 0 7 0 1 5 1 14

% Trucks 0 0.2 0 0.1 0.2 0.2 0.2Buses 0 6 5 4 2 1 18

% Buses 0 0.2 1.5 0.6 0.1 0.2 0.2

Alewife Brook PwwyFrom North

Rindge AveFrom East

Alewife Brook PwwyFrom South From West

Start Time Left Thru App. Total Left Right App. Total Thru Right App. Total App. Total Int. TotalPeak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 05:00 PM

05:00 PM 0 467 467 37 84 121 387 63 450 0 103805:15 PM 0 464 464 52 95 147 299 55 354 0 96505:30 PM 0 511 511 38 76 114 394 60 454 0 107905:45 PM 0 439 439 44 92 136 304 65 369 0 944

Total Volume 0 1881 1881 171 347 518 1384 243 1627 0 4026% App. Total 0 100 33 67 85.1 14.9

PHF .000 .920 .920 .822 .913 .881 .878 .935 .896 .000 .933Cars 0 1871 1871 169 343 512 1380 241 1621 0 4004

% Cars 0 99.5 99.5 98.8 98.8 98.8 99.7 99.2 99.6 0 99.5Trucks 0 7 7 0 0 0 3 1 4 0 11

% Trucks 0 0.4 0.4 0 0 0 0.2 0.4 0.2 0 0.3Buses 0 3 3 2 4 6 1 1 2 0 11

% Buses 0 0.2 0.2 1.2 1.2 1.2 0.1 0.4 0.1 0 0.3

Accurate Counts978-664-2565

Page 72: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 2

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pwwy

Rindge A

ve

Alewife Brook Pwwy

Thru

187173

1881Left

0000

InOut Total1723 1871 3594

3 7 105 3 8

1731 36121881

Right

34304347

Left

16902171

Out

Total

In241

512753

10

11

67

243761

518

Thru1380

31

1384

Right241

11

243

Out TotalIn

2040 1621 36617 4 115 2 7

2052 36791627

Tot

alO

utIn

00

00

00

00

00

00 Peak Hour Begins at 05:00 PM

CarsTrucksBuses

Peak Hour Data

North

Peak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Each Approach Begins at:

05:30 PM 05:15 PM 04:45 PM 04:30 PM+0 mins. 0 511 511 52 95 147 336 76 412 0

+15 mins. 0 439 439 38 76 114 387 63 450 0+30 mins. 0 487 487 44 92 136 299 55 354 0+45 mins. 0 504 504 41 87 128 394 60 454 0

Total Volume 0 1941 1941 175 350 525 1416 254 1670 0% App. Total 0 100 33.3 66.7 84.8 15.2

PHF .000 .950 .950 .841 .921 .893 .898 .836 .920 .000Cars 0 1935 1935 174 347 521 1413 252 1665 0

% Cars 0 99.7 99.7 99.4 99.1 99.2 99.8 99.2 99.7 0Trucks 0 2 2 0 0 0 2 1 3 0

% Trucks 0 0.1 0.1 0 0 0 0.1 0.4 0.2 0Buses 0 4 4 1 3 4 1 1 2 0

% Buses 0 0.2 0.2 0.6 0.9 0.8 0.1 0.4 0.1 0

Accurate Counts978-664-2565

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 3

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pwwy

Rindge A

ve

Alewife Brook Pwwy

Thru

193524

1941Left

0000

In - Peak Hour: 05:30 PM1935

24

1941R

ight

34703350

Left

17401175

In - Peak H

our: 05:15 PM

52104525

Thru1413

21

1416

Right252

11

254

In - Peak Hour: 04:45 PM

166532

1670

In -

Pea

k H

our:

04:

30 P

M0 0 0 0 Cars

TrucksBuses

Peak Hour Data

North

Accurate Counts978-664-2565

Page 73: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 1

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Groups Printed- BusesAlewife Brook Pwwy

From NorthRindge AveFrom East

Alewife Brook PwwyFrom South

Start Time Left Thru Left Right Thru Right Int. Total04:30 PM 0 0 0 0 0 0 004:45 PM 0 0 3 0 0 0 3

Total 0 0 3 0 0 0 3

05:00 PM 0 1 1 1 1 1 505:15 PM 0 1 1 3 0 0 505:30 PM 0 0 0 0 0 0 005:45 PM 0 1 0 0 0 0 1

Total 0 3 2 4 1 1 11

06:00 PM 0 1 0 0 1 0 206:15 PM 0 2 0 0 0 0 2

Grand Total 0 6 5 4 2 1 18Apprch % 0 100 55.6 44.4 66.7 33.3

Total % 0 33.3 27.8 22.2 11.1 5.6

Alewife Brook PwwyFrom North

Rindge AveFrom East

Alewife Brook PwwyFrom South From West

Start Time Left Thru App. Total Left Right App. Total Thru Right App. Total App. Total Int. TotalPeak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 04:30 PM

04:30 PM 0 0 0 0 0 0 0 0 0 0 004:45 PM 0 0 0 3 0 3 0 0 0 0 305:00 PM 0 1 1 1 1 2 1 1 2 0 505:15 PM 0 1 1 1 3 4 0 0 0 0 5

Total Volume 0 2 2 5 4 9 1 1 2 0 13% App. Total 0 100 55.6 44.4 50 50

PHF .000 .500 .500 .417 .333 .563 .250 .250 .250 .000 .650

Accurate Counts978-664-2565

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 2

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pwwy

Rindge A

ve

Alewife Brook Pwwy

Thru2

Left0

InOut Total5 2 7

Right 4

Left 5

Out

Total

In1

910

Thru1

Right1

Out TotalIn7 2 9

Tot

alO

utIn

00

0

Peak Hour Begins at 04:30 PM

Buses

Peak Hour Data

North

Peak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Each Approach Begins at:

05:30 PM 04:30 PM 04:30 PM 04:30 PM+0 mins. 0 0 0 0 0 0 0 0 0 0

+15 mins. 0 1 1 3 0 3 0 0 0 0+30 mins. 0 1 1 1 1 2 1 1 2 0+45 mins. 0 2 2 1 3 4 0 0 0 0

Total Volume 0 4 4 5 4 9 1 1 2 0% App. Total 0 100 55.6 44.4 50 50

PHF .000 .500 .500 .417 .333 .563 .250 .250 .250 .000

Accurate Counts978-664-2565

Page 74: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 3

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pwwy

Rindge A

ve

Alewife Brook Pwwy

Thru4

Left0

In - Peak Hour: 05:30 PM4

Right 4

Left 5

In - Peak H

our: 04:30 PM

9

Thru1

Right1

In - Peak Hour: 04:30 PM2

In -

Pea

k H

our:

04:

30 P

M0

Buses

Peak Hour Data

North

Accurate Counts978-664-2565

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 1

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Groups Printed- CarsAlewife Brook Pwwy

From NorthRindge AveFrom East

Alewife Brook PwwyFrom South

Start Time Left Thru Left Right Thru Right Int. Total04:30 PM 0 401 41 87 314 65 90804:45 PM 0 403 35 84 336 76 934

Total 0 804 76 171 650 141 1842

05:00 PM 0 463 36 83 386 62 103005:15 PM 0 461 51 92 297 54 95505:30 PM 0 509 38 76 394 60 107705:45 PM 0 438 44 92 303 65 942

Total 0 1871 169 343 1380 241 4004

06:00 PM 0 486 41 87 312 58 98406:15 PM 0 502 35 89 279 69 974

Grand Total 0 3663 321 690 2621 509 7804Apprch % 0 100 31.8 68.2 83.7 16.3

Total % 0 46.9 4.1 8.8 33.6 6.5

Alewife Brook PwwyFrom North

Rindge AveFrom East

Alewife Brook PwwyFrom South From West

Start Time Left Thru App. Total Left Right App. Total Thru Right App. Total App. Total Int. TotalPeak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 05:00 PM

05:00 PM 0 463 463 36 83 119 386 62 448 0 103005:15 PM 0 461 461 51 92 143 297 54 351 0 95505:30 PM 0 509 509 38 76 114 394 60 454 0 107705:45 PM 0 438 438 44 92 136 303 65 368 0 942

Total Volume 0 1871 1871 169 343 512 1380 241 1621 0 4004% App. Total 0 100 33 67 85.1 14.9

PHF .000 .919 .919 .828 .932 .895 .876 .927 .893 .000 .929

Accurate Counts978-664-2565

Page 75: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 2

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pwwy

Rindge A

ve

Alewife Brook Pwwy

Thru1871

Left0

InOut Total1723 1871 3594

Right343

Left169

Out

Total

In241

512753

Thru1380

Right241

Out TotalIn2040 1621 3661

Tot

alO

utIn

00

0

Peak Hour Begins at 05:00 PM

Cars

Peak Hour Data

North

Peak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Each Approach Begins at:

05:30 PM 05:15 PM 04:45 PM 04:30 PM+0 mins. 0 509 509 51 92 143 336 76 412 0

+15 mins. 0 438 438 38 76 114 386 62 448 0+30 mins. 0 486 486 44 92 136 297 54 351 0+45 mins. 0 502 502 41 87 128 394 60 454 0

Total Volume 0 1935 1935 174 347 521 1413 252 1665 0% App. Total 0 100 33.4 66.6 84.9 15.1

PHF .000 .950 .950 .853 .943 .911 .897 .829 .917 .000

Accurate Counts978-664-2565

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 3

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pwwy

Rindge A

ve

Alewife Brook Pwwy

Thru1935

Left0

In - Peak Hour: 05:30 PM1935

Right347

Left174

In - Peak H

our: 05:15 PM

521

Thru1413

Right252

In - Peak Hour: 04:45 PM1665

In -

Pea

k H

our:

04:

30 P

M0

Cars

Peak Hour Data

North

Accurate Counts978-664-2565

Page 76: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 1

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Groups Printed- TrucksAlewife Brook Pwwy

From NorthRindge AveFrom East

Alewife Brook PwwyFrom South

Start Time Left Thru Left Right Thru Right Int. Total04:30 PM 0 0 0 0 0 0 004:45 PM 0 0 0 1 0 0 1

Total 0 0 0 1 0 0 1

05:00 PM 0 3 0 0 0 0 305:15 PM 0 2 0 0 2 1 505:30 PM 0 2 0 0 0 0 205:45 PM 0 0 0 0 1 0 1

Total 0 7 0 0 3 1 11

06:00 PM 0 0 0 0 0 0 006:15 PM 0 0 0 0 2 0 2

Grand Total 0 7 0 1 5 1 14Apprch % 0 100 0 100 83.3 16.7

Total % 0 50 0 7.1 35.7 7.1

Alewife Brook PwwyFrom North

Rindge AveFrom East

Alewife Brook PwwyFrom South From West

Start Time Left Thru App. Total Left Right App. Total Thru Right App. Total App. Total Int. TotalPeak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 04:45 PM

04:45 PM 0 0 0 0 1 1 0 0 0 0 105:00 PM 0 3 3 0 0 0 0 0 0 0 305:15 PM 0 2 2 0 0 0 2 1 3 0 505:30 PM 0 2 2 0 0 0 0 0 0 0 2

Total Volume 0 7 7 0 1 1 2 1 3 0 11% App. Total 0 100 0 100 66.7 33.3

PHF .000 .583 .583 .000 .250 .250 .250 .250 .250 .000 .550

Accurate Counts978-664-2565

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 2

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pwwy

Rindge A

ve

Alewife Brook Pwwy

Thru7

Left0

InOut Total3 7 10

Right 1

Left 0

Out

Total

In1

12

Thru2

Right1

Out TotalIn7 3 10

Tot

alO

utIn

00

0

Peak Hour Begins at 04:45 PM

Trucks

Peak Hour Data

North

Peak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Each Approach Begins at:

04:45 PM 04:30 PM 05:00 PM 04:30 PM+0 mins. 0 0 0 0 0 0 0 0 0 0

+15 mins. 0 3 3 0 1 1 2 1 3 0+30 mins. 0 2 2 0 0 0 0 0 0 0+45 mins. 0 2 2 0 0 0 1 0 1 0

Total Volume 0 7 7 0 1 1 3 1 4 0% App. Total 0 100 0 100 75 25

PHF .000 .583 .583 .000 .250 .250 .375 .250 .333 .000

Accurate Counts978-664-2565

Page 77: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 3

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pwwy

Rindge A

ve

Alewife Brook Pwwy

Thru7

Left0

In - Peak Hour: 04:45 PM7

Right 1

Left 0

In - Peak H

our: 04:30 PM

1

Thru3

Right1

In - Peak Hour: 05:00 PM4

In -

Pea

k H

our:

04:

30 P

M0

Trucks

Peak Hour Data

North

Accurate Counts978-664-2565

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 1

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Groups Printed- PedsAlewife Brook Pwwy

From NorthRindge AveFrom East

Alewife Brook PwwyFrom South From West

Start Time EB WB SB NB WB EB SB NB Int. Total04:30 PM 0 0 3 3 11 17 3 1 3804:45 PM 0 0 0 1 7 9 4 0 21

Total 0 0 3 4 18 26 7 1 59

05:00 PM 4 1 4 0 13 11 13 2 4805:15 PM 0 2 4 1 10 16 6 1 4005:30 PM 0 1 0 1 5 18 10 0 3505:45 PM 0 0 0 1 4 12 0 0 17

Total 4 4 8 3 32 57 29 3 140

06:00 PM 0 0 0 0 7 23 4 0 3406:15 PM 0 0 1 1 6 20 7 0 35

Grand Total 4 4 12 8 63 126 47 4 268Apprch % 50 50 60 40 33.3 66.7 92.2 7.8

Total % 1.5 1.5 4.5 3 23.5 47 17.5 1.5

Alewife Brook PwwyFrom North

Rindge AveFrom East

Alewife Brook PwwyFrom South From West

Start Time EB WB App. Total SB NB App. Total WB EB App. Total SB NB App. Total Int. TotalPeak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 04:30 PM

04:30 PM 0 0 0 3 3 6 11 17 28 3 1 4 3804:45 PM 0 0 0 0 1 1 7 9 16 4 0 4 2105:00 PM 4 1 5 4 0 4 13 11 24 13 2 15 4805:15 PM 0 2 2 4 1 5 10 16 26 6 1 7 40

Total Volume 4 3 7 11 5 16 41 53 94 26 4 30 147% App. Total 57.1 42.9 68.8 31.2 43.6 56.4 86.7 13.3

PHF .250 .375 .350 .688 .417 .667 .788 .779 .839 .500 .500 .500 .766

Accurate Counts978-664-2565

Page 78: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 2

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pwwy

Rindge A

ve

Alewife Brook Pwwy

Right3

Left4

InOut Total31 7 38

Right 5

Left 11

Out

Total

In57

1673

Left41

Right53

Out TotalIn15 94 109

Left26

Rig

ht4

Tot

alO

utIn

4430

74

Peak Hour Begins at 04:30 PM

Peds

Peak Hour Data

North

Peak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Each Approach Begins at:

04:45 PM 04:30 PM 05:15 PM 04:45 PM+0 mins. 0 0 0 3 3 6 10 16 26 4 0 4

+15 mins. 4 1 5 0 1 1 5 18 23 13 2 15+30 mins. 0 2 2 4 0 4 4 12 16 6 1 7+45 mins. 0 1 1 4 1 5 7 23 30 10 0 10

Total Volume 4 4 8 11 5 16 26 69 95 33 3 36% App. Total 50 50 68.8 31.2 27.4 72.6 91.7 8.3

PHF .250 .500 .400 .688 .417 .667 .650 .750 .792 .635 .375 .600

Accurate Counts978-664-2565

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 3

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pwwy

Rindge A

ve

Alewife Brook Pwwy

Right4

Left4

In - Peak Hour: 04:45 PM8

Right 5

Left 11

In - Peak H

our: 04:30 PM

16

Left26

Right69

In - Peak Hour: 05:15 PM95

Left33

Rig

ht3

In -

Pea

k H

our:

04:

45 P

M36

Peds

Peak Hour Data

North

Accurate Counts978-664-2565

Page 79: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 1

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Groups Printed- Bikes StreetAlewife Brook Pwwy

From NorthRindge AveFrom East

Alewife Brook PwwyFrom South

Start Time Left Thru Left Right Thru Right Int. Total04:30 PM 0 0 1 0 0 0 104:45 PM 0 0 0 0 0 0 0

Total 0 0 1 0 0 0 1

05:00 PM 0 0 0 0 0 0 005:15 PM 0 0 1 0 1 0 205:30 PM 0 0 0 0 0 0 005:45 PM 0 0 0 0 0 0 0

Total 0 0 1 0 1 0 2

06:00 PM 0 0 0 0 2 0 206:15 PM 0 0 1 0 0 0 1

Grand Total 0 0 3 0 3 0 6Apprch % 0 0 100 0 100 0

Total % 0 0 50 0 50 0

Alewife Brook PwwyFrom North

Rindge AveFrom East

Alewife Brook PwwyFrom South From West

Start Time Left Thru App. Total Left Right App. Total Thru Right App. Total App. Total Int. TotalPeak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 05:15 PM

05:15 PM 0 0 0 1 0 1 1 0 1 0 205:30 PM 0 0 0 0 0 0 0 0 0 0 005:45 PM 0 0 0 0 0 0 0 0 0 0 006:00 PM 0 0 0 0 0 0 2 0 2 0 2

Total Volume 0 0 0 1 0 1 3 0 3 0 4% App. Total 0 0 100 0 100 0

PHF .000 .000 .000 .250 .000 .250 .375 .000 .375 .000 .500

Accurate Counts978-664-2565

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 2

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pwwy

Rindge A

ve

Alewife Brook Pwwy

Thru0

Left0

InOut Total3 0 3

Right 0

Left 1

Out

Total

In0

11

Thru3

Right0

Out TotalIn1 3 4

Tot

alO

utIn

00

0

Peak Hour Begins at 05:15 PM

Bikes Street

Peak Hour Data

North

Peak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Each Approach Begins at:

04:30 PM 04:30 PM 05:15 PM 04:30 PM+0 mins. 0 0 0 1 0 1 1 0 1 0

+15 mins. 0 0 0 0 0 0 0 0 0 0+30 mins. 0 0 0 0 0 0 0 0 0 0+45 mins. 0 0 0 1 0 1 2 0 2 0

Total Volume 0 0 0 2 0 2 3 0 3 0% App. Total 0 0 100 0 100 0

PHF .000 .000 .000 .500 .000 .500 .375 .000 .375 .000

Accurate Counts978-664-2565

Page 80: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 3

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pwwy

Rindge A

ve

Alewife Brook Pwwy

Thru0

Left0

In - Peak Hour: 04:30 PM0

Right 0

Left 2

In - Peak H

our: 04:30 PM

2

Thru3

Right0

In - Peak Hour: 05:15 PM3

In -

Pea

k H

our:

04:

30 P

M0

Bikes Street

Peak Hour Data

North

Accurate Counts978-664-2565

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 1

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Groups Printed- Bikes SWAlewife Brook Pwwy

From NorthRindge AveFrom East

Alewife Brook PwwyFrom South

Start Time Left Thru Left Right Thru Right Int. Total04:30 PM 0 0 0 0 0 0 004:45 PM 0 0 0 0 0 0 0

Total 0 0 0 0 0 0 0

05:00 PM 0 0 0 0 0 0 005:15 PM 0 0 0 0 1 0 105:30 PM 1 0 0 0 0 0 105:45 PM 0 1 0 0 2 0 3

Total 1 1 0 0 3 0 5

06:00 PM 0 0 0 0 2 1 306:15 PM 0 1 1 0 5 0 7

Grand Total 1 2 1 0 10 1 15Apprch % 33.3 66.7 100 0 90.9 9.1

Total % 6.7 13.3 6.7 0 66.7 6.7

Alewife Brook PwwyFrom North

Rindge AveFrom East

Alewife Brook PwwyFrom South From West

Start Time Left Thru App. Total Left Right App. Total Thru Right App. Total App. Total Int. TotalPeak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 05:30 PM

05:30 PM 1 0 1 0 0 0 0 0 0 0 105:45 PM 0 1 1 0 0 0 2 0 2 0 306:00 PM 0 0 0 0 0 0 2 1 3 0 306:15 PM 0 1 1 1 0 1 5 0 5 0 7

Total Volume 1 2 3 1 0 1 9 1 10 0 14% App. Total 33.3 66.7 100 0 90 10

PHF .250 .500 .750 .250 .000 .250 .450 .250 .500 .000 .500

Accurate Counts978-664-2565

Page 81: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 2

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pwwy

Rindge A

ve

Alewife Brook Pwwy

Thru2

Left1

InOut Total9 3 12

Right 0

Left 1

Out

Total

In2

13

Thru9

Right1

Out TotalIn3 10 13

Tot

alO

utIn

00

0

Peak Hour Begins at 05:30 PM

Bikes SW

Peak Hour Data

North

Peak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Each Approach Begins at:

05:30 PM 05:30 PM 05:30 PM 04:30 PM+0 mins. 1 0 1 0 0 0 0 0 0 0

+15 mins. 0 1 1 0 0 0 2 0 2 0+30 mins. 0 0 0 0 0 0 2 1 3 0+45 mins. 0 1 1 1 0 1 5 0 5 0

Total Volume 1 2 3 1 0 1 9 1 10 0% App. Total 33.3 66.7 100 0 90 10

PHF .250 .500 .750 .250 .000 .250 .450 .250 .500 .000

Accurate Counts978-664-2565

File Name : 11810003Site Code : 11810003Start Date : 12/6/2012Page No : 3

N/S Street : Alewife Brook ParkwayE/W Street : Rindge AvenueCity/State : Cambridge, MAWeather : Clear

Alewife Brook Pwwy

Rindge A

ve

Alewife Brook Pwwy

Thru2

Left1

In - Peak Hour: 05:30 PM3

Right 0

Left 1

In - Peak H

our: 05:30 PM

1

Thru9

Right1

In - Peak Hour: 05:30 PM10

In -

Pea

k H

our:

04:

30 P

M0

Bikes SW

Peak Hour Data

North

Accurate Counts978-664-2565

Page 82: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 1

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Groups Printed- C

ars - Trucks - B

usesA

ccess Road

From N

orthC

ambridge Park D

rFrom

East

Access R

oadFrom

SouthC

ambridge Park D

rFrom

West

Start Time

LeftThru

Right

U-TR

LeftThru

Right

U-TR

LeftThru

Right

U-TR

LeftThru

Right

U-TR

Int. Total07:30 A

M131

1736

02

3320

10

18

04

80

0261

07:45 AM

10419

352

435

360

14

50

48

00

257Total

23536

712

668

561

15

130

816

00

518

08:00 AM

8119

405

447

343

05

90

210

00

25908:15 A

M71

1148

17

4926

00

46

04

120

0239

08:30 AM

775

553

757

231

03

80

311

00

25308:45 A

M94

768

26

5921

01

12

03

90

0273

Total323

42211

1124

212104

41

1325

012

420

01024

09:00 AM

1181

710

1061

234

11

40

114

10

31009:15 A

M119

160

23

4513

00

00

03

180

0264

Grand Total

79580

41315

43386

1969

319

420

2490

10

2116A

pprch %61

6.131.7

1.26.8

60.930.9

1.44.7

29.765.6

020.9

78.30.9

0Total %

37.63.8

19.50.7

218.2

9.30.4

0.10.9

20

1.14.3

00

Cars

77776

40515

43381

1919

317

420

2285

10

2067%

Cars

97.795

98.1100

10098.7

97.4100

10089.5

1000

91.794.4

1000

97.7Trucks

71

70

04

00

01

00

24

00

26%

Trucks0.9

1.21.7

00

10

00

5.30

08.3

4.40

01.2

Buses

113

10

01

50

01

00

01

00

23%

Buses

1.43.8

0.20

00.3

2.60

05.3

00

01.1

00

1.1

Access R

oadFrom

North

Cam

bridge Park Dr

From E

astA

ccess Road

From South

Cam

bridge Park Dr

From W

estStart Tim

eLeft

ThruR

ightU

-TRA

pp. TotalLeft

ThruR

ightU

-TRA

pp. TotalLeft

ThruR

ightU

-TRA

pp. TotalLeft

ThruR

ightU

-TRA

pp. TotalInt. Total

Peak Hour A

nalysis From 07:30 A

M to 09:15 A

M - Peak 1 of 1

Peak Hour for Entire Intersection B

egins at 08:30 AM

08:30 AM

775

553

1407

5723

188

03

80

113

110

014

25308:45 A

M94

768

2171

659

210

861

12

04

39

00

12273

09:00 AM

1181

710

19010

6123

498

11

40

61

141

016

31009:15 A

M119

160

2182

345

130

610

00

00

318

00

21264

Total Volum

e408

14254

7683

26222

805

3332

514

021

1052

10

631100

% A

pp. Total59.7

237.2

17.8

66.724

1.59.5

23.866.7

015.9

82.51.6

0PH

F.857

.500.894

.583.899

.650.910

.870.313

.849.500

.417.438

.000.477

.833.722

.250.000

.750.887

Cars

39813

2497

66726

21978

5328

25

140

2110

511

062

1078%

Cars

97.592.9

98.0100

97.7100

98.697.5

10098.5

100100

1000

100100

98.1100

098.4

98.0Trucks

41

40

90

20

02

00

00

00

10

01

12%

Trucks1.0

7.11.6

01.3

00.9

00

0.60

00

00

01.9

00

1.61.1

Buses

60

10

70

12

03

00

00

00

00

00

10%

Buses

1.50

0.40

1.00

0.52.5

00.9

00

00

00

00

00

0.9

Accurate C

ounts978-664-2565

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 2

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Access R

oad

Cambridge Park Dr Cambridge Park Dr

Access R

oad

Right

24941254

Thru 131014

Left

39846408

U-T

R 7007

InO

utT

otal93

660753

09

92

79

95771

676

Right

7802

80Thru

21921

222Left

2600

26U-TR

5005

OutTotal In463323786

527639

474802 328

Left2002

Thru5005

Right

140014

U-T

R0000

Out

Total

In

4021

611

01

00

041

6221

Left

1000

10Thru

5110

52Right

1001

U-TR

0000

TotalOut In470 62 532

6 1 72 0 2

478 54163

Peak H

our Begins at 08:30 A

M

Cars

Trucks

Buses

Peak H

our Data

North

Peak Hour A

nalysis From 07:30 A

M to 09:15 A

M - Peak 1 of 1

Peak Hour for Each A

pproach Begins at:

08:30 AM

08:15 AM

07:45 AM

08:30 AM

+0 mins.

775

553

1407

4926

082

14

50

103

110

014

+15 mins.

947

682

1717

5723

188

05

90

143

90

012

+30 mins.

1181

710

1906

5921

086

04

60

101

141

016

+45 mins.

1191

602

18210

6123

498

03

80

113

180

021

Total Volum

e408

14254

7683

30226

935

3541

1628

045

1052

10

63%

App. Total

59.72

37.21

8.563.8

26.31.4

2.235.6

62.20

15.982.5

1.60

PHF

.857.500

.894.583

.899.750

.926.894

.313.903

.250.800

.778.000

.804.833

.722.250

.000.750

Cars

39813

2497

66730

22291

5348

114

280

4310

511

062

% C

ars97.5

92.998

10097.7

10098.2

97.8100

98.3100

87.5100

095.6

10098.1

1000

98.4Trucks

41

40

90

30

03

01

00

10

10

01

Accurate C

ounts978-664-2565

Page 83: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Buses

60

10

70

12

03

01

00

10

00

00

% B

uses1.5

00.4

01

00.4

2.20

0.80

6.20

02.2

00

00

0 A

ccess Road

Cambridge Park Dr Cambridge Park Dr

Access R

oad

Right

24941254

Thru 131014

Left

39846408

U-T

R 7007

In - Peak H

our: 08:30 AM

66097676

Right

9102

93Thru

22231

226Left

3000

30U-TR

5005

In - Peak Hour: 08:15 AM343

33

349

Left1001

Thru141116

Right

280028

U-T

R0000

In - Peak H

our: 07:45 AM

431145

Left

1000

10Thru

5110

52Right

1001

U-TR

0000

In - Peak Hour: 08:30 AM6210

63

Cars

Trucks

Buses

Peak H

our Data

North

Accurate C

ounts978-664-2565

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 1

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Groups Printed- B

usesA

ccess Road

From N

orthC

ambridge Park D

rFrom

East

Access R

oadFrom

SouthC

ambridge Park D

rFrom

West

Start Time

LeftThru

Right

U-TR

LeftThru

Right

U-TR

LeftThru

Right

U-TR

LeftThru

Right

U-TR

Int. Total07:30 A

M3

10

00

01

00

00

00

10

06

07:45 AM

00

00

00

00

00

00

00

00

0Total

31

00

00

10

00

00

01

00

6

08:00 AM

01

00

00

20

00

00

00

00

308:15 A

M2

10

00

00

00

10

00

00

04

08:30 AM

30

00

01

00

00

00

00

00

408:45 A

M1

01

00

01

00

00

00

00

03

Total6

21

00

13

00

10

00

00

014

09:00 AM

10

00

00

10

00

00

00

00

209:15 A

M1

00

00

00

00

00

00

00

01

Grand Total

113

10

01

50

01

00

01

00

23A

pprch %73.3

206.7

00

16.783.3

00

1000

00

1000

0Total %

47.813

4.30

04.3

21.70

04.3

00

04.3

00

Access R

oadFrom

North

Cam

bridge Park Dr

From E

astA

ccess Road

From South

Cam

bridge Park Dr

From W

estStart Tim

eLeft

ThruR

ightU

-TRA

pp. TotalLeft

ThruR

ightU

-TRA

pp. TotalLeft

ThruR

ightU

-TRA

pp. TotalLeft

ThruR

ightU

-TRA

pp. TotalInt. Total

Peak Hour A

nalysis From 07:30 A

M to 09:15 A

M - Peak 1 of 1

Peak Hour for Entire Intersection B

egins at 08:00 AM

08:00 AM

01

00

10

02

02

00

00

00

00

00

308:15 A

M2

10

03

00

00

00

10

01

00

00

04

08:30 AM

30

00

30

10

01

00

00

00

00

00

408:45 A

M1

01

02

00

10

10

00

00

00

00

03

Total Volum

e6

21

09

01

30

40

10

01

00

00

014

% A

pp. Total66.7

22.211.1

00

2575

00

1000

00

00

0PH

F.500

.500.250

.000.750

.000.250

.375.000

.500.000

.250.000

.000.250

.000.000

.000.000

.000.875

Accurate C

ounts978-664-2565

Page 84: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 2

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Access R

oad

Cambridge Park Dr Cambridge Park Dr

Access R

oad

Right 1

Thru 2

Left 6U

-TR 0

InO

utT

otal4

913

Right3

Thru1

Left0

U-TR0

OutTotal In6410

Left0T

hru1R

ight0U

-TR0

Out

Total

In2

13

Left0

Thru0

Right0

U-TR0

TotalOut In2 0 2

Peak H

our Begins at 08:00 A

M

Buses

Peak H

our Data

North

Peak Hour A

nalysis From 07:30 A

M to 09:15 A

M - Peak 1 of 1

Peak Hour for Each A

pproach Begins at:

08:00 AM

08:00 AM

07:30 AM

07:30 AM

+0 mins.

01

00

10

02

02

00

00

00

10

01

+15 mins.

21

00

30

00

00

00

00

00

00

00

+30 mins.

30

00

30

10

01

00

00

00

00

00

+45 mins.

10

10

20

01

01

01

00

10

00

00

Total Volum

e6

21

09

01

30

40

10

01

01

00

1%

App. Total

66.722.2

11.10

025

750

0100

00

0100

00

PHF

.500.500

.250.000

.750.000

.250.375

.000.500

.000.250

.000.000

.250.000

.250.000

.000.250

Accurate C

ounts978-664-2565

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 3

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Access R

oad

Cambridge Park Dr Cambridge Park Dr

Access R

oad

Right 1

Thru 2

Left 6U

-TR 0

In - Peak H

our: 08:00 AM

9

Right3

Thru1

Left0

U-TR0

In - Peak Hour: 08:00 AM4

Left0T

hru1R

ight0U

-TR0

In - Peak H

our: 07:30 AM

1

Left0

Thru1

Right0

U-TR0

In - Peak Hour: 07:30 AM1

Buses

Peak H

our Data

North

Accurate C

ounts978-664-2565

Page 85: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 1

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Groups Printed- C

arsA

ccess Road

From N

orthC

ambridge Park D

rFrom

East

Access R

oadFrom

SouthC

ambridge Park D

rFrom

West

Start Time

LeftThru

Right

U-TR

LeftThru

Right

U-TR

LeftThru

Right

U-TR

LeftThru

Right

U-TR

Int. Total07:30 A

M127

1635

02

3319

10

18

03

70

0252

07:45 AM

10219

352

434

360

14

50

46

00

252Total

22935

702

667

551

15

130

713

00

504

08:00 AM

8118

385

447

323

04

90

29

00

25208:15 A

M69

1048

17

4826

00

36

03

120

0233

08:30 AM

745

553

756

231

03

80

310

00

24808:45 A

M92

666

26

5820

01

12

03

90

0266

Total316

39207

1124

209101

41

1125

011

400

0999

09:00 AM

1161

710

1060

224

11

40

114

10

30609:15 A

M116

157

23

4513

00

00

03

180

0258

Grand Total

77776

40515

43381

1919

317

420

2285

10

2067A

pprch %61

631.8

1.26.9

61.130.6

1.44.8

27.467.7

020.4

78.70.9

0Total %

37.63.7

19.60.7

2.118.4

9.20.4

0.10.8

20

1.14.1

00

Access R

oadFrom

North

Cam

bridge Park Dr

From E

astA

ccess Road

From South

Cam

bridge Park Dr

From W

estStart Tim

eLeft

ThruR

ightU

-TRA

pp. TotalLeft

ThruR

ightU

-TRA

pp. TotalLeft

ThruR

ightU

-TRA

pp. TotalLeft

ThruR

ightU

-TRA

pp. TotalInt. Total

Peak Hour A

nalysis From 07:30 A

M to 09:15 A

M - Peak 1 of 1

Peak Hour for Entire Intersection B

egins at 08:30 AM

08:30 AM

745

553

1377

5623

187

03

80

113

100

013

24808:45 A

M92

666

2166

658

200

841

12

04

39

00

12266

09:00 AM

1161

710

18810

6022

496

11

40

61

141

016

30609:15 A

M116

157

2176

345

130

610

00

00

318

00

21258

Total Volum

e398

13249

7667

26219

785

3282

514

021

1051

10

621078

% A

pp. Total59.7

1.937.3

17.9

66.823.8

1.59.5

23.866.7

016.1

82.31.6

0PH

F.858

.542.877

.583.887

.650.913

.848.313

.854.500

.417.438

.000.477

.833.708

.250.000

.738.881

Accurate C

ounts978-664-2565

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 2

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Access R

oad

Cambridge Park Dr Cambridge Park Dr

Access R

oad

Right249

Thru 13

Left398

U-T

R 7

InO

utT

otal93

660753

Right78

Thru219

Left26

U-TR5

OutTotal In463323786

Left2T

hru5R

ight14

U-T

R0

Out

Total

In40

2161

Left10

Thru51

Right1

U-TR0

TotalOut In470 62 532

Peak H

our Begins at 08:30 A

M

Cars

Peak H

our Data

North

Peak Hour A

nalysis From 07:30 A

M to 09:15 A

M - Peak 1 of 1

Peak Hour for Each A

pproach Begins at:

08:30 AM

08:15 AM

07:45 AM

08:30 AM

+0 mins.

745

553

1377

4826

081

14

50

103

100

013

+15 mins.

926

662

1667

5623

187

04

90

133

90

012

+30 mins.

1161

710

1886

5820

084

03

60

91

141

016

+45 mins.

1161

572

17610

6022

496

03

80

113

180

021

Total Volum

e398

13249

7667

30222

915

3481

1428

043

1051

10

62%

App. Total

59.71.9

37.31

8.663.8

26.11.4

2.332.6

65.10

16.182.3

1.60

PHF

.858.542

.877.583

.887.750

.925.875

.313.906

.250.875

.778.000

.827.833

.708.250

.000.738

Accurate C

ounts978-664-2565

Page 86: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 3

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Access R

oad

Cambridge Park Dr Cambridge Park Dr

Access R

oad

Right249

Thru 13

Left398

U-T

R 7

In - Peak H

our: 08:30 AM

660

Right91

Thru222

Left30

U-TR5

In - Peak Hour: 08:15 AM343

Left1T

hru14R

ight28

U-T

R0

In - Peak H

our: 07:45 AM

43

Left10

Thru51

Right1

U-TR0

In - Peak Hour: 08:30 AM62

Cars

Peak H

our Data

North

Accurate C

ounts978-664-2565

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 1

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Groups Printed- T

rucksA

ccess Road

From N

orthC

ambridge Park D

rFrom

East

Access R

oadFrom

SouthC

ambridge Park D

rFrom

West

Start Time

LeftThru

Right

U-TR

LeftThru

Right

U-TR

LeftThru

Right

U-TR

LeftThru

Right

U-TR

Int. Total07:30 A

M1

01

00

00

00

00

01

00

03

07:45 AM

20

00

01

00

00

00

02

00

5Total

30

10

01

00

00

00

12

00

8

08:00 AM

00

20

00

00

01

00

01

00

408:15 A

M0

00

00

10

00

00

01

00

02

08:30 AM

00

00

00

00

00

00

01

00

108:45 A

M1

11

00

10

00

00

00

00

04

Total1

13

00

20

00

10

01

20

011

09:00 AM

10

00

01

00

00

00

00

00

209:15 A

M2

03

00

00

00

00

00

00

05

Grand Total

71

70

04

00

01

00

24

00

26A

pprch %46.7

6.746.7

00

1000

00

1000

033.3

66.70

0Total %

26.93.8

26.90

015.4

00

03.8

00

7.715.4

00

Access R

oadFrom

North

Cam

bridge Park Dr

From E

astA

ccess Road

From South

Cam

bridge Park Dr

From W

estStart Tim

eLeft

ThruR

ightU

-TRA

pp. TotalLeft

ThruR

ightU

-TRA

pp. TotalLeft

ThruR

ightU

-TRA

pp. TotalLeft

ThruR

ightU

-TRA

pp. TotalInt. Total

Peak Hour A

nalysis From 07:30 A

M to 09:15 A

M - Peak 1 of 1

Peak Hour for Entire Intersection B

egins at 07:30 AM

07:30 AM

10

10

20

00

00

00

00

01

00

01

307:45 A

M2

00

02

01

00

10

00

00

02

00

25

08:00 AM

00

20

20

00

00

01

00

10

10

01

408:15 A

M0

00

00

01

00

10

00

00

10

00

12

Total Volum

e3

03

06

02

00

20

10

01

23

00

514

% A

pp. Total50

050

00

1000

00

1000

040

600

0PH

F.375

.000.375

.000.750

.000.500

.000.000

.500.000

.250.000

.000.250

.500.375

.000.000

.625.700

Accurate C

ounts978-664-2565

Page 87: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 2

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Access R

oad

Cambridge Park Dr Cambridge Park Dr

Access R

oad

Right 3

Thru 0

Left 3U

-TR 0

InO

utT

otal3

69

Right0

Thru2

Left0

U-TR0

OutTotal In628

Left0T

hru1R

ight0U

-TR0

Out

Total

In0

11

Left2

Thru3

Right0

U-TR0

TotalOut In5 5 10

Peak H

our Begins at 07:30 A

M

Trucks

Peak H

our Data

North

Peak Hour A

nalysis From 07:30 A

M to 09:15 A

M - Peak 1 of 1

Peak Hour for Each A

pproach Begins at:

08:30 AM

08:15 AM

07:30 AM

07:30 AM

+0 mins.

00

00

00

10

01

00

00

01

00

01

+15 mins.

11

10

30

00

00

00

00

00

20

02

+30 mins.

10

00

10

10

01

01

00

10

10

01

+45 mins.

20

30

50

10

01

00

00

01

00

01

Total Volum

e4

14

09

03

00

30

10

01

23

00

5%

App. Total

44.411.1

44.40

0100

00

0100

00

4060

00

PHF

.500.250

.333.000

.450.000

.750.000

.000.750

.000.250

.000.000

.250.500

.375.000

.000.625

Accurate C

ounts978-664-2565

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 3

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Access R

oad

Cambridge Park Dr Cambridge Park Dr

Access R

oad

Right 4

Thru 1

Left 4U

-TR 0

In - Peak H

our: 08:30 AM

9

Right0

Thru3

Left0

U-TR0

In - Peak Hour: 08:15 AM3

Left0T

hru1R

ight0U

-TR0

In - Peak H

our: 07:30 AM

1

Left2

Thru3

Right0

U-TR0

In - Peak Hour: 07:30 AM5

Trucks

Peak H

our Data

North

Accurate C

ounts978-664-2565

Page 88: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 1

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Groups Printed- Peds

Access R

oadFrom

North

Cam

bridge Park Dr

From E

astA

ccess Road

From South

Cam

bridge Park Dr

From W

estStart Tim

eEB

WB

SBN

BW

BEB

NB

SBInt. Total

07:30 AM

713

03

04

42

3307:45 A

M9

92

101

63

141

Total16

222

131

107

374

08:00 AM

515

26

28

51

4408:15 A

M12

163

72

34

148

08:30 AM

1418

04

15

51

4808:45 A

M5

240

710

38

360

Total36

735

2415

1922

6200

09:00 AM

58

03

66

60

3409:15 A

M13

102

42

35

544

Grand Total

70113

944

2438

4014

352A

pprch %38.3

61.717

8338.7

61.374.1

25.9Total %

19.932.1

2.612.5

6.810.8

11.44

Access R

oadFrom

North

Cam

bridge Park Dr

From E

astA

ccess Road

From South

Cam

bridge Park Dr

From W

estStart Tim

eEB

WB

App. Total

SBN

BA

pp. TotalW

BEB

App. Total

NB

SBA

pp. TotalInt. Total

Peak Hour A

nalysis From 07:30 A

M to 09:15 A

M - Peak 1 of 1

Peak Hour for Entire Intersection B

egins at 08:00 AM

08:00 AM

515

202

68

28

105

16

4408:15 A

M12

1628

37

102

35

41

548

08:30 AM

1418

320

44

15

65

16

4808:45 A

M5

2429

07

710

313

83

1160

Total Volum

e36

73109

524

2915

1934

226

28200

% A

pp. Total33

6717.2

82.844.1

55.978.6

21.4PH

F.643

.760.852

.417.857

.725.375

.594.654

.688.500

.636.833

Accurate C

ounts978-664-2565

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 2

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Access R

oad

Cambridge Park Dr Cambridge Park Dr

Access R

oad

Right

73Left 36

InO

utT

otal46

109155

Right24

Left5

OutTotal In552984

Left15R

ight19

Out

Total

In11

3445

Left22

Right6

TotalOut In88 28 116

Peak H

our Begins at 08:00 A

M

Peds

Peak H

our Data

North

Peak Hour A

nalysis From 07:30 A

M to 09:15 A

M - Peak 1 of 1

Peak Hour for Each A

pproach Begins at:

08:00 AM

07:45 AM

08:15 AM

08:30 AM

+0 mins.

515

202

1012

23

55

16

+15 mins.

1216

282

68

15

68

311

+30 mins.

1418

323

710

103

136

06

+45 mins.

524

290

44

66

125

510

Total Volum

e36

73109

727

3419

1736

249

33%

App. Total

3367

20.679.4

52.847.2

72.727.3

PHF

.643.760

.852.583

.675.708

.475.708

.692.750

.450.750

Accurate C

ounts978-664-2565

Page 89: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 3

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Access R

oad

Cambridge Park Dr Cambridge Park Dr

Access R

oad

Right

73Left 36

In - Peak H

our: 08:00 AM

109

Right27

Left7

In - Peak Hour: 07:45 AM34

Left19R

ight17

In - Peak H

our: 08:15 AM

36

Left24

Right9

In - Peak Hour: 08:30 AM33

Peds

Peak H

our Data

North

Accurate C

ounts978-664-2565

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 1

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Groups Printed- B

ikes StreetA

ccess Road

From N

orthC

ambridge Park D

rFrom

East

Access R

oadFrom

SouthC

ambridge Park D

rFrom

West

Start Time

LeftThru

Right

LeftThru

Right

LeftThru

Right

LeftThru

Right

Int. Total07:30 A

M1

00

02

10

00

30

07

07:45 AM

20

30

20

00

01

20

10Total

30

30

41

00

04

20

17

08:00 AM

10

10

10

00

03

10

708:15 A

M1

12

02

10

00

44

015

08:30 AM

30

40

20

00

06

30

1808:45 A

M0

01

02

20

00

20

07

Total5

18

07

30

00

158

047

09:00 AM

10

50

10

00

01

20

1009:15 A

M0

00

01

00

00

10

02

Grand Total

91

160

134

00

021

120

76A

pprch %34.6

3.861.5

076.5

23.50

00

63.636.4

0Total %

11.81.3

21.10

17.15.3

00

027.6

15.80

Access R

oadFrom

North

Cam

bridge Park Dr

From E

astA

ccess Road

From South

Cam

bridge Park Dr

From W

estStart Tim

eLeft

ThruR

ightA

pp. TotalLeft

ThruR

ightA

pp. TotalLeft

ThruR

ightA

pp. TotalLeft

ThruR

ightA

pp. TotalInt. Total

Peak Hour A

nalysis From 07:30 A

M to 09:15 A

M - Peak 1 of 1

Peak Hour for Entire Intersection B

egins at 07:45 AM

07:45 AM

20

35

02

02

00

00

12

03

1008:00 A

M1

01

20

10

10

00

03

10

47

08:15 AM

11

24

02

13

00

00

44

08

1508:30 A

M3

04

70

20

20

00

06

30

918

Total Volum

e7

110

180

71

80

00

014

100

2450

% A

pp. Total38.9

5.655.6

087.5

12.50

00

58.341.7

0PH

F.583

.250.625

.643.000

.875.250

.667.000

.000.000

.000.583

.625.000

.667.694

Accurate C

ounts978-664-2565

Page 90: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 2

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Access R

oad

Cambridge Park Dr Cambridge Park Dr

Access R

oad

Right

10T

hru 1Left 7

InO

utT

otal15

1833

Right1

Thru7

Left0

OutTotal In17825

Left0T

hru0R

ight0

Out

Total

In1

01

Left14

Thru10

Right0

TotalOut In17 24 41

Peak H

our Begins at 07:45 A

M

Bikes S

treet

Peak H

our Data

North

Peak Hour A

nalysis From 07:30 A

M to 09:15 A

M - Peak 1 of 1

Peak Hour for Each A

pproach Begins at:

07:45 AM

08:00 AM

07:30 AM

07:45 AM

+0 mins.

20

35

01

01

00

00

12

03

+15 mins.

10

12

02

13

00

00

31

04

+30 mins.

11

24

02

02

00

00

44

08

+45 mins.

30

47

02

24

00

00

63

09

Total Volum

e7

110

180

73

100

00

014

100

24%

App. Total

38.95.6

55.60

7030

00

058.3

41.70

PHF

.583.250

.625.643

.000.875

.375.625

.000.000

.000.000

.583.625

.000.667

Accurate C

ounts978-664-2565

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 3

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Access R

oad

Cambridge Park Dr Cambridge Park Dr

Access R

oad

Right

10T

hru 1Left 7

In - Peak H

our: 07:45 AM

18

Right3

Thru7

Left0

In - Peak Hour: 08:00 AM10

Left0T

hru0R

ight0

In - Peak H

our: 07:30 AM

0

Left14

Thru10

Right0

In - Peak Hour: 07:45 AM24

Bikes S

treet

Peak H

our Data

North

Accurate C

ounts978-664-2565

Page 91: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 1

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Groups Printed- B

ikes SWA

ccess Road

From N

orthC

ambridge Park D

rFrom

East

Access R

oadFrom

SouthC

ambridge Park D

rFrom

West

Start Time

LeftThru

Right

LeftThru

Right

LeftThru

Right

LeftThru

Right

Int. Total07:30 A

M1

00

00

00

00

12

04

07:45 AM

00

10

10

00

01

00

3Total

10

10

10

00

02

20

7

08:00 AM

10

00

00

00

00

10

208:15 A

M0

00

01

00

00

00

01

08:30 AM

20

00

00

00

01

00

308:45 A

M0

00

00

10

00

20

03

Total3

00

01

10

00

31

09

09:00 AM

00

00

20

00

00

00

209:15 A

M1

00

00

00

00

01

02

Grand Total

50

10

41

00

05

40

20A

pprch %83.3

016.7

080

200

00

55.644.4

0Total %

250

50

205

00

025

200

Access R

oadFrom

North

Cam

bridge Park Dr

From E

astA

ccess Road

From South

Cam

bridge Park Dr

From W

estStart Tim

eLeft

ThruR

ightA

pp. TotalLeft

ThruR

ightA

pp. TotalLeft

ThruR

ightA

pp. TotalLeft

ThruR

ightA

pp. TotalInt. Total

Peak Hour A

nalysis From 07:30 A

M to 09:15 A

M - Peak 1 of 1

Peak Hour for Entire Intersection B

egins at 07:30 AM

07:30 AM

10

01

00

00

00

00

12

03

407:45 A

M0

01

10

10

10

00

01

00

13

08:00 AM

10

01

00

00

00

00

01

01

208:15 A

M0

00

00

10

10

00

00

00

01

Total Volum

e2

01

30

20

20

00

02

30

510

% A

pp. Total66.7

033.3

0100

00

00

4060

0PH

F.500

.000.250

.750.000

.500.000

.500.000

.000.000

.000.500

.375.000

.417.625

Accurate C

ounts978-664-2565

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 2

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Access R

oad

Cambridge Park Dr Cambridge Park Dr

Access R

oad

Right 1

Thru 0

Left 2

InO

utT

otal2

35

Right0

Thru2

Left0

OutTotal In527

Left0T

hru0R

ight0

Out

Total

In0

00

Left2

Thru3

Right0

TotalOut In3 5 8

Peak H

our Begins at 07:30 A

M

Bikes S

W

Peak H

our Data

North

Peak Hour A

nalysis From 07:30 A

M to 09:15 A

M - Peak 1 of 1

Peak Hour for Each A

pproach Begins at:

07:45 AM

08:15 AM

07:30 AM

07:30 AM

+0 mins.

00

11

01

01

00

00

12

03

+15 mins.

10

01

00

00

00

00

10

01

+30 mins.

00

00

00

11

00

00

01

01

+45 mins.

20

02

02

02

00

00

00

00

Total Volum

e3

01

40

31

40

00

02

30

5%

App. Total

750

250

7525

00

040

600

PHF

.375.000

.250.500

.000.375

.250.500

.000.000

.000.000

.500.375

.000.417

Accurate C

ounts978-664-2565

Page 92: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 3

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Access R

oad

Cambridge Park Dr Cambridge Park Dr

Access R

oad

Right 1

Thru 0

Left 3

In - Peak H

our: 07:45 AM

4

Right1

Thru3

Left0

In - Peak Hour: 08:15 AM4

Left0T

hru0R

ight0

In - Peak H

our: 07:30 AM

0

Left2

Thru3

Right0

In - Peak Hour: 07:30 AM5

Bikes S

W

Peak H

our Data

North

Accurate C

ounts978-664-2565

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 1

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Groups Printed- C

ars - Trucks - B

usesA

ccess Road

From N

orthC

ambridge Park D

rFrom

East

Access R

oadFrom

SouthC

ambridge Park D

rFrom

West

Start Time

LeftThru

Right

U-TR

LeftThru

Right

U-TR

LeftThru

Right

U-TR

LeftThru

Right

U-TR

Int. Total04:30 PM

1064

62

615

153

01

110

1255

20

23804:45 PM

906

51

613

191

23

160

1265

10

240Total

19610

113

1228

344

24

270

24120

30

478

05:00 PM177

63

37

1120

11

013

08

797

0336

05:15 PM185

112

110

818

14

217

08

711

0339

05:30 PM144

621

013

1314

03

116

04

742

0311

05:45 PM129

99

217

1517

05

124

08

661

0303

Total635

3235

647

4769

213

470

028

29011

01289

06:00 PM194

127

112

519

11

119

03

741

0350

06:15 PM173

144

013

619

12

222

01

540

0311

Grand Total

119868

5710

8486

1418

1811

1380

56538

150

2428A

pprch %89.9

5.14.3

0.826.3

2744.2

2.510.8

6.682.6

09.2

88.32.5

0Total %

49.32.8

2.30.4

3.53.5

5.80.3

0.70.5

5.70

2.322.2

0.60

Cars

118667

5710

8486

1408

1811

1370

56538

150

2413%

Cars

9998.5

100100

100100

99.3100

100100

99.30

100100

1000

99.4Trucks

31

00

00

00

00

10

00

00

5%

Trucks0.3

1.50

00

00

00

00.7

00

00

00.2

Buses

90

00

00

10

00

00

00

00

10%

Buses

0.80

00

00

0.70

00

00

00

00

0.4

Access R

oadFrom

North

Cam

bridge Park Dr

From E

astA

ccess Road

From South

Cam

bridge Park Dr

From W

estStart Tim

eLeft

ThruR

ightU

-TRA

pp. TotalLeft

ThruR

ightU

-TRA

pp. TotalLeft

ThruR

ightU

-TRA

pp. TotalLeft

ThruR

ightU

-TRA

pp. TotalInt. Total

Peak Hour A

nalysis From 04:30 PM

to 06:15 PM - Peak 1 of 1

Peak Hour for Entire Intersection B

egins at 05:15 PM05:15 PM

18511

21

19910

818

137

42

170

238

711

080

33905:30 PM

1446

210

17113

1314

040

31

160

204

742

080

31105:45 PM

1299

92

14917

1517

049

51

240

308

661

075

30306:00 PM

19412

71

21412

519

137

11

190

213

741

078

350Total V

olume

65238

394

73352

4168

2163

135

760

9423

2855

0313

1303%

App. Total

88.95.2

5.30.5

31.925.2

41.71.2

13.85.3

80.90

7.391.1

1.60

PHF

.840.792

.464.500

.856.765

.683.895

.500.832

.650.625

.792.000

.783.719

.963.625

.000.978

.931C

ars645

3839

4726

5241

682

16313

576

094

23285

50

3131296

% C

ars98.9

100100

10099.0

100100

100100

100100

100100

0100

100100

1000

10099.5

Trucks0

00

00

00

00

00

00

00

00

00

00

% Trucks

00

00

00

00

00

00

00

00

00

00

0B

uses7

00

07

00

00

00

00

00

00

00

07

% B

uses1.1

00

01.0

00

00

00

00

00

00

00

00.5

Accurate C

ounts978-664-2565

Page 93: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 2

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Access R

oad

Cambridge Park Dr Cambridge Park Dr

Access R

oad

Right

390039T

hru 380038Left

64507652

U-T

R 4004

InO

utT

otal96

722818

00

00

77

96825

729

Right

6800

68Thru

4100

41Left

5200

52U-TR

2002

OutTotal In10061611167

000707

10131174 161

Left130013

Thru5005

Right

760076

U-T

R0000

Out

Total

In

9594

1890

00

00

095

18994

Left

2300

23Thru

28500

285Right

5005

U-TR

0000

TotalOut In93 313 406

0 0 00 0 0

93 406313

Peak H

our Begins at 05:15 P

M

Cars

Trucks

Buses

Peak H

our Data

North

Peak Hour A

nalysis From 04:30 PM

to 06:15 PM - Peak 1 of 1

Peak Hour for Each A

pproach Begins at:

05:15 PM05:00 PM

05:30 PM04:45 PM

+0 mins.

18511

21

1997

1120

139

31

160

2012

651

078

+15 mins.

1446

210

17110

818

137

51

240

308

797

094

+30 mins.

1299

92

14913

1314

040

11

190

218

711

080

+45 mins.

19412

71

21417

1517

049

22

220

264

742

080

Total Volum

e652

3839

4733

4747

692

16511

581

097

32289

110

332%

App. Total

88.95.2

5.30.5

28.528.5

41.81.2

11.35.2

83.50

9.687

3.30

PHF

.840.792

.464.500

.856.691

.783.863

.500.842

.550.625

.844.000

.808.667

.915.393

.000.883

Cars

64538

394

72647

4769

2165

115

810

9732

28911

0332

% C

ars98.9

100100

10099

100100

100100

100100

100100

0100

100100

1000

100Trucks

00

00

00

00

00

00

00

00

00

00

Accurate C

ounts978-664-2565

Buses

70

00

70

00

00

00

00

00

00

00

% B

uses1.1

00

01

00

00

00

00

00

00

00

0 A

ccess Road

Cambridge Park Dr Cambridge Park Dr

Access R

oad

Right

390039T

hru 380038Left

64507652

U-T

R 4004

In - Peak H

our: 05:15 PM

72207729

Right

6900

69Thru

4700

47Left

4700

47U-TR

2002

In - Peak Hour: 05:00 PM163

00

163

Left110011

Thru5005

Right

810081

U-T

R0000

In - Peak H

our: 05:30 PM

970097

Left

3200

32Thru

28900

289Right

1100

11U-TR

0000

In - Peak Hour: 04:45 PM332

00

332

Cars

Trucks

Buses

Peak H

our Data

North

Accurate C

ounts978-664-2565

Page 94: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 1

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Groups Printed- B

usesA

ccess Road

From N

orthC

ambridge Park D

rFrom

East

Access R

oadFrom

SouthC

ambridge Park D

rFrom

West

Start Time

LeftThru

Right

U-TR

LeftThru

Right

U-TR

LeftThru

Right

U-TR

LeftThru

Right

U-TR

Int. Total04:30 PM

00

00

00

00

00

00

00

00

004:45 PM

00

00

00

00

00

00

00

00

0Total

00

00

00

00

00

00

00

00

0

05:00 PM2

00

00

00

00

00

00

00

02

05:15 PM3

00

00

00

00

00

00

00

03

05:30 PM2

00

00

00

00

00

00

00

02

05:45 PM1

00

00

00

00

00

00

00

01

Total8

00

00

00

00

00

00

00

08

06:00 PM1

00

00

00

00

00

00

00

01

06:15 PM0

00

00

01

00

00

00

00

01

Grand Total

90

00

00

10

00

00

00

00

10A

pprch %100

00

00

0100

00

00

00

00

0Total %

900

00

00

100

00

00

00

00

Access R

oadFrom

North

Cam

bridge Park Dr

From E

astA

ccess Road

From South

Cam

bridge Park Dr

From W

estStart Tim

eLeft

ThruR

ightU

-TRA

pp. TotalLeft

ThruR

ightU

-TRA

pp. TotalLeft

ThruR

ightU

-TRA

pp. TotalLeft

ThruR

ightU

-TRA

pp. TotalInt. Total

Peak Hour A

nalysis From 04:30 PM

to 06:15 PM - Peak 1 of 1

Peak Hour for Entire Intersection B

egins at 05:00 PM05:00 PM

20

00

20

00

00

00

00

00

00

00

205:15 PM

30

00

30

00

00

00

00

00

00

00

305:30 PM

20

00

20

00

00

00

00

00

00

00

205:45 PM

10

00

10

00

00

00

00

00

00

00

1Total V

olume

80

00

80

00

00

00

00

00

00

00

8%

App. Total

1000

00

00

00

00

00

00

00

PHF

.667.000

.000.000

.667.000

.000.000

.000.000

.000.000

.000.000

.000.000

.000.000

.000.000

.667

Accurate C

ounts978-664-2565

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 2

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Access R

oad

Cambridge Park Dr Cambridge Park Dr

Access R

oad

Right 0

Thru 0

Left 8U

-TR 0

InO

utT

otal0

88

Right0

Thru0

Left0

U-TR0

OutTotal In808

Left0T

hru0R

ight0U

-TR0

Out

Total

In0

00

Left0

Thru0

Right0

U-TR0

TotalOut In0 0 0

Peak H

our Begins at 05:00 P

M

Buses

Peak H

our Data

North

Peak Hour A

nalysis From 04:30 PM

to 06:15 PM - Peak 1 of 1

Peak Hour for Each A

pproach Begins at:

05:00 PM05:30 PM

04:30 PM04:30 PM

+0 mins.

20

00

20

00

00

00

00

00

00

00

+15 mins.

30

00

30

00

00

00

00

00

00

00

+30 mins.

20

00

20

00

00

00

00

00

00

00

+45 mins.

10

00

10

01

01

00

00

00

00

00

Total Volum

e8

00

08

00

10

10

00

00

00

00

0%

App. Total

1000

00

00

1000

00

00

00

00

PHF

.667.000

.000.000

.667.000

.000.250

.000.250

.000.000

.000.000

.000.000

.000.000

.000.000

Accurate C

ounts978-664-2565

Page 95: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 3

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Access R

oad

Cambridge Park Dr Cambridge Park Dr

Access R

oad

Right 0

Thru 0

Left 8U

-TR 0

In - Peak H

our: 05:00 PM

8

Right1

Thru0

Left0

U-TR0

In - Peak Hour: 05:30 PM1

Left0T

hru0R

ight0U

-TR0

In - Peak H

our: 04:30 PM

0

Left0

Thru0

Right0

U-TR0

In - Peak Hour: 04:30 PM0

Buses

Peak H

our Data

North

Accurate C

ounts978-664-2565

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 1

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Groups Printed- C

arsA

ccess Road

From N

orthC

ambridge Park D

rFrom

East

Access R

oadFrom

SouthC

ambridge Park D

rFrom

West

Start Time

LeftThru

Right

U-TR

LeftThru

Right

U-TR

LeftThru

Right

U-TR

LeftThru

Right

U-TR

Int. Total04:30 PM

1044

62

615

153

01

110

1255

20

23604:45 PM

905

51

613

191

23

160

1265

10

239Total

1949

113

1228

344

24

270

24120

30

475

05:00 PM175

63

37

1120

11

012

08

797

0333

05:15 PM182

112

110

818

14

217

08

711

0336

05:30 PM142

621

013

1314

03

116

04

742

0309

05:45 PM128

99

217

1517

05

124

08

661

0302

Total627

3235

647

4769

213

469

028

29011

01280

06:00 PM193

127

112

519

11

119

03

741

0349

06:15 PM172

144

013

618

12

222

01

540

0309

Grand Total

118667

5710

8486

1408

1811

1370

56538

150

2413A

pprch %89.8

5.14.3

0.826.4

2744

2.510.8

6.682.5

09.2

88.32.5

0Total %

49.22.8

2.40.4

3.53.6

5.80.3

0.70.5

5.70

2.322.3

0.60

Access R

oadFrom

North

Cam

bridge Park Dr

From E

astA

ccess Road

From South

Cam

bridge Park Dr

From W

estStart Tim

eLeft

ThruR

ightU

-TRA

pp. TotalLeft

ThruR

ightU

-TRA

pp. TotalLeft

ThruR

ightU

-TRA

pp. TotalLeft

ThruR

ightU

-TRA

pp. TotalInt. Total

Peak Hour A

nalysis From 04:30 PM

to 06:15 PM - Peak 1 of 1

Peak Hour for Entire Intersection B

egins at 05:15 PM05:15 PM

18211

21

19610

818

137

42

170

238

711

080

33605:30 PM

1426

210

16913

1314

040

31

160

204

742

080

30905:45 PM

1289

92

14817

1517

049

51

240

308

661

075

30206:00 PM

19312

71

21312

519

137

11

190

213

741

078

349Total V

olume

64538

394

72652

4168

2163

135

760

9423

2855

0313

1296%

App. Total

88.85.2

5.40.6

31.925.2

41.71.2

13.85.3

80.90

7.391.1

1.60

PHF

.835.792

.464.500

.852.765

.683.895

.500.832

.650.625

.792.000

.783.719

.963.625

.000.978

.928

Accurate C

ounts978-664-2565

Page 96: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 2

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Access R

oad

Cambridge Park Dr Cambridge Park Dr

Access R

oad

Right

39T

hru 38Left

645U

-TR 4

InO

utT

otal96

722818

Right68

Thru41

Left52

U-TR2

OutTotal In10061611167

Left13T

hru5R

ight76

U-T

R0

Out

Total

In95

94189

Left23

Thru285

Right5

U-TR0

TotalOut In93 313 406

Peak H

our Begins at 05:15 P

M

Cars

Peak H

our Data

North

Peak Hour A

nalysis From 04:30 PM

to 06:15 PM - Peak 1 of 1

Peak Hour for Each A

pproach Begins at:

05:15 PM05:00 PM

05:30 PM04:45 PM

+0 mins.

18211

21

1967

1120

139

31

160

2012

651

078

+15 mins.

1426

210

16910

818

137

51

240

308

797

094

+30 mins.

1289

92

14813

1314

040

11

190

218

711

080

+45 mins.

19312

71

21317

1517

049

22

220

264

742

080

Total Volum

e645

3839

4726

4747

692

16511

581

097

32289

110

332%

App. Total

88.85.2

5.40.6

28.528.5

41.81.2

11.35.2

83.50

9.687

3.30

PHF

.835.792

.464.500

.852.691

.783.863

.500.842

.550.625

.844.000

.808.667

.915.393

.000.883

Accurate C

ounts978-664-2565

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 3

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Access R

oad

Cambridge Park Dr Cambridge Park Dr

Access R

oad

Right

39T

hru 38Left

645U

-TR 4

In - Peak H

our: 05:15 PM

722

Right69

Thru47

Left47

U-TR2

In - Peak Hour: 05:00 PM163

Left11T

hru5R

ight81

U-T

R0

In - Peak H

our: 05:30 PM

97

Left32

Thru289

Right11

U-TR0

In - Peak Hour: 04:45 PM332

Cars

Peak H

our Data

North

Accurate C

ounts978-664-2565

Page 97: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 1

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Groups Printed- T

rucksA

ccess Road

From N

orthC

ambridge Park D

rFrom

East

Access R

oadFrom

SouthC

ambridge Park D

rFrom

West

Start Time

LeftThru

Right

U-TR

LeftThru

Right

U-TR

LeftThru

Right

U-TR

LeftThru

Right

U-TR

Int. Total04:30 PM

20

00

00

00

00

00

00

00

204:45 PM

01

00

00

00

00

00

00

00

1Total

21

00

00

00

00

00

00

00

3

05:00 PM0

00

00

00

00

01

00

00

01

05:15 PM0

00

00

00

00

00

00

00

00

05:30 PM0

00

00

00

00

00

00

00

00

05:45 PM0

00

00

00

00

00

00

00

00

Total0

00

00

00

00

01

00

00

01

06:00 PM0

00

00

00

00

00

00

00

00

06:15 PM1

00

00

00

00

00

00

00

01

Grand Total

31

00

00

00

00

10

00

00

5A

pprch %75

250

00

00

00

0100

00

00

0Total %

6020

00

00

00

00

200

00

00

Access R

oadFrom

North

Cam

bridge Park Dr

From E

astA

ccess Road

From South

Cam

bridge Park Dr

From W

estStart Tim

eLeft

ThruR

ightU

-TRA

pp. TotalLeft

ThruR

ightU

-TRA

pp. TotalLeft

ThruR

ightU

-TRA

pp. TotalLeft

ThruR

ightU

-TRA

pp. TotalInt. Total

Peak Hour A

nalysis From 04:30 PM

to 06:15 PM - Peak 1 of 1

Peak Hour for Entire Intersection B

egins at 04:30 PM04:30 PM

20

00

20

00

00

00

00

00

00

00

204:45 PM

01

00

10

00

00

00

00

00

00

00

105:00 PM

00

00

00

00

00

00

10

10

00

00

105:15 PM

00

00

00

00

00

00

00

00

00

00

0Total V

olume

21

00

30

00

00

00

10

10

00

00

4%

App. Total

66.733.3

00

00

00

00

1000

00

00

PHF

.250.250

.000.000

.375.000

.000.000

.000.000

.000.000

.250.000

.250.000

.000.000

.000.000

.500

Accurate C

ounts978-664-2565

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 2

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Access R

oad

Cambridge Park Dr Cambridge Park Dr

Access R

oad

Right 0

Thru 1

Left 2U

-TR 0

InO

utT

otal0

33

Right0

Thru0

Left0

U-TR0

OutTotal In303

Left0T

hru0R

ight1U

-TR0

Out

Total

In1

12

Left0

Thru0

Right0

U-TR0

TotalOut In0 0 0

Peak H

our Begins at 04:30 P

M

Trucks

Peak H

our Data

North

Peak Hour A

nalysis From 04:30 PM

to 06:15 PM - Peak 1 of 1

Peak Hour for Each A

pproach Begins at:

04:30 PM04:30 PM

04:30 PM04:30 PM

+0 mins.

20

00

20

00

00

00

00

00

00

00

+15 mins.

01

00

10

00

00

00

00

00

00

00

+30 mins.

00

00

00

00

00

00

10

10

00

00

+45 mins.

00

00

00

00

00

00

00

00

00

00

Total Volum

e2

10

03

00

00

00

01

01

00

00

0%

App. Total

66.733.3

00

00

00

00

1000

00

00

PHF

.250.250

.000.000

.375.000

.000.000

.000.000

.000.000

.250.000

.250.000

.000.000

.000.000

Accurate C

ounts978-664-2565

Page 98: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 3

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Access R

oad

Cambridge Park Dr Cambridge Park Dr

Access R

oad

Right 0

Thru 1

Left 2U

-TR 0

In - Peak H

our: 04:30 PM

3

Right0

Thru0

Left0

U-TR0

In - Peak Hour: 04:30 PM0

Left0T

hru0R

ight1U

-TR0

In - Peak H

our: 04:30 PM

1

Left0

Thru0

Right0

U-TR0

In - Peak Hour: 04:30 PM0

Trucks

Peak H

our Data

North

Accurate C

ounts978-664-2565

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 1

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Groups Printed- Peds

Access R

oadFrom

North

Cam

bridge Park Dr

From E

astA

ccess Road

From South

Cam

bridge Park Dr

From W

estStart Tim

eEB

WB

SBN

BW

BEB

NB

SBInt. Total

04:30 PM23

107

26

53

460

04:45 PM16

40

01

26

433

Total39

147

27

79

893

05:00 PM24

22

02

22

842

05:15 PM26

11

31

24

240

05:30 PM33

111

12

13

658

05:45 PM13

83

00

13

432

Total96

227

45

612

20172

06:00 PM23

41

10

10

333

06:15 PM18

71

02

26

339

Grand Total

17647

167

1416

2734

337A

pprch %78.9

21.169.6

30.446.7

53.344.3

55.7Total %

52.213.9

4.72.1

4.24.7

810.1

Access R

oadFrom

North

Cam

bridge Park Dr

From E

astA

ccess Road

From South

Cam

bridge Park Dr

From W

estStart Tim

eEB

WB

App. Total

SBN

BA

pp. TotalW

BEB

App. Total

NB

SBA

pp. TotalInt. Total

Peak Hour A

nalysis From 04:30 PM

to 06:15 PM - Peak 1 of 1

Peak Hour for Entire Intersection B

egins at 04:30 PM04:30 PM

2310

337

29

65

113

47

6004:45 PM

164

200

00

12

36

410

3305:00 PM

242

262

02

22

42

810

4205:15 PM

261

271

34

12

34

26

40Total V

olume

8917

10610

515

1011

2115

1833

175%

App. Total

8416

66.733.3

47.652.4

45.554.5

PHF

.856.425

.803.357

.417.417

.417.550

.477.625

.563.825

.729

Accurate C

ounts978-664-2565

Page 99: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 2

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Access R

oad

Cambridge Park Dr Cambridge Park Dr

Access R

oad

Right

17Left 89

InO

utT

otal20

106126

Right5

Left10

OutTotal In10015115

Left10R

ight11

Out

Total

In28

2149

Left15

Right18

TotalOut In27 33 60

Peak H

our Begins at 04:30 P

M

Peds

Peak H

our Data

North

Peak Hour A

nalysis From 04:30 PM

to 06:15 PM - Peak 1 of 1

Peak Hour for Each A

pproach Begins at:

05:15 PM04:30 PM

04:30 PM04:45 PM

+0 mins.

261

277

29

65

116

410

+15 mins.

3311

440

00

12

32

810

+30 mins.

138

212

02

22

44

26

+45 mins.

234

271

34

12

33

69

Total Volum

e95

24119

105

1510

1121

1520

35%

App. Total

79.820.2

66.733.3

47.652.4

42.957.1

PHF

.720.545

.676.357

.417.417

.417.550

.477.625

.625.875

Accurate C

ounts978-664-2565

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 3

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Access R

oad

Cambridge Park Dr Cambridge Park Dr

Access R

oad

Right

24Left 95

In - Peak H

our: 05:15 PM

119

Right5

Left10

In - Peak Hour: 04:30 PM15

Left10R

ight11

In - Peak H

our: 04:30 PM

21

Left15

Right20

In - Peak Hour: 04:45 PM35

Peds

Peak H

our Data

North

Accurate C

ounts978-664-2565

Page 100: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 1

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Groups Printed- B

ikes StreetA

ccess Road

From N

orthC

ambridge Park D

rFrom

East

Access R

oadFrom

SouthC

ambridge Park D

rFrom

West

Start Time

LeftThru

Right

U-TR

LeftThru

Right

U-TR

LeftThru

Right

U-TR

LeftThru

Right

U-TR

Int. Total04:30 PM

00

00

00

30

00

00

30

00

604:45 PM

00

00

02

10

00

00

01

10

5Total

00

00

02

40

00

00

31

10

11

05:00 PM0

00

00

12

00

00

00

01

04

05:15 PM0

00

00

03

00

10

01

10

06

05:30 PM0

00

00

11

00

00

00

10

03

05:45 PM0

00

00

23

00

10

02

10

09

Total0

00

00

49

00

20

03

31

022

06:00 PM0

00

00

02

00

00

00

40

06

06:15 PM0

00

00

00

00

00

01

00

01

Grand Total

00

00

06

150

02

00

78

20

40A

pprch %0

00

00

28.671.4

00

1000

041.2

47.111.8

0Total %

00

00

015

37.50

05

00

17.520

50

Access R

oadFrom

North

Cam

bridge Park Dr

From E

astA

ccess Road

From South

Cam

bridge Park Dr

From W

estStart Tim

eLeft

ThruR

ightA

pp. TotalLeft

ThruR

ightA

pp. TotalLeft

ThruR

ightA

pp. TotalLeft

ThruR

ightA

pp. TotalInt. Total

Peak Hour A

nalysis From 04:30 PM

to 06:15 PM - Peak 1 of 1

Peak Hour for Entire Intersection B

egins at 05:15 PM05:15 PM

00

00

00

33

01

01

11

02

605:30 PM

00

00

01

12

00

00

01

01

305:45 PM

00

00

02

35

01

01

21

03

906:00 PM

00

00

00

22

00

00

04

04

6Total V

olume

00

00

03

912

02

02

37

010

24%

App. Total

00

00

2575

0100

030

700

PHF

.000.000

.000.000

.000.375

.750.600

.000.500

.000.500

.375.438

.000.625

.667

Accurate C

ounts978-664-2565

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 2

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Access R

oad

Cambridge Park Dr Cambridge Park Dr

Access R

oad

Right 0

Thru 0

Left 0

InO

utT

otal14

014

Right9

Thru3

Left0

OutTotal In71219

Left0T

hru2R

ight0

Out

Total

In0

22

Left3

Thru7

Right0

TotalOut In3 10 13

Peak H

our Begins at 05:15 P

M

Bikes S

treet

Peak H

our Data

North

Peak Hour A

nalysis From 04:30 PM

to 06:15 PM - Peak 1 of 1

Peak Hour for Each A

pproach Begins at:

04:30 PM05:00 PM

05:00 PM05:15 PM

+0 mins.

00

00

01

23

00

00

11

02

+15 mins.

00

00

00

33

01

01

01

01

+30 mins.

00

00

01

12

00

00

21

03

+45 mins.

00

00

02

35

01

01

04

04

Total Volum

e0

00

00

49

130

20

23

70

10%

App. Total

00

00

30.869.2

0100

030

700

PHF

.000.000

.000.000

.000.500

.750.650

.000.500

.000.500

.375.438

.000.625

Accurate C

ounts978-664-2565

Page 101: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 3

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Access R

oad

Cambridge Park Dr Cambridge Park Dr

Access R

oad

Right 0

Thru 0

Left 0

In - Peak H

our: 04:30 PM

0

Right9

Thru4

Left0

In - Peak Hour: 05:00 PM13

Left0T

hru2R

ight0

In - Peak H

our: 05:00 PM

2

Left3

Thru7

Right0

In - Peak Hour: 05:15 PM10

Bikes S

treet

Peak H

our Data

North

Accurate C

ounts978-664-2565

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 1

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Groups Printed- B

ikes SWA

ccess Road

From N

orthC

ambridge Park D

rFrom

East

Access R

oadFrom

SouthC

ambridge Park D

rFrom

West

Start Time

LeftThru

Right

U-TR

LeftThru

Right

U-TR

LeftThru

Right

U-TR

LeftThru

Right

U-TR

Int. Total04:30 PM

20

00

00

10

00

00

00

00

304:45 PM

00

00

01

00

00

00

00

00

1Total

20

00

01

10

00

00

00

00

4

05:00 PM0

00

00

00

00

00

00

10

01

05:15 PM0

00

00

00

00

00

00

00

00

05:30 PM0

00

00

00

00

00

00

00

00

05:45 PM0

00

00

10

00

00

00

00

01

Total0

00

00

10

00

00

00

10

02

06:00 PM0

00

00

00

00

00

00

00

00

06:15 PM0

00

00

00

00

00

00

00

00

Grand Total

20

00

02

10

00

00

01

00

6A

pprch %100

00

00

66.733.3

00

00

00

1000

0Total %

33.30

00

033.3

16.70

00

00

016.7

00

Access R

oadFrom

North

Cam

bridge Park Dr

From E

astA

ccess Road

From South

Cam

bridge Park Dr

From W

estStart Tim

eLeft

ThruR

ightA

pp. TotalLeft

ThruR

ightA

pp. TotalLeft

ThruR

ightA

pp. TotalLeft

ThruR

ightA

pp. TotalInt. Total

Peak Hour A

nalysis From 04:30 PM

to 06:15 PM - Peak 1 of 1

Peak Hour for Entire Intersection B

egins at 04:30 PM04:30 PM

20

02

00

11

00

00

00

00

304:45 PM

00

00

01

01

00

00

00

00

105:00 PM

00

00

00

00

00

00

01

01

105:15 PM

00

00

00

00

00

00

00

00

0Total V

olume

20

02

01

12

00

00

01

01

5%

App. Total

1000

00

5050

00

00

1000

PHF

.250.000

.000.250

.000.250

.250.500

.000.000

.000.000

.000.250

.000.250

.417

Accurate C

ounts978-664-2565

Page 102: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 2

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Access R

oad

Cambridge Park Dr Cambridge Park Dr

Access R

oad

Right 0

Thru 0

Left 2

InO

utT

otal1

23

Right1

Thru1

Left0

OutTotal In325

Left0T

hru0R

ight0

Out

Total

In0

00

Left0

Thru1

Right0

TotalOut In1 1 2

Peak H

our Begins at 04:30 P

M

Bikes S

W

Peak H

our Data

North

Peak Hour A

nalysis From 04:30 PM

to 06:15 PM - Peak 1 of 1

Peak Hour for Each A

pproach Begins at:

04:30 PM04:30 PM

04:30 PM04:30 PM

+0 mins.

20

02

00

11

00

00

00

00

+15 mins.

00

00

01

01

00

00

00

00

+30 mins.

00

00

00

00

00

00

01

01

+45 mins.

00

00

00

00

00

00

00

00

Total Volum

e2

00

20

11

20

00

00

10

1%

App. Total

1000

00

5050

00

00

1000

PHF

.250.000

.000.250

.000.250

.250.500

.000.000

.000.000

.000.250

.000.250

Accurate C

ounts978-664-2565

File Nam

e: 11810004

Site Code

: 11810004Start D

ate: 12/6/2012

Page No

: 3

N/S Street : 'T' A

ccess Road

E/W Street: C

ambridge Park D

riveC

ity/State : Cam

bridge, MA

Weather : C

lear

Access R

oad

Cambridge Park Dr Cambridge Park Dr

Access R

oad

Right 0

Thru 0

Left 2

In - Peak H

our: 04:30 PM

2

Right1

Thru1

Left0

In - Peak Hour: 04:30 PM2

Left0T

hru0R

ight0

In - Peak H

our: 04:30 PM

0

Left0

Thru1

Right0

In - Peak Hour: 04:30 PM1

Bikes S

W

Peak H

our Data

North

Accurate C

ounts978-664-2565

Page 103: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 1

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Groups Printed- Cars - Trucks - BusesAccess Rd

From NorthExit to Rte 2From East

Access RdFrom South

Garage EntranceFrom West

Start Time Left Thru Right Left Thru Right Left Thru Right Left Thru Right Int. Total07:30 AM 23 320 54 1 0 0 0 0 49 0 0 0 44707:45 AM 22 236 48 0 0 0 0 0 53 0 0 0 359

Total 45 556 102 1 0 0 0 0 102 0 0 0 806

08:00 AM 14 231 73 0 0 0 1 0 50 0 0 0 36908:15 AM 11 202 80 0 0 0 0 0 51 0 0 0 34408:30 AM 16 222 57 0 0 0 0 0 38 0 0 0 33308:45 AM 24 205 61 0 0 0 0 0 41 0 0 0 331

Total 65 860 271 0 0 0 1 0 180 0 0 0 1377

09:00 AM 17 168 39 0 0 1 2 0 33 0 0 0 26009:15 AM 26 176 11 0 0 0 0 0 30 0 0 0 243

Grand Total 153 1760 423 1 0 1 3 0 345 0 0 0 2686Apprch % 6.5 75.3 18.1 50 0 50 0.9 0 99.1 0 0 0

Total % 5.7 65.5 15.7 0 0 0 0.1 0 12.8 0 0 0Cars 153 1709 423 0 0 0 2 0 304 0 0 0 2591

% Cars 100 97.1 100 0 0 0 66.7 0 88.1 0 0 0 96.5Trucks 0 8 0 0 0 0 1 0 1 0 0 0 10

% Trucks 0 0.5 0 0 0 0 33.3 0 0.3 0 0 0 0.4Buses 0 43 0 1 0 1 0 0 40 0 0 0 85

% Buses 0 2.4 0 100 0 100 0 0 11.6 0 0 0 3.2

Access RdFrom North

Exit to Rte 2From East

Access RdFrom South

Garage EntranceFrom West

Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. TotalPeak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 07:30 AM

07:30 AM 23 320 54 397 1 0 0 1 0 0 49 49 0 0 0 0 44707:45 AM 22 236 48 306 0 0 0 0 0 0 53 53 0 0 0 0 35908:00 AM 14 231 73 318 0 0 0 0 1 0 50 51 0 0 0 0 36908:15 AM 11 202 80 293 0 0 0 0 0 0 51 51 0 0 0 0 344

Total Volume 70 989 255 1314 1 0 0 1 1 0 203 204 0 0 0 0 1519% App. Total 5.3 75.3 19.4 100 0 0 0.5 0 99.5 0 0 0

PHF .761 .773 .797 .827 .250 .000 .000 .250 .250 .000 .958 .962 .000 .000 .000 .000 .850Cars 70 963 255 1288 0 0 0 0 1 0 182 183 0 0 0 0 1471

% Cars 100 97.4 100 98.0 0 0 0 0 100 0 89.7 89.7 0 0 0 0 96.8Trucks 0 3 0 3 0 0 0 0 0 0 0 0 0 0 0 0 3

% Trucks 0 0.3 0 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0.2Buses 0 23 0 23 1 0 0 1 0 0 21 21 0 0 0 0 45

% Buses 0 2.3 0 1.8 100 0 0 100 0 0 10.3 10.3 0 0 0 0 3.0

Accurate Counts978-664-2565

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 2

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Access Rd

Gar

age

Ent

ranc

e Exit to R

te 2

Access Rd

Right

25500

255Thru

9633

23989

Left

7000

70

InOut Total0 1288 12880 3 30 23 230 13141314

Right 0000

Thru 0000

Left 0011

Out

Total

In252

0252

00

021

122

273274

1

Left1001

Thru0000

Right182

021

203

Out TotalIn

963 183 11463 0 3

24 21 45990 1194204

Left

0 0 0 0T

hru0 0 0 0

Rig

ht0 0 0 0

Tot

alO

utIn

256

025

60

00

00

025

625

60 Peak Hour Begins at 07:30 AM

CarsTrucksBuses

Peak Hour Data

North

Peak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Each Approach Begins at:

07:30 AM 07:30 AM 07:30 AM 07:30 AM+0 mins. 23 320 54 397 1 0 0 1 0 0 49 49 0 0 0 0

+15 mins. 22 236 48 306 0 0 0 0 0 0 53 53 0 0 0 0+30 mins. 14 231 73 318 0 0 0 0 1 0 50 51 0 0 0 0+45 mins. 11 202 80 293 0 0 0 0 0 0 51 51 0 0 0 0

Total Volume 70 989 255 1314 1 0 0 1 1 0 203 204 0 0 0 0% App. Total 5.3 75.3 19.4 100 0 0 0.5 0 99.5 0 0 0

PHF .761 .773 .797 .827 .250 .000 .000 .250 .250 .000 .958 .962 .000 .000 .000 .000Cars 70 963 255 1288 0 0 0 0 1 0 182 183 0 0 0 0

% Cars 100 97.4 100 98 0 0 0 0 100 0 89.7 89.7 0 0 0 0Trucks 0 3 0 3 0 0 0 0 0 0 0 0 0 0 0 0

% Trucks 0 0.3 0 0.2 0 0 0 0 0 0 0 0 0 0 0 0Buses 0 23 0 23 1 0 0 1 0 0 21 21 0 0 0 0

% Buses 0 2.3 0 1.8 100 0 0 100 0 0 10.3 10.3 0 0 0 0

Accurate Counts978-664-2565

Page 104: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 3

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Access Rd

Gar

age

Ent

ranc

e Exit to R

te 2

Access Rd

Right

25500

255Thru

9633

23989

Left

7000

70

In - Peak Hour: 07:30 AM1288

323

1314

Right 0000

Thru 0000

Left 0011

In - Peak H

our: 07:30 AM

0011

Left1001

Thru0000

Right182

021

203

In - Peak Hour: 07:30 AM

1830

21204

Left

0 0 0 0T

hru0 0 0 0

Rig

ht0 0 0 0

In -

Pea

k H

our:

07:

30 A

M0 0 0 0 Cars

TrucksBuses

Peak Hour Data

North

Accurate Counts978-664-2565

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 1

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Groups Printed- BusesAccess Rd

From NorthExit to Rte 2From East

Access RdFrom South

Garage EntranceFrom West

Start Time Left Thru Right Left Thru Right Left Thru Right Left Thru Right Int. Total07:30 AM 0 4 0 1 0 0 0 0 1 0 0 0 607:45 AM 0 6 0 0 0 0 0 0 8 0 0 0 14

Total 0 10 0 1 0 0 0 0 9 0 0 0 20

08:00 AM 0 4 0 0 0 0 0 0 7 0 0 0 1108:15 AM 0 9 0 0 0 0 0 0 5 0 0 0 1408:30 AM 0 6 0 0 0 0 0 0 5 0 0 0 1108:45 AM 0 5 0 0 0 0 0 0 4 0 0 0 9

Total 0 24 0 0 0 0 0 0 21 0 0 0 45

09:00 AM 0 4 0 0 0 1 0 0 4 0 0 0 909:15 AM 0 5 0 0 0 0 0 0 6 0 0 0 11

Grand Total 0 43 0 1 0 1 0 0 40 0 0 0 85Apprch % 0 100 0 50 0 50 0 0 100 0 0 0

Total % 0 50.6 0 1.2 0 1.2 0 0 47.1 0 0 0

Access RdFrom North

Exit to Rte 2From East

Access RdFrom South

Garage EntranceFrom West

Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. TotalPeak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 07:45 AM

07:45 AM 0 6 0 6 0 0 0 0 0 0 8 8 0 0 0 0 1408:00 AM 0 4 0 4 0 0 0 0 0 0 7 7 0 0 0 0 1108:15 AM 0 9 0 9 0 0 0 0 0 0 5 5 0 0 0 0 1408:30 AM 0 6 0 6 0 0 0 0 0 0 5 5 0 0 0 0 11

Total Volume 0 25 0 25 0 0 0 0 0 0 25 25 0 0 0 0 50% App. Total 0 100 0 0 0 0 0 0 100 0 0 0

PHF .000 .694 .000 .694 .000 .000 .000 .000 .000 .000 .781 .781 .000 .000 .000 .000 .893

Accurate Counts978-664-2565

Page 105: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 2

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Access Rd

Gar

age

Ent

ranc

e Exit to R

te 2

Access Rd

Right0

Thru25

Left0

InOut Total0 25 25

Right 0

Thru 0

Left 0

Out

Total

In25

025

Left0

Thru0

Right25

Out TotalIn25 25 50

Left

0T

hru0

Rig

ht0

Tot

alO

utIn

00

0

Peak Hour Begins at 07:45 AM

Buses

Peak Hour Data

North

Peak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Each Approach Begins at:

07:45 AM 07:30 AM 07:45 AM 07:30 AM+0 mins. 0 6 0 6 1 0 0 1 0 0 8 8 0 0 0 0

+15 mins. 0 4 0 4 0 0 0 0 0 0 7 7 0 0 0 0+30 mins. 0 9 0 9 0 0 0 0 0 0 5 5 0 0 0 0+45 mins. 0 6 0 6 0 0 0 0 0 0 5 5 0 0 0 0

Total Volume 0 25 0 25 1 0 0 1 0 0 25 25 0 0 0 0% App. Total 0 100 0 100 0 0 0 0 100 0 0 0

PHF .000 .694 .000 .694 .250 .000 .000 .250 .000 .000 .781 .781 .000 .000 .000 .000

Accurate Counts978-664-2565

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 3

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Access Rd

Gar

age

Ent

ranc

e Exit to R

te 2

Access Rd

Right0

Thru25

Left0

In - Peak Hour: 07:45 AM25

Right 0

Thru 0

Left 1

In - Peak H

our: 07:30 AM

1

Left0

Thru0

Right25

In - Peak Hour: 07:45 AM25

Left

0T

hru0

Rig

ht0

In -

Pea

k H

our:

07:

30 A

M0

Buses

Peak Hour Data

North

Accurate Counts978-664-2565

Page 106: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 1

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Groups Printed- CarsAccess Rd

From NorthExit to Rte 2From East

Access RdFrom South

Garage EntranceFrom West

Start Time Left Thru Right Left Thru Right Left Thru Right Left Thru Right Int. Total07:30 AM 23 315 54 0 0 0 0 0 48 0 0 0 44007:45 AM 22 230 48 0 0 0 0 0 45 0 0 0 345

Total 45 545 102 0 0 0 0 0 93 0 0 0 785

08:00 AM 14 227 73 0 0 0 1 0 43 0 0 0 35808:15 AM 11 191 80 0 0 0 0 0 46 0 0 0 32808:30 AM 16 215 57 0 0 0 0 0 33 0 0 0 32108:45 AM 24 199 61 0 0 0 0 0 37 0 0 0 321

Total 65 832 271 0 0 0 1 0 159 0 0 0 1328

09:00 AM 17 162 39 0 0 0 1 0 28 0 0 0 24709:15 AM 26 170 11 0 0 0 0 0 24 0 0 0 231

Grand Total 153 1709 423 0 0 0 2 0 304 0 0 0 2591Apprch % 6.7 74.8 18.5 0 0 0 0.7 0 99.3 0 0 0

Total % 5.9 66 16.3 0 0 0 0.1 0 11.7 0 0 0

Access RdFrom North

Exit to Rte 2From East

Access RdFrom South

Garage EntranceFrom West

Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. TotalPeak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 07:30 AM

07:30 AM 23 315 54 392 0 0 0 0 0 0 48 48 0 0 0 0 44007:45 AM 22 230 48 300 0 0 0 0 0 0 45 45 0 0 0 0 34508:00 AM 14 227 73 314 0 0 0 0 1 0 43 44 0 0 0 0 35808:15 AM 11 191 80 282 0 0 0 0 0 0 46 46 0 0 0 0 328

Total Volume 70 963 255 1288 0 0 0 0 1 0 182 183 0 0 0 0 1471% App. Total 5.4 74.8 19.8 0 0 0 0.5 0 99.5 0 0 0

PHF .761 .764 .797 .821 .000 .000 .000 .000 .250 .000 .948 .953 .000 .000 .000 .000 .836

Accurate Counts978-664-2565

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 2

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Access Rd

Gar

age

Ent

ranc

e Exit to R

te 2

Access Rd

Right255

Thru963

Left70

InOut Total0 1288 1288

Right 0

Thru 0

Left 0

Out

Total

In252

0252

Left1

Thru0

Right182

Out TotalIn963 183 1146

Left

0T

hru0

Rig

ht0

Tot

alO

utIn

256

025

6

Peak Hour Begins at 07:30 AM

Cars

Peak Hour Data

North

Peak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Each Approach Begins at:

07:30 AM 07:30 AM 07:30 AM 07:30 AM+0 mins. 23 315 54 392 0 0 0 0 0 0 48 48 0 0 0 0

+15 mins. 22 230 48 300 0 0 0 0 0 0 45 45 0 0 0 0+30 mins. 14 227 73 314 0 0 0 0 1 0 43 44 0 0 0 0+45 mins. 11 191 80 282 0 0 0 0 0 0 46 46 0 0 0 0

Total Volume 70 963 255 1288 0 0 0 0 1 0 182 183 0 0 0 0% App. Total 5.4 74.8 19.8 0 0 0 0.5 0 99.5 0 0 0

PHF .761 .764 .797 .821 .000 .000 .000 .000 .250 .000 .948 .953 .000 .000 .000 .000

Accurate Counts978-664-2565

Page 107: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 3

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Access Rd

Gar

age

Ent

ranc

e Exit to R

te 2

Access Rd

Right255

Thru963

Left70

In - Peak Hour: 07:30 AM1288

Right 0

Thru 0

Left 0

In - Peak H

our: 07:30 AM

0

Left1

Thru0

Right182

In - Peak Hour: 07:30 AM183

Left

0T

hru0

Rig

ht0

In -

Pea

k H

our:

07:

30 A

M0

Cars

Peak Hour Data

North

Accurate Counts978-664-2565

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 1

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Groups Printed- TrucksAccess Rd

From NorthExit to Rte 2From East

Access RdFrom South

Garage EntranceFrom West

Start Time Left Thru Right Left Thru Right Left Thru Right Left Thru Right Int. Total07:30 AM 0 1 0 0 0 0 0 0 0 0 0 0 107:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0

Total 0 1 0 0 0 0 0 0 0 0 0 0 1

08:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 008:15 AM 0 2 0 0 0 0 0 0 0 0 0 0 208:30 AM 0 1 0 0 0 0 0 0 0 0 0 0 108:45 AM 0 1 0 0 0 0 0 0 0 0 0 0 1

Total 0 4 0 0 0 0 0 0 0 0 0 0 4

09:00 AM 0 2 0 0 0 0 1 0 1 0 0 0 409:15 AM 0 1 0 0 0 0 0 0 0 0 0 0 1

Grand Total 0 8 0 0 0 0 1 0 1 0 0 0 10Apprch % 0 100 0 0 0 0 50 0 50 0 0 0

Total % 0 80 0 0 0 0 10 0 10 0 0 0

Access RdFrom North

Exit to Rte 2From East

Access RdFrom South

Garage EntranceFrom West

Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. TotalPeak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 08:15 AM

08:15 AM 0 2 0 2 0 0 0 0 0 0 0 0 0 0 0 0 208:30 AM 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 108:45 AM 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 109:00 AM 0 2 0 2 0 0 0 0 1 0 1 2 0 0 0 0 4

Total Volume 0 6 0 6 0 0 0 0 1 0 1 2 0 0 0 0 8% App. Total 0 100 0 0 0 0 50 0 50 0 0 0

PHF .000 .750 .000 .750 .000 .000 .000 .000 .250 .000 .250 .250 .000 .000 .000 .000 .500

Accurate Counts978-664-2565

Page 108: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 2

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Access Rd

Gar

age

Ent

ranc

e Exit to R

te 2

Access Rd

Right0

Thru6

Left0

InOut Total0 6 6

Right 0

Thru 0

Left 0

Out

Total

In1

01

Left1

Thru0

Right1

Out TotalIn6 2 8

Left

0T

hru0

Rig

ht0

Tot

alO

utIn

10

1

Peak Hour Begins at 08:15 AM

Trucks

Peak Hour Data

North

Peak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Each Approach Begins at:

08:15 AM 07:30 AM 08:15 AM 07:30 AM+0 mins. 0 2 0 2 0 0 0 0 0 0 0 0 0 0 0 0

+15 mins. 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0+30 mins. 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0+45 mins. 0 2 0 2 0 0 0 0 1 0 1 2 0 0 0 0

Total Volume 0 6 0 6 0 0 0 0 1 0 1 2 0 0 0 0% App. Total 0 100 0 0 0 0 50 0 50 0 0 0

PHF .000 .750 .000 .750 .000 .000 .000 .000 .250 .000 .250 .250 .000 .000 .000 .000

Accurate Counts978-664-2565

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 3

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Access Rd

Gar

age

Ent

ranc

e Exit to R

te 2

Access Rd

Right0

Thru6

Left0

In - Peak Hour: 08:15 AM6

Right 0

Thru 0

Left 0

In - Peak H

our: 07:30 AM

0

Left1

Thru0

Right1

In - Peak Hour: 08:15 AM2

Left

0T

hru0

Rig

ht0

In -

Pea

k H

our:

07:

30 A

M0

Trucks

Peak Hour Data

North

Accurate Counts978-664-2565

Page 109: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 1

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Groups Printed- PedsAccess Rd

From NorthExit to Rte 2From East

Access RdFrom South

Garage EntranceFrom West

Start Time WB EB SB NB WB EB SB NB Int. Total07:30 AM 1 2 42 6 0 0 0 0 5107:45 AM 7 16 81 17 0 0 0 1 122

Total 8 18 123 23 0 0 0 1 173

08:00 AM 4 22 93 17 1 0 2 2 14108:15 AM 6 18 129 16 0 3 0 0 17208:30 AM 1 35 105 23 0 0 0 0 16408:45 AM 2 22 61 13 1 0 0 2 101

Total 13 97 388 69 2 3 2 4 578

09:00 AM 3 16 51 15 0 0 1 2 8809:15 AM 1 9 43 11 0 0 1 0 65

Grand Total 25 140 605 118 2 3 4 7 904Apprch % 15.2 84.8 83.7 16.3 40 60 36.4 63.6

Total % 2.8 15.5 66.9 13.1 0.2 0.3 0.4 0.8

Access RdFrom North

Exit to Rte 2From East

Access RdFrom South

Garage EntranceFrom West

Start Time WB EB App. Total SB NB App. Total WB EB App. Total SB NB App. Total Int. TotalPeak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 07:45 AM

07:45 AM 7 16 23 81 17 98 0 0 0 0 1 1 12208:00 AM 4 22 26 93 17 110 1 0 1 2 2 4 14108:15 AM 6 18 24 129 16 145 0 3 3 0 0 0 17208:30 AM 1 35 36 105 23 128 0 0 0 0 0 0 164

Total Volume 18 91 109 408 73 481 1 3 4 2 3 5 599% App. Total 16.5 83.5 84.8 15.2 25 75 40 60

PHF .643 .650 .757 .791 .793 .829 .250 .250 .333 .250 .375 .313 .871

Accurate Counts978-664-2565

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 2

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Access Rd

Gar

age

Ent

ranc

e Exit to R

te 2

Access Rd

Right91

Left18

InOut Total75 109 184

Right

73Left

408

Out

Total

In21

481502

Left1

Right3

Out TotalIn411 4 415

Left

2R

ight3

Tot

alO

utIn

925

97

Peak Hour Begins at 07:45 AM

Peds

Peak Hour Data

North

Peak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Each Approach Begins at:

08:00 AM 07:45 AM 08:00 AM 08:00 AM+0 mins. 4 22 26 81 17 98 1 0 1 2 2 4

+15 mins. 6 18 24 93 17 110 0 3 3 0 0 0+30 mins. 1 35 36 129 16 145 0 0 0 0 0 0+45 mins. 2 22 24 105 23 128 1 0 1 0 2 2

Total Volume 13 97 110 408 73 481 2 3 5 2 4 6% App. Total 11.8 88.2 84.8 15.2 40 60 33.3 66.7

PHF .542 .693 .764 .791 .793 .829 .500 .250 .417 .250 .500 .375

Accurate Counts978-664-2565

Page 110: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 3

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Access Rd

Gar

age

Ent

ranc

e Exit to R

te 2

Access Rd

Right97

Left13

In - Peak Hour: 08:00 AM110

Right

73Left

408

In - Peak H

our: 07:45 AM

481

Left2

Right3

In - Peak Hour: 08:00 AM5

Left

2R

ight4

In -

Pea

k H

our:

08:

00 A

M6

Peds

Peak Hour Data

North

Accurate Counts978-664-2565

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 1

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Groups Printed- Bikes StreetAccess Rd

From NorthExit to Rte 2From East

Access RdFrom South

Garage EntranceFrom West

Start Time Left Thru Right Left Thru Right Left Thru Right Left Thru Right Int. Total07:30 AM 0 1 0 0 0 0 0 0 0 0 0 0 107:45 AM 0 1 0 0 0 0 0 0 0 0 0 0 1

Total 0 2 0 0 0 0 0 0 0 0 0 0 2

08:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 008:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 008:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 008:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0

Total 0 0 0 0 0 0 0 0 0 0 0 0 0

09:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 009:15 AM 0 1 0 4 0 0 0 0 0 0 0 0 5

Grand Total 0 3 0 4 0 0 0 0 0 0 0 0 7Apprch % 0 100 0 100 0 0 0 0 0 0 0 0

Total % 0 42.9 0 57.1 0 0 0 0 0 0 0 0

Access RdFrom North

Exit to Rte 2From East

Access RdFrom South

Garage EntranceFrom West

Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. TotalPeak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 08:30 AM

08:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 008:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 009:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 009:15 AM 0 1 0 1 4 0 0 4 0 0 0 0 0 0 0 0 5

Total Volume 0 1 0 1 4 0 0 4 0 0 0 0 0 0 0 0 5% App. Total 0 100 0 100 0 0 0 0 0 0 0 0

PHF .000 .250 .000 .250 .250 .000 .000 .250 .000 .000 .000 .000 .000 .000 .000 .000 .250

Accurate Counts978-664-2565

Page 111: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 2

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Access Rd

Gar

age

Ent

ranc

e Exit to R

te 2

Access Rd

Right0

Thru1

Left0

InOut Total0 1 1

Right 0

Thru 0

Left 4

Out

Total

In0

44

Left0

Thru0

Right0

Out TotalIn5 0 5

Left

0T

hru0

Rig

ht0

Tot

alO

utIn

00

0

Peak Hour Begins at 08:30 AM

Bikes Street

Peak Hour Data

North

Peak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Each Approach Begins at:

07:30 AM 08:30 AM 07:30 AM 07:30 AM+0 mins. 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0

+15 mins. 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0+30 mins. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0+45 mins. 0 0 0 0 4 0 0 4 0 0 0 0 0 0 0 0

Total Volume 0 2 0 2 4 0 0 4 0 0 0 0 0 0 0 0% App. Total 0 100 0 100 0 0 0 0 0 0 0 0

PHF .000 .500 .000 .500 .250 .000 .000 .250 .000 .000 .000 .000 .000 .000 .000 .000

Accurate Counts978-664-2565

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 3

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Access Rd

Gar

age

Ent

ranc

e Exit to R

te 2

Access Rd

Right0

Thru2

Left0

In - Peak Hour: 07:30 AM2

Right 0

Thru 0

Left 4

In - Peak H

our: 08:30 AM

4

Left0

Thru0

Right0

In - Peak Hour: 07:30 AM0

Left

0T

hru0

Rig

ht0

In -

Pea

k H

our:

07:

30 A

M0

Bikes Street

Peak Hour Data

North

Accurate Counts978-664-2565

Page 112: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 1

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Groups Printed- Bikes SWAccess Rd

From NorthExit to Rte 2From East

Access RdFrom South

Garage EntranceFrom West

Start Time Left Thru Right Left Thru Right Left Thru Right Left Thru Right Int. Total07:30 AM 4 6 0 0 0 1 0 1 0 0 0 1 1307:45 AM 6 15 0 3 0 0 0 0 0 0 0 1 25

Total 10 21 0 3 0 1 0 1 0 0 0 2 38

08:00 AM 8 26 0 2 0 1 0 0 0 0 0 0 3708:15 AM 7 18 1 6 0 1 1 2 0 0 1 0 3708:30 AM 6 13 0 2 0 1 1 0 0 0 0 0 2308:45 AM 7 7 0 0 0 2 0 0 0 0 0 0 16

Total 28 64 1 10 0 5 2 2 0 0 1 0 113

09:00 AM 2 3 0 1 0 1 0 1 0 0 0 0 809:15 AM 4 5 0 1 0 1 1 0 0 0 0 0 12

Grand Total 44 93 1 15 0 8 3 4 0 0 1 2 171Apprch % 31.9 67.4 0.7 65.2 0 34.8 42.9 57.1 0 0 33.3 66.7

Total % 25.7 54.4 0.6 8.8 0 4.7 1.8 2.3 0 0 0.6 1.2

Access RdFrom North

Exit to Rte 2From East

Access RdFrom South

Garage EntranceFrom West

Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. TotalPeak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 07:45 AM

07:45 AM 6 15 0 21 3 0 0 3 0 0 0 0 0 0 1 1 2508:00 AM 8 26 0 34 2 0 1 3 0 0 0 0 0 0 0 0 3708:15 AM 7 18 1 26 6 0 1 7 1 2 0 3 0 1 0 1 3708:30 AM 6 13 0 19 2 0 1 3 1 0 0 1 0 0 0 0 23

Total Volume 27 72 1 100 13 0 3 16 2 2 0 4 0 1 1 2 122% App. Total 27 72 1 81.2 0 18.8 50 50 0 0 50 50

PHF .844 .692 .250 .735 .542 .000 .750 .571 .500 .250 .000 .333 .000 .250 .250 .500 .824

Accurate Counts978-664-2565

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 2

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Access Rd

Gar

age

Ent

ranc

e Exit to R

te 2

Access Rd

Right1

Thru72

Left27

InOut Total5 100 105

Right 3

Thru 0

Left 13

Out

Total

In28

1644

Left2

Thru2

Right0

Out TotalIn86 4 90

Left

0T

hru1

Rig

ht1

Tot

alO

utIn

32

5

Peak Hour Begins at 07:45 AM

Bikes SW

Peak Hour Data

North

Peak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1Peak Hour for Each Approach Begins at:

07:45 AM 07:45 AM 08:15 AM 07:30 AM+0 mins. 6 15 0 21 3 0 0 3 1 2 0 3 0 0 1 1

+15 mins. 8 26 0 34 2 0 1 3 1 0 0 1 0 0 1 1+30 mins. 7 18 1 26 6 0 1 7 0 0 0 0 0 0 0 0+45 mins. 6 13 0 19 2 0 1 3 0 1 0 1 0 1 0 1

Total Volume 27 72 1 100 13 0 3 16 2 3 0 5 0 1 2 3% App. Total 27 72 1 81.2 0 18.8 40 60 0 0 33.3 66.7

PHF .844 .692 .250 .735 .542 .000 .750 .571 .500 .375 .000 .417 .000 .250 .500 .750

Accurate Counts978-664-2565

Page 113: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 3

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Access Rd

Gar

age

Ent

ranc

e Exit to R

te 2

Access Rd

Right1

Thru72

Left27

In - Peak Hour: 07:45 AM100

Right 3

Thru 0

Left 13

In - Peak H

our: 07:45 AM

16

Left2

Thru3

Right0

In - Peak Hour: 08:15 AM5

Left

0T

hru1

Rig

ht2

In -

Pea

k H

our:

07:

30 A

M3

Bikes SW

Peak Hour Data

North

Accurate Counts978-664-2565

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 1

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Groups Printed- Cars - Trucks - BusesAccess Rd

From NorthExit to Rte 2From East

Access RdFrom South

Garage EntranceFrom West

Start Time Left Thru Right Left Thru Right Left Thru Right Left Thru Right Int. Total04:30 PM 67 112 1 0 0 0 0 0 144 0 0 0 32404:45 PM 50 107 0 0 0 0 0 0 117 0 0 0 274

Total 117 219 1 0 0 0 0 0 261 0 0 0 598

05:00 PM 90 146 0 0 0 0 0 0 142 0 0 0 37805:15 PM 80 159 0 0 0 0 0 0 131 0 0 0 37005:30 PM 60 149 3 0 0 0 0 0 118 0 0 0 33005:45 PM 88 131 0 0 0 0 0 0 140 0 0 0 359

Total 318 585 3 0 0 0 0 0 531 0 0 0 1437

06:00 PM 66 157 1 0 0 0 0 0 130 0 0 0 35406:15 PM 65 185 1 0 0 0 0 0 107 0 0 0 358

Grand Total 566 1146 6 0 0 0 0 0 1029 0 0 0 2747Apprch % 32.9 66.7 0.3 0 0 0 0 0 100 0 0 0

Total % 20.6 41.7 0.2 0 0 0 0 0 37.5 0 0 0Cars 564 1098 6 0 0 0 0 0 1009 0 0 0 2677

% Cars 99.6 95.8 100 0 0 0 0 0 98.1 0 0 0 97.5Trucks 0 4 0 0 0 0 0 0 0 0 0 0 4

% Trucks 0 0.3 0 0 0 0 0 0 0 0 0 0 0.1Buses 2 44 0 0 0 0 0 0 20 0 0 0 66

% Buses 0.4 3.8 0 0 0 0 0 0 1.9 0 0 0 2.4

Access RdFrom North

Exit to Rte 2From East

Access RdFrom South

Garage EntranceFrom West

Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. TotalPeak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 05:00 PM

05:00 PM 90 146 0 236 0 0 0 0 0 0 142 142 0 0 0 0 37805:15 PM 80 159 0 239 0 0 0 0 0 0 131 131 0 0 0 0 37005:30 PM 60 149 3 212 0 0 0 0 0 0 118 118 0 0 0 0 33005:45 PM 88 131 0 219 0 0 0 0 0 0 140 140 0 0 0 0 359

Total Volume 318 585 3 906 0 0 0 0 0 0 531 531 0 0 0 0 1437% App. Total 35.1 64.6 0.3 0 0 0 0 0 100 0 0 0

PHF .883 .920 .250 .948 .000 .000 .000 .000 .000 .000 .935 .935 .000 .000 .000 .000 .950Cars 317 560 3 880 0 0 0 0 0 0 525 525 0 0 0 0 1405

% Cars 99.7 95.7 100 97.1 0 0 0 0 0 0 98.9 98.9 0 0 0 0 97.8Trucks 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

% Trucks 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Buses 1 25 0 26 0 0 0 0 0 0 6 6 0 0 0 0 32

% Buses 0.3 4.3 0 2.9 0 0 0 0 0 0 1.1 1.1 0 0 0 0 2.2

Accurate Counts978-664-2565

Page 114: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 2

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Access Rd

Gar

age

Ent

ranc

e Exit to R

te 2

Access Rd

Right

3003

Thru

5600

25585

Left

31701

318

InOut Total0 880 8800 0 00 26 260 906906

Right 0000

Thru 0000

Left 0000

Out

Total

In842

0842

00

07

07

849849

0

Left0000

Thru0000

Right525

06

531

Out TotalIn

560 525 10850 0 0

25 6 31585 1116531

Left

0 0 0 0T

hru0 0 0 0

Rig

ht0 0 0 0

Tot

alO

utIn

30

30

00

00

03

30 Peak Hour Begins at 05:00 PM

CarsTrucksBuses

Peak Hour Data

North

Peak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Each Approach Begins at:

05:00 PM 04:30 PM 04:30 PM 04:30 PM+0 mins. 90 146 0 236 0 0 0 0 0 0 144 144 0 0 0 0

+15 mins. 80 159 0 239 0 0 0 0 0 0 117 117 0 0 0 0+30 mins. 60 149 3 212 0 0 0 0 0 0 142 142 0 0 0 0+45 mins. 88 131 0 219 0 0 0 0 0 0 131 131 0 0 0 0

Total Volume 318 585 3 906 0 0 0 0 0 0 534 534 0 0 0 0% App. Total 35.1 64.6 0.3 0 0 0 0 0 100 0 0 0

PHF .883 .920 .250 .948 .000 .000 .000 .000 .000 .000 .927 .927 .000 .000 .000 .000Cars 317 560 3 880 0 0 0 0 0 0 524 524 0 0 0 0

% Cars 99.7 95.7 100 97.1 0 0 0 0 0 0 98.1 98.1 0 0 0 0Trucks 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

% Trucks 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Buses 1 25 0 26 0 0 0 0 0 0 10 10 0 0 0 0

% Buses 0.3 4.3 0 2.9 0 0 0 0 0 0 1.9 1.9 0 0 0 0

Accurate Counts978-664-2565

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 3

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Access Rd

Gar

age

Ent

ranc

e Exit to R

te 2

Access Rd

Right

3003

Thru

5600

25585

Left

31701

318

In - Peak Hour: 05:00 PM880

026

906R

ight 0000T

hru 0000Left 0000

In - Peak H

our: 04:30 PM

0000

Left0000

Thru0000

Right524

010

534

In - Peak Hour: 04:30 PM

5240

10534

Left

0 0 0 0T

hru0 0 0 0

Rig

ht0 0 0 0

In -

Pea

k H

our:

04:

30 P

M0 0 0 0 Cars

TrucksBuses

Peak Hour Data

North

Accurate Counts978-664-2565

Page 115: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 1

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Groups Printed- BusesAccess Rd

From NorthExit to Rte 2From East

Access RdFrom South

Garage EntranceFrom West

Start Time Left Thru Right Left Thru Right Left Thru Right Left Thru Right Int. Total04:30 PM 0 0 0 0 0 0 0 0 2 0 0 0 204:45 PM 0 7 0 0 0 0 0 0 4 0 0 0 11

Total 0 7 0 0 0 0 0 0 6 0 0 0 13

05:00 PM 0 6 0 0 0 0 0 0 3 0 0 0 905:15 PM 0 8 0 0 0 0 0 0 1 0 0 0 905:30 PM 1 4 0 0 0 0 0 0 1 0 0 0 605:45 PM 0 7 0 0 0 0 0 0 1 0 0 0 8

Total 1 25 0 0 0 0 0 0 6 0 0 0 32

06:00 PM 0 7 0 0 0 0 0 0 4 0 0 0 1106:15 PM 1 5 0 0 0 0 0 0 4 0 0 0 10

Grand Total 2 44 0 0 0 0 0 0 20 0 0 0 66Apprch % 4.3 95.7 0 0 0 0 0 0 100 0 0 0

Total % 3 66.7 0 0 0 0 0 0 30.3 0 0 0

Access RdFrom North

Exit to Rte 2From East

Access RdFrom South

Garage EntranceFrom West

Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. TotalPeak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 04:45 PM

04:45 PM 0 7 0 7 0 0 0 0 0 0 4 4 0 0 0 0 1105:00 PM 0 6 0 6 0 0 0 0 0 0 3 3 0 0 0 0 905:15 PM 0 8 0 8 0 0 0 0 0 0 1 1 0 0 0 0 905:30 PM 1 4 0 5 0 0 0 0 0 0 1 1 0 0 0 0 6

Total Volume 1 25 0 26 0 0 0 0 0 0 9 9 0 0 0 0 35% App. Total 3.8 96.2 0 0 0 0 0 0 100 0 0 0

PHF .250 .781 .000 .813 .000 .000 .000 .000 .000 .000 .563 .563 .000 .000 .000 .000 .795

Accurate Counts978-664-2565

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 2

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Access Rd

Gar

age

Ent

ranc

e Exit to R

te 2

Access Rd

Right0

Thru25

Left1

InOut Total0 26 26

Right 0

Thru 0

Left 0

Out

Total

In10

010

Left0

Thru0

Right9

Out TotalIn25 9 34

Left

0T

hru0

Rig

ht0

Tot

alO

utIn

00

0

Peak Hour Begins at 04:45 PM

Buses

Peak Hour Data

North

Peak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Each Approach Begins at:

05:15 PM 04:30 PM 04:30 PM 04:30 PM+0 mins. 0 8 0 8 0 0 0 0 0 0 2 2 0 0 0 0

+15 mins. 1 4 0 5 0 0 0 0 0 0 4 4 0 0 0 0+30 mins. 0 7 0 7 0 0 0 0 0 0 3 3 0 0 0 0+45 mins. 0 7 0 7 0 0 0 0 0 0 1 1 0 0 0 0

Total Volume 1 26 0 27 0 0 0 0 0 0 10 10 0 0 0 0% App. Total 3.7 96.3 0 0 0 0 0 0 100 0 0 0

PHF .250 .813 .000 .844 .000 .000 .000 .000 .000 .000 .625 .625 .000 .000 .000 .000

Accurate Counts978-664-2565

Page 116: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 3

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Access Rd

Gar

age

Ent

ranc

e Exit to R

te 2

Access Rd

Right0

Thru26

Left1

In - Peak Hour: 05:15 PM27

Right 0

Thru 0

Left 0

In - Peak H

our: 04:30 PM

0

Left0

Thru0

Right10

In - Peak Hour: 04:30 PM10

Left

0T

hru0

Rig

ht0

In -

Pea

k H

our:

04:

30 P

M0

Buses

Peak Hour Data

North

Accurate Counts978-664-2565

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 1

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Groups Printed- CarsAccess Rd

From NorthExit to Rte 2From East

Access RdFrom South

Garage EntranceFrom West

Start Time Left Thru Right Left Thru Right Left Thru Right Left Thru Right Int. Total04:30 PM 67 110 1 0 0 0 0 0 142 0 0 0 32004:45 PM 50 99 0 0 0 0 0 0 113 0 0 0 262

Total 117 209 1 0 0 0 0 0 255 0 0 0 582

05:00 PM 90 140 0 0 0 0 0 0 139 0 0 0 36905:15 PM 80 151 0 0 0 0 0 0 130 0 0 0 36105:30 PM 59 145 3 0 0 0 0 0 117 0 0 0 32405:45 PM 88 124 0 0 0 0 0 0 139 0 0 0 351

Total 317 560 3 0 0 0 0 0 525 0 0 0 1405

06:00 PM 66 149 1 0 0 0 0 0 126 0 0 0 34206:15 PM 64 180 1 0 0 0 0 0 103 0 0 0 348

Grand Total 564 1098 6 0 0 0 0 0 1009 0 0 0 2677Apprch % 33.8 65.8 0.4 0 0 0 0 0 100 0 0 0

Total % 21.1 41 0.2 0 0 0 0 0 37.7 0 0 0

Access RdFrom North

Exit to Rte 2From East

Access RdFrom South

Garage EntranceFrom West

Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. TotalPeak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 05:00 PM

05:00 PM 90 140 0 230 0 0 0 0 0 0 139 139 0 0 0 0 36905:15 PM 80 151 0 231 0 0 0 0 0 0 130 130 0 0 0 0 36105:30 PM 59 145 3 207 0 0 0 0 0 0 117 117 0 0 0 0 32405:45 PM 88 124 0 212 0 0 0 0 0 0 139 139 0 0 0 0 351

Total Volume 317 560 3 880 0 0 0 0 0 0 525 525 0 0 0 0 1405% App. Total 36 63.6 0.3 0 0 0 0 0 100 0 0 0

PHF .881 .927 .250 .952 .000 .000 .000 .000 .000 .000 .944 .944 .000 .000 .000 .000 .952

Accurate Counts978-664-2565

Page 117: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 2

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Access Rd

Gar

age

Ent

ranc

e Exit to R

te 2

Access Rd

Right3

Thru560

Left317

InOut Total0 880 880

Right 0

Thru 0

Left 0

Out

Total

In842

0842

Left0

Thru0

Right525

Out TotalIn560 525 1085

Left

0T

hru0

Rig

ht0

Tot

alO

utIn

30

3

Peak Hour Begins at 05:00 PM

Cars

Peak Hour Data

North

Peak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Each Approach Begins at:

05:00 PM 04:30 PM 05:00 PM 04:30 PM+0 mins. 90 140 0 230 0 0 0 0 0 0 139 139 0 0 0 0

+15 mins. 80 151 0 231 0 0 0 0 0 0 130 130 0 0 0 0+30 mins. 59 145 3 207 0 0 0 0 0 0 117 117 0 0 0 0+45 mins. 88 124 0 212 0 0 0 0 0 0 139 139 0 0 0 0

Total Volume 317 560 3 880 0 0 0 0 0 0 525 525 0 0 0 0% App. Total 36 63.6 0.3 0 0 0 0 0 100 0 0 0

PHF .881 .927 .250 .952 .000 .000 .000 .000 .000 .000 .944 .944 .000 .000 .000 .000

Accurate Counts978-664-2565

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 3

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Access Rd

Gar

age

Ent

ranc

e Exit to R

te 2

Access Rd

Right3

Thru560

Left317

In - Peak Hour: 05:00 PM880

Right 0

Thru 0

Left 0

In - Peak H

our: 04:30 PM

0

Left0

Thru0

Right525

In - Peak Hour: 05:00 PM525

Left

0T

hru0

Rig

ht0

In -

Pea

k H

our:

04:

30 P

M0

Cars

Peak Hour Data

North

Accurate Counts978-664-2565

Page 118: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 1

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Groups Printed- TrucksAccess Rd

From NorthExit to Rte 2From East

Access RdFrom South

Garage EntranceFrom West

Start Time Left Thru Right Left Thru Right Left Thru Right Left Thru Right Int. Total04:30 PM 0 2 0 0 0 0 0 0 0 0 0 0 204:45 PM 0 1 0 0 0 0 0 0 0 0 0 0 1

Total 0 3 0 0 0 0 0 0 0 0 0 0 3

05:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 005:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 005:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 005:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0

Total 0 0 0 0 0 0 0 0 0 0 0 0 0

06:00 PM 0 1 0 0 0 0 0 0 0 0 0 0 106:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0

Grand Total 0 4 0 0 0 0 0 0 0 0 0 0 4Apprch % 0 100 0 0 0 0 0 0 0 0 0 0

Total % 0 100 0 0 0 0 0 0 0 0 0 0

Access RdFrom North

Exit to Rte 2From East

Access RdFrom South

Garage EntranceFrom West

Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. TotalPeak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 04:30 PM

04:30 PM 0 2 0 2 0 0 0 0 0 0 0 0 0 0 0 0 204:45 PM 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 105:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 005:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Total Volume 0 3 0 3 0 0 0 0 0 0 0 0 0 0 0 0 3% App. Total 0 100 0 0 0 0 0 0 0 0 0 0

PHF .000 .375 .000 .375 .000 .000 .000 .000 .000 .000 .000 .000 .000 .000 .000 .000 .375

Accurate Counts978-664-2565

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 2

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Access Rd

Gar

age

Ent

ranc

e Exit to R

te 2

Access Rd

Right0

Thru3

Left0

InOut Total0 3 3

Right 0

Thru 0

Left 0

Out

Total

In0

00

Left0

Thru0

Right0

Out TotalIn3 0 3

Left

0T

hru0

Rig

ht0

Tot

alO

utIn

00

0

Peak Hour Begins at 04:30 PM

Trucks

Peak Hour Data

North

Peak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Each Approach Begins at:

04:30 PM 04:30 PM 04:30 PM 04:30 PM+0 mins. 0 2 0 2 0 0 0 0 0 0 0 0 0 0 0 0

+15 mins. 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0+30 mins. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0+45 mins. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Total Volume 0 3 0 3 0 0 0 0 0 0 0 0 0 0 0 0% App. Total 0 100 0 0 0 0 0 0 0 0 0 0

PHF .000 .375 .000 .375 .000 .000 .000 .000 .000 .000 .000 .000 .000 .000 .000 .000

Accurate Counts978-664-2565

Page 119: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 3

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Access Rd

Gar

age

Ent

ranc

e Exit to R

te 2

Access Rd

Right0

Thru3

Left0

In - Peak Hour: 04:30 PM3

Right 0

Thru 0

Left 0

In - Peak H

our: 04:30 PM

0

Left0

Thru0

Right0

In - Peak Hour: 04:30 PM0

Left

0T

hru0

Rig

ht0

In -

Pea

k H

our:

04:

30 P

M0

Trucks

Peak Hour Data

North

Accurate Counts978-664-2565

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 1

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Groups Printed- PedsAccess Rd

From NorthExit to Rte 2From East

Access RdFrom South

Garage EntranceFrom West

Start Time WB EB SB NB WB EB SB NB Int. Total04:30 PM 2 1 16 19 0 4 0 2 4404:45 PM 1 0 17 23 0 0 0 1 42

Total 3 1 33 42 0 4 0 3 86

05:00 PM 1 7 21 54 0 0 1 0 8405:15 PM 14 1 29 35 0 0 1 0 8005:30 PM 12 0 27 56 0 0 0 3 9805:45 PM 9 0 23 56 0 2 0 0 90

Total 36 8 100 201 0 2 2 3 352

06:00 PM 10 1 24 67 1 0 0 0 10306:15 PM 6 1 9 49 0 0 0 1 66

Grand Total 55 11 166 359 1 6 2 7 607Apprch % 83.3 16.7 31.6 68.4 14.3 85.7 22.2 77.8

Total % 9.1 1.8 27.3 59.1 0.2 1 0.3 1.2

Access RdFrom North

Exit to Rte 2From East

Access RdFrom South

Garage EntranceFrom West

Start Time WB EB App. Total SB NB App. Total WB EB App. Total SB NB App. Total Int. TotalPeak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 05:15 PM

05:15 PM 14 1 15 29 35 64 0 0 0 1 0 1 8005:30 PM 12 0 12 27 56 83 0 0 0 0 3 3 9805:45 PM 9 0 9 23 56 79 0 2 2 0 0 0 9006:00 PM 10 1 11 24 67 91 1 0 1 0 0 0 103

Total Volume 45 2 47 103 214 317 1 2 3 1 3 4 371% App. Total 95.7 4.3 32.5 67.5 33.3 66.7 25 75

PHF .804 .500 .783 .888 .799 .871 .250 .250 .375 .250 .250 .333 .900

Accurate Counts978-664-2565

Page 120: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 2

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Access Rd

Gar

age

Ent

ranc

e Exit to R

te 2

Access Rd

Right2

Left45

InOut Total215 47 262

Right214

Left103

Out

Total

In47

317364

Left1

Right2

Out TotalIn106 3 109

Left

1R

ight3

Tot

alO

utIn

34

7

Peak Hour Begins at 05:15 PM

Peds

Peak Hour Data

North

Peak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Each Approach Begins at:

05:15 PM 05:15 PM 04:30 PM 04:45 PM+0 mins. 14 1 15 29 35 64 0 4 4 0 1 1

+15 mins. 12 0 12 27 56 83 0 0 0 1 0 1+30 mins. 9 0 9 23 56 79 0 0 0 1 0 1+45 mins. 10 1 11 24 67 91 0 0 0 0 3 3

Total Volume 45 2 47 103 214 317 0 4 4 2 4 6% App. Total 95.7 4.3 32.5 67.5 0 100 33.3 66.7

PHF .804 .500 .783 .888 .799 .871 .000 .250 .250 .500 .333 .500

Accurate Counts978-664-2565

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 3

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Access Rd

Gar

age

Ent

ranc

e Exit to R

te 2

Access Rd

Right2

Left45

In - Peak Hour: 05:15 PM47

Right214

Left103

In - Peak H

our: 05:15 PM

317

Left0

Right4

In - Peak Hour: 04:30 PM4

Left

2R

ight4

In -

Pea

k H

our:

04:

45 P

M6

Peds

Peak Hour Data

North

Accurate Counts978-664-2565

Page 121: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 1

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Groups Printed- Bikes StreetAccess Rd

From NorthExit to Rte 2From East

Access RdFrom South

Garage EntranceFrom West

Start Time Left Thru Right Left Thru Right Left Thru Right Left Thru Right Int. Total04:30 PM 0 0 0 0 0 0 0 4 0 0 0 0 404:45 PM 0 0 0 0 0 0 0 2 0 0 0 0 2

Total 0 0 0 0 0 0 0 6 0 0 0 0 6

05:00 PM 0 1 0 0 0 0 0 5 0 0 0 0 605:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 005:30 PM 1 0 0 0 0 0 0 4 0 0 0 0 505:45 PM 1 0 0 0 0 0 0 11 0 0 0 0 12

Total 2 1 0 0 0 0 0 20 0 0 0 0 23

06:00 PM 2 0 0 0 0 0 0 4 0 0 0 0 606:15 PM 1 1 0 0 0 0 0 4 0 0 0 0 6

Grand Total 5 2 0 0 0 0 0 34 0 0 0 0 41Apprch % 71.4 28.6 0 0 0 0 0 100 0 0 0 0

Total % 12.2 4.9 0 0 0 0 0 82.9 0 0 0 0

Access RdFrom North

Exit to Rte 2From East

Access RdFrom South

Garage EntranceFrom West

Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. TotalPeak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 05:30 PM

05:30 PM 1 0 0 1 0 0 0 0 0 4 0 4 0 0 0 0 505:45 PM 1 0 0 1 0 0 0 0 0 11 0 11 0 0 0 0 1206:00 PM 2 0 0 2 0 0 0 0 0 4 0 4 0 0 0 0 606:15 PM 1 1 0 2 0 0 0 0 0 4 0 4 0 0 0 0 6

Total Volume 5 1 0 6 0 0 0 0 0 23 0 23 0 0 0 0 29% App. Total 83.3 16.7 0 0 0 0 0 100 0 0 0 0

PHF .625 .250 .000 .750 .000 .000 .000 .000 .000 .523 .000 .523 .000 .000 .000 .000 .604

Accurate Counts978-664-2565

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 2

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Access Rd

Gar

age

Ent

ranc

e Exit to R

te 2

Access Rd

Right0

Thru1

Left5

InOut Total23 6 29

Right 0

Thru 0

Left 0

Out

Total

In5

05

Left0

Thru23

Right0

Out TotalIn1 23 24

Left

0T

hru0

Rig

ht0

Tot

alO

utIn

00

0

Peak Hour Begins at 05:30 PM

Bikes Street

Peak Hour Data

North

Peak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Each Approach Begins at:

05:30 PM 04:30 PM 05:30 PM 04:30 PM+0 mins. 1 0 0 1 0 0 0 0 0 4 0 4 0 0 0 0

+15 mins. 1 0 0 1 0 0 0 0 0 11 0 11 0 0 0 0+30 mins. 2 0 0 2 0 0 0 0 0 4 0 4 0 0 0 0+45 mins. 1 1 0 2 0 0 0 0 0 4 0 4 0 0 0 0

Total Volume 5 1 0 6 0 0 0 0 0 23 0 23 0 0 0 0% App. Total 83.3 16.7 0 0 0 0 0 100 0 0 0 0

PHF .625 .250 .000 .750 .000 .000 .000 .000 .000 .523 .000 .523 .000 .000 .000 .000

Accurate Counts978-664-2565

Page 122: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 3

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Access Rd

Gar

age

Ent

ranc

e Exit to R

te 2

Access Rd

Right0

Thru1

Left5

In - Peak Hour: 05:30 PM6

Right 0

Thru 0

Left 0

In - Peak H

our: 04:30 PM

0

Left0

Thru23

Right0

In - Peak Hour: 05:30 PM23

Left

0T

hru0

Rig

ht0

In -

Pea

k H

our:

04:

30 P

M0

Bikes Street

Peak Hour Data

North

Accurate Counts978-664-2565

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 1

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Groups Printed- Bikes SWAccess Rd

From NorthExit to Rte 2From East

Access RdFrom South

Garage EntranceFrom West

Start Time Left Thru Right Left Thru Right Left Thru Right Left Thru Right Int. Total04:30 PM 0 1 0 1 0 1 0 10 0 0 0 0 1304:45 PM 3 0 0 0 0 4 0 3 0 0 0 0 10

Total 3 1 0 1 0 5 0 13 0 0 0 0 23

05:00 PM 2 0 0 0 0 6 0 8 0 0 0 0 1605:15 PM 0 1 0 0 0 12 0 14 0 0 0 0 2705:30 PM 0 0 0 0 0 7 0 5 1 0 0 0 1305:45 PM 2 1 0 1 0 14 0 10 1 0 0 0 29

Total 4 2 0 1 0 39 0 37 2 0 0 0 85

06:00 PM 2 0 0 0 0 8 0 16 3 0 0 0 2906:15 PM 0 1 0 0 0 5 0 11 1 0 0 0 18

Grand Total 9 4 0 2 0 57 0 77 6 0 0 0 155Apprch % 69.2 30.8 0 3.4 0 96.6 0 92.8 7.2 0 0 0

Total % 5.8 2.6 0 1.3 0 36.8 0 49.7 3.9 0 0 0

Access RdFrom North

Exit to Rte 2From East

Access RdFrom South

Garage EntranceFrom West

Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. TotalPeak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 05:15 PM

05:15 PM 0 1 0 1 0 0 12 12 0 14 0 14 0 0 0 0 2705:30 PM 0 0 0 0 0 0 7 7 0 5 1 6 0 0 0 0 1305:45 PM 2 1 0 3 1 0 14 15 0 10 1 11 0 0 0 0 2906:00 PM 2 0 0 2 0 0 8 8 0 16 3 19 0 0 0 0 29

Total Volume 4 2 0 6 1 0 41 42 0 45 5 50 0 0 0 0 98% App. Total 66.7 33.3 0 2.4 0 97.6 0 90 10 0 0 0

PHF .500 .500 .000 .500 .250 .000 .732 .700 .000 .703 .417 .658 .000 .000 .000 .000 .845

Accurate Counts978-664-2565

Page 123: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 2

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Access Rd

Gar

age

Ent

ranc

e Exit to R

te 2

Access Rd

Right0

Thru2

Left4

InOut Total86 6 92

Right

41T

hru 0Left 1

Out

Total

In9

4251

Left0

Thru45

Right5

Out TotalIn3 50 53

Left

0T

hru0

Rig

ht0

Tot

alO

utIn

00

0

Peak Hour Begins at 05:15 PM

Bikes SW

Peak Hour Data

North

Peak Hour Analysis From 04:30 PM to 06:15 PM - Peak 1 of 1Peak Hour for Each Approach Begins at:

04:30 PM 05:15 PM 05:15 PM 04:30 PM+0 mins. 0 1 0 1 0 0 12 12 0 14 0 14 0 0 0 0

+15 mins. 3 0 0 3 0 0 7 7 0 5 1 6 0 0 0 0+30 mins. 2 0 0 2 1 0 14 15 0 10 1 11 0 0 0 0+45 mins. 0 1 0 1 0 0 8 8 0 16 3 19 0 0 0 0

Total Volume 5 2 0 7 1 0 41 42 0 45 5 50 0 0 0 0% App. Total 71.4 28.6 0 2.4 0 97.6 0 90 10 0 0 0

PHF .417 .500 .000 .583 .250 .000 .732 .700 .000 .703 .417 .658 .000 .000 .000 .000

Accurate Counts978-664-2565

File Name : 11810005Site Code : 11810005Start Date : 12/6/2012Page No : 3

N/S Street : Alewife 'T' Access RoadE/W Street: Garage / Exit to Route 2City/State : Cambridge, MAWeather : Clear

Access Rd

Gar

age

Ent

ranc

e Exit to R

te 2

Access Rd

Right0

Thru2

Left5

In - Peak Hour: 04:30 PM7

Right

41T

hru 0Left 1

In - Peak H

our: 05:15 PM

42

Left0

Thru45

Right5

In - Peak Hour: 05:15 PM50

Left

0T

hru0

Rig

ht0

In -

Pea

k H

our:

04:

30 P

M0

Bikes SW

Peak Hour Data

North

Accurate Counts978-664-2565

Page 124: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

This Page Left Blank Intentionally

Page 125: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Synchro Results

Page 126: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

This Page Left Blank Intentionally

Page 127: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Existing Conditions

Page 128: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

This Page Left Blank Intentionally

Page 129: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Que

ues

1: R

oute

2 &

Rou

te 1

6 1/

16/2

013

130

Cam

bridg

epar

k Driv

e 7:

30 a

m 1

2/8/

2012

Exis

ting

(201

3) A

M P

eak H

our

Sync

hro

7 -

Repo

rtPa

ge 1

Lane

Gro

upW

BTSW

RLa

ne G

roup

Flow

(vph

)14

7113

36v/c

Rat

io1.

041.

52Co

ntro

l Dela

y43

.826

6.0

Queu

e De

lay68

.90.

0To

tal D

elay

112.

726

6.0

Queu

e Le

ngth

50t

h (ft

)~3

68~1

456

Queu

e Le

ngth

95t

h (ft

)m

32#1

367

Inte

rnal

Link D

ist (f

t)89

Turn

Bay

Len

gth

(ft)

Base

Cap

acity

(vph

)14

1787

8St

arva

tion

Cap

Redu

ctn19

30

Spillb

ack C

ap R

educ

tn0

0St

orag

e Ca

p Re

ductn

00

Redu

ced

v/c R

atio

1.20

1.52

Inte

rsec

tion

Sum

mar

y~

Vo

lume

exce

eds c

apac

ity, q

ueue

is th

eore

ticall

y inf

inite

.

Que

ue sh

own

is m

axim

um a

fter t

wo cy

cles.

#

95th

per

cent

ile vo

lume

exce

eds c

apac

ity, q

ueue

may

be

longe

r.

Que

ue sh

own

is m

axim

um a

fter t

wo cy

cles.

m

Volu

me

for 9

5th

perc

entile

que

ue is

met

ered

by u

pstre

am si

gnal.

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s1:

Rou

te 2

& R

oute

16

1/15

/201

3

130

Cam

bridg

epar

k Driv

e 7:

30 a

m 1

2/8/

2012

Exis

ting

(201

3) A

M P

eak H

our

Sync

hro

7 -

Repo

rtPa

ge 1

Mov

emen

tEB

LEB

TW

BTW

BRSW

LSW

RLa

ne C

onfig

urat

ions

Volum

e (v

ph)

00

1383

00

1029

Idea

l Flow

(vph

pl)19

0019

0019

0019

0019

0019

00To

tal L

ost t

ime

(s)

2.5

4.5

Lane

Util.

Fac

tor

0.95

1.00

Frt

1.00

0.86

Flt P

rote

cted

1.00

1.00

Satd

. Flow

(pro

t)35

0516

27Fl

t Per

mitte

d1.

001.

00Sa

td. F

low (p

erm

)35

0516

27Pe

ak-h

our f

acto

r, PH

F0.

920.

920.

940.

920.

920.

77Ad

j. Flow

(vph

)0

014

710

013

36RT

OR R

educ

tion

(vph

)0

00

00

3La

ne G

roup

Flow

(vph

)0

014

710

013

33He

avy V

ehicl

es (%

)2%

2%3%

2%2%

1%Tu

rn T

ype

custo

mPr

otec

ted

Phas

es1

2Pe

rmitte

d Ph

ases

3 4

Actu

ated

Gre

en, G

(s)

46.0

64.0

Effe

ctive

Gre

en, g

(s)

46.5

64.5

Actu

ated

g/C

Rat

io0.

390.

54Cl

eara

nce

Tim

e (s

)La

ne G

rp C

ap (v

ph)

1358

875

v/s R

atio

Prot

c0.4

2v/s

Rat

io Pe

rmc0

.82

v/c R

atio

1.08

1.52

Unifo

rm D

elay,

d136

.827

.8Pr

ogre

ssion

Fac

tor

0.63

1.00

Incr

emen

tal D

elay,

d238

.924

1.3

Delay

(s)

62.2

269.

0Le

vel o

f Ser

vice

EF

Appr

oach

Dela

y (s)

0.0

62.2

269.

0Ap

proa

ch L

OSA

EF

Inte

rsec

tion

Sum

mar

yHC

M A

vera

ge C

ontro

l Dela

y16

0.6

HCM

Lev

el of

Ser

vice

FHC

M V

olum

e to

Cap

acity

ratio

1.32

Actu

ated

Cyc

le Le

ngth

(s)

120.

0Su

m o

f lost

time

(s)

7.0

Inte

rsec

tion

Capa

city U

tiliza

tion

109.

0%IC

U Le

vel o

f Ser

vice

HAn

alysis

Per

iod (m

in)15

c C

ritica

l Lan

e Gr

oup

Page 130: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Que

ues

2: R

oute

2 &

Ale

wife

Bro

ok P

arkw

ay1/

16/2

013

130

Cam

bridg

epar

k Driv

e 7:

30 a

m 1

2/8/

2012

Exis

ting

(201

3) A

M P

eak H

our

Sync

hro

7 -

Repo

rtPa

ge 2

Lane

Gro

upEB

LW

BRSB

TNW

TLa

ne G

roup

Flow

(vph

)47

221

031

212

73v/c

Rat

io0.

820.

710.

301.

43Co

ntro

l Dela

y59

.227

.932

.223

2.3

Queu

e De

lay0.

023

.20.

024

0.8

Tota

l Dela

y59

.251

.132

.247

3.0

Queu

e Le

ngth

50t

h (ft

)18

214

396

~702

Queu

e Le

ngth

95t

h (ft

)#2

5821

412

6#8

39In

tern

al Lin

k Dist

(ft)

106

210

Turn

Bay

Len

gth

(ft)

Base

Cap

acity

(vph

)57

929

710

4889

1St

arva

tion

Cap

Redu

ctn0

00

0Sp

illbac

k Cap

Red

uctn

081

024

3St

orag

e Ca

p Re

ductn

00

00

Redu

ced

v/c R

atio

0.82

0.97

0.30

1.96

Inte

rsec

tion

Sum

mar

y~

Vo

lume

exce

eds c

apac

ity, q

ueue

is th

eore

ticall

y inf

inite

.

Que

ue sh

own

is m

axim

um a

fter t

wo cy

cles.

#

95th

per

cent

ile vo

lume

exce

eds c

apac

ity, q

ueue

may

be

longe

r.

Que

ue sh

own

is m

axim

um a

fter t

wo cy

cles.

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s2:

Rou

te 2

& A

lew

ife B

rook

Par

kway

1/15

/201

3

130

Cam

bridg

epar

k Driv

e 7:

30 a

m 1

2/8/

2012

Exis

ting

(201

3) A

M P

eak H

our

Sync

hro

7 -

Repo

rtPa

ge 2

Mov

emen

tEB

LW

BRSB

TNW

TLa

ne C

onfig

urat

ions

Volum

e (v

ph)

434

174

265

1209

Idea

l Flow

(vph

pl)19

0019

0019

0019

00La

ne W

idth

912

1112

Tota

l Los

t tim

e (s

)4.

54.

54.

54.

5La

ne U

til. F

acto

r0.

971.

000.

950.

95Fr

t1.

000.

861.

001.

00Fl

t Pro

tecte

d0.

951.

001.

001.

00Sa

td. F

low (p

rot)

3090

950

3355

2850

Flt P

erm

itted

0.95

1.00

1.00

1.00

Satd

. Flow

(per

m)

3090

950

3355

2850

Peak

-hou

r fac

tor,

PHF

0.92

0.83

0.85

0.95

Adj. F

low (v

ph)

472

210

312

1273

RTOR

Red

uctio

n (v

ph)

00

00

Lane

Gro

up F

low (v

ph)

472

210

312

1273

Heav

y Veh

icles

(%)

2%12

%4%

2%Tu

rn T

ype

Prot

custo

mPr

otec

ted

Phas

es4

3Pe

rmitte

d Ph

ases

22

Actu

ated

Gre

en, G

(s)

22.0

37.0

37.0

37.0

Effe

ctive

Gre

en, g

(s)

22.5

37.5

37.5

37.5

Actu

ated

g/C

Rat

io0.

190.

310.

310.

31Cl

eara

nce

Tim

e (s

)5.

05.

05.

05.

0La

ne G

rp C

ap (v

ph)

579

297

1048

891

v/s R

atio

Prot

c0.1

5c0

.09

v/s R

atio

Perm

0.22

c0.4

5v/c

Rat

io0.

820.

710.

301.

43Un

iform

Dela

y, d1

46.8

36.4

31.3

41.2

Prog

ress

ion F

acto

r1.

000.

381.

001.

00In

crem

enta

l Dela

y, d2

12.0

13.0

0.7

199.

4De

lay (s

)58

.726

.832

.024

0.7

Leve

l of S

ervic

eE

CC

FAp

proa

ch D

elay (

s)32

.024

0.7

Appr

oach

LOS

CF

Inte

rsec

tion

Sum

mar

yHC

M A

vera

ge C

ontro

l Dela

y15

4.3

HCM

Lev

el of

Ser

vice

FHC

M V

olum

e to

Cap

acity

ratio

0.85

Actu

ated

Cyc

le Le

ngth

(s)

120.

0Su

m o

f lost

time

(s)

22.5

Inte

rsec

tion

Capa

city U

tiliza

tion

79.5

%IC

U Le

vel o

f Ser

vice

DAn

alysis

Per

iod (m

in)15

c C

ritica

l Lan

e Gr

oup

Page 131: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Que

ues

3: A

lew

ife B

rook

Par

kway

& R

oute

21/

16/2

013

130

Cam

bridg

epar

k Driv

e 7:

30 a

m 1

2/8/

2012

Exis

ting

(201

3) A

M P

eak H

our

Sync

hro

7 -

Repo

rtPa

ge 3

Lane

Gro

upSB

TSE

RLa

ne G

roup

Flow

(vph

)31

211

61v/c

Rat

io0.

290.

60Co

ntro

l Dela

y4.

77.

9Qu

eue

Delay

0.2

0.0

Tota

l Dela

y4.

97.

9Qu

eue

Leng

th 5

0th

(ft)

614

4Qu

eue

Leng

th 9

5th

(ft)

817

6In

tern

al Lin

k Dist

(ft)

189

Turn

Bay

Len

gth

(ft)

Base

Cap

acity

(vph

)10

8519

48St

arva

tion

Cap

Redu

ctn28

20

Spillb

ack C

ap R

educ

tn0

0St

orag

e Ca

p Re

ductn

00

Redu

ced

v/c R

atio

0.39

0.60

Inte

rsec

tion

Sum

mar

y

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s3:

Ale

wife

Bro

ok P

arkw

ay &

Rou

te 2

1/15

/201

3

130

Cam

bridg

epar

k Driv

e 7:

30 a

m 1

2/8/

2012

Exis

ting

(201

3) A

M P

eak H

our

Sync

hro

7 -

Repo

rtPa

ge 3

Mov

emen

tNB

LNB

TSB

TSB

RSE

LSE

RLa

ne C

onfig

urat

ions

Volum

e (v

ph)

00

265

00

987

Idea

l Flow

(vph

pl)19

0019

0019

0019

0019

0019

00To

tal L

ost t

ime

(s)

4.5

2.5

Lane

Util.

Fac

tor

0.95

0.88

Frt

1.00

0.85

Flt P

rote

cted

1.00

1.00

Satd

. Flow

(pro

t)34

7127

87Fl

t Per

mitte

d1.

001.

00Sa

td. F

low (p

erm

)34

7127

87Pe

ak-h

our f

acto

r, PH

F0.

920.

920.

850.

920.

920.

85Ad

j. Flow

(vph

)0

031

20

011

61RT

OR R

educ

tion

(vph

)0

00

00

223

Lane

Gro

up F

low (v

ph)

00

312

00

938

Heav

y Veh

icles

(%)

2%2%

4%2%

2%2%

Turn

Typ

ecu

stom

Prot

ecte

d Ph

ases

31

2 4

Perm

itted

Phas

esAc

tuat

ed G

reen

, G (s

)37

.073

.0Ef

fecti

ve G

reen

, g (s

)37

.569

.0Ac

tuat

ed g

/C R

atio

0.31

0.58

Clea

ranc

e Ti

me

(s)

5.0

Lane

Grp

Cap

(vph

)10

8516

03v/s

Rat

io Pr

otc0

.09

c0.3

4v/s

Rat

io Pe

rmv/c

Rat

io0.

290.

59Un

iform

Dela

y, d1

31.2

16.3

Prog

ress

ion F

acto

r0.

131.

00In

crem

enta

l Dela

y, d2

0.6

1.6

Delay

(s)

4.7

17.9

Leve

l of S

ervic

eA

BAp

proa

ch D

elay (

s)0.

04.

717

.9Ap

proa

ch L

OSA

AB

Inte

rsec

tion

Sum

mar

yHC

M A

vera

ge C

ontro

l Dela

y15

.1HC

M L

evel

of S

ervic

eB

HCM

Volu

me

to C

apac

ity ra

tio0.

46Ac

tuat

ed C

ycle

Leng

th (s

) 12

0.0

Sum

of lo

st tim

e (s

)9.

5In

ters

ectio

n Ca

pacit

y Utili

zatio

n49

.9%

ICU

Leve

l of S

ervic

eA

Analy

sis P

eriod

(min)

15c

Crit

ical L

ane

Grou

p

Page 132: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

HC

M U

nsig

naliz

ed In

ters

ectio

n C

apac

ity A

naly

sis

8: A

lew

ife A

cces

s R

oad

& R

oute

2 R

amp

1/15

/201

3

130

Cam

bridg

epar

k Driv

e 7:

30 a

m 1

2/8/

2012

Exis

ting

(201

3) A

M P

eak H

our

Sync

hro

7 -

Repo

rtPa

ge 8

Mov

emen

tEB

LEB

TEB

RW

BLW

BTW

BRNB

LNB

TNB

RSB

LSB

TSB

RLa

ne C

onfig

urat

ions

Sign

Con

trol

Stop

Stop

Yield

Yield

Volum

e (v

ph)

00

00

00

00

203

7098

922

5Pe

ak H

our F

acto

r0.

920.

920.

920.

920.

920.

920.

960.

960.

960.

830.

830.

83Ho

urly

flow

rate

(vph

)0

00

00

00

021

184

1192

271

Dire

ction

, Lan

e #

NB 1

SB 1

Volum

e To

tal (

vph)

211

1547

Volum

e Le

ft (v

ph)

084

Volum

e Ri

ght (

vph)

211

271

Hadj

(s)

-0.4

3-0

.06

Depa

rture

Hea

dway

(s)

3.2

3.8

Degr

ee U

tiliza

tion,

x0.

191.

65Ca

pacit

y (ve

h/h)

1121

947

Cont

rol D

elay (

s)6.

930

8.8

Appr

oach

Dela

y (s)

6.9

308.

8Ap

proa

ch L

OSA

F

Inte

rsec

tion

Sum

mar

yDe

lay

272.

5HC

M L

evel

of S

ervic

eF

Inte

rsec

tion

Capa

city U

tiliza

tion

98.1

%IC

U Le

vel o

f Ser

vice

FAn

alysis

Per

iod (m

in)15

Que

ues

4: R

oute

2 &

Ale

wife

Bro

ok P

arkw

ay1/

16/2

013

130

Cam

bridg

epar

k Driv

e 7:

30 a

m 1

2/8/

2012

Exis

ting

(201

3) A

M P

eak H

our

Sync

hro

7 -

Repo

rtPa

ge 4

Lane

Gro

upW

BTW

BRNB

TLa

ne G

roup

Flow

(vph

)20

011

422

9v/c

Rat

io0.

280.

160.

12Co

ntro

l Dela

y25

.54.

714

.0Qu

eue

Delay

0.4

0.0

0.0

Tota

l Dela

y25

.84.

714

.0Qu

eue

Leng

th 5

0th

(ft)

103

044

Queu

e Le

ngth

95t

h (ft

)15

433

61In

tern

al Lin

k Dist

(ft)

9313

3Tu

rn B

ay L

engt

h (ft

)20

0Ba

se C

apac

ity (v

ph)

704

700

1839

Star

vatio

n Ca

p Re

ductn

00

0Sp

illbac

k Cap

Red

uctn

188

00

Stor

age

Cap

Redu

ctn0

00

Redu

ced

v/c R

atio

0.39

0.16

0.12

Inte

rsec

tion

Sum

mar

y

Page 133: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s4:

Rou

te 2

& A

lew

ife B

rook

Par

kway

1/15

/201

3

130

Cam

bridg

epar

k Driv

e 7:

30 a

m 1

2/8/

2012

Exis

ting

(201

3) A

M P

eak H

our

Sync

hro

7 -

Repo

rtPa

ge 4

Mov

emen

tEB

LEB

TEB

RW

BLW

BTW

BRNB

LNB

TNB

RSB

LSB

TSB

RLa

ne C

onfig

urat

ions

Volum

e (v

ph)

00

00

174

990

195

00

00

Idea

l Flow

(vph

pl)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00La

ne W

idth

1212

1212

1214

1211

1212

1212

Tota

l Los

t tim

e (s

)2.

53.

04.

5La

ne U

til. F

acto

r1.

001.

000.

95Fr

t1.

000.

851.

00Fl

t Pro

tecte

d1.

001.

001.

00Sa

td. F

low (p

rot)

1743

1580

3421

Flt P

erm

itted

1.00

1.00

1.00

Satd

. Flow

(per

m)

1743

1580

3421

Peak

-hou

r fac

tor,

PHF

0.92

0.92

0.92

0.87

0.87

0.87

0.85

0.85

0.85

0.92

0.92

0.92

Adj. F

low (v

ph)

00

00

200

114

022

90

00

0RT

OR R

educ

tion

(vph

)0

00

00

700

00

00

0La

ne G

roup

Flow

(vph

)0

00

020

044

022

90

00

0He

avy V

ehicl

es (%

)2%

2%2%

2%9%

9%2%

2%2%

2%2%

2%Tu

rn T

ype

Prot

Prot

ecte

d Ph

ases

1 2

1 2

3 4

Perm

itted

Phas

esAc

tuat

ed G

reen

, G (s

)46

.046

.064

.0Ef

fecti

ve G

reen

, g (s

)46

.546

.064

.5Ac

tuat

ed g

/C R

atio

0.39

0.38

0.54

Clea

ranc

e Ti

me

(s)

Lane

Grp

Cap

(vph

)67

560

618

39v/s

Rat

io Pr

otc0

.11

0.03

c0.0

7v/s

Rat

io Pe

rmv/c

Rat

io0.

300.

070.

12Un

iform

Dela

y, d1

25.4

23.5

13.8

Prog

ress

ion F

acto

r1.

001.

001.

00In

crem

enta

l Dela

y, d2

1.1

0.2

0.1

Delay

(s)

26.5

23.7

13.9

Leve

l of S

ervic

eC

CB

Appr

oach

Dela

y (s)

0.0

25.5

13.9

0.0

Appr

oach

LOS

AC

BA

Inte

rsec

tion

Sum

mar

yHC

M A

vera

ge C

ontro

l Dela

y20

.6HC

M L

evel

of S

ervic

eC

HCM

Volu

me

to C

apac

ity ra

tio0.

19Ac

tuat

ed C

ycle

Leng

th (s

) 12

0.0

Sum

of lo

st tim

e (s

)7.

0In

ters

ectio

n Ca

pacit

y Utili

zatio

n24

.6%

ICU

Leve

l of S

ervic

eA

Analy

sis P

eriod

(min)

15c

Crit

ical L

ane

Grou

p

Que

ues

5: C

ambr

idge

park

Driv

e &

Ale

wife

Bro

ok P

arkw

ay1/

16/2

013

130

Cam

bridg

epar

k Driv

e 7:

30 a

m 1

2/8/

2012

Exis

ting

(201

3) A

M P

eak H

our

Sync

hro

7 -

Repo

rtPa

ge 5

Lane

Gro

upEB

LNB

LNB

TSB

TSB

RLa

ne G

roup

Flow

(vph

)57

325

314

1513

4066

v/c R

atio

0.73

0.81

0.59

0.82

0.05

Cont

rol D

elay

26.9

31.1

6.2

30.7

0.1

Queu

e De

lay0.

68.

020

.01.

80.

0To

tal D

elay

27.6

39.1

26.1

32.5

0.1

Queu

e Le

ngth

50t

h (ft

)21

210

711

542

30

Queu

e Le

ngth

95t

h (ft

)22

0m

114

m14

0#6

620

Inte

rnal

Link D

ist (f

t)39

515

638

3Tu

rn B

ay L

engt

h (ft

)50

Base

Cap

acity

(vph

)10

0631

224

1516

4013

72St

arva

tion

Cap

Redu

ctn0

3510

350

0Sp

illbac

k Cap

Red

uctn

164

00

161

0St

orag

e Ca

p Re

ductn

00

00

0Re

duce

d v/c

Rat

io0.

680.

911.

030.

910.

05

Inte

rsec

tion

Sum

mar

y#

95

th p

erce

ntile

volum

e ex

ceed

s cap

acity

, que

ue m

ay b

e lon

ger.

Q

ueue

show

n is

max

imum

afte

r two

cycle

s.m

V

olum

e fo

r 95t

h pe

rcen

tile q

ueue

is m

eter

ed b

y ups

tream

sign

al.

Page 134: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s5:

Cam

brid

gepa

rk D

rive

& A

lew

ife B

rook

Par

kway

1/15

/201

3

130

Cam

bridg

epar

k Driv

e 7:

30 a

m 1

2/8/

2012

Exis

ting

(201

3) A

M P

eak H

our

Sync

hro

7 -

Repo

rtPa

ge 5

Mov

emen

tEB

LEB

RNB

LNB

TSB

TSB

RLa

ne C

onfig

urat

ions

Volum

e (v

ph)

3142

224

513

7311

9359

Idea

l Flow

(vph

pl)19

0019

0019

0019

0019

0019

00La

ne W

idth

1112

1212

118

Tota

l Los

t tim

e (s

)4.

04.

04.

04.

03.

0La

ne U

til. F

acto

r*0

.55

1.00

0.95

0.95

1.00

Frt

0.86

1.00

1.00

1.00

0.85

Flt P

rote

cted

1.00

0.95

1.00

1.00

1.00

Satd

. Flow

(pro

t)22

5217

8736

0032

0013

72Fl

t Per

mitte

d1.

000.

091.

001.

001.

00Sa

td. F

low (p

erm

)22

5217

336

0032

0013

72Pe

ak-h

our f

acto

r, PH

F0.

790.

790.

970.

970.

890.

89Ad

j. Flow

(vph

)39

534

253

1415

1340

66RT

OR R

educ

tion

(vph

)19

10

00

00

Lane

Gro

up F

low (v

ph)

382

025

314

1513

4066

Heav

y Veh

icles

(%)

3%3%

1%1%

2%2%

Turn

Typ

eD.

P+P

Free

Prot

ecte

d Ph

ases

3 4

21

21

Perm

itted

Phas

es1

Free

Actu

ated

Gre

en, G

(s)

30.5

74.5

79.5

60.5

120.

0Ef

fecti

ve G

reen

, g (s

)31

.576

.580

.561

.512

0.0

Actu

ated

g/C

Rat

io0.

260.

640.

670.

511.

00Cl

eara

nce

Tim

e (s

)5.

05.

0Ve

hicle

Exte

nsion

(s)

3.0

3.0

Lane

Grp

Cap

(vph

)59

131

224

1516

4013

72v/s

Rat

io Pr

otc0

.17

c0.1

00.

39c0

.42

v/s R

atio

Perm

0.41

0.05

v/c R

atio

0.65

0.81

0.59

0.82

0.05

Unifo

rm D

elay,

d139

.336

.610

.724

.50.

0Pr

ogre

ssion

Fac

tor

1.00

0.76

0.52

1.00

1.00

Incr

emen

tal D

elay,

d22.

41.

50.

04.

60.

1De

lay (s

)41

.729

.25.

629

.20.

1Le

vel o

f Ser

vice

DC

AC

AAp

proa

ch D

elay (

s)41

.79.

227

.8Ap

proa

ch L

OSD

AC

Inte

rsec

tion

Sum

mar

yHC

M A

vera

ge C

ontro

l Dela

y21

.5HC

M L

evel

of S

ervic

eC

HCM

Volu

me

to C

apac

ity ra

tio0.

77Ac

tuat

ed C

ycle

Leng

th (s

) 12

0.0

Sum

of lo

st tim

e (s

)12

.0In

ters

ectio

n Ca

pacit

y Utili

zatio

n70

.9%

ICU

Leve

l of S

ervic

eC

Analy

sis P

eriod

(min)

15c

Crit

ical L

ane

Grou

p

Que

ues

6: R

indg

e A

ve. &

Ale

wife

Bro

ok P

arkw

ay1/

16/2

013

130

Cam

bridg

epar

k Driv

e 7:

30 a

m 1

2/8/

2012

Exis

ting

(201

3) A

M P

eak H

our

Sync

hro

7 -

Repo

rtPa

ge 6

Lane

Gro

upW

BLW

BRNB

TSB

TLa

ne G

roup

Flow

(vph

)22

051

913

4818

78v/c

Rat

io0.

941.

071.

000.

87Co

ntro

l Dela

y98

.278

.646

.017

.5Qu

eue

Delay

0.0

9.6

6.3

20.8

Tota

l Dela

y98

.288

.152

.338

.3Qu

eue

Leng

th 5

0th

(ft)

171

~197

467

744

Queu

e Le

ngth

95t

h (ft

)#3

26#4

15#7

74#8

66In

tern

al Lin

k Dist

(ft)

628

2121

156

Turn

Bay

Len

gth

(ft)

100

Base

Cap

acity

(vph

)23

348

413

4521

47St

arva

tion

Cap

Redu

ctn0

00

335

Spillb

ack C

ap R

educ

tn0

1129

0St

orag

e Ca

p Re

ductn

00

00

Redu

ced

v/c R

atio

0.94

1.10

1.02

1.04

Inte

rsec

tion

Sum

mar

y~

Vo

lume

exce

eds c

apac

ity, q

ueue

is th

eore

ticall

y inf

inite

.

Que

ue sh

own

is m

axim

um a

fter t

wo cy

cles.

#

95th

per

cent

ile vo

lume

exce

eds c

apac

ity, q

ueue

may

be

longe

r.

Que

ue sh

own

is m

axim

um a

fter t

wo cy

cles.

Page 135: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s6:

Rin

dge

Ave

. & A

lew

ife B

rook

Par

kway

1/15

/201

3

130

Cam

bridg

epar

k Driv

e 7:

30 a

m 1

2/8/

2012

Exis

ting

(201

3) A

M P

eak H

our

Sync

hro

7 -

Repo

rtPa

ge 6

Mov

emen

tW

BLW

BRNB

TNB

RSB

LSB

TLa

ne C

onfig

urat

ions

Volum

e (v

ph)

205

483

1135

920

1615

Idea

l Flow

(vph

pl)18

0018

0018

0018

0019

0019

00La

ne W

idth

109

1112

1211

Tota

l Los

t tim

e (s

)4.

04.

04.

04.

0La

ne U

til. F

acto

r1.

001.

000.

950.

95Fr

t1.

000.

850.

991.

00Fl

t Pro

tecte

d0.

951.

001.

001.

00Sa

td. F

low (p

rot)

1747

1377

2000

3200

Flt P

erm

itted

0.95

1.00

1.00

1.00

Satd

. Flow

(per

m)

1747

1377

2000

3200

Peak

-hou

r fac

tor,

PHF

0.93

0.93

0.91

0.91

0.86

0.86

Adj. F

low (v

ph)

220

519

1247

101

018

78RT

OR R

educ

tion

(vph

)0

301

40

00

Lane

Gro

up F

low (v

ph)

220

218

1344

00

1878

Heav

y Veh

icles

(%)

0%0%

2%2%

2%2%

Turn

Typ

ePr

otPr

otec

ted

Phas

es3

31

21

2Pe

rmitte

d Ph

ases

Actu

ated

Gre

en, G

(s)

15.0

15.0

79.5

79.5

Effe

ctive

Gre

en, g

(s)

16.0

16.0

80.5

80.5

Actu

ated

g/C

Rat

io0.

130.

130.

670.

67Cl

eara

nce

Tim

e (s

)5.

05.

0Ve

hicle

Exte

nsion

(s)

3.0

3.0

Lane

Grp

Cap

(vph

)23

318

413

4221

47v/s

Rat

io Pr

ot0.

13c0

.16

c0.6

70.

59v/s

Rat

io Pe

rmv/c

Rat

io0.

941.

191.

000.

87Un

iform

Dela

y, d1

51.6

52.0

19.8

15.7

Prog

ress

ion F

acto

r1.

001.

001.

000.

78In

crem

enta

l Dela

y, d2

43.3

125.

425

.02.

9De

lay (s

)94

.917

7.4

44.7

15.1

Leve

l of S

ervic

eF

FD

BAp

proa

ch D

elay (

s)15

2.9

44.7

15.1

Appr

oach

LOS

FD

B

Inte

rsec

tion

Sum

mar

yHC

M A

vera

ge C

ontro

l Dela

y50

.8HC

M L

evel

of S

ervic

eD

HCM

Volu

me

to C

apac

ity ra

tio1.

03Ac

tuat

ed C

ycle

Leng

th (s

) 12

0.0

Sum

of lo

st tim

e (s

)23

.5In

ters

ectio

n Ca

pacit

y Utili

zatio

n74

.4%

ICU

Leve

l of S

ervic

eD

Analy

sis P

eriod

(min)

15c

Crit

ical L

ane

Grou

p

Que

ues

7: C

ambr

idge

park

Driv

e &

Cam

brid

gepa

rk P

lace

1/16

/201

3

130

Cam

bridg

epar

k Driv

e 7:

30 a

m 1

2/8/

2012

Exis

ting

(201

3) A

M P

eak H

our

Sync

hro

7 -

Repo

rtPa

ge 7

Lane

Gro

upEB

TW

BTW

BRNB

TSB

LSB

TLa

ne G

roup

Flow

(vph

)64

218

136

5537

335

6v/c

Rat

io0.

160.

450.

310.

130.

590.

48Co

ntro

l Dela

y25

.930

.56.

914

.127

.016

.0Qu

eue

Delay

0.0

0.0

0.0

0.0

0.0

0.0

Tota

l Dela

y25

.930

.56.

914

.127

.016

.0Qu

eue

Leng

th 5

0th

(ft)

2710

20

817

411

0Qu

eue

Leng

th 9

5th

(ft)

5315

836

3024

717

0In

tern

al Lin

k Dist

(ft)

145

395

322

442

Turn

Bay

Len

gth

(ft)

Base

Cap

acity

(vph

)40

448

243

443

963

573

8St

arva

tion

Cap

Redu

ctn0

00

00

0Sp

illbac

k Cap

Red

uctn

00

00

00

Stor

age

Cap

Redu

ctn0

00

00

0Re

duce

d v/c

Rat

io0.

160.

450.

310.

130.

590.

48

Inte

rsec

tion

Sum

mar

y

Page 136: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s7:

Cam

brid

gepa

rk D

rive

& C

ambr

idge

park

Pla

ce1/

15/2

013

130

Cam

bridg

epar

k Driv

e 7:

30 a

m 1

2/8/

2012

Exis

ting

(201

3) A

M P

eak H

our

Sync

hro

7 -

Repo

rtPa

ge 7

Mov

emen

tEB

LEB

TEB

RW

BLW

BTW

BRNB

LNB

TNB

RSB

LSB

TSB

RLa

ne C

onfig

urat

ions

Volum

e (v

ph)

1438

021

164

116

114

2838

766

159

Idea

l Flow

(vph

pl)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00La

ne W

idth

1211

1212

1111

1214

1212

1212

Tota

l Los

t tim

e (s

)1.

01.

01.

01.

07.

01.

0La

ne U

til. F

acto

r1.

001.

001.

001.

000.

950.

95Fr

pb, p

ed/b

ikes

1.00

1.00

0.79

0.96

1.00

0.97

Flpb

, ped

/bike

s0.

970.

991.

001.

001.

001.

00Fr

t1.

001.

000.

850.

911.

000.

92Fl

t Pro

tecte

d0.

990.

991.

001.

000.

950.

99Sa

td. F

low (p

rot)

1571

1781

1209

1685

1681

1559

Flt P

erm

itted

0.91

0.97

1.00

1.00

0.95

0.99

Satd

. Flow

(per

m)

1454

1736

1209

1685

1681

1559

Peak

-hou

r fac

tor,

PHF

0.81

0.81

0.81

0.85

0.85

0.85

0.77

0.77

0.77

0.84

0.84

0.84

Adj. F

low (v

ph)

1747

025

193

136

118

3646

179

189

RTOR

Red

uctio

n (v

ph)

00

00

098

027

00

450

Lane

Gro

up F

low (v

ph)

064

00

218

380

280

373

311

0Co

nfl. P

eds.

(#/h

r)86

2626

8621

3333

21Co

nfl. B

ikes (

#/hr

)10

91

Heav

y Veh

icles

(%)

12%

12%

12%

2%2%

2%5%

5%5%

2%2%

2%Tu

rn T

ype

Perm

Perm

Perm

Split

Split

Prot

ecte

d Ph

ases

44

33

22

Perm

itted

Phas

es4

44

Actu

ated

Gre

en, G

(s)

21.0

21.0

21.0

18.0

36.0

36.0

Effe

ctive

Gre

en, g

(s)

25.0

25.0

25.0

22.0

34.0

40.0

Actu

ated

g/C

Rat

io0.

280.

280.

280.

240.

380.

44Cl

eara

nce

Tim

e (s

)5.

05.

05.

05.

05.

05.

0La

ne G

rp C

ap (v

ph)

404

482

336

412

635

693

v/s R

atio

Prot

c0.0

2c0

.22

0.20

v/s R

atio

Perm

0.04

c0.1

30.

03v/c

Rat

io0.

160.

450.

110.

070.

590.

45Un

iform

Dela

y, d1

24.6

26.8

24.2

26.1

22.4

17.3

Prog

ress

ion F

acto

r1.

001.

001.

001.

001.

001.

00In

crem

enta

l Dela

y, d2

0.8

3.0

0.7

0.3

4.0

2.1

Delay

(s)

25.4

29.9

24.9

26.4

26.3

19.4

Leve

l of S

ervic

eC

CC

CC

BAp

proa

ch D

elay (

s)25

.428

.026

.423

.0Ap

proa

ch L

OSC

CC

C

Inte

rsec

tion

Sum

mar

yHC

M A

vera

ge C

ontro

l Dela

y24

.7HC

M L

evel

of S

ervic

eC

HCM

Volu

me

to C

apac

ity ra

tio0.

39Ac

tuat

ed C

ycle

Leng

th (s

) 90

.0Su

m o

f lost

time

(s)

9.0

Inte

rsec

tion

Capa

city U

tiliza

tion

59.2

%IC

U Le

vel o

f Ser

vice

BAn

alysis

Per

iod (m

in)15

c C

ritica

l Lan

e Gr

oup

HC

M �

nsig

naliz

ed In

ters

ectio

n C

apac

ity A

naly

sis

�: A

le�

i�e A

cces

s �

oad

& �

o�te

� �

amp

1/15

/201

3

130

Cam

bridg

epar

k Driv

e 7:

30 a

m 1

2/8/

2012

Exis

ting

(201

3) A

M P

eak H

our

Sync

hro

7 -

Repo

rtPa

ge 8

Mov

emen

tEB

LEB

TEB

RW

BLW

BTW

BRNB

LNB

TNB

RSB

LSB

TSB

RLa

ne C

onfig

urat

ions

Sign

Con

trol

Stop

Stop

�ield

�ield

Volum

e (v

ph)

00

00

00

00

203

7098

922

5Pe

ak H

our F

acto

r0.

920.

920.

920.

920.

920.

920.

960.

960.

960.

830.

830.

83Ho

urly

flow

rate

(vph

)0

00

00

00

021

184

1192

271

Dire

ction

, Lan

e #

NB 1

SB 1

Volum

e To

tal (

vph)

211

1547

Volum

e Le

ft (v

ph)

084

Volum

e Ri

ght (

vph)

211

271

Hadj

(s)

-0.4

3-0

.06

Depa

rture

Hea

dway

(s)

3.2

3.8

Degr

ee U

tiliza

tion,

x0.

191.

65Ca

pacit

y (ve

h/h)

1121

947

Cont

rol D

elay (

s)6.

930

8.8

Appr

oach

Dela

y (s)

6.9

308.

8Ap

proa

ch L

OSA

F

Inte

rsec

tion

Sum

mar

yDe

lay

272.

5HC

M L

evel

of S

ervic

eF

Inte

rsec

tion

Capa

city U

tiliza

tion

98.1

%IC

U Le

vel o

f Ser

vice

FAn

alysis

Per

iod (m

in)15

Page 137: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Que

ues

1: R

oute

2 &

Rou

te 1

61/

16/2

013

130

Cam

bridg

epar

k Driv

e 5:

00 p

m 1

2/8/

2012

Exis

ting

(201

3) P

M P

eak H

our

Sync

hro

7 -

Repo

rtPa

ge 1

Lane

Gro

upW

BTSW

RLa

ne G

roup

Flow

(vph

)23

4681

8v/c

Rat

io1.

091.

43Co

ntro

l Dela

y59

.623

5.1

Queu

e De

lay50

.30.

0To

tal D

elay

109.

923

5.1

Queu

e Le

ngth

50t

h (ft

)~3

43~8

62Qu

eue

Leng

th 9

5th

(ft)

m70

#110

8In

tern

al Lin

k Dist

(ft)

89Tu

rn B

ay L

engt

h (ft

)Ba

se C

apac

ity (v

ph)

2144

572

Star

vatio

n Ca

p Re

ductn

203

0Sp

illbac

k Cap

Red

uctn

00

Stor

age

Cap

Redu

ctn0

0Re

duce

d v/c

Rat

io1.

211.

43

Inte

rsec

tion

Sum

mar

y~

Vo

lume

exce

eds c

apac

ity, q

ueue

is th

eore

ticall

y inf

inite

.

Que

ue sh

own

is m

axim

um a

fter t

wo cy

cles.

#

95th

per

cent

ile vo

lume

exce

eds c

apac

ity, q

ueue

may

be

longe

r.

Que

ue sh

own

is m

axim

um a

fter t

wo cy

cles.

m

Volu

me

for 9

5th

perc

entile

que

ue is

met

ered

by u

pstre

am si

gnal.

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s1:

Rou

te 2

& R

oute

16

1/15

/201

3

130

Cam

bridg

epar

k Driv

e 5:

00 p

m 1

2/8/

2012

Exis

ting

(201

3) P

M P

eak H

our

Sync

hro

7 -

Repo

rtPa

ge 1

Mov

emen

tEB

LEB

TW

BTW

BRSW

LSW

RLa

ne C

onfig

urat

ions

Volum

e (v

ph)

00

2182

00

793

Idea

l Flow

(vph

pl)19

0019

0019

0019

0019

0019

00To

tal L

ost t

ime

(s)

2.0

4.5

Lane

Util.

Fac

tor

0.95

1.00

Frt

1.00

0.86

Flt P

rote

cted

1.00

1.00

Satd

. Flow

(pro

t)35

7416

44Fl

t Per

mitte

d1.

001.

00Sa

td. F

low (p

erm

)35

7416

44Pe

ak-h

our f

acto

r, PH

F0.

920.

920.

930.

920.

920.

97Ad

j. Flow

(vph

)0

023

460

081

8RT

OR R

educ

tion

(vph

)0

00

00

3La

ne G

roup

Flow

(vph

)0

023

460

081

5He

avy V

ehicl

es (%

)2%

2%1%

2%2%

0%Tu

rn T

ype

custo

mPr

otec

ted

Phas

es1

2Pe

rmitte

d Ph

ases

3 4

Actu

ated

Gre

en, G

(s)

69.0

41.0

Effe

ctive

Gre

en, g

(s)

70.0

41.5

Actu

ated

g/C

Rat

io0.

580.

35Cl

eara

nce

Tim

e (s

)La

ne G

rp C

ap (v

ph)

2085

569

v/s R

atio

Prot

c0.6

6v/s

Rat

io Pe

rmc0

.50

v/c R

atio

1.13

1.43

Unifo

rm D

elay,

d125

.039

.2Pr

ogre

ssion

Fac

tor

0.56

1.00

Incr

emen

tal D

elay,

d257

.020

4.3

Delay

(s)

71.1

243.

6Le

vel o

f Ser

vice

EF

Appr

oach

Dela

y (s)

0.0

71.1

243.

6Ap

proa

ch L

OSA

EF

Inte

rsec

tion

Sum

mar

yHC

M A

vera

ge C

ontro

l Dela

y11

5.7

HCM

Lev

el of

Ser

vice

FHC

M V

olum

e to

Cap

acity

ratio

1.22

Actu

ated

Cyc

le Le

ngth

(s)

120.

0Su

m o

f lost

time

(s)

6.5

Inte

rsec

tion

Capa

city U

tiliza

tion

116.

5%IC

U Le

vel o

f Ser

vice

HAn

alysis

Per

iod (m

in)15

c C

ritica

l Lan

e Gr

oup

Page 138: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Que

ues

2: R

oute

2 &

Ale

wife

Bro

ok P

arkw

ay1/

16/2

013

130

Cam

bridg

epar

k Driv

e 5:

00 p

m 1

2/8/

2012

Exis

ting

(201

3) P

M P

eak H

our

Sync

hro

7 -

Repo

rtPa

ge 2

Lane

Gro

upEB

LW

BRSB

TNW

TLa

ne G

roup

Flow

(vph

)63

054

537

618

11v/c

Rat

io1.

101.

130.

821.

25Co

ntro

l Dela

y11

3.9

90.4

65.6

146.

8Qu

eue

Delay

0.0

127.

00.

014

5.7

Tota

l Dela

y11

3.9

217.

465

.629

2.5

Queu

e Le

ngth

50t

h (ft

)~2

86~4

9115

1~1

167

Queu

e Le

ngth

95t

h (ft

)#3

81#6

73#2

25#1

344

Inte

rnal

Link D

ist (f

t)10

621

0Tu

rn B

ay L

engt

h (ft

)Ba

se C

apac

ity (v

ph)

572

483

461

1449

Star

vatio

n Ca

p Re

ductn

00

00

Spillb

ack C

ap R

educ

tn0

990

299

Stor

age

Cap

Redu

ctn0

00

0Re

duce

d v/c

Rat

io1.

101.

420.

821.

57

Inte

rsec

tion

Sum

mar

y~

Vo

lume

exce

eds c

apac

ity, q

ueue

is th

eore

ticall

y inf

inite

.

Que

ue sh

own

is m

axim

um a

fter t

wo cy

cles.

#

95th

per

cent

ile vo

lume

exce

eds c

apac

ity, q

ueue

may

be

longe

r.

Que

ue sh

own

is m

axim

um a

fter t

wo cy

cles.

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s2:

Rou

te 2

& A

lew

ife B

rook

Par

kway

1/15

/201

3

130

Cam

bridg

epar

k Driv

e 5:

00 p

m 1

2/8/

2012

Exis

ting

(201

3) P

M P

eak H

our

Sync

hro

7 -

Repo

rtPa

ge 2

Mov

emen

tEB

LW

BRSB

TNW

TLa

ne C

onfig

urat

ions

Volum

e (v

ph)

548

480

357

1702

Idea

l Flow

(vph

pl)19

0019

0019

0019

00La

ne W

idth

912

1112

Tota

l Los

t tim

e (s

)4.

04.

04.

04.

0La

ne U

til. F

acto

r0.

971.

000.

95*0

.75

Frt

1.00

0.86

1.00

1.00

Flt P

rote

cted

0.95

1.00

1.00

1.00

Satd

. Flow

(pro

t)31

2095

034

5528

50Fl

t Per

mitte

d0.

951.

001.

001.

00Sa

td. F

low (p

erm

)31

2095

034

5528

50Pe

ak-h

our f

acto

r, PH

F0.

870.

880.

950.

94Ad

j. Flow

(vph

)63

054

537

618

11RT

OR R

educ

tion

(vph

)0

00

0La

ne G

roup

Flow

(vph

)63

054

537

618

11He

avy V

ehicl

es (%

)1%

2%1%

1%Tu

rn T

ype

Prot

custo

mPr

otec

ted

Phas

es4

3Pe

rmitte

d Ph

ases

22

Actu

ated

Gre

en, G

(s)

21.0

60.0

15.0

60.0

Effe

ctive

Gre

en, g

(s)

22.0

61.0

16.0

61.0

Actu

ated

g/C

Rat

io0.

180.

510.

130.

51Cl

eara

nce

Tim

e (s

)5.

05.

05.

05.

0La

ne G

rp C

ap (v

ph)

572

483

461

1449

v/s R

atio

Prot

c0.2

0c0

.11

v/s R

atio

Perm

0.57

c0.6

4v/c

Rat

io1.

101.

130.

821.

25Un

iform

Dela

y, d1

49.0

29.5

50.6

29.5

Prog

ress

ion F

acto

r1.

000.

371.

001.

00In

crem

enta

l Dela

y, d2

68.4

74.2

14.7

118.

3De

lay (s

)11

7.4

85.2

65.2

147.

8Le

vel o

f Ser

vice

FF

EF

Appr

oach

Dela

y (s)

65.2

147.

8Ap

proa

ch L

OSE

F

Inte

rsec

tion

Sum

mar

yHC

M A

vera

ge C

ontro

l Dela

y12

2.7

HCM

Lev

el of

Ser

vice

FHC

M V

olum

e to

Cap

acity

ratio

1.15

Actu

ated

Cyc

le Le

ngth

(s)

120.

0Su

m o

f lost

time

(s)

21.0

Inte

rsec

tion

Capa

city U

tiliza

tion

115.

6%IC

U Le

vel o

f Ser

vice

HAn

alysis

Per

iod (m

in)15

c C

ritica

l Lan

e Gr

oup

Page 139: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Que

ues

3: A

lew

ife B

rook

Par

kway

& R

oute

21/

16/2

013

130

Cam

bridg

epar

k Driv

e 5:

00 p

m 1

2/8/

2012

Exis

ting

(201

3) P

M P

eak H

our

Sync

hro

7 -

Repo

rtPa

ge 3

Lane

Gro

upSB

TSE

RLa

ne G

roup

Flow

(vph

)37

612

46v/c

Rat

io0.

790.

54Co

ntro

l Dela

y34

.04.

6Qu

eue

Delay

0.1

0.0

Tota

l Dela

y34

.14.

6Qu

eue

Leng

th 5

0th

(ft)

4013

8Qu

eue

Leng

th 9

5th

(ft)

m76

135

Inte

rnal

Link D

ist (f

t)18

9Tu

rn B

ay L

engt

h (ft

)Ba

se C

apac

ity (v

ph)

477

2317

Star

vatio

n Ca

p Re

ductn

20

Spillb

ack C

ap R

educ

tn0

0St

orag

e Ca

p Re

ductn

00

Redu

ced

v/c R

atio

0.79

0.54

Inte

rsec

tion

Sum

mar

ym

V

olum

e fo

r 95t

h pe

rcen

tile q

ueue

is m

eter

ed b

y ups

tream

sign

al.

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s3:

Ale

wife

Bro

ok P

arkw

ay &

Rou

te 2

1/15

/201

3

130

Cam

bridg

epar

k Driv

e 5:

00 p

m 1

2/8/

2012

Exis

ting

(201

3) P

M P

eak H

our

Sync

hro

7 -

Repo

rtPa

ge 3

Mov

emen

tNB

LNB

TSB

TSB

RSE

LSE

RLa

ne C

onfig

urat

ions

Volum

e (v

ph)

00

357

00

984

Idea

l Flow

(vph

pl)19

0019

0019

0019

0019

0019

00To

tal L

ost t

ime

(s)

4.0

2.5

Lane

Util.

Fac

tor

0.95

0.88

Frt

1.00

0.85

Flt P

rote

cted

1.00

1.00

Satd

. Flow

(pro

t)35

7428

42Fl

t Per

mitte

d1.

001.

00Sa

td. F

low (p

erm

)35

7428

42Pe

ak-h

our f

acto

r, PH

F0.

920.

920.

950.

960.

920.

79Ad

j. Flow

(vph

)0

037

60

012

46RT

OR R

educ

tion

(vph

)0

00

00

10La

ne G

roup

Flow

(vph

)0

037

60

012

36He

avy V

ehicl

es (%

)2%

2%1%

0%2%

0%Tu

rn T

ype

custo

mPr

otec

ted

Phas

es3

1 2

4Pe

rmitte

d Ph

ases

Actu

ated

Gre

en, G

(s)

15.0

95.0

Effe

ctive

Gre

en, g

(s)

16.0

91.0

Actu

ated

g/C

Rat

io0.

130.

76Cl

eara

nce

Tim

e (s

)5.

0La

ne G

rp C

ap (v

ph)

477

2155

v/s R

atio

Prot

c0.1

1c0

.43

v/s R

atio

Perm

v/c R

atio

0.79

0.57

Unifo

rm D

elay,

d150

.46.

2Pr

ogre

ssion

Fac

tor

0.52

1.00

Incr

emen

tal D

elay,

d27.

21.

1De

lay (s

)33

.37.

3Le

vel o

f Ser

vice

CA

Appr

oach

Dela

y (s)

0.0

33.3

7.3

Appr

oach

LOS

AC

A

Inte

rsec

tion

Sum

mar

yHC

M A

vera

ge C

ontro

l Dela

y13

.3HC

M L

evel

of S

ervic

eB

HCM

Volu

me

to C

apac

ity ra

tio0.

58Ac

tuat

ed C

ycle

Leng

th (s

) 12

0.0

Sum

of lo

st tim

e (s

)9.

0In

ters

ectio

n Ca

pacit

y Utili

zatio

n51

.0%

ICU

Leve

l of S

ervic

eA

Analy

sis P

eriod

(min)

15c

Crit

ical L

ane

Grou

p

Page 140: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Que

ues

4: R

oute

2 &

Ale

wife

Bro

ok P

arkw

ay1/

16/2

013

130

Cam

bridg

epar

k Driv

e 5:

00 p

m 1

2/8/

2012

Exis

ting

(201

3) P

M P

eak H

our

Sync

hro

7 -

Repo

rtPa

ge 4

Lane

Gro

upW

BTW

BRNB

TLa

ne G

roup

Flow

(vph

)53

942

031

9v/c

Rat

io0.

750.

500.

33Co

ntro

l Dela

y26

.25.

130

.2Qu

eue

Delay

4.5

0.0

0.0

Tota

l Dela

y30

.85.

130

.2Qu

eue

Leng

th 5

0th

(ft)

498

3895

Queu

e Le

ngth

95t

h (ft

)76

211

713

5In

tern

al Lin

k Dist

(ft)

9313

3Tu

rn B

ay L

engt

h (ft

)20

0Ba

se C

apac

ity (v

ph)

715

845

968

Star

vatio

n Ca

p Re

ductn

00

0Sp

illbac

k Cap

Red

uctn

114

00

Stor

age

Cap

Redu

ctn0

00

Redu

ced

v/c R

atio

0.90

0.50

0.33

Inte

rsec

tion

Sum

mar

y

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s4:

Rou

te 2

& A

lew

ife B

rook

Par

kway

1/15

/201

3

130

Cam

bridg

epar

k Driv

e 5:

00 p

m 1

2/8/

2012

Exis

ting

(201

3) P

M P

eak H

our

Sync

hro

7 -

Repo

rtPa

ge 4

Mov

emen

tEB

LEB

TEB

RW

BLW

BTW

BRNB

LNB

TNB

RSB

LSB

TSB

RLa

ne C

onfig

urat

ions

Volum

e (v

ph)

00

00

480

374

030

60

00

0Id

eal F

low (v

phpl)

1900

1900

1900

1900

1900

1900

1900

1900

1900

1900

1900

1900

Lane

Widt

h 12

1212

1212

1412

1112

1212

12To

tal L

ost t

ime

(s)

2.5

3.0

4.5

Lane

Util.

Fac

tor

*0.5

8*0

.75

0.95

Frt

1.00

0.85

1.00

Flt P

rote

cted

1.00

1.00

1.00

Satd

. Flow

(pro

t)12

0012

0028

00Fl

t Per

mitte

d1.

001.

001.

00Sa

td. F

low (p

erm

)12

0012

0028

00Pe

ak-h

our f

acto

r, PH

F0.

920.

920.

920.

920.

890.

890.

770.

960.

770.

920.

920.

92Ad

j. Flow

(vph

)0

00

053

942

00

319

00

00

RTOR

Red

uctio

n (v

ph)

00

00

014

00

00

00

0La

ne G

roup

Flow

(vph

)0

00

053

928

00

319

00

00

Heav

y Veh

icles

(%)

2%2%

2%2%

1%1%

0%1%

0%2%

2%2%

Turn

Typ

ePr

otPr

otec

ted

Phas

es1

21

23

4Pe

rmitte

d Ph

ases

Actu

ated

Gre

en, G

(s)

69.0

69.0

41.0

Effe

ctive

Gre

en, g

(s)

69.5

69.0

41.5

Actu

ated

g/C

Rat

io0.

580.

580.

35Cl

eara

nce

Tim

e (s

)La

ne G

rp C

ap (v

ph)

695

690

968

v/s R

atio

Prot

c0.4

50.

23c0

.11

v/s R

atio

Perm

v/c R

atio

0.78

0.41

0.33

Unifo

rm D

elay,

d119

.314

.129

.0Pr

ogre

ssion

Fac

tor

1.00

1.00

1.00

Incr

emen

tal D

elay,

d28.

31.

80.

9De

lay (s

)27

.615

.929

.9Le

vel o

f Ser

vice

CB

CAp

proa

ch D

elay (

s)0.

022

.529

.90.

0Ap

proa

ch L

OSA

CC

A

Inte

rsec

tion

Sum

mar

yHC

M A

vera

ge C

ontro

l Dela

y24

.3HC

M L

evel

of S

ervic

eC

HCM

Volu

me

to C

apac

ity ra

tio0.

60Ac

tuat

ed C

ycle

Leng

th (s

) 12

0.0

Sum

of lo

st tim

e (s

)7.

0In

ters

ectio

n Ca

pacit

y Utili

zatio

n40

.8%

ICU

Leve

l of S

ervic

eA

Analy

sis P

eriod

(min)

15c

Crit

ical L

ane

Grou

p

Page 141: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Que

ues

5: C

ambr

idge

park

Driv

e &

Ale

wife

Bro

ok P

arkw

ay1/

16/2

013

130

Cam

bridg

epar

k Driv

e 5:

00 p

m 1

2/8/

2012

Exis

ting

(201

3) P

M P

eak H

our

Sync

hro

7 -

Repo

rtPa

ge 5

Lane

Gro

upEB

LNB

LNB

TSB

TSB

RLa

ne G

roup

Flow

(vph

)11

0013

617

8815

4948

v/c R

atio

1.28

0.89

1.09

1.08

0.03

Cont

rol D

elay

163.

634

.856

.482

.10.

1Qu

eue

Delay

179.

21.

725

8.4

19.7

0.0

Tota

l Dela

y34

2.8

36.5

314.

810

1.8

0.1

Queu

e Le

ngth

50t

h (ft

)~5

3546

~800

~703

0Qu

eue

Leng

th 9

5th

(ft)

#669

m19

m11

4#7

450

Inte

rnal

Link D

ist (f

t)39

515

638

3Tu

rn B

ay L

engt

h (ft

)50

Base

Cap

acity

(vph

)85

815

316

4314

4013

86St

arva

tion

Cap

Redu

ctn0

257

10

0Sp

illbac

k Cap

Red

uctn

204

00

600

Stor

age

Cap

Redu

ctn0

00

00

Redu

ced

v/c R

atio

1.68

0.90

1.67

1.12

0.03

Inte

rsec

tion

Sum

mar

y~

Vo

lume

exce

eds c

apac

ity, q

ueue

is th

eore

ticall

y inf

inite

.

Que

ue sh

own

is m

axim

um a

fter t

wo cy

cles.

#

95th

per

cent

ile vo

lume

exce

eds c

apac

ity, q

ueue

may

be

longe

r.

Que

ue sh

own

is m

axim

um a

fter t

wo cy

cles.

m

Volu

me

for 9

5th

perc

entile

que

ue is

met

ered

by u

pstre

am si

gnal.

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s5:

Cam

brid

gepa

rk D

rive

& A

lew

ife B

rook

Par

kway

1/15

/201

3

130

Cam

bridg

epar

k Driv

e 5:

00 p

m 1

2/8/

2012

Exis

ting

(201

3) P

M P

eak H

our

Sync

hro

7 -

Repo

rtPa

ge 5

Mov

emen

tEB

LEB

RNB

LNB

TSB

TSB

RLa

ne C

onfig

urat

ions

Volum

e (v

ph)

399

591

122

1609

1301

40Id

eal F

low (v

phpl)

1900

1900

1900

1900

1900

1900

Lane

Widt

h 11

1212

1211

8To

tal L

ost t

ime

(s)

4.0

4.0

4.0

4.0

3.0

Lane

Util.

Fac

tor

0.97

1.00

0.95

0.95

1.00

Frt

0.91

1.00

1.00

1.00

0.85

Flt P

rote

cted

0.98

0.95

1.00

1.00

1.00

Satd

. Flow

(pro

t)17

7418

0534

0036

0013

86Fl

t Per

mitte

d0.

980.

081.

001.

001.

00Sa

td. F

low (p

erm

)17

7415

834

0036

0013

86Pe

ak-h

our f

acto

r, PH

F0.

900.

900.

900.

900.

840.

84Ad

j. Flow

(vph

)44

365

713

617

8815

4948

RTOR

Red

uctio

n (v

ph)

600

00

00

Lane

Gro

up F

low (v

ph)

1040

013

617

8815

4948

Heav

y Veh

icles

(%)

2%2%

0%0%

1%1%

Turn

Typ

eD.

P+P

Free

Prot

ecte

d Ph

ases

3 4

21

21

Perm

itted

Phas

es1

Free

Actu

ated

Gre

en, G

(s)

53.0

52.0

57.0

47.0

120.

0Ef

fecti

ve G

reen

, g (s

)54

.054

.058

.048

.012

0.0

Actu

ated

g/C

Rat

io0.

450.

450.

480.

401.

00Cl

eara

nce

Tim

e (s

)5.

05.

0Ve

hicle

Exte

nsion

(s)

3.0

3.0

Lane

Grp

Cap

(vph

)79

815

316

4314

4013

86v/s

Rat

io Pr

otc0

.59

0.04

c0.5

30.

43v/s

Rat

io Pe

rm0.

350.

03v/c

Rat

io1.

300.

891.

091.

080.

03Un

iform

Dela

y, d1

33.0

53.4

31.0

36.0

0.0

Prog

ress

ion F

acto

r1.

000.

560.

401.

001.

00In

crem

enta

l Dela

y, d2

145.

66.

140

.947

.00.

0De

lay (s

)17

8.6

36.2

53.3

83.0

0.0

Leve

l of S

ervic

eF

DD

FA

Appr

oach

Dela

y (s)

178.

652

.180

.5Ap

proa

ch L

OSF

DF

Inte

rsec

tion

Sum

mar

yHC

M A

vera

ge C

ontro

l Dela

y92

.0HC

M L

evel

of S

ervic

eF

HCM

Volu

me

to C

apac

ity ra

tio1.

19Ac

tuat

ed C

ycle

Leng

th (s

) 12

0.0

Sum

of lo

st tim

e (s

)8.

0In

ters

ectio

n Ca

pacit

y Utili

zatio

n82

.8%

ICU

Leve

l of S

ervic

eE

Analy

sis P

eriod

(min)

15c

Crit

ical L

ane

Grou

p

Page 142: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Que

ues

6: R

indg

e A

ve. &

Ale

wife

Bro

ok P

arkw

ay1/

16/2

013

130

Cam

bridg

epar

k Driv

e 5:

00 p

m 1

2/8/

2012

Exis

ting

(201

3) P

M P

eak H

our

Sync

hro

7 -

Repo

rtPa

ge 6

Lane

Gro

upW

BLW

BRNB

TSB

TLa

ne G

roup

Flow

(vph

)19

439

418

0820

57v/c

Rat

io0.

530.

681.

851.

23Co

ntro

l Dela

y48

.513

.240

9.6

124.

2Qu

eue

Delay

0.0

2.2

57.3

54.8

Tota

l Dela

y48

.515

.446

6.9

178.

9Qu

eue

Leng

th 5

0th

(ft)

135

25~1

188

~107

1Qu

eue

Leng

th 9

5th

(ft)

207

120

#133

8m

#864

Inte

rnal

Link D

ist (f

t)62

821

2115

6Tu

rn B

ay L

engt

h (ft

)10

0Ba

se C

apac

ity (v

ph)

364

580

978

1670

Star

vatio

n Ca

p Re

ductn

00

015

1Sp

illbac

k Cap

Red

uctn

086

630

Stor

age

Cap

Redu

ctn0

00

0Re

duce

d v/c

Rat

io0.

530.

801.

981.

35

Inte

rsec

tion

Sum

mar

y~

Vo

lume

exce

eds c

apac

ity, q

ueue

is th

eore

ticall

y inf

inite

.

Que

ue sh

own

is m

axim

um a

fter t

wo cy

cles.

#

95th

per

cent

ile vo

lume

exce

eds c

apac

ity, q

ueue

may

be

longe

r.

Que

ue sh

own

is m

axim

um a

fter t

wo cy

cles.

m

Volu

me

for 9

5th

perc

entile

que

ue is

met

ered

by u

pstre

am si

gnal.

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s6:

Rin

dge

Ave

. & A

lew

ife B

rook

Par

kway

1/15

/201

3

130

Cam

bridg

epar

k Driv

e 5:

00 p

m 1

2/8/

2012

Exis

ting

(201

3) P

M P

eak H

our

Sync

hro

7 -

Repo

rtPa

ge 6

Mov

emen

tW

BLW

BRNB

TNB

RSB

LSB

TLa

ne C

onfig

urat

ions

Volum

e (v

ph)

171

347

1384

243

018

92Id

eal F

low (v

phpl)

1900

1900

1900

1900

1900

1900

Lane

Widt

h 10

911

1212

11To

tal L

ost t

ime

(s)

4.0

4.0

4.0

4.0

Lane

Util.

Fac

tor

1.00

1.00

*0.9

00.

95Fr

pb, p

ed/b

ikes

1.00

1.00

1.00

1.00

Flpb

, ped

/bike

s1.

001.

001.

001.

00Fr

t1.

000.

850.

981.

00Fl

t Pro

tecte

d0.

951.

001.

001.

00Sa

td. F

low (p

rot)

1747

1439

2000

3455

Flt P

erm

itted

0.95

1.00

1.00

1.00

Satd

. Flow

(per

m)

1747

1439

2000

3455

Peak

-hou

r fac

tor,

PHF

0.88

0.88

0.90

0.90

0.92

0.92

Adj. F

low (v

ph)

194

394

1538

270

020

57RT

OR R

educ

tion

(vph

)0

280

110

00

Lane

Gro

up F

low (v

ph)

194

114

1797

00

2057

Conf

l. Bike

s (#/

hr)

4He

avy V

ehicl

es (%

)1%

1%0%

0%1%

1%Tu

rn T

ype

Prot

Prot

ecte

d Ph

ases

33

1 2

1 2

Perm

itted

Phas

esAc

tuat

ed G

reen

, G (s

)24

.024

.057

.057

.0Ef

fecti

ve G

reen

, g (s

)25

.025

.058

.058

.0Ac

tuat

ed g

/C R

atio

0.21

0.21

0.48

0.48

Clea

ranc

e Ti

me

(s)

5.0

5.0

Vehic

le Ex

tens

ion (s

)3.

03.

0La

ne G

rp C

ap (v

ph)

364

300

967

1670

v/s R

atio

Prot

c0.1

10.

08c0

.90

0.60

v/s R

atio

Perm

v/c R

atio

0.53

0.38

1.86

1.23

Unifo

rm D

elay,

d142

.340

.831

.031

.0Pr

ogre

ssion

Fac

tor

1.00

1.00

1.00

0.50

Incr

emen

tal D

elay,

d21.

50.

839

0.3

104.

8De

lay (s

)43

.841

.642

1.3

120.

3Le

vel o

f Ser

vice

DD

FF

Appr

oach

Dela

y (s)

42.3

421.

312

0.3

Appr

oach

LOS

DF

F

Inte

rsec

tion

Sum

mar

yHC

M A

vera

ge C

ontro

l Dela

y23

2.2

HCM

Lev

el of

Ser

vice

FHC

M V

olum

e to

Cap

acity

ratio

1.46

Actu

ated

Cyc

le Le

ngth

(s)

120.

0Su

m o

f lost

time

(s)

37.0

Inte

rsec

tion

Capa

city U

tiliza

tion

74.2

%IC

U Le

vel o

f Ser

vice

DAn

alysis

Per

iod (m

in)15

c C

ritica

l Lan

e Gr

oup

Page 143: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Que

ues

7: C

ambr

idge

park

Driv

e &

Ale

wife

Acc

ess

Roa

d1/

16/2

013

130

Cam

bridg

epar

k Driv

e 5:

00 p

m 1

2/8/

2012

Exis

ting

(201

3) P

M P

eak H

our

Sync

hro

7 -

Repo

rtPa

ge 7

Lane

Gro

upEB

TW

BTW

BRNB

TSB

LSB

TLa

ne G

roup

Flow

(vph

)37

411

482

121

396

399

v/c R

atio

0.53

0.21

0.16

0.24

0.91

0.73

Cont

rol D

elay

24.0

19.0

5.0

10.0

60.4

36.0

Queu

e De

lay0.

00.

00.

00.

00.

00.

0To

tal D

elay

24.0

19.0

5.0

10.0

60.4

36.0

Queu

e Le

ngth

50t

h (ft

)15

842

011

230

207

Queu

e Le

ngth

95t

h (ft

)23

773

2332

#403

315

Inte

rnal

Link D

ist (f

t)14

539

532

252

3Tu

rn B

ay L

engt

h (ft

)Ba

se C

apac

ity (v

ph)

700

543

504

497

434

545

Star

vatio

n Ca

p Re

ductn

00

00

00

Spillb

ack C

ap R

educ

tn0

00

00

0St

orag

e Ca

p Re

ductn

00

00

00

Redu

ced

v/c R

atio

0.53

0.21

0.16

0.24

0.91

0.73

Inte

rsec

tion

Sum

mar

y#

95

th p

erce

ntile

volum

e ex

ceed

s cap

acity

, que

ue m

ay b

e lon

ger.

Q

ueue

show

n is

max

imum

afte

r two

cycle

s.

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s7:

Cam

brid

gepa

rk D

rive

& A

lew

ife A

cces

s R

oad

1/15

/201

3

130

Cam

bridg

epar

k Driv

e 5:

00 p

m 1

2/8/

2012

Exis

ting

(201

3) P

M P

eak H

our

Sync

hro

7 -

Repo

rtPa

ge 7

Mov

emen

tEB

LEB

TEB

RW

BLW

BTW

BRNB

LNB

TNB

RSB

LSB

TSB

RLa

ne C

onfig

urat

ions

Volum

e (v

ph)

2829

011

4947

6913

470

641

3235

Idea

l Flow

(vph

pl)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00La

ne W

idth

1211

1212

1111

1214

1212

1212

Tota

l Los

t tim

e (s

)1.

01.

01.

01.

07.

01.

0La

ne U

til. F

acto

r1.

001.

001.

001.

000.

950.

95Fr

pb, p

ed/b

ikes

1.00

1.00

0.73

0.98

1.00

0.99

Flpb

, ped

/bike

s0.

981.

001.

001.

001.

001.

00Fr

t1.

001.

000.

850.

891.

000.

99Fl

t Pro

tecte

d1.

000.

981.

000.

990.

950.

96Sa

td. F

low (p

rot)

1787

1783

1138

1732

1698

1680

Flt P

erm

itted

0.97

0.74

1.00

0.99

0.95

0.96

Satd

. Flow

(per

m)

1745

1356

1138

1732

1698

1680

Peak

-hou

r fac

tor,

PHF

0.88

0.88

0.88

0.84

0.84

0.84

0.72

0.72

0.72

0.89

0.89

0.89

Adj. F

low (v

ph)

3233

012

5856

8218

697

720

3639

RTOR

Red

uctio

n (v

ph)

01

00

049

073

00

40

Lane

Gro

up F

low (v

ph)

037

30

011

433

048

039

639

50

Conf

l. Ped

s. (#

/hr)

118

1111

118

3211

1132

Conf

l. Bike

s (#/

hr)

45

2He

avy V

ehicl

es (%

)0%

0%0%

0%0%

0%1%

1%1%

1%1%

1%Tu

rn T

ype

Perm

Perm

Perm

Split

Split

Prot

ecte

d Ph

ases

66

44

22

Perm

itted

Phas

es6

66

Actu

ated

Gre

en, G

(s)

32.0

32.0

32.0

18.0

25.0

25.0

Effe

ctive

Gre

en, g

(s)

36.0

36.0

36.0

22.0

23.0

29.0

Actu

ated

g/C

Rat

io0.

400.

400.

400.

240.

260.

32Cl

eara

nce

Tim

e (s

)5.

05.

05.

05.

05.

05.

0La

ne G

rp C

ap (v

ph)

698

542

455

423

434

541

v/s R

atio

Prot

c0.0

3c0

.23

0.24

v/s R

atio

Perm

c0.2

10.

080.

03v/c

Rat

io0.

530.

210.

070.

110.

910.

73Un

iform

Dela

y, d1

20.6

17.7

16.7

26.4

32.5

27.0

Prog

ress

ion F

acto

r1.

001.

001.

001.

001.

001.

00In

crem

enta

l Dela

y, d2

2.9

0.9

0.3

0.5

26.0

8.4

Delay

(s)

23.5

18.6

17.0

27.0

58.6

35.4

Leve

l of S

ervic

eC

BB

CE

DAp

proa

ch D

elay (

s)23

.517

.927

.047

.0Ap

proa

ch L

OSC

BC

D

Inte

rsec

tion

Sum

mar

yHC

M A

vera

ge C

ontro

l Dela

y35

.6HC

M L

evel

of S

ervic

eD

HCM

Volu

me

to C

apac

ity ra

tio0.

52Ac

tuat

ed C

ycle

Leng

th (s

) 90

.0Su

m o

f lost

time

(s)

9.0

Inte

rsec

tion

Capa

city U

tiliza

tion

59.2

%IC

U Le

vel o

f Ser

vice

BAn

alysis

Per

iod (m

in)15

c C

ritica

l Lan

e Gr

oup

Page 144: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

HC

M �

nsig

naliz

ed In

ters

ectio

n C

apac

ity A

naly

sis

�: A

lew

ife A

cces

s R

oad

& R

o�te

� R

amp

1/15

/201

3

130

Cam

bridg

epar

k Driv

e 5:

00 p

m 1

2/8/

2012

Exis

ting

(201

3) P

M P

eak H

our

Sync

hro

7 -

Repo

rtPa

ge 8

Mov

emen

tEB

LEB

TEB

RW

BLW

BTW

BRNB

LNB

TNB

RSB

LSB

TSB

RLa

ne C

onfig

urat

ions

Sign

Con

trol

Stop

Stop

�ield

�ield

Volum

e (v

ph)

00

00

00

00

534

320

585

3Pe

ak H

our F

acto

r0.

920.

920.

920.

920.

920.

920.

920.

920.

930.

920.

870.

87Ho

urly

flow

rate

(vph

)0

00

00

00

057

434

867

23

Dire

ction

, Lan

e #

NB 1

SB 1

Volum

e To

tal (

vph)

574

1024

Volum

e Le

ft (v

ph)

034

8Vo

lume

Righ

t (vp

h)57

43

Hadj

(s)

-0.5

30.

12De

partu

re H

eadw

ay (s

)3.

24.

0De

gree

Utili

zatio

n, x

0.51

1.14

Capa

city (

veh/

h)11

1690

4Co

ntro

l Dela

y (s)

9.5

94.6

Appr

oach

Dela

y (s)

9.5

94.6

Appr

oach

LOS

AF

Inte

rsec

tion

Sum

mar

yDe

lay

64.0

HCM

Lev

el of

Ser

vice

FIn

ters

ectio

n Ca

pacit

y Utili

zatio

n 97

.1%

ICU

Leve

l of S

ervic

e F

Analy

sis P

eriod

(min)

15

Page 145: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Build Conditions

Page 146: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

This Page Left Blank Intentionally

Page 147: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Que

ues

1: R

oute

2 &

Rou

te 1

6 2/

12/2

013

130

Cam

brid

gepa

rk D

rive

7:30

am

12/

8/20

12 B

uild

(201

3) A

M P

eak

Hou

rSy

nchr

o 7

- R

epor

tPa

ge 1

Lane

Gro

upW

BTSW

RLa

ne G

roup

Flo

w (v

ph)

1476

1336

v/c

Rat

io1.

041.

52C

ontro

l Del

ay45

.326

6.0

Que

ue D

elay

69.5

0.0

Tota

l Del

ay11

4.8

266.

0Q

ueue

Len

gth

50th

(ft)

~370

~145

6Q

ueue

Len

gth

95th

(ft)

m33

#136

7In

tern

al L

ink

Dis

t (ft)

89Tu

rn B

ay L

engt

h (ft

)Ba

se C

apac

ity (v

ph)

1417

878

Star

vatio

n C

ap R

educ

tn19

30

Spillb

ack

Cap

Red

uctn

00

Stor

age

Cap

Red

uctn

00

Red

uced

v/c

Rat

io1.

211.

52

Inte

rsec

tion

Sum

mar

y~

Vo

lum

e ex

ceed

s ca

paci

ty, q

ueue

is th

eore

tical

ly in

finite

.

Que

ue s

how

n is

max

imum

afte

r tw

o cy

cles

.#

95

th p

erce

ntile

vol

ume

exce

eds

capa

city

, que

ue m

ay b

e lo

nger

.

Que

ue s

how

n is

max

imum

afte

r tw

o cy

cles

.m

V

olum

e fo

r 95t

h pe

rcen

tile

queu

e is

met

ered

by

upst

ream

sig

nal.

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s1:

Rou

te 2

& R

oute

16

2/12

/201

3

130

Cam

brid

gepa

rk D

rive

7:30

am

12/

8/20

12 B

uild

(201

3) A

M P

eak

Hou

rSy

nchr

o 7

- R

epor

tPa

ge 2

Mov

emen

tEB

LEB

TW

BTW

BRSW

LSW

RLa

ne C

onfig

urat

ions

Volu

me

(vph

)0

013

870

010

29Id

eal F

low

(vph

pl)

1900

1900

1900

1900

1900

1900

Tota

l Los

t tim

e (s

)2.

54.

5La

ne U

til. F

acto

r0.

951.

00Fr

t1.

000.

86Fl

t Pro

tect

ed1.

001.

00Sa

td. F

low

(pro

t)35

0516

27Fl

t Per

mitt

ed1.

001.

00Sa

td. F

low

(per

m)

3505

1627

Peak

-hou

r fac

tor,

PHF

0.92

0.92

0.94

0.92

0.92

0.77

Adj.

Flow

(vph

)0

014

760

013

36R

TOR

Red

uctio

n (v

ph)

00

00

03

Lane

Gro

up F

low

(vph

)0

014

760

013

33H

eavy

Veh

icle

s (%

)2%

2%3%

2%2%

1%Tu

rn T

ype

cust

omPr

otec

ted

Phas

es1

2Pe

rmitt

ed P

hase

s3

4Ac

tuat

ed G

reen

, G (s

)46

.064

.0Ef

fect

ive

Gre

en, g

(s)

46.5

64.5

Actu

ated

g/C

Rat

io0.

390.

54C

lear

ance

Tim

e (s

)La

ne G

rp C

ap (v

ph)

1358

875

v/s

Rat

io P

rot

c0.4

2v/

s R

atio

Per

mc0

.82

v/c

Rat

io1.

091.

52U

nifo

rm D

elay

, d1

36.8

27.8

Prog

ress

ion

Fact

or0.

631.

00In

crem

enta

l Del

ay, d

240

.524

1.3

Del

ay (s

)63

.826

9.0

Leve

l of S

ervi

ceE

FAp

proa

ch D

elay

(s)

0.0

63.8

269.

0Ap

proa

ch L

OS

AE

F

Inte

rsec

tion

Sum

mar

yH

CM

Ave

rage

Con

trol D

elay

161.

3H

CM

Lev

el o

f Ser

vice

FH

CM

Vol

ume

to C

apac

ity ra

tio1.

32Ac

tuat

ed C

ycle

Len

gth

(s)

120.

0Su

m o

f los

t tim

e (s

)7.

0In

ters

ectio

n C

apac

ity U

tiliz

atio

n10

9.1%

ICU

Lev

el o

f Ser

vice

HAn

alys

is P

erio

d (m

in)

15c

C

ritic

al L

ane

Gro

up

Page 148: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Que

ues

2: R

oute

2 &

Ale

wife

Bro

ok P

arkw

ay2/

12/2

013

130

Cam

brid

gepa

rk D

rive

7:30

am

12/

8/20

12 B

uild

(201

3) A

M P

eak

Hou

rSy

nchr

o 7

- R

epor

tPa

ge 3

Lane

Gro

upEB

LW

BRSB

TN

WT

Lane

Gro

up F

low

(vph

)47

221

231

312

75v/

c R

atio

0.82

0.71

0.30

1.43

Con

trol D

elay

59.2

28.4

32.2

233.

2Q

ueue

Del

ay0.

026

.00.

024

6.7

Tota

l Del

ay59

.254

.432

.247

9.9

Que

ue L

engt

h 50

th (f

t)18

214

596

~703

Que

ue L

engt

h 95

th (f

t)#2

5821

612

7#8

41In

tern

al L

ink

Dis

t (ft)

106

210

Turn

Bay

Len

gth

(ft)

Base

Cap

acity

(vph

)57

929

710

4889

1St

arva

tion

Cap

Red

uctn

00

00

Spillb

ack

Cap

Red

uctn

082

024

7St

orag

e C

ap R

educ

tn0

00

0R

educ

ed v

/c R

atio

0.82

0.99

0.30

1.98

Inte

rsec

tion

Sum

mar

y~

Vo

lum

e ex

ceed

s ca

paci

ty, q

ueue

is th

eore

tical

ly in

finite

.

Que

ue s

how

n is

max

imum

afte

r tw

o cy

cles

.#

95

th p

erce

ntile

vol

ume

exce

eds

capa

city

, que

ue m

ay b

e lo

nger

.

Que

ue s

how

n is

max

imum

afte

r tw

o cy

cles

.

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s2:

Rou

te 2

& A

lew

ife B

rook

Par

kway

2/12

/201

3

130

Cam

brid

gepa

rk D

rive

7:30

am

12/

8/20

12 B

uild

(201

3) A

M P

eak

Hou

rSy

nchr

o 7

- R

epor

tPa

ge 4

Mov

emen

tEB

LW

BRSB

TN

WT

Lane

Con

figur

atio

nsVo

lum

e (v

ph)

434

176

266

1211

Idea

l Flo

w (v

phpl

)19

0019

0019

0019

00La

ne W

idth

9

1211

12To

tal L

ost t

ime

(s)

4.5

4.5

4.5

4.5

Lane

Util

. Fac

tor

0.97

1.00

0.95

0.95

Frt

1.00

0.86

1.00

1.00

Flt P

rote

cted

0.95

1.00

1.00

1.00

Satd

. Flo

w (p

rot)

3090

950

3355

2850

Flt P

erm

itted

0.95

1.00

1.00

1.00

Satd

. Flo

w (p

erm

)30

9095

033

5528

50Pe

ak-h

our f

acto

r, PH

F0.

920.

830.

850.

95Ad

j. Fl

ow (v

ph)

472

212

313

1275

RTO

R R

educ

tion

(vph

)0

00

0La

ne G

roup

Flo

w (v

ph)

472

212

313

1275

Hea

vy V

ehic

les

(%)

2%12

%4%

2%Tu

rn T

ype

Prot

cust

omPr

otec

ted

Phas

es4

3Pe

rmitt

ed P

hase

s2

2Ac

tuat

ed G

reen

, G (s

)22

.037

.037

.037

.0Ef

fect

ive

Gre

en, g

(s)

22.5

37.5

37.5

37.5

Actu

ated

g/C

Rat

io0.

190.

310.

310.

31C

lear

ance

Tim

e (s

)5.

05.

05.

05.

0La

ne G

rp C

ap (v

ph)

579

297

1048

891

v/s

Rat

io P

rot

c0.1

5c0

.09

v/s

Rat

io P

erm

0.22

c0.4

5v/

c R

atio

0.82

0.71

0.30

1.43

Uni

form

Del

ay, d

146

.836

.531

.341

.2Pr

ogre

ssio

n Fa

ctor

1.00

0.38

1.00

1.00

Incr

emen

tal D

elay

, d2

12.0

13.4

0.7

200.

4D

elay

(s)

58.7

27.2

32.0

241.

7Le

vel o

f Ser

vice

EC

CF

Appr

oach

Del

ay (s

)32

.024

1.7

Appr

oach

LO

SC

F

Inte

rsec

tion

Sum

mar

yH

CM

Ave

rage

Con

trol D

elay

154.

8H

CM

Lev

el o

f Ser

vice

FH

CM

Vol

ume

to C

apac

ity ra

tio0.

85Ac

tuat

ed C

ycle

Len

gth

(s)

120.

0Su

m o

f los

t tim

e (s

)22

.5In

ters

ectio

n C

apac

ity U

tiliz

atio

n79

.7%

ICU

Lev

el o

f Ser

vice

DAn

alys

is P

erio

d (m

in)

15c

C

ritic

al L

ane

Gro

up

Page 149: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Que

ues

3: A

lew

ife B

rook

Par

kway

& R

oute

22/

12/2

013

130

Cam

brid

gepa

rk D

rive

7:30

am

12/

8/20

12 B

uild

(201

3) A

M P

eak

Hou

rSy

nchr

o 7

- R

epor

tPa

ge 5

Lane

Gro

upSB

TSE

RLa

ne G

roup

Flo

w (v

ph)

313

1161

v/c

Rat

io0.

290.

60C

ontro

l Del

ay4.

77.

9Q

ueue

Del

ay0.

20.

0To

tal D

elay

4.9

7.9

Que

ue L

engt

h 50

th (f

t)6

145

Que

ue L

engt

h 95

th (f

t)8

177

Inte

rnal

Lin

k D

ist (

ft)18

9Tu

rn B

ay L

engt

h (ft

)Ba

se C

apac

ity (v

ph)

1085

1947

Star

vatio

n C

ap R

educ

tn28

10

Spillb

ack

Cap

Red

uctn

00

Stor

age

Cap

Red

uctn

00

Red

uced

v/c

Rat

io0.

390.

60

Inte

rsec

tion

Sum

mar

y

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s3:

Ale

wife

Bro

ok P

arkw

ay &

Rou

te 2

2/12

/201

3

130

Cam

brid

gepa

rk D

rive

7:30

am

12/

8/20

12 B

uild

(201

3) A

M P

eak

Hou

rSy

nchr

o 7

- R

epor

tPa

ge 6

Mov

emen

tN

BLN

BTSB

TSB

RSE

LSE

RLa

ne C

onfig

urat

ions

Volu

me

(vph

)0

026

60

098

7Id

eal F

low

(vph

pl)

1900

1900

1900

1900

1900

1900

Tota

l Los

t tim

e (s

)4.

52.

5La

ne U

til. F

acto

r0.

950.

88Fr

t1.

000.

85Fl

t Pro

tect

ed1.

001.

00Sa

td. F

low

(pro

t)34

7127

87Fl

t Per

mitt

ed1.

001.

00Sa

td. F

low

(per

m)

3471

2787

Peak

-hou

r fac

tor,

PHF

0.92

0.92

0.85

0.92

0.92

0.85

Adj.

Flow

(vph

)0

031

30

011

61R

TOR

Red

uctio

n (v

ph)

00

00

022

2La

ne G

roup

Flo

w (v

ph)

00

313

00

939

Hea

vy V

ehic

les

(%)

2%2%

4%2%

2%2%

Turn

Typ

ecu

stom

Prot

ecte

d Ph

ases

31

2 4

Perm

itted

Pha

ses

Actu

ated

Gre

en, G

(s)

37.0

73.0

Effe

ctiv

e G

reen

, g (s

)37

.569

.0Ac

tuat

ed g

/C R

atio

0.31

0.58

Cle

aran

ce T

ime

(s)

5.0

Lane

Grp

Cap

(vph

)10

8516

03v/

s R

atio

Pro

tc0

.09

c0.3

4v/

s R

atio

Per

mv/

c R

atio

0.29

0.59

Uni

form

Del

ay, d

131

.216

.3Pr

ogre

ssio

n Fa

ctor

0.13

1.00

Incr

emen

tal D

elay

, d2

0.7

1.6

Del

ay (s

)4.

717

.9Le

vel o

f Ser

vice

AB

Appr

oach

Del

ay (s

)0.

04.

717

.9Ap

proa

ch L

OS

AA

B

Inte

rsec

tion

Sum

mar

yH

CM

Ave

rage

Con

trol D

elay

15.1

HC

M L

evel

of S

ervi

ceB

HC

M V

olum

e to

Cap

acity

ratio

0.46

Actu

ated

Cyc

le L

engt

h (s

) 12

0.0

Sum

of l

ost t

ime

(s)

9.5

Inte

rsec

tion

Cap

acity

Util

izat

ion

49.9

%IC

U L

evel

of S

ervi

ceA

Anal

ysis

Per

iod

(min

)15

c

Crit

ical

Lan

e G

roup

Page 150: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Que

ues

4: R

oute

2 &

Ale

wife

Bro

ok P

arkw

ay2/

12/2

013

130

Cam

brid

gepa

rk D

rive

7:30

am

12/

8/20

12 B

uild

(201

3) A

M P

eak

Hou

rSy

nchr

o 7

- R

epor

tPa

ge 7

Lane

Gro

upW

BTW

BRN

BTLa

ne G

roup

Flo

w (v

ph)

202

123

239

v/c

Rat

io0.

290.

170.

13C

ontro

l Del

ay25

.54.

614

.0Q

ueue

Del

ay0.

40.

00.

0To

tal D

elay

25.9

4.6

14.0

Que

ue L

engt

h 50

th (f

t)10

40

46Q

ueue

Len

gth

95th

(ft)

156

3464

Inte

rnal

Lin

k D

ist (

ft)93

133

Turn

Bay

Len

gth

(ft)

200

Base

Cap

acity

(vph

)70

470

618

39St

arva

tion

Cap

Red

uctn

00

0Sp

illbac

k C

ap R

educ

tn18

70

0St

orag

e C

ap R

educ

tn0

00

Red

uced

v/c

Rat

io0.

390.

170.

13

Inte

rsec

tion

Sum

mar

y

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s4:

Rou

te 2

& A

lew

ife B

rook

Par

kway

2/12

/201

3

130

Cam

brid

gepa

rk D

rive

7:30

am

12/

8/20

12 B

uild

(201

3) A

M P

eak

Hou

rSy

nchr

o 7

- R

epor

tPa

ge 8

Mov

emen

tEB

LEB

TEB

RW

BLW

BTW

BRN

BLN

BTN

BRSB

LSB

TSB

RLa

ne C

onfig

urat

ions

Volu

me

(vph

)0

00

017

610

70

203

00

00

Idea

l Flo

w (v

phpl

)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00La

ne W

idth

12

1212

1212

1412

1112

1212

12To

tal L

ost t

ime

(s)

2.5

3.0

4.5

Lane

Util

. Fac

tor

1.00

1.00

0.95

Frt

1.00

0.85

1.00

Flt P

rote

cted

1.00

1.00

1.00

Satd

. Flo

w (p

rot)

1743

1580

3421

Flt P

erm

itted

1.00

1.00

1.00

Satd

. Flo

w (p

erm

)17

4315

8034

21Pe

ak-h

our f

acto

r, PH

F0.

920.

920.

920.

870.

870.

870.

850.

850.

850.

920.

920.

92Ad

j. Fl

ow (v

ph)

00

00

202

123

023

90

00

0R

TOR

Red

uctio

n (v

ph)

00

00

076

00

00

00

Lane

Gro

up F

low

(vph

)0

00

020

247

023

90

00

0H

eavy

Veh

icle

s (%

)2%

2%2%

2%9%

9%2%

2%2%

2%2%

2%Tu

rn T

ype

Prot

Prot

ecte

d Ph

ases

1 2

1 2

3 4

Perm

itted

Pha

ses

Actu

ated

Gre

en, G

(s)

46.0

46.0

64.0

Effe

ctiv

e G

reen

, g (s

)46

.546

.064

.5Ac

tuat

ed g

/C R

atio

0.39

0.38

0.54

Cle

aran

ce T

ime

(s)

Lane

Grp

Cap

(vph

)67

560

618

39v/

s R

atio

Pro

tc0

.12

0.03

c0.0

7v/

s R

atio

Per

mv/

c R

atio

0.30

0.08

0.13

Uni

form

Del

ay, d

125

.523

.513

.8Pr

ogre

ssio

n Fa

ctor

1.00

1.00

1.00

Incr

emen

tal D

elay

, d2

1.1

0.3

0.1

Del

ay (s

)26

.623

.813

.9Le

vel o

f Ser

vice

CC

BAp

proa

ch D

elay

(s)

0.0

25.5

13.9

0.0

Appr

oach

LO

SA

CB

A

Inte

rsec

tion

Sum

mar

yH

CM

Ave

rage

Con

trol D

elay

20.6

HC

M L

evel

of S

ervi

ceC

HC

M V

olum

e to

Cap

acity

ratio

0.20

Actu

ated

Cyc

le L

engt

h (s

) 12

0.0

Sum

of l

ost t

ime

(s)

7.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

24.7

%IC

U L

evel

of S

ervi

ceA

Anal

ysis

Per

iod

(min

)15

c

Crit

ical

Lan

e G

roup

Page 151: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Que

ues

5: C

ambr

idge

park

Driv

e &

Ale

wife

Bro

ok P

arkw

ay2/

12/2

013

130

Cam

brid

gepa

rk D

rive

7:30

am

12/

8/20

12 B

uild

(201

3) A

M P

eak

Hou

rSy

nchr

o 7

- R

epor

tPa

ge 9

Lane

Gro

upEB

LN

BLN

BTSB

TSB

RLa

ne G

roup

Flo

w (v

ph)

618

261

1415

1340

67v/

c R

atio

0.76

0.86

0.60

0.84

0.05

Con

trol D

elay

28.2

34.8

7.0

33.5

0.1

Que

ue D

elay

1.6

14.6

22.7

3.1

0.0

Tota

l Del

ay29

.849

.429

.736

.70.

1Q

ueue

Len

gth

50th

(ft)

240

127

132

455

0Q

ueue

Len

gth

95th

(ft)

244

m12

6m

142

#693

0In

tern

al L

ink

Dis

t (ft)

395

156

383

Turn

Bay

Len

gth

(ft)

50Ba

se C

apac

ity (v

ph)

1006

302

2356

1588

1372

Star

vatio

n C

ap R

educ

tn0

3498

70

0Sp

illbac

k C

ap R

educ

tn21

90

016

10

Stor

age

Cap

Red

uctn

00

00

0R

educ

ed v

/c R

atio

0.79

0.97

1.03

0.94

0.05

Inte

rsec

tion

Sum

mar

y#

95

th p

erce

ntile

vol

ume

exce

eds

capa

city

, que

ue m

ay b

e lo

nger

.

Que

ue s

how

n is

max

imum

afte

r tw

o cy

cles

.m

V

olum

e fo

r 95t

h pe

rcen

tile

queu

e is

met

ered

by

upst

ream

sig

nal.

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s5:

Cam

brid

gepa

rk D

rive

& A

lew

ife B

rook

Par

kway

2/12

/201

3

130

Cam

brid

gepa

rk D

rive

7:30

am

12/

8/20

12 B

uild

(201

3) A

M P

eak

Hou

rSy

nchr

o 7

- R

epor

tPa

ge 1

0

Mov

emen

tEB

LEB

RN

BLN

BTSB

TSB

RLa

ne C

onfig

urat

ions

Volu

me

(vph

)40

448

253

1373

1193

60Id

eal F

low

(vph

pl)

1900

1900

1900

1900

1900

1900

Lane

Wid

th

1112

1212

118

Tota

l Los

t tim

e (s

)4.

04.

04.

04.

03.

0La

ne U

til. F

acto

r*0

.55

1.00

0.95

0.95

1.00

Frt

0.86

1.00

1.00

1.00

0.85

Flt P

rote

cted

1.00

0.95

1.00

1.00

1.00

Satd

. Flo

w (p

rot)

2252

1787

3600

3200

1372

Flt P

erm

itted

1.00

0.08

1.00

1.00

1.00

Satd

. Flo

w (p

erm

)22

5215

836

0032

0013

72Pe

ak-h

our f

acto

r, PH

F0.

790.

790.

970.

970.

890.

89Ad

j. Fl

ow (v

ph)

5156

726

114

1513

4067

RTO

R R

educ

tion

(vph

)18

70

00

00

Lane

Gro

up F

low

(vph

)43

10

261

1415

1340

67H

eavy

Veh

icle

s (%

)3%

3%1%

1%2%

2%Tu

rn T

ype

D.P

+PFr

eePr

otec

ted

Phas

es3

42

1 2

1Pe

rmitt

ed P

hase

s1

Free

Actu

ated

Gre

en, G

(s)

32.5

72.5

77.5

58.5

120.

0Ef

fect

ive

Gre

en, g

(s)

33.5

74.5

78.5

59.5

120.

0Ac

tuat

ed g

/C R

atio

0.28

0.62

0.65

0.50

1.00

Cle

aran

ce T

ime

(s)

5.0

5.0

Vehi

cle

Exte

nsio

n (s

)3.

03.

0La

ne G

rp C

ap (v

ph)

629

302

2355

1587

1372

v/s

Rat

io P

rot

c0.1

9c0

.11

0.39

0.42

v/s

Rat

io P

erm

c0.4

30.

05v/

c R

atio

0.69

0.86

0.60

0.84

0.05

Uni

form

Del

ay, d

138

.638

.711

.826

.20.

0Pr

ogre

ssio

n Fa

ctor

1.00

0.76

0.53

1.00

1.00

Incr

emen

tal D

elay

, d2

3.1

2.5

0.0

5.7

0.1

Del

ay (s

)41

.732

.16.

331

.90.

1Le

vel o

f Ser

vice

DC

AC

AAp

proa

ch D

elay

(s)

41.7

10.3

30.4

Appr

oach

LO

SD

BC

Inte

rsec

tion

Sum

mar

yH

CM

Ave

rage

Con

trol D

elay

23.2

HC

M L

evel

of S

ervi

ceC

HC

M V

olum

e to

Cap

acity

ratio

0.81

Actu

ated

Cyc

le L

engt

h (s

) 12

0.0

Sum

of l

ost t

ime

(s)

12.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

72.4

%IC

U L

evel

of S

ervi

ceC

Anal

ysis

Per

iod

(min

)15

c

Crit

ical

Lan

e G

roup

Page 152: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Que

ues

6: R

indg

e A

ve. &

Ale

wife

Bro

ok P

arkw

ay2/

12/2

013

130

Cam

brid

gepa

rk D

rive

7:30

am

12/

8/20

12 B

uild

(201

3) A

M P

eak

Hou

rSy

nchr

o 7

- R

epor

tPa

ge 1

1

Lane

Gro

upW

BLW

BRN

BTSB

TLa

ne G

roup

Flo

w (v

ph)

220

527

1350

1908

v/c

Rat

io0.

941.

091.

030.

91C

ontro

l Del

ay98

.284

.354

.620

.7Q

ueue

Del

ay0.

015

.913

.839

.7To

tal D

elay

98.2

100.

268

.360

.5Q

ueue

Len

gth

50th

(ft)

171

~210

~584

815

Que

ue L

engt

h 95

th (f

t)#3

26#4

29#7

96#9

25In

tern

al L

ink

Dis

t (ft)

628

2121

156

Turn

Bay

Len

gth

(ft)

100

Base

Cap

acity

(vph

)23

348

413

1320

94St

arva

tion

Cap

Red

uctn

00

033

7Sp

illbac

k C

ap R

educ

tn0

1746

0St

orag

e C

ap R

educ

tn0

00

0R

educ

ed v

/c R

atio

0.94

1.13

1.07

1.09

Inte

rsec

tion

Sum

mar

y~

Vo

lum

e ex

ceed

s ca

paci

ty, q

ueue

is th

eore

tical

ly in

finite

.

Que

ue s

how

n is

max

imum

afte

r tw

o cy

cles

.#

95

th p

erce

ntile

vol

ume

exce

eds

capa

city

, que

ue m

ay b

e lo

nger

.

Que

ue s

how

n is

max

imum

afte

r tw

o cy

cles

.

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s6:

Rin

dge

Ave

. & A

lew

ife B

rook

Par

kway

2/12

/201

3

130

Cam

brid

gepa

rk D

rive

7:30

am

12/

8/20

12 B

uild

(201

3) A

M P

eak

Hou

rSy

nchr

o 7

- R

epor

tPa

ge 1

2

Mov

emen

tW

BLW

BRN

BTN

BRSB

LSB

TLa

ne C

onfig

urat

ions

Volu

me

(vph

)20

549

011

3792

016

41Id

eal F

low

(vph

pl)

1800

1800

1800

1800

1900

1900

Lane

Wid

th

109

1112

1211

Tota

l Los

t tim

e (s

)4.

04.

04.

04.

0La

ne U

til. F

acto

r1.

001.

000.

950.

95Fr

t1.

000.

850.

991.

00Fl

t Pro

tect

ed0.

951.

001.

001.

00Sa

td. F

low

(pro

t)17

4713

7720

0032

00Fl

t Per

mitt

ed0.

951.

001.

001.

00Sa

td. F

low

(per

m)

1747

1377

2000

3200

Peak

-hou

r fac

tor,

PHF

0.93

0.93

0.91

0.91

0.86

0.86

Adj.

Flow

(vph

)22

052

712

4910

10

1908

RTO

R R

educ

tion

(vph

)0

301

40

00

Lane

Gro

up F

low

(vph

)22

022

613

460

019

08H

eavy

Veh

icle

s (%

)0%

0%2%

2%2%

2%Tu

rn T

ype

Prot

Prot

ecte

d Ph

ases

33

1 2

1 2

Perm

itted

Pha

ses

Actu

ated

Gre

en, G

(s)

15.0

15.0

77.5

77.5

Effe

ctiv

e G

reen

, g (s

)16

.016

.078

.578

.5Ac

tuat

ed g

/C R

atio

0.13

0.13

0.65

0.65

Cle

aran

ce T

ime

(s)

5.0

5.0

Vehi

cle

Exte

nsio

n (s

)3.

03.

0La

ne G

rp C

ap (v

ph)

233

184

1308

2093

v/s

Rat

io P

rot

0.13

c0.1

6c0

.67

0.60

v/s

Rat

io P

erm

v/c

Rat

io0.

941.

231.

030.

91U

nifo

rm D

elay

, d1

51.6

52.0

20.8

17.8

Prog

ress

ion

Fact

or1.

001.

001.

000.

79In

crem

enta

l Del

ay, d

243

.314

1.6

32.7

4.2

Del

ay (s

)94

.919

3.6

53.4

18.2

Leve

l of S

ervi

ceF

FD

BAp

proa

ch D

elay

(s)

164.

553

.418

.2Ap

proa

ch L

OS

FD

B

Inte

rsec

tion

Sum

mar

yH

CM

Ave

rage

Con

trol D

elay

57.3

HC

M L

evel

of S

ervi

ceE

HC

M V

olum

e to

Cap

acity

ratio

1.06

Actu

ated

Cyc

le L

engt

h (s

) 12

0.0

Sum

of l

ost t

ime

(s)

25.5

Inte

rsec

tion

Cap

acity

Util

izat

ion

75.0

%IC

U L

evel

of S

ervi

ceD

Anal

ysis

Per

iod

(min

)15

c

Crit

ical

Lan

e G

roup

Page 153: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Que

ues

7: C

ambr

idge

park

Driv

e &

Cam

brid

gepa

rk P

lace

2/12

/201

3

130

Cam

brid

gepa

rk D

rive

7:30

am

12/

8/20

12 B

uild

(201

3) A

M P

eak

Hou

rSy

nchr

o 7

- R

epor

tPa

ge 1

3

Lane

Gro

upEB

TW

BTW

BRN

BTSB

LSB

TLa

ne G

roup

Flo

w (v

ph)

119

229

136

5537

835

4v/

c R

atio

0.30

0.48

0.31

0.13

0.60

0.48

Con

trol D

elay

28.1

31.0

6.9

14.1

27.2

15.7

Que

ue D

elay

0.0

0.0

0.0

0.0

0.0

0.0

Tota

l Del

ay28

.131

.06.

914

.127

.215

.7Q

ueue

Len

gth

50th

(ft)

5310

80

817

710

7Q

ueue

Len

gth

95th

(ft)

8816

636

3025

016

7In

tern

al L

ink

Dis

t (ft)

145

395

322

442

Turn

Bay

Len

gth

(ft)

Base

Cap

acity

(vph

)40

348

143

443

963

573

9St

arva

tion

Cap

Red

uctn

00

00

00

Spillb

ack

Cap

Red

uctn

00

00

00

Stor

age

Cap

Red

uctn

00

00

00

Red

uced

v/c

Rat

io0.

300.

480.

310.

130.

600.

48

Inte

rsec

tion

Sum

mar

y

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s7:

Cam

brid

gepa

rk D

rive

& C

ambr

idge

park

Pla

ce2/

12/2

013

130

Cam

brid

gepa

rk D

rive

7:30

am

12/

8/20

12 B

uild

(201

3) A

M P

eak

Hou

rSy

nchr

o 7

- R

epor

tPa

ge 1

4

Mov

emen

tEB

LEB

TEB

RW

BLW

BTW

BRN

BLN

BTN

BRSB

LSB

TSB

RLa

ne C

onfig

urat

ions

Volu

me

(vph

)23

740

2117

311

61

1428

387

6616

1Id

eal F

low

(vph

pl)

1900

1900

1900

1900

1900

1900

1900

1900

1900

1900

1900

1900

Lane

Wid

th

1211

1212

1111

1214

1212

1212

Tota

l Los

t tim

e (s

)1.

01.

01.

01.

07.

01.

0La

ne U

til. F

acto

r1.

001.

001.

001.

000.

950.

95Fr

pb, p

ed/b

ikes

1.00

1.00

0.79

0.96

1.00

0.97

Flpb

, ped

/bik

es0.

971.

001.

001.

001.

001.

00Fr

t1.

001.

000.

850.

911.

000.

92Fl

t Pro

tect

ed0.

990.

991.

001.

000.

950.

99Sa

td. F

low

(pro

t)15

8017

8312

0916

8516

8115

56Fl

t Per

mitt

ed0.

910.

971.

001.

000.

950.

99Sa

td. F

low

(per

m)

1451

1731

1209

1685

1681

1556

Peak

-hou

r fac

tor,

PHF

0.81

0.81

0.81

0.85

0.85

0.85

0.77

0.77

0.77

0.84

0.84

0.84

Adj.

Flow

(vph

)28

910

2520

413

61

1836

461

7919

2R

TOR

Red

uctio

n (v

ph)

00

00

098

027

00

470

Lane

Gro

up F

low

(vph

)0

119

00

229

380

280

378

307

0C

onfl.

Ped

s. (#

/hr)

8626

2686

2133

3321

Con

fl. B

ikes

(#/h

r)10

91

Hea

vy V

ehic

les

(%)

12%

12%

12%

2%2%

2%5%

5%5%

2%2%

2%Tu

rn T

ype

Perm

Perm

Perm

Split

Split

Prot

ecte

d Ph

ases

44

33

22

Perm

itted

Pha

ses

44

4Ac

tuat

ed G

reen

, G (s

)21

.021

.021

.018

.036

.036

.0Ef

fect

ive

Gre

en, g

(s)

25.0

25.0

25.0

22.0

34.0

40.0

Actu

ated

g/C

Rat

io0.

280.

280.

280.

240.

380.

44C

lear

ance

Tim

e (s

)5.

05.

05.

05.

05.

05.

0La

ne G

rp C

ap (v

ph)

403

481

336

412

635

692

v/s

Rat

io P

rot

c0.0

2c0

.22

0.20

v/s

Rat

io P

erm

0.08

c0.1

30.

03v/

c R

atio

0.30

0.48

0.11

0.07

0.60

0.44

Uni

form

Del

ay, d

125

.627

.024

.226

.122

.517

.3Pr

ogre

ssio

n Fa

ctor

1.00

1.00

1.00

1.00

1.00

1.00

Incr

emen

tal D

elay

, d2

1.9

3.4

0.7

0.3

4.1

2.1

Del

ay (s

)27

.430

.424

.926

.426

.619

.4Le

vel o

f Ser

vice

CC

CC

CB

Appr

oach

Del

ay (s

)27

.428

.426

.423

.1Ap

proa

ch L

OS

CC

CC

Inte

rsec

tion

Sum

mar

yH

CM

Ave

rage

Con

trol D

elay

25.1

HC

M L

evel

of S

ervi

ceC

HC

M V

olum

e to

Cap

acity

ratio

0.41

Actu

ated

Cyc

le L

engt

h (s

) 90

.0Su

m o

f los

t tim

e (s

)9.

0In

ters

ectio

n C

apac

ity U

tiliz

atio

n59

.2%

ICU

Lev

el o

f Ser

vice

BAn

alys

is P

erio

d (m

in)

15c

C

ritic

al L

ane

Gro

up

Page 154: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

HC

M U

nsig

naliz

ed In

ters

ectio

n C

apac

ity A

naly

sis

8: A

lew

ife A

cces

s R

oad

& R

oute

2 R

amp

2/12

/201

3

130

Cam

brid

gepa

rk D

rive

7:30

am

12/

8/20

12 B

uild

(201

3) A

M P

eak

Hou

rSy

nchr

o 7

- R

epor

tPa

ge 1

5

Mov

emen

tEB

LEB

TEB

RW

BLW

BTW

BRN

BLN

BTN

BRSB

LSB

TSB

RLa

ne C

onfig

urat

ions

Sign

Con

trol

Stop

Stop

Yiel

dYi

eld

Volu

me

(vph

)0

00

00

00

021

270

991

225

Peak

Hou

r Fac

tor

0.92

0.92

0.92

0.92

0.92

0.92

0.96

0.96

0.96

0.83

0.83

0.83

Hou

rly fl

ow ra

te (v

ph)

00

00

00

00

221

8411

9427

1

Dire

ctio

n, L

ane

#N

B 1

SB 1

Volu

me

Tota

l (vp

h)22

115

49Vo

lum

e Le

ft (v

ph)

084

Volu

me

Rig

ht (v

ph)

221

271

Had

j (s)

-0.4

3-0

.06

Dep

artu

re H

eadw

ay (s

)3.

23.

8D

egre

e U

tiliz

atio

n, x

0.20

1.65

Cap

acity

(veh

/h)

1121

947

Con

trol D

elay

(s)

7.0

310.

0Ap

proa

ch D

elay

(s)

7.0

310.

0Ap

proa

ch L

OS

AF

Inte

rsec

tion

Sum

mar

yD

elay

27

2.2

HC

M L

evel

of S

ervi

ceF

Inte

rsec

tion

Cap

acity

Util

izat

ion

98.8

%IC

U L

evel

of S

ervi

ce

FAn

alys

is P

erio

d (m

in)

15

Page 155: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Que

ues

1: R

oute

2 &

Rou

te 1

62/

12/2

013

130

Cam

brid

gepa

rk D

rive

5:00

pm

12/

8/20

12 B

uild

(201

3) P

M P

eak

Hou

rSy

nchr

o 7

- R

epor

tPa

ge 1

Lane

Gro

upW

BTSW

RLa

ne G

roup

Flo

w (v

ph)

2348

818

v/c

Rat

io1.

101.

43C

ontro

l Del

ay60

.023

5.1

Que

ue D

elay

50.4

0.0

Tota

l Del

ay11

0.4

235.

1Q

ueue

Len

gth

50th

(ft)

~344

~862

Que

ue L

engt

h 95

th (f

t)m

70#1

108

Inte

rnal

Lin

k D

ist (

ft)89

Turn

Bay

Len

gth

(ft)

Base

Cap

acity

(vph

)21

4457

2St

arva

tion

Cap

Red

uctn

203

0Sp

illbac

k C

ap R

educ

tn0

0St

orag

e C

ap R

educ

tn0

0R

educ

ed v

/c R

atio

1.21

1.43

Inte

rsec

tion

Sum

mar

y~

Vo

lum

e ex

ceed

s ca

paci

ty, q

ueue

is th

eore

tical

ly in

finite

.

Que

ue s

how

n is

max

imum

afte

r tw

o cy

cles

.#

95

th p

erce

ntile

vol

ume

exce

eds

capa

city

, que

ue m

ay b

e lo

nger

.

Que

ue s

how

n is

max

imum

afte

r tw

o cy

cles

.m

V

olum

e fo

r 95t

h pe

rcen

tile

queu

e is

met

ered

by

upst

ream

sig

nal.

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s1:

Rou

te 2

& R

oute

16

2/12

/201

3

130

Cam

brid

gepa

rk D

rive

5:00

pm

12/

8/20

12 B

uild

(201

3) P

M P

eak

Hou

rSy

nchr

o 7

- R

epor

tPa

ge 2

Mov

emen

tEB

LEB

TW

BTW

BRSW

LSW

RLa

ne C

onfig

urat

ions

Volu

me

(vph

)0

021

840

079

3Id

eal F

low

(vph

pl)

1900

1900

1900

1900

1900

1900

Tota

l Los

t tim

e (s

)2.

04.

5La

ne U

til. F

acto

r0.

951.

00Fr

t1.

000.

86Fl

t Pro

tect

ed1.

001.

00Sa

td. F

low

(pro

t)35

7416

44Fl

t Per

mitt

ed1.

001.

00Sa

td. F

low

(per

m)

3574

1644

Peak

-hou

r fac

tor,

PHF

0.92

0.92

0.93

0.92

0.92

0.97

Adj.

Flow

(vph

)0

023

480

081

8R

TOR

Red

uctio

n (v

ph)

00

00

03

Lane

Gro

up F

low

(vph

)0

023

480

081

5H

eavy

Veh

icle

s (%

)2%

2%1%

2%2%

0%Tu

rn T

ype

cust

omPr

otec

ted

Phas

es1

2Pe

rmitt

ed P

hase

s3

4Ac

tuat

ed G

reen

, G (s

)69

.041

.0Ef

fect

ive

Gre

en, g

(s)

70.0

41.5

Actu

ated

g/C

Rat

io0.

580.

35C

lear

ance

Tim

e (s

)La

ne G

rp C

ap (v

ph)

2085

569

v/s

Rat

io P

rot

c0.6

6v/

s R

atio

Per

mc0

.50

v/c

Rat

io1.

131.

43U

nifo

rm D

elay

, d1

25.0

39.2

Prog

ress

ion

Fact

or0.

561.

00In

crem

enta

l Del

ay, d

257

.420

4.3

Del

ay (s

)71

.624

3.6

Leve

l of S

ervi

ceE

FAp

proa

ch D

elay

(s)

0.0

71.6

243.

6Ap

proa

ch L

OS

AE

F

Inte

rsec

tion

Sum

mar

yH

CM

Ave

rage

Con

trol D

elay

116.

0H

CM

Lev

el o

f Ser

vice

FH

CM

Vol

ume

to C

apac

ity ra

tio1.

22Ac

tuat

ed C

ycle

Len

gth

(s)

120.

0Su

m o

f los

t tim

e (s

)6.

5In

ters

ectio

n C

apac

ity U

tiliz

atio

n11

6.6%

ICU

Lev

el o

f Ser

vice

HAn

alys

is P

erio

d (m

in)

15c

C

ritic

al L

ane

Gro

up

Page 156: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Que

ues

2: R

oute

2 &

Ale

wife

Bro

ok P

arkw

ay2/

12/2

013

130

Cam

brid

gepa

rk D

rive

5:00

pm

12/

8/20

12 B

uild

(201

3) P

M P

eak

Hou

rSy

nchr

o 7

- R

epor

tPa

ge 3

Lane

Gro

upEB

LW

BRSB

TN

WT

Lane

Gro

up F

low

(vph

)63

054

738

018

12v/

c R

atio

1.10

1.13

0.82

1.25

Con

trol D

elay

113.

992

.066

.414

7.1

Que

ue D

elay

0.0

129.

30.

014

5.8

Tota

l Del

ay11

3.9

221.

366

.429

2.9

Que

ue L

engt

h 50

th (f

t)~2

86~4

9315

3~1

168

Que

ue L

engt

h 95

th (f

t)#3

81#6

79#2

28#1

344

Inte

rnal

Lin

k D

ist (

ft)10

621

0Tu

rn B

ay L

engt

h (ft

)Ba

se C

apac

ity (v

ph)

572

483

461

1449

Star

vatio

n C

ap R

educ

tn0

00

0Sp

illbac

k C

ap R

educ

tn0

100

029

9St

orag

e C

ap R

educ

tn0

00

0R

educ

ed v

/c R

atio

1.10

1.43

0.82

1.58

Inte

rsec

tion

Sum

mar

y~

Vo

lum

e ex

ceed

s ca

paci

ty, q

ueue

is th

eore

tical

ly in

finite

.

Que

ue s

how

n is

max

imum

afte

r tw

o cy

cles

.#

95

th p

erce

ntile

vol

ume

exce

eds

capa

city

, que

ue m

ay b

e lo

nger

.

Que

ue s

how

n is

max

imum

afte

r tw

o cy

cles

.

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s2:

Rou

te 2

& A

lew

ife B

rook

Par

kway

2/12

/201

3

130

Cam

brid

gepa

rk D

rive

5:00

pm

12/

8/20

12 B

uild

(201

3) P

M P

eak

Hou

rSy

nchr

o 7

- R

epor

tPa

ge 4

Mov

emen

tEB

LW

BRSB

TN

WT

Lane

Con

figur

atio

nsVo

lum

e (v

ph)

548

481

361

1703

Idea

l Flo

w (v

phpl

)19

0019

0019

0019

00La

ne W

idth

9

1211

12To

tal L

ost t

ime

(s)

4.0

4.0

4.0

4.0

Lane

Util

. Fac

tor

0.97

1.00

0.95

*0.7

5Fr

t1.

000.

861.

001.

00Fl

t Pro

tect

ed0.

951.

001.

001.

00Sa

td. F

low

(pro

t)31

2095

034

5528

50Fl

t Per

mitt

ed0.

951.

001.

001.

00Sa

td. F

low

(per

m)

3120

950

3455

2850

Peak

-hou

r fac

tor,

PHF

0.87

0.88

0.95

0.94

Adj.

Flow

(vph

)63

054

738

018

12R

TOR

Red

uctio

n (v

ph)

00

00

Lane

Gro

up F

low

(vph

)63

054

738

018

12H

eavy

Veh

icle

s (%

)1%

2%1%

1%Tu

rn T

ype

Prot

cust

omPr

otec

ted

Phas

es4

3Pe

rmitt

ed P

hase

s2

2Ac

tuat

ed G

reen

, G (s

)21

.060

.015

.060

.0Ef

fect

ive

Gre

en, g

(s)

22.0

61.0

16.0

61.0

Actu

ated

g/C

Rat

io0.

180.

510.

130.

51C

lear

ance

Tim

e (s

)5.

05.

05.

05.

0La

ne G

rp C

ap (v

ph)

572

483

461

1449

v/s

Rat

io P

rot

c0.2

0c0

.11

v/s

Rat

io P

erm

0.58

c0.6

4v/

c R

atio

1.10

1.13

0.82

1.25

Uni

form

Del

ay, d

149

.029

.550

.629

.5Pr

ogre

ssio

n Fa

ctor

1.00

0.37

1.00

1.00

Incr

emen

tal D

elay

, d2

68.4

75.8

15.3

118.

6D

elay

(s)

117.

486

.966

.014

8.1

Leve

l of S

ervi

ceF

FE

FAp

proa

ch D

elay

(s)

66.0

148.

1Ap

proa

ch L

OS

EF

Inte

rsec

tion

Sum

mar

yH

CM

Ave

rage

Con

trol D

elay

123.

2H

CM

Lev

el o

f Ser

vice

FH

CM

Vol

ume

to C

apac

ity ra

tio1.

15Ac

tuat

ed C

ycle

Len

gth

(s)

120.

0Su

m o

f los

t tim

e (s

)21

.0In

ters

ectio

n C

apac

ity U

tiliz

atio

n11

5.8%

ICU

Lev

el o

f Ser

vice

HAn

alys

is P

erio

d (m

in)

15c

C

ritic

al L

ane

Gro

up

Page 157: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Que

ues

3: A

lew

ife B

rook

Par

kway

& R

oute

22/

12/2

013

130

Cam

brid

gepa

rk D

rive

5:00

pm

12/

8/20

12 B

uild

(201

3) P

M P

eak

Hou

rSy

nchr

o 7

- R

epor

tPa

ge 5

Lane

Gro

upSB

TSE

RLa

ne G

roup

Flo

w (v

ph)

380

1246

v/c

Rat

io0.

800.

54C

ontro

l Del

ay34

.64.

6Q

ueue

Del

ay0.

10.

0To

tal D

elay

34.7

4.6

Que

ue L

engt

h 50

th (f

t)41

138

Que

ue L

engt

h 95

th (f

t)m

7613

6In

tern

al L

ink

Dis

t (ft)

189

Turn

Bay

Len

gth

(ft)

Base

Cap

acity

(vph

)47

723

17St

arva

tion

Cap

Red

uctn

20

Spillb

ack

Cap

Red

uctn

00

Stor

age

Cap

Red

uctn

00

Red

uced

v/c

Rat

io0.

800.

54

Inte

rsec

tion

Sum

mar

ym

V

olum

e fo

r 95t

h pe

rcen

tile

queu

e is

met

ered

by

upst

ream

sig

nal.

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s3:

Ale

wife

Bro

ok P

arkw

ay &

Rou

te 2

2/12

/201

3

130

Cam

brid

gepa

rk D

rive

5:00

pm

12/

8/20

12 B

uild

(201

3) P

M P

eak

Hou

rSy

nchr

o 7

- R

epor

tPa

ge 6

Mov

emen

tN

BLN

BTSB

TSB

RSE

LSE

RLa

ne C

onfig

urat

ions

Volu

me

(vph

)0

036

10

098

4Id

eal F

low

(vph

pl)

1900

1900

1900

1900

1900

1900

Tota

l Los

t tim

e (s

)4.

02.

5La

ne U

til. F

acto

r0.

950.

88Fr

t1.

000.

85Fl

t Pro

tect

ed1.

001.

00Sa

td. F

low

(pro

t)35

7428

42Fl

t Per

mitt

ed1.

001.

00Sa

td. F

low

(per

m)

3574

2842

Peak

-hou

r fac

tor,

PHF

0.92

0.92

0.95

0.96

0.92

0.79

Adj.

Flow

(vph

)0

038

00

012

46R

TOR

Red

uctio

n (v

ph)

00

00

010

Lane

Gro

up F

low

(vph

)0

038

00

012

36H

eavy

Veh

icle

s (%

)2%

2%1%

0%2%

0%Tu

rn T

ype

cust

omPr

otec

ted

Phas

es3

1 2

4Pe

rmitt

ed P

hase

sAc

tuat

ed G

reen

, G (s

)15

.095

.0Ef

fect

ive

Gre

en, g

(s)

16.0

91.0

Actu

ated

g/C

Rat

io0.

130.

76C

lear

ance

Tim

e (s

)5.

0La

ne G

rp C

ap (v

ph)

477

2155

v/s

Rat

io P

rot

c0.1

1c0

.43

v/s

Rat

io P

erm

v/c

Rat

io0.

800.

57U

nifo

rm D

elay

, d1

50.4

6.2

Prog

ress

ion

Fact

or0.

521.

00In

crem

enta

l Del

ay, d

27.

41.

1D

elay

(s)

33.8

7.3

Leve

l of S

ervi

ceC

AAp

proa

ch D

elay

(s)

0.0

33.8

7.3

Appr

oach

LO

SA

CA

Inte

rsec

tion

Sum

mar

yH

CM

Ave

rage

Con

trol D

elay

13.5

HC

M L

evel

of S

ervi

ceB

HC

M V

olum

e to

Cap

acity

ratio

0.59

Actu

ated

Cyc

le L

engt

h (s

) 12

0.0

Sum

of l

ost t

ime

(s)

9.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

51.1

%IC

U L

evel

of S

ervi

ceA

Anal

ysis

Per

iod

(min

)15

c

Crit

ical

Lan

e G

roup

Page 158: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Que

ues

4: R

oute

2 &

Ale

wife

Bro

ok P

arkw

ay2/

12/2

013

130

Cam

brid

gepa

rk D

rive

5:00

pm

12/

8/20

12 B

uild

(201

3) P

M P

eak

Hou

rSy

nchr

o 7

- R

epor

tPa

ge 7

Lane

Gro

upW

BTW

BRN

BTLa

ne G

roup

Flo

w (v

ph)

540

425

323

v/c

Rat

io0.

760.

500.

33C

ontro

l Del

ay26

.35.

430

.2Q

ueue

Del

ay4.

70.

00.

0To

tal D

elay

31.0

5.4

30.2

Que

ue L

engt

h 50

th (f

t)50

044

96Q

ueue

Len

gth

95th

(ft)

763

126

137

Inte

rnal

Lin

k D

ist (

ft)93

133

Turn

Bay

Len

gth

(ft)

200

Base

Cap

acity

(vph

)71

584

396

8St

arva

tion

Cap

Red

uctn

00

0Sp

illbac

k C

ap R

educ

tn11

50

0St

orag

e C

ap R

educ

tn0

00

Red

uced

v/c

Rat

io0.

900.

500.

33

Inte

rsec

tion

Sum

mar

y

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s4:

Rou

te 2

& A

lew

ife B

rook

Par

kway

2/12

/201

3

130

Cam

brid

gepa

rk D

rive

5:00

pm

12/

8/20

12 B

uild

(201

3) P

M P

eak

Hou

rSy

nchr

o 7

- R

epor

tPa

ge 8

Mov

emen

tEB

LEB

TEB

RW

BLW

BTW

BRN

BLN

BTN

BRSB

LSB

TSB

RLa

ne C

onfig

urat

ions

Volu

me

(vph

)0

00

048

137

80

310

00

00

Idea

l Flo

w (v

phpl

)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00La

ne W

idth

12

1212

1212

1412

1112

1212

12To

tal L

ost t

ime

(s)

2.5

3.0

4.5

Lane

Util

. Fac

tor

*0.5

8*0

.75

0.95

Frt

1.00

0.85

1.00

Flt P

rote

cted

1.00

1.00

1.00

Satd

. Flo

w (p

rot)

1200

1200

2800

Flt P

erm

itted

1.00

1.00

1.00

Satd

. Flo

w (p

erm

)12

0012

0028

00Pe

ak-h

our f

acto

r, PH

F0.

920.

920.

920.

920.

890.

890.

770.

960.

770.

920.

920.

92Ad

j. Fl

ow (v

ph)

00

00

540

425

032

30

00

0R

TOR

Red

uctio

n (v

ph)

00

00

013

80

00

00

0La

ne G

roup

Flo

w (v

ph)

00

00

540

287

032

30

00

0H

eavy

Veh

icle

s (%

)2%

2%2%

2%1%

1%0%

1%0%

2%2%

2%Tu

rn T

ype

Prot

Prot

ecte

d Ph

ases

1 2

1 2

3 4

Perm

itted

Pha

ses

Actu

ated

Gre

en, G

(s)

69.0

69.0

41.0

Effe

ctiv

e G

reen

, g (s

)69

.569

.041

.5Ac

tuat

ed g

/C R

atio

0.58

0.58

0.35

Cle

aran

ce T

ime

(s)

Lane

Grp

Cap

(vph

)69

569

096

8v/

s R

atio

Pro

tc0

.45

0.24

c0.1

2v/

s R

atio

Per

mv/

c R

atio

0.78

0.42

0.33

Uni

form

Del

ay, d

119

.314

.229

.0Pr

ogre

ssio

n Fa

ctor

1.00

1.00

1.00

Incr

emen

tal D

elay

, d2

8.3

1.8

0.9

Del

ay (s

)27

.716

.130

.0Le

vel o

f Ser

vice

CB

CAp

proa

ch D

elay

(s)

0.0

22.6

30.0

0.0

Appr

oach

LO

SA

CC

A

Inte

rsec

tion

Sum

mar

yH

CM

Ave

rage

Con

trol D

elay

24.4

HC

M L

evel

of S

ervi

ceC

HC

M V

olum

e to

Cap

acity

ratio

0.60

Actu

ated

Cyc

le L

engt

h (s

) 12

0.0

Sum

of l

ost t

ime

(s)

7.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

41.0

%IC

U L

evel

of S

ervi

ceA

Anal

ysis

Per

iod

(min

)15

c

Crit

ical

Lan

e G

roup

Page 159: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Que

ues

5: C

ambr

idge

park

Driv

e &

Ale

wife

Bro

ok P

arkw

ay2/

12/2

013

130

Cam

brid

gepa

rk D

rive

5:00

pm

12/

8/20

12 B

uild

(201

3) P

M P

eak

Hou

rSy

nchr

o 7

- R

epor

tPa

ge 9

Lane

Gro

upEB

LN

BLN

BTSB

TSB

RLa

ne G

roup

Flo

w (v

ph)

1121

173

1788

1549

52v/

c R

atio

1.31

1.13

1.09

1.08

0.04

Con

trol D

elay

174.

095

.556

.982

.10.

0Q

ueue

Del

ay18

8.7

0.0

268.

319

.70.

0To

tal D

elay

362.

795

.532

5.3

101.

80.

0Q

ueue

Len

gth

50th

(ft)

~552

~99

~800

~703

0Q

ueue

Len

gth

95th

(ft)

#688

m37

m12

1#7

450

Inte

rnal

Lin

k D

ist (

ft)39

515

638

3Tu

rn B

ay L

engt

h (ft

)50

Base

Cap

acity

(vph

)85

815

316

4314

4013

86St

arva

tion

Cap

Red

uctn

00

585

00

Spillb

ack

Cap

Red

uctn

209

00

600

Stor

age

Cap

Red

uctn

00

00

0R

educ

ed v

/c R

atio

1.73

1.13

1.69

1.12

0.04

Inte

rsec

tion

Sum

mar

y~

Vo

lum

e ex

ceed

s ca

paci

ty, q

ueue

is th

eore

tical

ly in

finite

.

Que

ue s

how

n is

max

imum

afte

r tw

o cy

cles

.#

95

th p

erce

ntile

vol

ume

exce

eds

capa

city

, que

ue m

ay b

e lo

nger

.

Que

ue s

how

n is

max

imum

afte

r tw

o cy

cles

.m

V

olum

e fo

r 95t

h pe

rcen

tile

queu

e is

met

ered

by

upst

ream

sig

nal.

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s5:

Cam

brid

gepa

rk D

rive

& A

lew

ife B

rook

Par

kway

2/12

/201

3

130

Cam

brid

gepa

rk D

rive

5:00

pm

12/

8/20

12 B

uild

(201

3) P

M P

eak

Hou

rSy

nchr

o 7

- R

epor

tPa

ge 1

0

Mov

emen

tEB

LEB

RN

BLN

BTSB

TSB

RLa

ne C

onfig

urat

ions

Volu

me

(vph

)40

460

515

616

0913

0144

Idea

l Flo

w (v

phpl

)19

0019

0019

0019

0019

0019

00La

ne W

idth

11

1212

1211

8To

tal L

ost t

ime

(s)

4.0

4.0

4.0

4.0

3.0

Lane

Util

. Fac

tor

0.97

1.00

0.95

0.95

1.00

Frt

0.91

1.00

1.00

1.00

0.85

Flt P

rote

cted

0.98

0.95

1.00

1.00

1.00

Satd

. Flo

w (p

rot)

1774

1805

3400

3600

1386

Flt P

erm

itted

0.98

0.08

1.00

1.00

1.00

Satd

. Flo

w (p

erm

)17

7415

834

0036

0013

86Pe

ak-h

our f

acto

r, PH

F0.

900.

900.

900.

900.

840.

84Ad

j. Fl

ow (v

ph)

449

672

173

1788

1549

52R

TOR

Red

uctio

n (v

ph)

600

00

00

Lane

Gro

up F

low

(vph

)10

610

173

1788

1549

52H

eavy

Veh

icle

s (%

)2%

2%0%

0%1%

1%Tu

rn T

ype

D.P

+PFr

eePr

otec

ted

Phas

es3

42

1 2

1Pe

rmitt

ed P

hase

s1

Free

Actu

ated

Gre

en, G

(s)

53.0

52.0

57.0

47.0

120.

0Ef

fect

ive

Gre

en, g

(s)

54.0

54.0

58.0

48.0

120.

0Ac

tuat

ed g

/C R

atio

0.45

0.45

0.48

0.40

1.00

Cle

aran

ce T

ime

(s)

5.0

5.0

Vehi

cle

Exte

nsio

n (s

)3.

03.

0La

ne G

rp C

ap (v

ph)

798

153

1643

1440

1386

v/s

Rat

io P

rot

c0.6

00.

06c0

.53

0.43

v/s

Rat

io P

erm

c0.4

50.

04v/

c R

atio

1.33

1.13

1.09

1.08

0.04

Uni

form

Del

ay, d

133

.053

.931

.036

.00.

0Pr

ogre

ssio

n Fa

ctor

1.00

0.58

0.42

1.00

1.00

Incr

emen

tal D

elay

, d2

156.

966

.940

.947

.00.

1D

elay

(s)

189.

998

.254

.083

.00.

1Le

vel o

f Ser

vice

FF

DF

AAp

proa

ch D

elay

(s)

189.

957

.980

.3Ap

proa

ch L

OS

FE

F

Inte

rsec

tion

Sum

mar

yH

CM

Ave

rage

Con

trol D

elay

97.1

HC

M L

evel

of S

ervi

ceF

HC

M V

olum

e to

Cap

acity

ratio

1.21

Actu

ated

Cyc

le L

engt

h (s

) 12

0.0

Sum

of l

ost t

ime

(s)

8.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

85.3

%IC

U L

evel

of S

ervi

ceE

Anal

ysis

Per

iod

(min

)15

c

Crit

ical

Lan

e G

roup

Page 160: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Que

ues

6: R

indg

e A

ve. &

Ale

wife

Bro

ok P

arkw

ay2/

12/2

013

130

Cam

brid

gepa

rk D

rive

5:00

pm

12/

8/20

12 B

uild

(201

3) P

M P

eak

Hou

rSy

nchr

o 7

- R

epor

tPa

ge 1

1

Lane

Gro

upW

BLW

BRN

BTSB

TLa

ne G

roup

Flo

w (v

ph)

194

424

1816

2072

v/c

Rat

io0.

530.

731.

861.

24C

ontro

l Del

ay48

.516

.841

3.2

128.

4Q

ueue

Del

ay0.

03.

758

.554

.8To

tal D

elay

48.5

20.4

471.

718

3.2

Que

ue L

engt

h 50

th (f

t)13

546

~119

6~1

084

Que

ue L

engt

h 95

th (f

t)20

715

7#1

345

m#8

65In

tern

al L

ink

Dis

t (ft)

628

2121

156

Turn

Bay

Len

gth

(ft)

100

Base

Cap

acity

(vph

)36

458

097

816

70St

arva

tion

Cap

Red

uctn

00

015

0Sp

illbac

k C

ap R

educ

tn0

8764

0St

orag

e C

ap R

educ

tn0

00

0R

educ

ed v

/c R

atio

0.53

0.86

1.99

1.36

Inte

rsec

tion

Sum

mar

y~

Vo

lum

e ex

ceed

s ca

paci

ty, q

ueue

is th

eore

tical

ly in

finite

.

Que

ue s

how

n is

max

imum

afte

r tw

o cy

cles

.#

95

th p

erce

ntile

vol

ume

exce

eds

capa

city

, que

ue m

ay b

e lo

nger

.

Que

ue s

how

n is

max

imum

afte

r tw

o cy

cles

.m

V

olum

e fo

r 95t

h pe

rcen

tile

queu

e is

met

ered

by

upst

ream

sig

nal.

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s6:

Rin

dge

Ave

. & A

lew

ife B

rook

Par

kway

2/12

/201

3

130

Cam

brid

gepa

rk D

rive

5:00

pm

12/

8/20

12 B

uild

(201

3) P

M P

eak

Hou

rSy

nchr

o 7

- R

epor

tPa

ge 1

2

Mov

emen

tW

BLW

BRN

BTN

BRSB

LSB

TLa

ne C

onfig

urat

ions

Volu

me

(vph

)17

137

313

9124

30

1906

Idea

l Flo

w (v

phpl

)19

0019

0019

0019

0019

0019

00La

ne W

idth

10

911

1212

11To

tal L

ost t

ime

(s)

4.0

4.0

4.0

4.0

Lane

Util

. Fac

tor

1.00

1.00

*0.9

00.

95Fr

pb, p

ed/b

ikes

1.00

1.00

1.00

1.00

Flpb

, ped

/bik

es1.

001.

001.

001.

00Fr

t1.

000.

850.

981.

00Fl

t Pro

tect

ed0.

951.

001.

001.

00Sa

td. F

low

(pro

t)17

4714

3920

0034

55Fl

t Per

mitt

ed0.

951.

001.

001.

00Sa

td. F

low

(per

m)

1747

1439

2000

3455

Peak

-hou

r fac

tor,

PHF

0.88

0.88

0.90

0.90

0.92

0.92

Adj.

Flow

(vph

)19

442

415

4627

00

2072

RTO

R R

educ

tion

(vph

)0

280

110

00

Lane

Gro

up F

low

(vph

)19

414

418

050

020

72C

onfl.

Bik

es (#

/hr)

4H

eavy

Veh

icle

s (%

)1%

1%0%

0%1%

1%Tu

rn T

ype

Prot

Prot

ecte

d Ph

ases

33

1 2

1 2

Perm

itted

Pha

ses

Actu

ated

Gre

en, G

(s)

24.0

24.0

57.0

57.0

Effe

ctiv

e G

reen

, g (s

)25

.025

.058

.058

.0Ac

tuat

ed g

/C R

atio

0.21

0.21

0.48

0.48

Cle

aran

ce T

ime

(s)

5.0

5.0

Vehi

cle

Exte

nsio

n (s

)3.

03.

0La

ne G

rp C

ap (v

ph)

364

300

967

1670

v/s

Rat

io P

rot

c0.1

10.

10c0

.90

0.60

v/s

Rat

io P

erm

v/c

Rat

io0.

530.

481.

871.

24U

nifo

rm D

elay

, d1

42.3

41.8

31.0

31.0

Prog

ress

ion

Fact

or1.

001.

001.

000.

51In

crem

enta

l Del

ay, d

21.

51.

239

4.0

108.

8D

elay

(s)

43.8

43.0

425.

012

4.5

Leve

l of S

ervi

ceD

DF

FAp

proa

ch D

elay

(s)

43.2

425.

012

4.5

Appr

oach

LO

SD

FF

Inte

rsec

tion

Sum

mar

yH

CM

Ave

rage

Con

trol D

elay

234.

5H

CM

Lev

el o

f Ser

vice

FH

CM

Vol

ume

to C

apac

ity ra

tio1.

47Ac

tuat

ed C

ycle

Len

gth

(s)

120.

0Su

m o

f los

t tim

e (s

)37

.0In

ters

ectio

n C

apac

ity U

tiliz

atio

n76

.0%

ICU

Lev

el o

f Ser

vice

DAn

alys

is P

erio

d (m

in)

15c

C

ritic

al L

ane

Gro

up

Page 161: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Que

ues

7: C

ambr

idge

park

Driv

e &

Ale

wife

Acc

ess

Roa

d2/

12/2

013

130

Cam

brid

gepa

rk D

rive

5:00

pm

12/

8/20

12 B

uild

(201

3) P

M P

eak

Hou

rSy

nchr

o 7

- R

epor

tPa

ge 1

3

Lane

Gro

upEB

TW

BTW

BRN

BTSB

LSB

TLa

ne G

roup

Flo

w (v

ph)

401

159

8212

140

339

9v/

c R

atio

0.58

0.28

0.16

0.24

0.93

0.73

Con

trol D

elay

25.1

19.9

5.0

10.0

63.2

35.9

Que

ue D

elay

0.0

0.0

0.0

0.0

0.0

0.0

Tota

l Del

ay25

.119

.95.

010

.063

.235

.9Q

ueue

Len

gth

50th

(ft)

173

600

1123

520

6Q

ueue

Len

gth

95th

(ft)

258

9823

32#4

1231

4In

tern

al L

ink

Dis

t (ft)

145

395

322

523

Turn

Bay

Len

gth

(ft)

Base

Cap

acity

(vph

)69

457

050

449

743

454

5St

arva

tion

Cap

Red

uctn

00

00

00

Spillb

ack

Cap

Red

uctn

00

00

00

Stor

age

Cap

Red

uctn

00

00

00

Red

uced

v/c

Rat

io0.

580.

280.

160.

240.

930.

73

Inte

rsec

tion

Sum

mar

y#

95

th p

erce

ntile

vol

ume

exce

eds

capa

city

, que

ue m

ay b

e lo

nger

.

Que

ue s

how

n is

max

imum

afte

r tw

o cy

cles

.

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s7:

Cam

brid

gepa

rk D

rive

& A

lew

ife A

cces

s R

oad

2/12

/201

3

130

Cam

brid

gepa

rk D

rive

5:00

pm

12/

8/20

12 B

uild

(201

3) P

M P

eak

Hou

rSy

nchr

o 7

- R

epor

tPa

ge 1

4

Mov

emen

tEB

LEB

TEB

RW

BLW

BTW

BRN

BLN

BTN

BRSB

LSB

TSB

RLa

ne C

onfig

urat

ions

Volu

me

(vph

)33

309

1149

8569

134

7064

132

41Id

eal F

low

(vph

pl)

1900

1900

1900

1900

1900

1900

1900

1900

1900

1900

1900

1900

Lane

Wid

th

1211

1212

1111

1214

1212

1212

Tota

l Los

t tim

e (s

)1.

01.

01.

01.

07.

01.

0La

ne U

til. F

acto

r1.

001.

001.

001.

000.

950.

95Fr

pb, p

ed/b

ikes

1.00

1.00

0.73

0.98

1.00

0.99

Flpb

, ped

/bik

es0.

981.

001.

001.

001.

001.

00Fr

t1.

001.

000.

850.

891.

000.

98Fl

t Pro

tect

ed1.

000.

981.

000.

990.

950.

96Sa

td. F

low

(pro

t)17

8717

9811

3817

3216

9816

74Fl

t Per

mitt

ed0.

960.

781.

000.

990.

950.

96Sa

td. F

low

(per

m)

1731

1425

1138

1732

1698

1674

Peak

-hou

r fac

tor,

PHF

0.88

0.88

0.88

0.84

0.84

0.84

0.72

0.72

0.72

0.89

0.89

0.89

Adj.

Flow

(vph

)38

351

1258

101

8218

697

720

3646

RTO

R R

educ

tion

(vph

)0

10

00

490

730

05

0La

ne G

roup

Flo

w (v

ph)

040

00

015

933

048

040

339

40

Con

fl. P

eds.

(#/h

r)11

811

1111

832

1111

32C

onfl.

Bik

es (#

/hr)

45

2H

eavy

Veh

icle

s (%

)0%

0%0%

0%0%

0%1%

1%1%

1%1%

1%Tu

rn T

ype

Perm

Perm

Perm

Split

Split

Prot

ecte

d Ph

ases

66

44

22

Perm

itted

Pha

ses

66

6Ac

tuat

ed G

reen

, G (s

)32

.032

.032

.018

.025

.025

.0Ef

fect

ive

Gre

en, g

(s)

36.0

36.0

36.0

22.0

23.0

29.0

Actu

ated

g/C

Rat

io0.

400.

400.

400.

240.

260.

32C

lear

ance

Tim

e (s

)5.

05.

05.

05.

05.

05.

0La

ne G

rp C

ap (v

ph)

692

570

455

423

434

539

v/s

Rat

io P

rot

c0.0

3c0

.24

0.24

v/s

Rat

io P

erm

c0.2

30.

110.

03v/

c R

atio

0.58

0.28

0.07

0.11

0.93

0.73

Uni

form

Del

ay, d

121

.118

.216

.726

.432

.727

.0Pr

ogre

ssio

n Fa

ctor

1.00

1.00

1.00

1.00

1.00

1.00

Incr

emen

tal D

elay

, d2

3.5

1.2

0.3

0.5

28.6

8.5

Del

ay (s

)24

.619

.517

.027

.061

.335

.5Le

vel o

f Ser

vice

CB

BC

ED

Appr

oach

Del

ay (s

)24

.618

.627

.048

.4Ap

proa

ch L

OS

CB

CD

Inte

rsec

tion

Sum

mar

yH

CM

Ave

rage

Con

trol D

elay

36.1

HC

M L

evel

of S

ervi

ceD

HC

M V

olum

e to

Cap

acity

ratio

0.54

Actu

ated

Cyc

le L

engt

h (s

) 90

.0Su

m o

f los

t tim

e (s

)9.

0In

ters

ectio

n C

apac

ity U

tiliz

atio

n60

.5%

ICU

Lev

el o

f Ser

vice

BAn

alys

is P

erio

d (m

in)

15c

C

ritic

al L

ane

Gro

up

Page 162: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

HC

M U

nsig

naliz

ed In

ters

ectio

n C

apac

ity A

naly

sis

8: A

lew

ife A

cces

s R

oad

& R

oute

2 R

amp

2/12

/201

3

130

Cam

brid

gepa

rk D

rive

5:00

pm

12/

8/20

12 B

uild

(201

3) P

M P

eak

Hou

rSy

nchr

o 7

- R

epor

tPa

ge 1

5

Mov

emen

tEB

LEB

TEB

RW

BLW

BTW

BRN

BLN

BTN

BRSB

LSB

TSB

RLa

ne C

onfig

urat

ions

Sign

Con

trol

Stop

Stop

Yiel

dYi

eld

Volu

me

(vph

)0

00

00

00

053

932

059

13

Peak

Hou

r Fac

tor

0.92

0.92

0.92

0.92

0.92

0.92

0.92

0.92

0.93

0.92

0.87

0.87

Hou

rly fl

ow ra

te (v

ph)

00

00

00

00

580

348

679

3

Dire

ctio

n, L

ane

#N

B 1

SB 1

Volu

me

Tota

l (vp

h)58

010

31Vo

lum

e Le

ft (v

ph)

034

8Vo

lum

e R

ight

(vph

)58

03

Had

j (s)

-0.5

30.

12D

epar

ture

Hea

dway

(s)

3.2

4.0

Deg

ree

Util

izat

ion,

x0.

521.

15C

apac

ity (v

eh/h

)11

1690

5C

ontro

l Del

ay (s

)9.

597

.4Ap

proa

ch D

elay

(s)

9.5

97.4

Appr

oach

LO

SA

F

Inte

rsec

tion

Sum

mar

yD

elay

65

.8H

CM

Lev

el o

f Ser

vice

FIn

ters

ectio

n C

apac

ity U

tiliz

atio

n 97

.7%

ICU

Lev

el o

f Ser

vice

F

Anal

ysis

Per

iod

(min

)15

Page 163: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Future Conditions

Page 164: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

This Page Left Blank Intentionally

Page 165: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Que

ues

1: R

oute

2 &

Rou

te 1

6 2/

12/2

013

130

Cam

brid

gepa

rk D

rive

7:30

am

12/

8/20

12 F

utur

e (2

018)

AM

Pea

k H

our (

with

impr

ovem

ents

)Sy

nchr

o 7

- R

epor

tPa

ge 1

Lane

Gro

upW

BTSW

RLa

ne G

roup

Flo

w (v

ph)

1533

1378

v/c

Rat

io0.

701.

00C

ontro

l Del

ay4.

354

.7Q

ueue

Del

ay2.

40.

0To

tal D

elay

6.7

54.7

Que

ue L

engt

h 50

th (f

t)31

584

Que

ue L

engt

h 95

th (f

t)m

3053

5In

tern

al L

ink

Dis

t (ft)

89Tu

rn B

ay L

engt

h (ft

)Ba

se C

apac

ity (v

ph)

2203

1380

Star

vatio

n C

ap R

educ

tn51

40

Spillb

ack

Cap

Red

uctn

00

Stor

age

Cap

Red

uctn

00

Red

uced

v/c

Rat

io0.

911.

00

Inte

rsec

tion

Sum

mar

ym

V

olum

e fo

r 95t

h pe

rcen

tile

queu

e is

met

ered

by

upst

ream

sig

nal.

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s1:

Rou

te 2

& R

oute

16

2/12

/201

3

130

Cam

brid

gepa

rk D

rive

7:30

am

12/

8/20

12 F

utur

e (2

018)

AM

Pea

k H

our (

with

impr

ovem

ents

)Sy

nchr

o 7

- R

epor

tPa

ge 2

Mov

emen

tEB

LEB

TW

BTW

BRSW

LSW

RLa

ne C

onfig

urat

ions

Volu

me

(vph

)0

014

410

010

61Id

eal F

low

(vph

pl)

1900

1900

1900

1900

1900

1900

Tota

l Los

t tim

e (s

)4.

54.

5La

ne U

til. F

acto

r0.

910.

88Fr

t1.

000.

85Fl

t Pro

tect

ed1.

001.

00Sa

td. F

low

(pro

t)50

3628

14Fl

t Per

mitt

ed1.

001.

00Sa

td. F

low

(per

m)

5036

2814

Peak

-hou

r fac

tor,

PHF

0.92

0.92

0.94

0.92

0.92

0.77

Adj.

Flow

(vph

)0

015

330

013

78R

TOR

Red

uctio

n (v

ph)

00

00

08

Lane

Gro

up F

low

(vph

)0

015

330

013

70H

eavy

Veh

icle

s (%

)2%

2%3%

2%2%

1%Tu

rn T

ype

cust

omPr

otec

ted

Phas

es2

3 4

Perm

itted

Pha

ses

Actu

ated

Gre

en, G

(s)

52.0

58.0

Effe

ctiv

e G

reen

, g (s

)52

.558

.5Ac

tuat

ed g

/C R

atio

0.44

0.49

Cle

aran

ce T

ime

(s)

5.0

Lane

Grp

Cap

(vph

)22

0313

72v/

s R

atio

Pro

tc0

.30

c0.4

9v/

s R

atio

Per

mv/

c R

atio

0.70

1.00

Uni

form

Del

ay, d

127

.330

.7Pr

ogre

ssio

n Fa

ctor

0.14

1.00

Incr

emen

tal D

elay

, d2

0.5

24.0

Del

ay (s

)4.

354

.7Le

vel o

f Ser

vice

AD

Appr

oach

Del

ay (s

)0.

04.

354

.7Ap

proa

ch L

OS

AA

D

Inte

rsec

tion

Sum

mar

yH

CM

Ave

rage

Con

trol D

elay

28.1

HC

M L

evel

of S

ervi

ceC

HC

M V

olum

e to

Cap

acity

ratio

0.86

Actu

ated

Cyc

le L

engt

h (s

) 12

0.0

Sum

of l

ost t

ime

(s)

9.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

72.5

%IC

U L

evel

of S

ervi

ceC

Anal

ysis

Per

iod

(min

)15

c

Crit

ical

Lan

e G

roup

Page 166: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Que

ues

2: R

oute

2 &

Ale

wife

Bro

ok P

arkw

ay2/

12/2

013

130

Cam

brid

gepa

rk D

rive

7:30

am

12/

8/20

12 F

utur

e (2

018)

AM

Pea

k H

our (

with

impr

ovem

ents

)Sy

nchr

o 7

- R

epor

tPa

ge 3

Lane

Gro

upEB

LW

BRSB

TN

WT

Lane

Gro

up F

low

(vph

)50

322

332

913

22v/

c R

atio

0.80

0.54

0.40

1.06

Con

trol D

elay

55.9

11.4

39.6

76.5

Que

ue D

elay

0.0

0.0

0.0

0.0

Tota

l Del

ay55

.911

.439

.676

.5Q

ueue

Len

gth

50th

(ft)

192

5611

2~5

92Q

ueue

Len

gth

95th

(ft)

#258

7814

7#7

31In

tern

al L

ink

Dis

t (ft)

106

210

Turn

Bay

Len

gth

(ft)

Base

Cap

acity

(vph

)63

141

682

512

47St

arva

tion

Cap

Red

uctn

00

00

Spillb

ack

Cap

Red

uctn

00

00

Stor

age

Cap

Red

uctn

00

00

Red

uced

v/c

Rat

io0.

800.

540.

401.

06

Inte

rsec

tion

Sum

mar

y~

Vo

lum

e ex

ceed

s ca

paci

ty, q

ueue

is th

eore

tical

ly in

finite

.

Que

ue s

how

n is

max

imum

afte

r tw

o cy

cles

.#

95

th p

erce

ntile

vol

ume

exce

eds

capa

city

, que

ue m

ay b

e lo

nger

.

Que

ue s

how

n is

max

imum

afte

r tw

o cy

cles

.

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s2:

Rou

te 2

& A

lew

ife B

rook

Par

kway

2/12

/201

3

130

Cam

brid

gepa

rk D

rive

7:30

am

12/

8/20

12 F

utur

e (2

018)

AM

Pea

k H

our (

with

impr

ovem

ents

)Sy

nchr

o 7

- R

epor

tPa

ge 4

Mov

emen

tEB

LW

BRSB

TN

WT

Lane

Con

figur

atio

nsVo

lum

e (v

ph)

463

185

280

1256

Idea

l Flo

w (v

phpl

)19

0019

0019

0019

00La

ne W

idth

9

1211

12To

tal L

ost t

ime

(s)

4.5

4.5

4.5

4.5

Lane

Util

. Fac

tor

0.97

1.00

0.95

0.95

Frt

1.00

0.86

1.00

1.00

Flt P

rote

cted

0.95

1.00

1.00

1.00

Satd

. Flo

w (p

rot)

3090

950

3355

2850

Flt P

erm

itted

0.95

1.00

1.00

1.00

Satd

. Flo

w (p

erm

)30

9095

033

5528

50Pe

ak-h

our f

acto

r, PH

F0.

920.

830.

850.

95Ad

j. Fl

ow (v

ph)

503

223

329

1322

RTO

R R

educ

tion

(vph

)0

00

0La

ne G

roup

Flo

w (v

ph)

503

223

329

1322

Hea

vy V

ehic

les

(%)

2%12

%4%

2%Tu

rn T

ype

Prot

cust

omPr

otec

ted

Phas

es4

3Pe

rmitt

ed P

hase

s2

2Ac

tuat

ed G

reen

, G (s

)24

.052

.029

.052

.0Ef

fect

ive

Gre

en, g

(s)

24.5

52.5

29.5

52.5

Actu

ated

g/C

Rat

io0.

200.

440.

250.

44C

lear

ance

Tim

e (s

)5.

05.

05.

05.

0La

ne G

rp C

ap (v

ph)

631

416

825

1247

v/s

Rat

io P

rot

c0.1

6c0

.10

v/s

Rat

io P

erm

0.23

c0.4

6v/

c R

atio

0.80

0.54

0.40

1.06

Uni

form

Del

ay, d

145

.424

.837

.833

.8Pr

ogre

ssio

n Fa

ctor

1.00

0.26

1.00

1.00

Incr

emen

tal D

elay

, d2

10.1

4.8

1.4

43.1

Del

ay (s

)55

.511

.139

.376

.8Le

vel o

f Ser

vice

EB

DE

Appr

oach

Del

ay (s

)39

.376

.8Ap

proa

ch L

OS

DE

Inte

rsec

tion

Sum

mar

yH

CM

Ave

rage

Con

trol D

elay

60.9

HC

M L

evel

of S

ervi

ceE

HC

M V

olum

e to

Cap

acity

ratio

0.82

Actu

ated

Cyc

le L

engt

h (s

) 12

0.0

Sum

of l

ost t

ime

(s)

13.5

Inte

rsec

tion

Cap

acity

Util

izat

ion

82.3

%IC

U L

evel

of S

ervi

ceE

Anal

ysis

Per

iod

(min

)15

c

Crit

ical

Lan

e G

roup

Page 167: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Que

ues

3: A

lew

ife B

rook

Par

kway

& R

oute

22/

12/2

013

130

Cam

brid

gepa

rk D

rive

7:30

am

12/

8/20

12 F

utur

e (2

018)

AM

Pea

k H

our (

with

impr

ovem

ents

)Sy

nchr

o 7

- R

epor

tPa

ge 5

Lane

Gro

upSB

TSE

RLa

ne G

roup

Flo

w (v

ph)

329

1216

v/c

Rat

io0.

390.

61C

ontro

l Del

ay5.

78.

6Q

ueue

Del

ay0.

20.

0To

tal D

elay

5.9

8.6

Que

ue L

engt

h 50

th (f

t)7

187

Que

ue L

engt

h 95

th (f

t)9

218

Inte

rnal

Lin

k D

ist (

ft)18

9Tu

rn B

ay L

engt

h (ft

)Ba

se C

apac

ity (v

ph)

853

1999

Star

vatio

n C

ap R

educ

tn99

0Sp

illbac

k C

ap R

educ

tn0

0St

orag

e C

ap R

educ

tn0

0R

educ

ed v

/c R

atio

0.44

0.61

Inte

rsec

tion

Sum

mar

y

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s3:

Ale

wife

Bro

ok P

arkw

ay &

Rou

te 2

2/12

/201

3

130

Cam

brid

gepa

rk D

rive

7:30

am

12/

8/20

12 F

utur

e (2

018)

AM

Pea

k H

our (

with

impr

ovem

ents

)Sy

nchr

o 7

- R

epor

tPa

ge 6

Mov

emen

tN

BLN

BTSB

TSB

RSE

LSE

RLa

ne C

onfig

urat

ions

Volu

me

(vph

)0

028

00

010

34Id

eal F

low

(vph

pl)

1900

1900

1900

1900

1900

1900

Tota

l Los

t tim

e (s

)4.

54.

5La

ne U

til. F

acto

r0.

950.

88Fr

t1.

000.

85Fl

t Pro

tect

ed1.

001.

00Sa

td. F

low

(pro

t)34

7127

87Fl

t Per

mitt

ed1.

001.

00Sa

td. F

low

(per

m)

3471

2787

Peak

-hou

r fac

tor,

PHF

0.92

0.92

0.85

0.92

0.92

0.85

Adj.

Flow

(vph

)0

032

90

012

16R

TOR

Red

uctio

n (v

ph)

00

00

010

7La

ne G

roup

Flo

w (v

ph)

00

329

00

1109

Hea

vy V

ehic

les

(%)

2%2%

4%2%

2%2%

Turn

Typ

ecu

stom

Prot

ecte

d Ph

ases

32

4Pe

rmitt

ed P

hase

sAc

tuat

ed G

reen

, G (s

)29

.081

.0Ef

fect

ive

Gre

en, g

(s)

29.5

81.5

Actu

ated

g/C

Rat

io0.

250.

68C

lear

ance

Tim

e (s

)5.

0La

ne G

rp C

ap (v

ph)

853

1893

v/s

Rat

io P

rot

c0.0

9c0

.40

v/s

Rat

io P

erm

v/c

Rat

io0.

390.

59U

nifo

rm D

elay

, d1

37.7

10.3

Prog

ress

ion

Fact

or0.

121.

00In

crem

enta

l Del

ay, d

21.

21.

3D

elay

(s)

5.7

11.6

Leve

l of S

ervi

ceA

BAp

proa

ch D

elay

(s)

0.0

5.7

11.6

Appr

oach

LO

SA

AB

Inte

rsec

tion

Sum

mar

yH

CM

Ave

rage

Con

trol D

elay

10.3

HC

M L

evel

of S

ervi

ceB

HC

M V

olum

e to

Cap

acity

ratio

0.53

Actu

ated

Cyc

le L

engt

h (s

) 12

0.0

Sum

of l

ost t

ime

(s)

9.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

52.0

%IC

U L

evel

of S

ervi

ceA

Anal

ysis

Per

iod

(min

)15

c

Crit

ical

Lan

e G

roup

Page 168: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Que

ues

4: R

oute

2 &

Ale

wife

Bro

ok P

arkw

ay2/

12/2

013

130

Cam

brid

gepa

rk D

rive

7:30

am

12/

8/20

12 F

utur

e (2

018)

AM

Pea

k H

our (

with

impr

ovem

ents

)Sy

nchr

o 7

- R

epor

tPa

ge 7

Lane

Gro

upW

BTW

BRN

BTLa

ne G

roup

Flo

w (v

ph)

213

151

286

v/c

Rat

io0.

280.

140.

34C

ontro

l Del

ay22

.91.

338

.6Q

ueue

Del

ay0.

00.

00.

0To

tal D

elay

22.9

1.3

38.6

Que

ue L

engt

h 50

th (f

t)10

40

96Q

ueue

Len

gth

95th

(ft)

154

1912

8In

tern

al L

ink

Dis

t (ft)

9313

3Tu

rn B

ay L

engt

h (ft

)20

0Ba

se C

apac

ity (v

ph)

763

1116

841

Star

vatio

n C

ap R

educ

tn0

00

Spillb

ack

Cap

Red

uctn

360

0St

orag

e C

ap R

educ

tn0

00

Red

uced

v/c

Rat

io0.

290.

140.

34

Inte

rsec

tion

Sum

mar

y

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s4:

Rou

te 2

& A

lew

ife B

rook

Par

kway

2/12

/201

3

130

Cam

brid

gepa

rk D

rive

7:30

am

12/

8/20

12 F

utur

e (2

018)

AM

Pea

k H

our (

with

impr

ovem

ents

)Sy

nchr

o 7

- R

epor

tPa

ge 8

Mov

emen

tEB

LEB

TEB

RW

BLW

BTW

BRN

BLN

BTN

BRSB

LSB

TSB

RLa

ne C

onfig

urat

ions

Volu

me

(vph

)0

00

018

513

10

243

00

00

Idea

l Flo

w (v

phpl

)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00La

ne W

idth

12

1212

1212

1412

1112

1212

12To

tal L

ost t

ime

(s)

4.5

5.0

4.5

Lane

Util

. Fac

tor

1.00

1.00

0.95

Frt

1.00

0.85

1.00

Flt P

rote

cted

1.00

1.00

1.00

Satd

. Flo

w (p

rot)

1743

1580

3421

Flt P

erm

itted

1.00

1.00

1.00

Satd

. Flo

w (p

erm

)17

4315

8034

21Pe

ak-h

our f

acto

r, PH

F0.

920.

920.

920.

870.

870.

870.

850.

850.

850.

920.

920.

92Ad

j. Fl

ow (v

ph)

00

00

213

151

028

60

00

0R

TOR

Red

uctio

n (v

ph)

00

00

049

00

00

00

Lane

Gro

up F

low

(vph

)0

00

021

310

20

286

00

00

Hea

vy V

ehic

les

(%)

2%2%

2%2%

9%9%

2%2%

2%2%

2%2%

Turn

Typ

ecu

stom

Prot

ecte

d Ph

ases

22

43

Perm

itted

Pha

ses

Actu

ated

Gre

en, G

(s)

52.0

81.0

29.0

Effe

ctiv

e G

reen

, g (s

)52

.581

.029

.5Ac

tuat

ed g

/C R

atio

0.44

0.68

0.25

Cle

aran

ce T

ime

(s)

5.0

5.0

Lane

Grp

Cap

(vph

)76

310

6784

1v/

s R

atio

Pro

tc0

.12

c0.0

6c0

.08

v/s

Rat

io P

erm

v/c

Rat

io0.

280.

100.

34U

nifo

rm D

elay

, d1

21.6

6.8

37.2

Prog

ress

ion

Fact

or1.

001.

001.

00In

crem

enta

l Del

ay, d

20.

90.

21.

1D

elay

(s)

22.5

7.0

38.3

Leve

l of S

ervi

ceC

AD

Appr

oach

Del

ay (s

)0.

016

.138

.30.

0Ap

proa

ch L

OS

AB

DA

Inte

rsec

tion

Sum

mar

yH

CM

Ave

rage

Con

trol D

elay

25.9

HC

M L

evel

of S

ervi

ceC

HC

M V

olum

e to

Cap

acity

ratio

0.26

Actu

ated

Cyc

le L

engt

h (s

) 12

0.0

Sum

of l

ost t

ime

(s)

14.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

25.6

%IC

U L

evel

of S

ervi

ceA

Anal

ysis

Per

iod

(min

)15

c

Crit

ical

Lan

e G

roup

Page 169: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Que

ues

5: C

ambr

idge

park

Driv

e &

Ale

wife

Bro

ok P

arkw

ay2/

12/2

013

130

Cam

brid

gepa

rk D

rive

7:30

am

12/

8/20

12 F

utur

e (2

018)

AM

Pea

k H

our (

with

impr

ovem

ents

)Sy

nchr

o 7

- R

epor

tPa

ge 9

Lane

Gro

upEB

LN

BLN

BTSB

TSB

RLa

ne G

roup

Flo

w (v

ph)

763

293

1476

1403

73v/

c R

atio

0.83

0.95

0.66

0.97

0.05

Con

trol D

elay

41.6

42.6

8.9

51.5

0.1

Que

ue D

elay

12.2

59.7

62.6

22.3

0.0

Tota

l Del

ay53

.810

2.4

71.6

73.8

0.1

Que

ue L

engt

h 50

th (f

t)36

716

915

4~5

610

Que

ue L

engt

h 95

th (f

t)35

6m

138

m13

9#7

770

Inte

rnal

Lin

k D

ist (

ft)39

515

638

3Tu

rn B

ay L

engt

h (ft

)50

Base

Cap

acity

(vph

)10

2530

722

2314

4313

72St

arva

tion

Cap

Red

uctn

451

920

00

Spillb

ack

Cap

Red

uctn

247

00

111

0St

orag

e C

ap R

educ

tn0

00

00

Red

uced

v/c

Rat

io0.

981.

141.

131.

050.

05

Inte

rsec

tion

Sum

mar

y~

Vo

lum

e ex

ceed

s ca

paci

ty, q

ueue

is th

eore

tical

ly in

finite

.

Que

ue s

how

n is

max

imum

afte

r tw

o cy

cles

.#

95

th p

erce

ntile

vol

ume

exce

eds

capa

city

, que

ue m

ay b

e lo

nger

.

Que

ue s

how

n is

max

imum

afte

r tw

o cy

cles

.m

V

olum

e fo

r 95t

h pe

rcen

tile

queu

e is

met

ered

by

upst

ream

sig

nal.

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s5:

Cam

brid

gepa

rk D

rive

& A

lew

ife B

rook

Par

kway

2/12

/201

3

130

Cam

brid

gepa

rk D

rive

7:30

am

12/

8/20

12 F

utur

e (2

018)

AM

Pea

k H

our (

with

impr

ovem

ents

)Sy

nchr

o 7

- R

epor

tPa

ge 1

0

Mov

emen

tEB

LEB

RN

BLN

BTSB

TSB

RLa

ne C

onfig

urat

ions

Volu

me

(vph

)68

535

284

1432

1249

65Id

eal F

low

(vph

pl)

1900

1900

1900

1900

1900

1900

Lane

Wid

th

1112

1212

118

Tota

l Los

t tim

e (s

)3.

63.

63.

63.

63.

0La

ne U

til. F

acto

r*0

.55

1.00

0.95

0.95

1.00

Frt

0.87

1.00

1.00

1.00

0.85

Flt P

rote

cted

0.99

0.95

1.00

1.00

1.00

Satd

. Flo

w (p

rot)

2252

1787

3600

3200

1372

Flt P

erm

itted

0.99

0.07

1.00

1.00

1.00

Satd

. Flo

w (p

erm

)22

5213

936

0032

0013

72Pe

ak-h

our f

acto

r, PH

F0.

790.

790.

970.

970.

890.

89Ad

j. Fl

ow (v

ph)

8667

729

314

7614

0373

RTO

R R

educ

tion

(vph

)18

80

00

00

Lane

Gro

up F

low

(vph

)57

50

293

1476

1403

73H

eavy

Veh

icle

s (%

)3%

3%1%

1%2%

2%Tu

rn T

ype

D.P

+PFr

eePr

otec

ted

Phas

es3

42

1 2

1Pe

rmitt

ed P

hase

s1

Free

Actu

ated

Gre

en, G

(s)

37.7

68.5

73.1

53.1

120.

0Ef

fect

ive

Gre

en, g

(s)

38.7

70.5

74.1

54.1

120.

0Ac

tuat

ed g

/C R

atio

0.32

0.59

0.62

0.45

1.00

Cle

aran

ce T

ime

(s)

4.6

4.6

Vehi

cle

Exte

nsio

n (s

)3.

03.

0La

ne G

rp C

ap (v

ph)

726

307

2223

1443

1372

v/s

Rat

io P

rot

c0.2

6c0

.13

0.41

c0.4

4v/

s R

atio

Per

m0.

430.

05v/

c R

atio

0.79

0.95

0.66

0.97

0.05

Uni

form

Del

ay, d

137

.044

.614

.932

.20.

0Pr

ogre

ssio

n Fa

ctor

1.49

0.76

0.54

1.00

1.00

Incr

emen

tal D

elay

, d2

5.1

7.5

0.1

17.9

0.1

Del

ay (s

)60

.141

.28.

150

.20.

1Le

vel o

f Ser

vice

ED

AD

AAp

proa

ch D

elay

(s)

60.1

13.6

47.7

Appr

oach

LO

SE

BD

Inte

rsec

tion

Sum

mar

yH

CM

Ave

rage

Con

trol D

elay

35.0

HC

M L

evel

of S

ervi

ceC

HC

M V

olum

e to

Cap

acity

ratio

0.91

Actu

ated

Cyc

le L

engt

h (s

) 12

0.0

Sum

of l

ost t

ime

(s)

10.8

Inte

rsec

tion

Cap

acity

Util

izat

ion

79.2

%IC

U L

evel

of S

ervi

ceD

Anal

ysis

Per

iod

(min

)15

c

Crit

ical

Lan

e G

roup

Page 170: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Que

ues

6: R

indg

e A

ve. &

Ale

wife

Bro

ok P

arkw

ay2/

12/2

013

130

Cam

brid

gepa

rk D

rive

7:30

am

12/

8/20

12 F

utur

e (2

018)

AM

Pea

k H

our (

with

impr

ovem

ents

)Sy

nchr

o 7

- R

epor

tPa

ge 1

1

Lane

Gro

upW

BLW

BRN

BTSB

TLa

ne G

roup

Flo

w (v

ph)

226

560

1415

2074

v/c

Rat

io0.

951.

161.

141.

05C

ontro

l Del

ay97

.611

0.2

98.3

49.6

Que

ue D

elay

0.0

28.2

28.7

101.

9To

tal D

elay

97.6

138.

412

7.0

151.

6Q

ueue

Len

gth

50th

(ft)

176

~268

~686

~965

Que

ue L

engt

h 95

th (f

t)#3

31#4

91#8

65m

#108

1In

tern

al L

ink

Dis

t (ft)

628

2121

156

Turn

Bay

Len

gth

(ft)

100

Base

Cap

acity

(vph

)23

948

412

3919

76St

arva

tion

Cap

Red

uctn

00

036

0Sp

illbac

k C

ap R

educ

tn0

2667

0St

orag

e C

ap R

educ

tn0

00

0R

educ

ed v

/c R

atio

0.95

1.22

1.21

1.28

Inte

rsec

tion

Sum

mar

y~

Vo

lum

e ex

ceed

s ca

paci

ty, q

ueue

is th

eore

tical

ly in

finite

.

Que

ue s

how

n is

max

imum

afte

r tw

o cy

cles

.#

95

th p

erce

ntile

vol

ume

exce

eds

capa

city

, que

ue m

ay b

e lo

nger

.

Que

ue s

how

n is

max

imum

afte

r tw

o cy

cles

.m

V

olum

e fo

r 95t

h pe

rcen

tile

queu

e is

met

ered

by

upst

ream

sig

nal.

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s6:

Rin

dge

Ave

. & A

lew

ife B

rook

Par

kway

2/12

/201

3

130

Cam

brid

gepa

rk D

rive

7:30

am

12/

8/20

12 F

utur

e (2

018)

AM

Pea

k H

our (

with

impr

ovem

ents

)Sy

nchr

o 7

- R

epor

tPa

ge 1

2

Mov

emen

tW

BLW

BRN

BTN

BRSB

LSB

TLa

ne C

onfig

urat

ions

Volu

me

(vph

)21

052

111

9494

017

84Id

eal F

low

(vph

pl)

1800

1800

1800

1800

1900

1900

Lane

Wid

th

109

1112

1211

Tota

l Los

t tim

e (s

)3.

63.

63.

63.

6La

ne U

til. F

acto

r1.

001.

000.

950.

95Fr

t1.

000.

850.

991.

00Fl

t Pro

tect

ed0.

951.

001.

001.

00Sa

td. F

low

(pro

t)17

4713

7720

0032

00Fl

t Per

mitt

ed0.

951.

001.

001.

00Sa

td. F

low

(per

m)

1747

1377

2000

3200

Peak

-hou

r fac

tor,

PHF

0.93

0.93

0.91

0.91

0.86

0.86

Adj.

Flow

(vph

)22

656

013

1210

30

2074

RTO

R R

educ

tion

(vph

)0

296

40

00

Lane

Gro

up F

low

(vph

)22

626

414

110

020

74H

eavy

Veh

icle

s (%

)0%

0%2%

2%2%

2%Tu

rn T

ype

Prot

Prot

ecte

d Ph

ases

33

1 2

1 2

Perm

itted

Pha

ses

Actu

ated

Gre

en, G

(s)

15.4

15.4

73.1

73.1

Effe

ctiv

e G

reen

, g (s

)16

.416

.474

.174

.1Ac

tuat

ed g

/C R

atio

0.14

0.14

0.62

0.62

Cle

aran

ce T

ime

(s)

4.6

4.6

Vehi

cle

Exte

nsio

n (s

)3.

03.

0La

ne G

rp C

ap (v

ph)

239

188

1235

1976

v/s

Rat

io P

rot

0.13

c0.1

9c0

.71

0.65

v/s

Rat

io P

erm

v/c

Rat

io0.

951.

401.

141.

05U

nifo

rm D

elay

, d1

51.4

51.8

23.0

23.0

Prog

ress

ion

Fact

or1.

001.

001.

000.

82In

crem

enta

l Del

ay, d

243

.021

0.4

74.2

28.6

Del

ay (s

)94

.326

2.2

97.1

47.3

Leve

l of S

ervi

ceF

FF

DAp

proa

ch D

elay

(s)

213.

997

.147

.3Ap

proa

ch L

OS

FF

D

Inte

rsec

tion

Sum

mar

yH

CM

Ave

rage

Con

trol D

elay

94.4

HC

M L

evel

of S

ervi

ceF

HC

M V

olum

e to

Cap

acity

ratio

1.19

Actu

ated

Cyc

le L

engt

h (s

) 12

0.0

Sum

of l

ost t

ime

(s)

29.5

Inte

rsec

tion

Cap

acity

Util

izat

ion

78.7

%IC

U L

evel

of S

ervi

ceD

Anal

ysis

Per

iod

(min

)15

c

Crit

ical

Lan

e G

roup

Page 171: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Que

ues

7: C

ambr

idge

park

Driv

e &

Cam

brid

gepa

rk P

lace

2/12

/201

3

130

Cam

brid

gepa

rk D

rive

7:30

am

12/

8/20

12 F

utur

e (2

018)

AM

Pea

k H

our (

with

impr

ovem

ents

)Sy

nchr

o 7

- R

epor

tPa

ge 1

3

Lane

Gro

upEB

TW

BTW

BRN

BTSB

LSB

TLa

ne G

roup

Flo

w (v

ph)

283

267

140

5738

836

8v/

c R

atio

0.66

0.46

0.31

0.21

0.53

0.48

Con

trol D

elay

42.4

14.1

1.3

22.5

28.4

18.9

Que

ue D

elay

0.0

0.0

0.0

0.0

0.0

0.0

Tota

l Del

ay42

.414

.11.

322

.528

.418

.9Q

ueue

Len

gth

50th

(ft)

185

710

1322

815

6Q

ueue

Len

gth

95th

(ft)

248

m76

m0

4030

022

0In

tern

al L

ink

Dis

t (ft)

145

395

322

442

Turn

Bay

Len

gth

(ft)

Base

Cap

acity

(vph

)42

858

644

527

872

876

7St

arva

tion

Cap

Red

uctn

00

00

00

Spillb

ack

Cap

Red

uctn

00

00

00

Stor

age

Cap

Red

uctn

00

00

00

Red

uced

v/c

Rat

io0.

660.

460.

310.

210.

530.

48

Inte

rsec

tion

Sum

mar

ym

V

olum

e fo

r 95t

h pe

rcen

tile

queu

e is

met

ered

by

upst

ream

sig

nal.

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s7:

Cam

brid

gepa

rk D

rive

& C

ambr

idge

park

Pla

ce2/

12/2

013

130

Cam

brid

gepa

rk D

rive

7:30

am

12/

8/20

12 F

utur

e (2

018)

AM

Pea

k H

our (

with

impr

ovem

ents

)Sy

nchr

o 7

- R

epor

tPa

ge 1

4

Mov

emen

tEB

LEB

TEB

RW

BLW

BTW

BRN

BLN

BTN

BRSB

LSB

TSB

RLa

ne C

onfig

urat

ions

Volu

me

(vph

)51

178

022

205

119

114

2939

768

170

Idea

l Flo

w (v

phpl

)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00La

ne W

idth

12

1112

1211

1112

1412

1212

12To

tal L

ost t

ime

(s)

1.0

1.0

1.0

1.0

7.0

1.0

Lane

Util

. Fac

tor

1.00

1.00

1.00

1.00

0.95

0.95

Frpb

, ped

/bik

es1.

001.

000.

680.

931.

000.

94Fl

pb, p

ed/b

ikes

0.97

1.00

1.00

1.00

1.00

1.00

Frt

1.00

1.00

0.85

0.91

1.00

0.92

Flt P

rote

cted

0.99

1.00

1.00

1.00

0.95

0.99

Satd

. Flo

w (p

rot)

1575

1786

1034

1636

1681

1509

Flt P

erm

itted

0.79

0.96

1.00

1.00

0.95

0.99

Satd

. Flo

w (p

erm

)12

5317

1510

3416

3616

8115

09Pe

ak-h

our f

acto

r, PH

F0.

810.

810.

810.

850.

850.

850.

770.

770.

770.

840.

840.

84Ad

j. Fl

ow (v

ph)

6322

00

2624

114

01

1838

473

8120

2R

TOR

Red

uctio

n (v

ph)

00

00

092

032

00

370

Lane

Gro

up F

low

(vph

)0

283

00

267

480

250

388

331

0C

onfl.

Ped

s. (#

/hr)

8626

2686

2133

3321

Con

fl. B

ikes

(#/h

r)10

91

Hea

vy V

ehic

les

(%)

12%

12%

12%

2%2%

2%5%

5%5%

2%2%

2%Tu

rn T

ype

Perm

Perm

Perm

Split

Split

Prot

ecte

d Ph

ases

44

66

22

Perm

itted

Pha

ses

44

4Ac

tuat

ed G

reen

, G (s

)37

.037

.037

.014

.054

.054

.0Ef

fect

ive

Gre

en, g

(s)

41.0

41.0

41.0

18.0

52.0

58.0

Actu

ated

g/C

Rat

io0.

340.

340.

340.

150.

430.

48C

lear

ance

Tim

e (s

)5.

05.

05.

05.

05.

05.

0La

ne G

rp C

ap (v

ph)

428

586

353

245

728

729

v/s

Rat

io P

rot

c0.0

2c0

.23

0.22

v/s

Rat

io P

erm

c0.2

30.

160.

05v/

c R

atio

0.66

0.46

0.14

0.10

0.53

0.45

Uni

form

Del

ay, d

133

.630

.827

.344

.025

.120

.5Pr

ogre

ssio

n Fa

ctor

1.00

0.39

0.00

1.00

1.00

1.00

Incr

emen

tal D

elay

, d2

7.8

1.8

0.6

0.8

2.8

2.0

Del

ay (s

)41

.413

.80.

644

.827

.822

.6Le

vel o

f Ser

vice

DB

AD

CC

Appr

oach

Del

ay (s

)41

.49.

344

.825

.3Ap

proa

ch L

OS

DA

DC

Inte

rsec

tion

Sum

mar

yH

CM

Ave

rage

Con

trol D

elay

24.7

HC

M L

evel

of S

ervi

ceC

HC

M V

olum

e to

Cap

acity

ratio

0.50

Actu

ated

Cyc

le L

engt

h (s

) 12

0.0

Sum

of l

ost t

ime

(s)

9.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

63.5

%IC

U L

evel

of S

ervi

ceB

Anal

ysis

Per

iod

(min

)15

c

Crit

ical

Lan

e G

roup

Page 172: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

HC

M U

nsig

naliz

ed In

ters

ectio

n C

apac

ity A

naly

sis

8: A

lew

ife A

cces

s R

oad

& R

oute

2 R

amp

2/12

/201

3

130

Cam

brid

gepa

rk D

rive

7:30

am

12/

8/20

12 F

utur

e (2

018)

AM

Pea

k H

our (

with

impr

ovem

ents

)Sy

nchr

o 7

- R

epor

tPa

ge 1

5

Mov

emen

tEB

LEB

TEB

RW

BLW

BTW

BRN

BLN

BTN

BRSB

LSB

TSB

RLa

ne C

onfig

urat

ions

Sign

Con

trol

Stop

Stop

Yiel

dYi

eld

Volu

me

(vph

)0

00

00

00

024

572

1021

231

Peak

Hou

r Fac

tor

0.92

0.92

0.92

0.92

0.92

0.92

0.96

0.96

0.96

0.83

0.83

0.83

Hou

rly fl

ow ra

te (v

ph)

00

00

00

00

255

8712

3027

8

Dire

ctio

n, L

ane

#N

B 1

SB 1

Volu

me

Tota

l (vp

h)25

515

95Vo

lum

e Le

ft (v

ph)

087

Volu

me

Rig

ht (v

ph)

255

278

Had

j (s)

-0.4

3-0

.06

Dep

artu

re H

eadw

ay (s

)3.

23.

8D

egre

e U

tiliz

atio

n, x

0.23

1.70

Cap

acity

(veh

/h)

1122

948

Con

trol D

elay

(s)

7.1

331.

6Ap

proa

ch D

elay

(s)

7.1

331.

6Ap

proa

ch L

OS

AF

Inte

rsec

tion

Sum

mar

yD

elay

28

6.9

HC

M L

evel

of S

ervi

ceF

Inte

rsec

tion

Cap

acity

Util

izat

ion

102.

9%IC

U L

evel

of S

ervi

ce

GAn

alys

is P

erio

d (m

in)

15

Page 173: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Que

ues

1: R

oute

2 &

Rou

te 1

62/

12/2

013

130

Cam

brid

gepa

rk D

rive

5:00

pm

12/

8/20

12 F

utur

e (2

018)

PM

Pea

k H

our (

with

Impr

ovem

ents

)Sy

nchr

o 7

- R

epor

tPa

ge 1

Lane

Gro

upW

BTSW

RLa

ne G

roup

Flo

w (v

ph)

2439

858

v/c

Rat

io0.

950.

73C

ontro

l Del

ay6.

128

.8Q

ueue

Del

ay10

9.9

0.0

Tota

l Del

ay11

6.0

28.8

Que

ue L

engt

h 50

th (f

t)47

254

Que

ue L

engt

h 95

th (f

t)m

3633

4In

tern

al L

ink

Dis

t (ft)

89Tu

rn B

ay L

engt

h (ft

)Ba

se C

apac

ity (v

ph)

2568

1181

Star

vatio

n C

ap R

educ

tn61

50

Spillb

ack

Cap

Red

uctn

00

Stor

age

Cap

Red

uctn

00

Red

uced

v/c

Rat

io1.

250.

73

Inte

rsec

tion

Sum

mar

ym

V

olum

e fo

r 95t

h pe

rcen

tile

queu

e is

met

ered

by

upst

ream

sig

nal.

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s1:

Rou

te 2

& R

oute

16

2/12

/201

3

130

Cam

brid

gepa

rk D

rive

5:00

pm

12/

8/20

12 F

utur

e (2

018)

PM

Pea

k H

our (

with

Impr

ovem

ents

)Sy

nchr

o 7

- R

epor

tPa

ge 2

Mov

emen

tEB

LEB

TW

BTW

BRSW

LSW

RLa

ne C

onfig

urat

ions

Volu

me

(vph

)0

022

680

083

2Id

eal F

low

(vph

pl)

1900

1900

1900

1900

1900

1900

Tota

l Los

t tim

e (s

)4.

04.

5La

ne U

til. F

acto

r0.

910.

88Fr

t1.

000.

85Fl

t Pro

tect

ed1.

001.

00Sa

td. F

low

(pro

t)51

3628

42Fl

t Per

mitt

ed1.

001.

00Sa

td. F

low

(per

m)

5136

2842

Peak

-hou

r fac

tor,

PHF

0.92

0.92

0.93

0.92

0.92

0.97

Adj.

Flow

(vph

)0

024

390

085

8R

TOR

Red

uctio

n (v

ph)

00

00

01

Lane

Gro

up F

low

(vph

)0

024

390

085

7H

eavy

Veh

icle

s (%

)2%

2%1%

2%2%

0%Tu

rn T

ype

cust

omPr

otec

ted

Phas

es2

3 4

Perm

itted

Pha

ses

Actu

ated

Gre

en, G

(s)

49.0

41.0

Effe

ctiv

e G

reen

, g (s

)50

.041

.5Ac

tuat

ed g

/C R

atio

0.50

0.42

Cle

aran

ce T

ime

(s)

5.0

Lane

Grp

Cap

(vph

)25

6811

79v/

s R

atio

Pro

tc0

.47

c0.3

0v/

s R

atio

Per

mv/

c R

atio

0.95

0.73

Uni

form

Del

ay, d

123

.824

.5Pr

ogre

ssio

n Fa

ctor

0.16

1.00

Incr

emen

tal D

elay

, d2

1.1

3.9

Del

ay (s

)4.

928

.4Le

vel o

f Ser

vice

AC

Appr

oach

Del

ay (s

)0.

04.

928

.4Ap

proa

ch L

OS

AA

C

Inte

rsec

tion

Sum

mar

yH

CM

Ave

rage

Con

trol D

elay

11.0

HC

M L

evel

of S

ervi

ceB

HC

M V

olum

e to

Cap

acity

ratio

0.85

Actu

ated

Cyc

le L

engt

h (s

) 10

0.0

Sum

of l

ost t

ime

(s)

8.5

Inte

rsec

tion

Cap

acity

Util

izat

ion

80.0

%IC

U L

evel

of S

ervi

ceD

Anal

ysis

Per

iod

(min

)15

c

Crit

ical

Lan

e G

roup

Page 174: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Que

ues

2: R

oute

2 &

Ale

wife

Bro

ok P

arkw

ay2/

12/2

013

130

Cam

brid

gepa

rk D

rive

5:00

pm

12/

8/20

12 F

utur

e (2

018)

PM

Pea

k H

our (

with

Impr

ovem

ents

)Sy

nchr

o 7

- R

epor

tPa

ge 3

Lane

Gro

upEB

LW

BRSB

TN

WT

Lane

Gro

up F

low

(vph

)65

956

441

618

85v/

c R

atio

0.96

1.19

0.75

1.32

Con

trol D

elay

65.5

105.

849

.717

5.6

Que

ue D

elay

0.0

14.4

0.0

17.1

Tota

l Del

ay65

.512

0.2

49.7

192.

7Q

ueue

Len

gth

50th

(ft)

215

~428

134

~104

2Q

ueue

Len

gth

95th

(ft)

#309

m#4

74#1

89#1

218

Inte

rnal

Lin

k D

ist (

ft)10

621

0Tu

rn B

ay L

engt

h (ft

)Ba

se C

apac

ity (v

ph)

686

475

553

1425

Star

vatio

n C

ap R

educ

tn0

00

0Sp

illbac

k C

ap R

educ

tn0

130

40St

orag

e C

ap R

educ

tn0

00

0R

educ

ed v

/c R

atio

0.96

1.22

0.75

1.36

Inte

rsec

tion

Sum

mar

y~

Vo

lum

e ex

ceed

s ca

paci

ty, q

ueue

is th

eore

tical

ly in

finite

.

Que

ue s

how

n is

max

imum

afte

r tw

o cy

cles

.#

95

th p

erce

ntile

vol

ume

exce

eds

capa

city

, que

ue m

ay b

e lo

nger

.

Que

ue s

how

n is

max

imum

afte

r tw

o cy

cles

.m

V

olum

e fo

r 95t

h pe

rcen

tile

queu

e is

met

ered

by

upst

ream

sig

nal.

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s2:

Rou

te 2

& A

lew

ife B

rook

Par

kway

2/12

/201

3

130

Cam

brid

gepa

rk D

rive

5:00

pm

12/

8/20

12 F

utur

e (2

018)

PM

Pea

k H

our (

with

Impr

ovem

ents

)Sy

nchr

o 7

- R

epor

tPa

ge 4

Mov

emen

tEB

LW

BRSB

TN

WT

Lane

Con

figur

atio

nsVo

lum

e (v

ph)

573

496

395

1772

Idea

l Flo

w (v

phpl

)19

0019

0019

0019

00La

ne W

idth

9

1211

12To

tal L

ost t

ime

(s)

4.0

4.0

4.0

4.0

Lane

Util

. Fac

tor

0.97

1.00

0.95

*0.7

5Fr

t1.

000.

861.

001.

00Fl

t Pro

tect

ed0.

951.

001.

001.

00Sa

td. F

low

(pro

t)31

2095

034

5528

50Fl

t Per

mitt

ed0.

951.

001.

001.

00Sa

td. F

low

(per

m)

3120

950

3455

2850

Peak

-hou

r fac

tor,

PHF

0.87

0.88

0.95

0.94

Adj.

Flow

(vph

)65

956

441

618

85R

TOR

Red

uctio

n (v

ph)

00

00

Lane

Gro

up F

low

(vph

)65

956

441

618

85H

eavy

Veh

icle

s (%

)1%

2%1%

1%Tu

rn T

ype

Prot

cust

omPr

otec

ted

Phas

es4

3Pe

rmitt

ed P

hase

s2

2Ac

tuat

ed G

reen

, G (s

)21

.049

.015

.049

.0Ef

fect

ive

Gre

en, g

(s)

22.0

50.0

16.0

50.0

Actu

ated

g/C

Rat

io0.

220.

500.

160.

50C

lear

ance

Tim

e (s

)5.

05.

05.

05.

0La

ne G

rp C

ap (v

ph)

686

475

553

1425

v/s

Rat

io P

rot

c0.2

1c0

.12

v/s

Rat

io P

erm

0.59

c0.6

6v/

c R

atio

0.96

1.19

0.75

1.32

Uni

form

Del

ay, d

138

.625

.040

.125

.0Pr

ogre

ssio

n Fa

ctor

1.00

0.23

1.00

1.00

Incr

emen

tal D

elay

, d2

26.0

92.4

9.1

150.

3D

elay

(s)

64.5

98.0

49.2

175.

3Le

vel o

f Ser

vice

EF

DF

Appr

oach

Del

ay (s

)49

.217

5.3

Appr

oach

LO

SD

F

Inte

rsec

tion

Sum

mar

yH

CM

Ave

rage

Con

trol D

elay

127.

3H

CM

Lev

el o

f Ser

vice

FH

CM

Vol

ume

to C

apac

ity ra

tio1.

13Ac

tuat

ed C

ycle

Len

gth

(s)

100.

0Su

m o

f los

t tim

e (s

)12

.0In

ters

ectio

n C

apac

ity U

tiliz

atio

n12

0.3%

ICU

Lev

el o

f Ser

vice

HAn

alys

is P

erio

d (m

in)

15c

C

ritic

al L

ane

Gro

up

Page 175: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Que

ues

3: A

lew

ife B

rook

Par

kway

& R

oute

22/

12/2

013

130

Cam

brid

gepa

rk D

rive

5:00

pm

12/

8/20

12 F

utur

e (2

018)

PM

Pea

k H

our (

with

Impr

ovem

ents

)Sy

nchr

o 7

- R

epor

tPa

ge 5

Lane

Gro

upSB

TSE

RLa

ne G

roup

Flo

w (v

ph)

416

1295

v/c

Rat

io0.

730.

60C

ontro

l Del

ay23

.86.

6Q

ueue

Del

ay0.

00.

0To

tal D

elay

23.9

6.6

Que

ue L

engt

h 50

th (f

t)26

163

Que

ue L

engt

h 95

th (f

t)m

7616

5In

tern

al L

ink

Dis

t (ft)

189

Turn

Bay

Len

gth

(ft)

Base

Cap

acity

(vph

)57

221

60St

arva

tion

Cap

Red

uctn

20

Spillb

ack

Cap

Red

uctn

00

Stor

age

Cap

Red

uctn

00

Red

uced

v/c

Rat

io0.

730.

60

Inte

rsec

tion

Sum

mar

ym

V

olum

e fo

r 95t

h pe

rcen

tile

queu

e is

met

ered

by

upst

ream

sig

nal.

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s3:

Ale

wife

Bro

ok P

arkw

ay &

Rou

te 2

2/12

/201

3

130

Cam

brid

gepa

rk D

rive

5:00

pm

12/

8/20

12 F

utur

e (2

018)

PM

Pea

k H

our (

with

Impr

ovem

ents

)Sy

nchr

o 7

- R

epor

tPa

ge 6

Mov

emen

tN

BLN

BTSB

TSB

RSE

LSE

RLa

ne C

onfig

urat

ions

Volu

me

(vph

)0

039

50

010

23Id

eal F

low

(vph

pl)

1900

1900

1900

1900

1900

1900

Tota

l Los

t tim

e (s

)4.

04.

5La

ne U

til. F

acto

r0.

950.

88Fr

t1.

000.

85Fl

t Pro

tect

ed1.

001.

00Sa

td. F

low

(pro

t)35

7428

42Fl

t Per

mitt

ed1.

001.

00Sa

td. F

low

(per

m)

3574

2842

Peak

-hou

r fac

tor,

PHF

0.92

0.92

0.95

0.96

0.92

0.79

Adj.

Flow

(vph

)0

041

60

012

95R

TOR

Red

uctio

n (v

ph)

00

00

014

Lane

Gro

up F

low

(vph

)0

041

60

012

81H

eavy

Veh

icle

s (%

)2%

2%1%

0%2%

0%Tu

rn T

ype

cust

omPr

otec

ted

Phas

es3

2 4

Perm

itted

Pha

ses

Actu

ated

Gre

en, G

(s)

15.0

75.0

Effe

ctiv

e G

reen

, g (s

)16

.075

.5Ac

tuat

ed g

/C R

atio

0.16

0.76

Cle

aran

ce T

ime

(s)

5.0

Lane

Grp

Cap

(vph

)57

221

46v/

s R

atio

Pro

tc0

.12

c0.4

5v/

s R

atio

Per

mv/

c R

atio

0.73

0.60

Uni

form

Del

ay, d

139

.95.

5Pr

ogre

ssio

n Fa

ctor

0.46

1.00

Incr

emen

tal D

elay

, d2

5.1

1.2

Del

ay (s

)23

.66.

7Le

vel o

f Ser

vice

CA

Appr

oach

Del

ay (s

)0.

023

.66.

7Ap

proa

ch L

OS

AC

A

Inte

rsec

tion

Sum

mar

yH

CM

Ave

rage

Con

trol D

elay

10.8

HC

M L

evel

of S

ervi

ceB

HC

M V

olum

e to

Cap

acity

ratio

0.62

Actu

ated

Cyc

le L

engt

h (s

) 10

0.0

Sum

of l

ost t

ime

(s)

8.5

Inte

rsec

tion

Cap

acity

Util

izat

ion

53.8

%IC

U L

evel

of S

ervi

ceA

Anal

ysis

Per

iod

(min

)15

c

Crit

ical

Lan

e G

roup

Page 176: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Que

ues

4: R

oute

2 &

Ale

wife

Bro

ok P

arkw

ay2/

12/2

013

130

Cam

brid

gepa

rk D

rive

5:00

pm

12/

8/20

12 F

utur

e (2

018)

PM

Pea

k H

our (

with

Impr

ovem

ents

)Sy

nchr

o 7

- R

epor

tPa

ge 7

Lane

Gro

upW

BTW

BRN

BTLa

ne G

roup

Flo

w (v

ph)

557

448

351

v/c

Rat

io0.

940.

490.

81C

ontro

l Del

ay50

.06.

456

.6Q

ueue

Del

ay19

.10.

00.

0To

tal D

elay

69.1

6.4

56.6

Que

ue L

engt

h 50

th (f

t)55

310

611

5Q

ueue

Len

gth

95th

(ft)

#934

177

#186

Inte

rnal

Lin

k D

ist (

ft)93

133

Turn

Bay

Len

gth

(ft)

200

Base

Cap

acity

(vph

)59

491

343

4St

arva

tion

Cap

Red

uctn

00

0Sp

illbac

k C

ap R

educ

tn53

00

Stor

age

Cap

Red

uctn

00

0R

educ

ed v

/c R

atio

1.03

0.49

0.81

Inte

rsec

tion

Sum

mar

y#

95

th p

erce

ntile

vol

ume

exce

eds

capa

city

, que

ue m

ay b

e lo

nger

.

Que

ue s

how

n is

max

imum

afte

r tw

o cy

cles

.

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s4:

Rou

te 2

& A

lew

ife B

rook

Par

kway

2/12

/201

3

130

Cam

brid

gepa

rk D

rive

5:00

pm

12/

8/20

12 F

utur

e (2

018)

PM

Pea

k H

our (

with

Impr

ovem

ents

)Sy

nchr

o 7

- R

epor

tPa

ge 8

Mov

emen

tEB

LEB

TEB

RW

BLW

BTW

BRN

BLN

BTN

BRSB

LSB

TSB

RLa

ne C

onfig

urat

ions

Volu

me

(vph

)0

00

049

639

90

337

00

00

Idea

l Flo

w (v

phpl

)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00La

ne W

idth

12

1212

1212

1412

1112

1212

12To

tal L

ost t

ime

(s)

4.5

5.0

4.5

Lane

Util

. Fac

tor

*0.5

8*0

.75

0.95

Frt

1.00

0.85

1.00

Flt P

rote

cted

1.00

1.00

1.00

Satd

. Flo

w (p

rot)

1200

1200

2800

Flt P

erm

itted

1.00

1.00

1.00

Satd

. Flo

w (p

erm

)12

0012

0028

00Pe

ak-h

our f

acto

r, PH

F0.

920.

920.

920.

920.

890.

890.

770.

960.

770.

920.

920.

92Ad

j. Fl

ow (v

ph)

00

00

557

448

035

10

00

0R

TOR

Red

uctio

n (v

ph)

00

00

013

00

00

00

Lane

Gro

up F

low

(vph

)0

00

055

743

50

351

00

00

Hea

vy V

ehic

les

(%)

2%2%

2%2%

1%1%

0%1%

0%2%

2%2%

Turn

Typ

ecu

stom

Prot

ecte

d Ph

ases

22

43

Perm

itted

Pha

ses

Actu

ated

Gre

en, G

(s)

49.0

75.0

15.0

Effe

ctiv

e G

reen

, g (s

)49

.575

.015

.5Ac

tuat

ed g

/C R

atio

0.50

0.75

0.16

Cle

aran

ce T

ime

(s)

5.0

5.0

Lane

Grp

Cap

(vph

)59

490

043

4v/

s R

atio

Pro

tc0

.46

c0.3

6c0

.13

v/s

Rat

io P

erm

v/c

Rat

io0.

940.

480.

81U

nifo

rm D

elay

, d1

23.8

4.9

40.8

Prog

ress

ion

Fact

or1.

001.

001.

00In

crem

enta

l Del

ay, d

224

.41.

914

.9D

elay

(s)

48.2

6.8

55.8

Leve

l of S

ervi

ceD

AE

Appr

oach

Del

ay (s

)0.

029

.755

.80.

0Ap

proa

ch L

OS

AC

EA

Inte

rsec

tion

Sum

mar

yH

CM

Ave

rage

Con

trol D

elay

36.5

HC

M L

evel

of S

ervi

ceD

HC

M V

olum

e to

Cap

acity

ratio

0.82

Actu

ated

Cyc

le L

engt

h (s

) 10

0.0

Sum

of l

ost t

ime

(s)

14.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

42.9

%IC

U L

evel

of S

ervi

ceA

Anal

ysis

Per

iod

(min

)15

c

Crit

ical

Lan

e G

roup

Page 177: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Que

ues

5: C

ambr

idge

park

Driv

e &

Ale

wife

Bro

ok P

arkw

ay2/

12/2

013

130

Cam

brid

gepa

rk D

rive

5:00

pm

12/

8/20

12 F

utur

e (2

018)

PM

Pea

k H

our (

with

Impr

ovem

ents

)Sy

nchr

o 7

- R

epor

tPa

ge 9

Lane

Gro

upEB

LN

BLN

BTSB

TSB

RLa

ne G

roup

Flo

w (v

ph)

1210

287

1868

1621

67v/

c R

atio

1.27

1.37

1.24

1.35

0.05

Con

trol D

elay

157.

119

2.9

125.

419

2.2

0.1

Que

ue D

elay

316.

90.

027

3.3

203.

30.

0To

tal D

elay

474.

019

2.9

398.

739

5.5

0.1

Que

ue L

engt

h 50

th (f

t)~4

94~1

85~7

62~7

150

Que

ue L

engt

h 95

th (f

t)m

#586

m53

m11

6#7

670

Inte

rnal

Lin

k D

ist (

ft)39

515

638

3Tu

rn B

ay L

engt

h (ft

)50

Base

Cap

acity

(vph

)95

221

015

1012

0213

86St

arva

tion

Cap

Red

uctn

00

498

00

Spillb

ack

Cap

Red

uctn

340

00

302

0St

orag

e C

ap R

educ

tn0

00

00

Red

uced

v/c

Rat

io1.

981.

371.

851.

800.

05

Inte

rsec

tion

Sum

mar

y~

Vo

lum

e ex

ceed

s ca

paci

ty, q

ueue

is th

eore

tical

ly in

finite

.

Que

ue s

how

n is

max

imum

afte

r tw

o cy

cles

.#

95

th p

erce

ntile

vol

ume

exce

eds

capa

city

, que

ue m

ay b

e lo

nger

.

Que

ue s

how

n is

max

imum

afte

r tw

o cy

cles

.m

V

olum

e fo

r 95t

h pe

rcen

tile

queu

e is

met

ered

by

upst

ream

sig

nal.

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s5:

Cam

brid

gepa

rk D

rive

& A

lew

ife B

rook

Par

kway

2/12

/201

3

130

Cam

brid

gepa

rk D

rive

5:00

pm

12/

8/20

12 F

utur

e (2

018)

PM

Pea

k H

our (

with

Impr

ovem

ents

)Sy

nchr

o 7

- R

epor

tPa

ge 1

0

Mov

emen

tEB

LEB

RN

BLN

BTSB

TSB

RLa

ne C

onfig

urat

ions

Volu

me

(vph

)42

866

125

816

8113

6256

Idea

l Flo

w (v

phpl

)19

0019

0019

0019

0019

0019

00La

ne W

idth

11

1212

1211

8To

tal L

ost t

ime

(s)

3.6

3.6

3.6

3.6

3.0

Lane

Util

. Fac

tor

0.97

1.00

0.95

0.95

1.00

Frt

0.91

1.00

1.00

1.00

0.85

Flt P

rote

cted

0.98

0.95

1.00

1.00

1.00

Satd

. Flo

w (p

rot)

1774

1805

3400

3600

1386

Flt P

erm

itted

0.98

0.12

1.00

1.00

1.00

Satd

. Flo

w (p

erm

)17

7422

834

0036

0013

86Pe

ak-h

our f

acto

r, PH

F0.

900.

900.

900.

900.

840.

84Ad

j. Fl

ow (v

ph)

476

734

287

1868

1621

67R

TOR

Red

uctio

n (v

ph)

930

00

00

Lane

Gro

up F

low

(vph

)11

170

287

1868

1621

67H

eavy

Veh

icle

s (%

)2%

2%0%

0%1%

1%Tu

rn T

ype

D.P

+PFr

eePr

otec

ted

Phas

es3

42

1 2

1Pe

rmitt

ed P

hase

s1

Free

Actu

ated

Gre

en, G

(s)

47.4

38.8

43.4

32.4

100.

0Ef

fect

ive

Gre

en, g

(s)

48.4

40.8

44.4

33.4

100.

0Ac

tuat

ed g

/C R

atio

0.48

0.41

0.44

0.33

1.00

Cle

aran

ce T

ime

(s)

4.6

4.6

Vehi

cle

Exte

nsio

n (s

)3.

03.

0La

ne G

rp C

ap (v

ph)

859

210

1510

1202

1386

v/s

Rat

io P

rot

c0.6

30.

10c0

.55

0.45

v/s

Rat

io P

erm

c0.4

60.

05v/

c R

atio

1.30

1.37

1.24

1.35

0.05

Uni

form

Del

ay, d

125

.843

.127

.833

.30.

0Pr

ogre

ssio

n Fa

ctor

1.54

0.62

0.49

1.00

1.00

Incr

emen

tal D

elay

, d2

140.

216

7.8

107.

216

2.5

0.1

Del

ay (s

)18

0.1

194.

512

0.8

195.

80.

1Le

vel o

f Ser

vice

FF

FF

AAp

proa

ch D

elay

(s)

180.

113

0.6

188.

0Ap

proa

ch L

OS

FF

F

Inte

rsec

tion

Sum

mar

yH

CM

Ave

rage

Con

trol D

elay

161.

6H

CM

Lev

el o

f Ser

vice

FH

CM

Vol

ume

to C

apac

ity ra

tio1.

30Ac

tuat

ed C

ycle

Len

gth

(s)

100.

0Su

m o

f los

t tim

e (s

)7.

2In

ters

ectio

n C

apac

ity U

tiliz

atio

n95

.1%

ICU

Lev

el o

f Ser

vice

FAn

alys

is P

erio

d (m

in)

15c

C

ritic

al L

ane

Gro

up

Page 178: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Que

ues

6: R

indg

e A

ve. &

Ale

wife

Bro

ok P

arkw

ay2/

12/2

013

130

Cam

brid

gepa

rk D

rive

5:00

pm

12/

8/20

12 F

utur

e (2

018)

PM

Pea

k H

our (

with

Impr

ovem

ents

)Sy

nchr

o 7

- R

epor

tPa

ge 1

1

Lane

Gro

upW

BLW

BRN

BTSB

TLa

ne G

roup

Flo

w (v

ph)

199

522

1923

2182

v/c

Rat

io0.

590.

842.

131.

42C

ontro

l Del

ay44

.621

.853

5.1

209.

4Q

ueue

Del

ay0.

057

.141

.195

.3To

tal D

elay

44.6

78.9

576.

230

4.7

Que

ue L

engt

h 50

th (f

t)11

654

~110

2~1

032

Que

ue L

engt

h 95

th (f

t)18

6#2

26#1

251

m#6

43In

tern

al L

ink

Dis

t (ft)

628

2121

156

Turn

Bay

Len

gth

(ft)

100

Base

Cap

acity

(vph

)33

962

290

115

34St

arva

tion

Cap

Red

uctn

00

019

9Sp

illbac

k C

ap R

educ

tn0

154

370

Stor

age

Cap

Red

uctn

00

00

Red

uced

v/c

Rat

io0.

591.

122.

231.

63

Inte

rsec

tion

Sum

mar

y~

Vo

lum

e ex

ceed

s ca

paci

ty, q

ueue

is th

eore

tical

ly in

finite

.

Que

ue s

how

n is

max

imum

afte

r tw

o cy

cles

.#

95

th p

erce

ntile

vol

ume

exce

eds

capa

city

, que

ue m

ay b

e lo

nger

.

Que

ue s

how

n is

max

imum

afte

r tw

o cy

cles

.m

V

olum

e fo

r 95t

h pe

rcen

tile

queu

e is

met

ered

by

upst

ream

sig

nal.

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s6:

Rin

dge

Ave

. & A

lew

ife B

rook

Par

kway

2/12

/201

3

130

Cam

brid

gepa

rk D

rive

5:00

pm

12/

8/20

12 F

utur

e (2

018)

PM

Pea

k H

our (

with

Impr

ovem

ents

)Sy

nchr

o 7

- R

epor

tPa

ge 1

2

Mov

emen

tW

BLW

BRN

BTN

BRSB

LSB

TLa

ne C

onfig

urat

ions

Volu

me

(vph

)17

545

914

8025

10

2007

Idea

l Flo

w (v

phpl

)19

0019

0019

0019

0019

0019

00La

ne W

idth

10

911

1212

11To

tal L

ost t

ime

(s)

3.6

3.6

3.6

3.6

Lane

Util

. Fac

tor

1.00

1.00

*0.9

00.

95Fr

pb, p

ed/b

ikes

1.00

1.00

1.00

1.00

Flpb

, ped

/bik

es1.

001.

001.

001.

00Fr

t1.

000.

850.

981.

00Fl

t Pro

tect

ed0.

951.

001.

001.

00Sa

td. F

low

(pro

t)17

4714

3920

0034

55Fl

t Per

mitt

ed0.

951.

001.

001.

00Sa

td. F

low

(per

m)

1747

1439

2000

3455

Peak

-hou

r fac

tor,

PHF

0.88

0.88

0.90

0.90

0.92

0.92

Adj.

Flow

(vph

)19

952

216

4427

90

2182

RTO

R R

educ

tion

(vph

)0

343

130

00

Lane

Gro

up F

low

(vph

)19

917

919

100

021

82C

onfl.

Bik

es (#

/hr)

4H

eavy

Veh

icle

s (%

)1%

1%0%

0%1%

1%Tu

rn T

ype

Prot

Prot

ecte

d Ph

ases

33

1 2

1 2

Perm

itted

Pha

ses

Actu

ated

Gre

en, G

(s)

18.4

18.4

43.4

43.4

Effe

ctiv

e G

reen

, g (s

)19

.419

.444

.444

.4Ac

tuat

ed g

/C R

atio

0.19

0.19

0.44

0.44

Cle

aran

ce T

ime

(s)

4.6

4.6

Vehi

cle

Exte

nsio

n (s

)3.

03.

0La

ne G

rp C

ap (v

ph)

339

279

888

1534

v/s

Rat

io P

rot

0.11

c0.1

2c0

.96

0.63

v/s

Rat

io P

erm

v/c

Rat

io0.

590.

642.

151.

42U

nifo

rm D

elay

, d1

36.7

37.1

27.8

27.8

Prog

ress

ion

Fact

or1.

001.

001.

000.

47In

crem

enta

l Del

ay, d

22.

65.

052

1.8

190.

4D

elay

(s)

39.2

42.1

549.

620

3.5

Leve

l of S

ervi

ceD

DF

FAp

proa

ch D

elay

(s)

41.3

549.

620

3.5

Appr

oach

LO

SD

FF

Inte

rsec

tion

Sum

mar

yH

CM

Ave

rage

Con

trol D

elay

317.

2H

CM

Lev

el o

f Ser

vice

FH

CM

Vol

ume

to C

apac

ity ra

tio1.

69Ac

tuat

ed C

ycle

Len

gth

(s)

100.

0Su

m o

f los

t tim

e (s

)36

.2In

ters

ectio

n C

apac

ity U

tiliz

atio

n84

.0%

ICU

Lev

el o

f Ser

vice

EAn

alys

is P

erio

d (m

in)

15c

C

ritic

al L

ane

Gro

up

Page 179: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Que

ues

7: C

ambr

idge

park

Driv

e &

Ale

wife

Acc

ess

Roa

d2/

12/2

013

130

Cam

brid

gepa

rk D

rive

5:00

pm

12/

8/20

12 F

utur

e (2

018)

PM

Pea

k H

our (

with

Impr

ovem

ents

)Sy

nchr

o 7

- R

epor

tPa

ge 1

3

Lane

Gro

upEB

TW

BTW

BRN

BTSB

LSB

TLa

ne G

roup

Flo

w (v

ph)

489

295

8512

442

142

1v/

c R

atio

0.66

0.44

0.16

0.27

0.99

0.81

Con

trol D

elay

27.3

7.9

0.7

11.4

80.3

44.8

Que

ue D

elay

0.0

0.0

0.0

0.0

0.0

0.0

Tota

l Del

ay27

.37.

90.

711

.480

.344

.8Q

ueue

Len

gth

50th

(ft)

238

621

1228

325

3Q

ueue

Len

gth

95th

(ft)

342

m53

m1

35#4

81#4

09In

tern

al L

ink

Dis

t (ft)

145

395

322

523

Turn

Bay

Len

gth

(ft)

Base

Cap

acity

(vph

)74

267

152

945

842

552

1St

arva

tion

Cap

Red

uctn

00

00

00

Spillb

ack

Cap

Red

uctn

00

00

00

Stor

age

Cap

Red

uctn

00

00

00

Red

uced

v/c

Rat

io0.

660.

440.

160.

270.

990.

81

Inte

rsec

tion

Sum

mar

y#

95

th p

erce

ntile

vol

ume

exce

eds

capa

city

, que

ue m

ay b

e lo

nger

.

Que

ue s

how

n is

max

imum

afte

r tw

o cy

cles

.m

V

olum

e fo

r 95t

h pe

rcen

tile

queu

e is

met

ered

by

upst

ream

sig

nal.

HC

M S

igna

lized

Inte

rsec

tion

Cap

acity

Ana

lysi

s7:

Cam

brid

gepa

rk D

rive

& A

lew

ife A

cces

s R

oad

2/12

/201

3

130

Cam

brid

gepa

rk D

rive

5:00

pm

12/

8/20

12 F

utur

e (2

018)

PM

Pea

k H

our (

with

Impr

ovem

ents

)Sy

nchr

o 7

- R

epor

tPa

ge 1

4

Mov

emen

tEB

LEB

TEB

RW

BLW

BTW

BRN

BLN

BTN

BRSB

LSB

TSB

RLa

ne C

onfig

urat

ions

Volu

me

(vph

)48

371

1150

197

7113

472

657

3360

Idea

l Flo

w (v

phpl

)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00La

ne W

idth

12

1112

1211

1112

1412

1212

12To

tal L

ost t

ime

(s)

1.0

1.0

1.0

1.0

7.0

1.0

Lane

Util

. Fac

tor

1.00

1.00

1.00

1.00

0.95

0.95

Frpb

, ped

/bik

es1.

001.

000.

700.

971.

000.

99Fl

pb, p

ed/b

ikes

0.98

1.00

1.00

1.00

1.00

1.00

Frt

1.00

1.00

0.85

0.89

1.00

0.98

Flt P

rote

cted

0.99

0.99

1.00

0.99

0.95

0.96

Satd

. Flo

w (p

rot)

1789

1815

1095

1728

1698

1659

Flt P

erm

itted

0.94

0.83

1.00

0.99

0.95

0.96

Satd

. Flo

w (p

erm

)16

8215

2310

9517

2816

9816

59Pe

ak-h

our f

acto

r, PH

F0.

880.

880.

880.

840.

840.

840.

720.

720.

720.

890.

890.

89Ad

j. Fl

ow (v

ph)

5542

212

6023

585

186

100

738

3767

RTO

R R

educ

tion

(vph

)0

10

00

480

780

07

0La

ne G

roup

Flo

w (v

ph)

048

80

029

537

046

042

141

40

Con

fl. P

eds.

(#/h

r)11

811

1111

832

1111

32C

onfl.

Bik

es (#

/hr)

45

2H

eavy

Veh

icle

s (%

)0%

0%0%

0%0%

0%1%

1%1%

1%1%

1%Tu

rn T

ype

Perm

Perm

Perm

Split

Split

Prot

ecte

d Ph

ases

66

44

22

Perm

itted

Pha

ses

66

6Ac

tuat

ed G

reen

, G (s

)40

.040

.040

.018

.027

.027

.0Ef

fect

ive

Gre

en, g

(s)

44.0

44.0

44.0

22.0

25.0

31.0

Actu

ated

g/C

Rat

io0.

440.

440.

440.

220.

250.

31C

lear

ance

Tim

e (s

)5.

05.

05.

05.

05.

05.

0La

ne G

rp C

ap (v

ph)

740

670

482

380

425

514

v/s

Rat

io P

rot

c0.0

3c0

.25

0.25

v/s

Rat

io P

erm

c0.2

90.

190.

03v/

c R

atio

0.66

0.44

0.08

0.12

0.99

0.81

Uni

form

Del

ay, d

122

.119

.416

.231

.337

.431

.7Pr

ogre

ssio

n Fa

ctor

1.00

0.39

0.16

1.00

1.00

1.00

Incr

emen

tal D

elay

, d2

4.6

0.2

0.0

0.7

41.4

12.7

Del

ay (s

)26

.77.

72.

731

.978

.844

.4Le

vel o

f Ser

vice

CA

AC

ED

Appr

oach

Del

ay (s

)26

.76.

631

.961

.6Ap

proa

ch L

OS

CA

CE

Inte

rsec

tion

Sum

mar

yH

CM

Ave

rage

Con

trol D

elay

38.9

HC

M L

evel

of S

ervi

ceD

HC

M V

olum

e to

Cap

acity

ratio

0.61

Actu

ated

Cyc

le L

engt

h (s

) 10

0.0

Sum

of l

ost t

ime

(s)

9.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

78.2

%IC

U L

evel

of S

ervi

ceD

Anal

ysis

Per

iod

(min

)15

c

Crit

ical

Lan

e G

roup

Page 180: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

HC

M U

nsig

naliz

ed In

ters

ectio

n C

apac

ity A

naly

sis

8: A

lew

ife A

cces

s R

oad

& R

oute

2 R

amp

2/12

/201

3

130

Cam

brid

gepa

rk D

rive

5:00

pm

12/

8/20

12 F

utur

e (2

018)

PM

Pea

k H

our (

with

Impr

ovem

ents

)Sy

nchr

o 7

- R

epor

tPa

ge 1

5

Mov

emen

tEB

LEB

TEB

RW

BLW

BTW

BRN

BLN

BTN

BRSB

LSB

TSB

RLa

ne C

onfig

urat

ions

Sign

Con

trol

Stop

Stop

Yiel

dYi

eld

Volu

me

(vph

)0

00

00

00

056

632

862

43

Peak

Hou

r Fac

tor

0.92

0.92

0.92

0.92

0.92

0.92

0.92

0.92

0.93

0.92

0.87

0.87

Hou

rly fl

ow ra

te (v

ph)

00

00

00

00

609

357

717

3

Dire

ctio

n, L

ane

#N

B 1

SB 1

Volu

me

Tota

l (vp

h)60

910

77Vo

lum

e Le

ft (v

ph)

035

7Vo

lum

e R

ight

(vph

)60

93

Had

j (s)

-0.5

30.

12D

epar

ture

Hea

dway

(s)

3.2

4.0

Deg

ree

Util

izat

ion,

x0.

541.

20C

apac

ity (v

eh/h

)11

1790

8C

ontro

l Del

ay (s

)9.

911

7.4

Appr

oach

Del

ay (s

)9.

911

7.4

Appr

oach

LO

SA

F

Inte

rsec

tion

Sum

mar

yD

elay

78

.6H

CM

Lev

el o

f Ser

vice

FIn

ters

ectio

n C

apac

ity U

tiliz

atio

n 10

1.5%

ICU

Lev

el o

f Ser

vice

G

Anal

ysis

Per

iod

(min

)15

Page 181: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

Crash Data Reports

Page 182: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

This Page Left Blank Intentionally

Page 183: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

130 CPD Crash Data

Concord Tpke / Alewife Brook Pkwy

Alewife Brook Pkwy / Cambridge Park Dr

Alewife Brook Pkwy / Rindge Ave

Cambridge Park Dr / Alewife Station

Access Rd

Route 2 Ramp / Alewife Station

Access Rd

37 8 18 2 0

23 12 14 1 0

23 5 8 1 1

83 25 40 4 1

27.67 8.33 13.33 1.33 1.00

19 3 3 3 0

2 0 2 0 0

46 18 29 1 1

1 0 0 0 0

2 0 0 0 0

9 2 1 0 0

4 1 3 0 0

0 0 0 0 0

0 1 2 0 0

83 25 40 4 1

1 0 0 0 0

23 3 12 1 0

56 22 25 3 1

3 0 3 0 0

0 0 0 0 0

83 25 40 4 1

13 8 4 0 0

8 5 0 0 1

1 0 3 0 0

43 11 23 3 0

18 1 10 1 0

83 25 40 4 1

65 23 33 3 0

17 2 6 1 1

1 0 1 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

83 25 40 4 1

0 0 3 0 0

Year2008

2009

2010

Total

Average

Collision TypeAngle

Head-on

Rear-end

Rear-to-Rear

Sideswipe, opposite direction

Sideswipe, same direction

Single vehicle crash

Unknown

Not reported

Total

Crash SeverityFatal injury

Non-fatal injury

Property damage only (none injured)

Not Reported

Unknown

Total

Time of DayWeekday, 7:00 AM - 9:00 AM

Weekday, 4:00 PM - 6:00 PM

Saturday, 11:00 AM - 2:00 PM

Weekday, other time

Unknown

Weekend, other time

Total

Pavement ConditionsDry

Wet

Snow

Not reported

Total

Non Motroist (Bike, Pedestrian)Total

MassHighway Crash Rates

Ice

Sand, mud, dirt, oil, gravel

Water (standing, moving)

Slush

Other

Page 184: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

CITY/TOWN : Cambridge, MA COUNT DATE : December 2012

DISTRICT : 6 UNSIGNALIZED : SIGNALIZED :

~ INTERSECTION DATA ~

MAJOR STREET : Concord Turnpike

MINOR STREET(S) : Alewife Brook Parkway

SB

1150

North

WB

854

EB

1532

NB

2008

PEAK HOUR VOLUMES

1 2 3 4 5

NB SB WB EB

2,008 1,150 854 1,532 5,544

0.090 61,600

83# OF

YEARS :3

AVERAGE # OF CRASHES PER YEAR (

A ) :27.67

1.23 RATE =( A * 1,000,000 )

( V * 365 )

Comments :

Project Title & Date: 130 CPD \ January 4th 2013

CRASH RATE CALCULATION :

TOTAL # OF CRASHES :

" K " FACTOR :

PEAK HOURLY VOLUMES (AM/PM) :

DIRECTION :

Total Peak Hourly

Approach Volume

DIAGRAM(Label Approaches)

APPROACH :

INTERSECTION CRASH RATE WORKSHEET

INTERSECTION ADT ( V ) = TOTAL DAILY APPROACH VOLUME :

INTERSECTION

Page 185: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

CITY/TOWN : Cambridge, MA COUNT DATE : December 2012

DISTRICT : 6 UNSIGNALIZED : SIGNALIZED :

~ INTERSECTION DATA ~

MAJOR STREET : Alewife Brook Parkway

MINOR STREET(S) : Cambridge Park Drive

SB

1341

North

EB

990

NB

1731

PEAK HOUR VOLUMES

1 2 3 4 5

NB SB EB

1,731 1,341 990 4,062

0.090 45,133

25# OF

YEARS :3

AVERAGE # OF CRASHES PER YEAR (

A ) :8.33

0.51 RATE =( A * 1,000,000 )

( V * 365 )

Comments :

Project Title & Date: 130 CPD \ January 4th 2013

PEAK HOURLY VOLUMES (AM/PM) :

" K " FACTOR :INTERSECTION ADT ( V ) = TOTAL DAILY

APPROACH VOLUME :

TOTAL # OF CRASHES :

CRASH RATE CALCULATION :

INTERSECTION CRASH RATE WORKSHEET

INTERSECTIONDIAGRAM

(Label Approaches)

APPROACH :Total Peak

Hourly Approach Volume

DIRECTION :

Page 186: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

CITY/TOWN : Cambridge, MA COUNT DATE : December 2012

DISTRICT : 6 UNSIGNALIZED : SIGNALIZED :

~ INTERSECTION DATA ~

MAJOR STREET : Alewife Brook Parkway

MINOR STREET(S) : Rindge Avenue

SB

1892

North

EB

518

NB

1627

PEAK HOUR VOLUMES

1 2 3 4 5

NB SB EB

1,627 1,892 518 4,037

0.090 44,856

40# OF

YEARS :3

AVERAGE # OF CRASHES PER YEAR (

A ) :13.33

0.81 RATE =( A * 1,000,000 )

( V * 365 )

Comments :

Project Title & Date: 130 CPD \ January 4th 2013

TOTAL # OF CRASHES :

CRASH RATE CALCULATION :

INTERSECTION CRASH RATE WORKSHEET

INTERSECTIONDIAGRAM

(Label Approaches)

APPROACH :Total Peak

Hourly Approach Volume

DIRECTION :

PEAK HOURLY VOLUMES (AM/PM) :

" K " FACTOR :INTERSECTION ADT ( V ) = TOTAL DAILY

APPROACH VOLUME :

Page 187: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

CITY/TOWN : Cambridge, MA COUNT DATE : December 2012

DISTRICT : 6 UNSIGNALIZED : SIGNALIZED :

~ INTERSECTION DATA ~

MAJOR STREET : Cambridge Park Drive

MINOR STREET(S) : Alewife Station Access Road

SB

702

North

WB

163

EB

329

NB

87

PEAK HOUR VOLUMES

1 2 3 4 5

NB SB EB WB

87 702 329 163 1,281

0.090 14,233

4# OF

YEARS :3

AVERAGE # OF CRASHES PER YEAR (

A ) :1.33

0.26 RATE =( A * 1,000,000 )

( V * 365 )

Comments :

Project Title & Date: 130 CPD \ January 4th 2013

TOTAL # OF CRASHES :

CRASH RATE CALCULATION :

INTERSECTION CRASH RATE WORKSHEET

INTERSECTIONDIAGRAM

(Label Approaches)

APPROACH :Total Peak

Hourly Approach Volume

DIRECTION :

PEAK HOURLY VOLUMES (AM/PM) :

" K " FACTOR :INTERSECTION ADT ( V ) = TOTAL DAILY

APPROACH VOLUME :

Page 188: The Residences at 130 Cambridgepark Drive/media/Files/CDD/ZoningDevel/Speci… · The Residences at 130 Cambridgepark Drive Cambridge, ... Alewife Station Access Road and the Route

CITY/TOWN : Cambridge, MA COUNT DATE : December 2012

DISTRICT : 6 UNSIGNALIZED : SIGNALIZED :

~ INTERSECTION DATA ~

MAJOR STREET : Route 2 Ramp

MINOR STREET(S) : Alewife Station Access Road

SB

908

North

NB

534

PEAK HOUR VOLUMES

1 2 3 4 5

NB SB

534 908 1,442

0.090 16,022

1# OF

YEARS :3

AVERAGE # OF CRASHES PER YEAR (

A ) :0.33

0.06 RATE =( A * 1,000,000 )

( V * 365 )

Comments :

Project Title & Date: 130 CPD \ January 4th 2013

TOTAL # OF CRASHES :

CRASH RATE CALCULATION :

INTERSECTION CRASH RATE WORKSHEET

INTERSECTIONDIAGRAM

(Label Approaches)

APPROACH :Total Peak

Hourly Approach Volume

DIRECTION :

PEAK HOURLY VOLUMES (AM/PM) :

" K " FACTOR :INTERSECTION ADT ( V ) = TOTAL DAILY

APPROACH VOLUME :