The Process of Self Audit From Start to Finish

Tom MillerVP & GM Environmental Affairs

Nucor Corporation 

Page 2: The Processof Self Audit From Start to Finish

Who is Nucor?

• Largest Steel Producer in the U.S.• Capable of producing almost 27 million tons per year

• North America’s Largest Recycler• Recycled 21,100,000 tons of scrap metal in 2017

• Over $20.2 Billion in Sales in 2017• #151 in Fortune 500

• More than 27,000 ‘Teammates’ at over 220 facilities in North America

Page 3: The Processof Self Audit From Start to Finish

Where is Nucor?

Page 4: The Processof Self Audit From Start to Finish

Overview

• 244 Facilities • Steel Mills

• On‐site environmental team

• Products Facilities• 1 coordinator overseeing Environmental & Safety

• 7 Corporate Environmental Teammates

Page 5: The Processof Self Audit From Start to Finish

Overview

• Audit program handled in house– 1 Audit Coordinator– Each audit is led and performed by environmental teammates throughout corporation

• Legal counsel present – Provides confidentiality

Page 6: The Processof Self Audit From Start to Finish

Role of Legal Counsel

• Attorney/client privileged information• Present for entire audit • Provides follow‐up documents with findings, recommendations, and action plan

• Available for questions and assist at any point in process 

Page 7: The Processof Self Audit From Start to Finish

Scheduling

Mills vs Products Facilities• 3 years for bigger/higher risk facilities• 5 years for small/lower risk facilities

– After initial audit IF audit findings were low risk – Little to no turnover in on‐site environmental teammate(s)

Page 8: The Processof Self Audit From Start to Finish

Team

Led by Teammates• Lead & Co‐Lead (Managers)• 1 Legal Representative

• 3‐5 Engineers/Coordinators• 1 Corporate Representative

Page 9: The Processof Self Audit From Start to Finish

Timeline: Pre-Audit

• 6 weeks: Facility posts all permits and plans on Nucor intranet

• 3 weeks: Audit Team Conference Call• Review previous audit report • Make assignments• Identify research needs• Discuss logistics 

Page 10: The Processof Self Audit From Start to Finish

Pre-Audit

• Audit Coordinator: notifies Facility and Team of deadlines, requirements, scheduling, and missing documents. 

• Compare permits/paper to actual • Review remaining permits/plans

Bulk of permit and plan review should be completed PRIOR to arriving on‐site

Page 11: The Processof Self Audit From Start to Finish

On-Site Audit: Opening Meeting

Opening Meeting:• Meeting with facility management and supervisors

– Led by designated lead environmental manager

• Review purpose of audit – Highlight “here to help” role

• Importance of confidentiality 

Page 12: The Processof Self Audit From Start to Finish

On-Site Audit: Audit Process

• Initially, focus on compliance paperwork• Walk through of facility

– Exterior first– Cover entire facility – Pictures taken throughout

• Compliance paperwork reviewed throughout• Staff for multiple groups

Page 13: The Processof Self Audit From Start to Finish

On-Site Audit: Findings

• All findings documented• Draft audit findings entered into protected site

– Access for corporate, counsel, auditors and facility only• Findings include:

– Preliminary finding classification– Affected program– Location at facility– Finding; observation and comments for possible resolution– Citation to applicable law, regulation, permit or plan

Page 14: The Processof Self Audit From Start to Finish

On-Site Audit: Findings

Page 15: The Processof Self Audit From Start to Finish

On-Site Audit: Classifications

• Corrective Actions

• Preventative Actions

• Deficiencies

• Deviations

Page 16: The Processof Self Audit From Start to Finish

On-Site Audit: Summary Prep

• Audit team works with facility environmental staff – Classifications of findings– Presentation for closing meeting– PowerPoint of major findings prepared and agreed on

Page 17: The Processof Self Audit From Start to Finish

On-Site Audit: Closing Meeting

• Present findings

• Audience: facility managers, supervisors and appropriate leads

• Address questions/concerns

Page 18: The Processof Self Audit From Start to Finish

Post Audit

• Environmental Audit Report – 30 days after conclusion of audit • Prepared by counsel

• Environmental Audit Close Out Plan – 30 days after Audit Report • Prepared by facility 

• Close Out Plan Evaluation – 30 days after Close Out Plan • Prepared by counsel

• Draft Audit Completion Report – 180 days after Plan Evaluation  • Prepared by facility

• Final Audit Completion Report – 60 days after Draft Completion Report 

• Prepared by counsel after meeting with facility

Page 19: The Processof Self Audit From Start to Finish

Post Audit

• Correction timeline– Corrective Actions ‐ Resolved within 60 days– Preventive Actions ‐ Resolved within 120 days– Deficiencies and Deviations – Resolved within 180 days

Page 20: The Processof Self Audit From Start to Finish

Audit Tracker

• Counsel and Audit Coordinator maintain for compiling results

• Looking for:– Trends showing general problem areas– Turnaround times– Audit rotation

Page 21: The Processof Self Audit From Start to Finish

Successes and Challenges

Successes• Open dialogue with facility 

– “Tell us what’s wrong”

• Quick status update on facility as teammates transition• Teammates learning from teammates

Page 22: The Processof Self Audit From Start to Finish

Successes and Challenges

Challenges• Having all permits/plans reviewed prior to audit• Fully closing out plan

– Findings tied to capital improvements– Out of site, out of mind

Page 23: The Processof Self Audit From Start to Finish

Questions?

Tom MillerVP & GM Environmental Affairs

Nucor Corporation [email protected]