the problem. kickstart project there is a better way safe, affordable housing for the world and for...
TRANSCRIPT
The Problem
The Problem
The Problem
Kickstart Project
There is a Better WaySafe, affordable housing for
the world and for quick recovery after natural
disasters!
AMHCo Solution
Solution
Solution
Solution
Solution
Onsite Manufacture
Fast Delivery
Housing Shortage
Worldwide Housing shortage: Over 21 million new housing units required each year Unsafe housing replacement: 25% of the world population live in unsafe housing Natural disaster relief: Over 500,000 families became
homeless each year in the past five years
Market
• Emergency housing (Earthquakes, tsunamis, storms, landslides, etc.)
• Replacement housing (Mud brick, bamboo, veneer, tin sheds, tents, etc.)
• Indigenous housing• Tourism developments• Defence & Military Applications• Mining and natural resources• Student accommodation• Offices, retails shops, prisons
Benefits
• Affordable• Safe standardized construction• Speed of delivery• Consistent quality• Flexible, modular system• Global application• Environment friendly• Can be built at the site• Low maintenance costs
Features
• Modular Construction• Monocoque Design • Composite Prestressed Structure• Automated Manufacturing• On-Site Manufacturing• Single and/or Multistory • Felixible & Universal Lay-out• All Inclusive Built-Ins to suit local
requirements• Energy savings, hot or cold climate• Solar power, rain water collection options
Market Numbers
• Worldwide Housing Shortage: 21M units/a• Unsafe House Replacement: 350M units/a• Disaster Relief Projects: 1M units/a• Indigenous Housing Projects: 0.5M units/a• Mining Developments: 0.2M units/a• Tourism Development: 0.3M units/a• Student Accomodation: 0.4M units/a
Estimated Growth 5- 10% p/a
(Unit sizes from 35sqm to 100sqm)
Timeframes
Project Timetable
AMHCo Pty Ltd
Kickstart Project Plan
Month 1 Month 2
Month 3 Month 4 Month 5 Month 6 Month 7 Month 8
Kickstart Funding Approval Project Management Engineering & IP Manufacture Installation Structural & Fire Testing Display Appraisal & Documentation Rewards Program
Costs• Project costs summary
AMHCo Pty LtdKickstart Project Costs Summary
ITEMS USD
COSTS: 1. Financing/Management 40,000 2. IP Protection 30,000 3. Design/Engineering 54,500 4. Manufacture 214,000 5. Options 15,000 6. Installation 73,000 7. Display 49,500 8. Testing 129,000 9. Rewards 28,00010. Fees & Contingencies 77,000Total 710,000
Rewards
(
AMHCo Kickstart ProjectRewards Program
Reward Nr. Pledge Amount ($)
Pledges Reserved Type of Reward Estimated Delivery Time Total Amount ($)
1Up to 5 Unlimited
A letter of appreciation
First month after the project start N.A.
225 Unlimited As in 1. plus updates
As in 1. plus monthly updates N.A.
3100 Unlimited As in 2. plus photos
As in 2. plus on project completion N.A.
4 500 Unlimited As in 3. plus video As in 3. N.A.
51,000 500
As in 4. plus AMHCo polo shirt As in 4. 500,000
65,000 250
As in 5. plus invitation to the launch As in 5. 1,250,000
78,000 25
As in 6. plus one night accommodation in Australia
As in 6. plus in 6 months from launch 200,000
.
The Team
• Robert Nolan Managing Director
• Pentti Soininen Technical Director• Mark Birkinshaw Marketing Director
• Partners and Advisors
Mark Robert Pentti
Thank you
Contact Details
Mr Robert Nolan
Phone + 61 407 910 108
Email [email protected]
Web www.amhcorporation.com