the princess elisabeth station closing the network · 2020. 6. 18. · 1 the princess elisabeth...

10
1 The Princess Elisabeth Station COMNAP Energy Management Workshop “Energy concept” Johan Berte 08/08/2010 BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx www.antarcticstation.org Closing the network SOUTH AFRICA (CPT) 1100 km Network: Logistics Logistics Science SAR BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx Operations range: science • Starting point for field expeditions up to 200 km • Standalone facilities for observations : geomagnetic, ionosphere gravimetric GPS 200 km ionosphere, gravimetric, GPS measurements, seismic … • Climatology, glaciology, microbiology … Utsteinen Sør Rondane Plateau BELARE 2004/5 : Building site selection Ridge Glacier Prevailing wind East BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx Selected site: Utsteinen nunatak Latitude = 71° 57’ 1.15781” S Longitude = 23° 20’ 48.72511” E Elevation = 1397.4382 m 0 0.2 0.4 0.6 0.8 1 1.2 1.4 N NNE NE ENE E ESE SE SSE S SSW SW WSW W WNW NW NNW -30 -25 -20 -15 -10 -5 0 BELARE 2004/5 Building site studies -40 -35 -30 12/19/2004 2/7/2005 3/29/2005 5/18/2005 7/7/2005 8/26/2005 10/15/2005 12/4/2005 Tm (degC) Tx (degC) Tn (degC) BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx Site: island concept BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx Protective mountain range in East Prevailing wind: incoming from glacier (wind modelling) Station East from research area

Upload: others

Post on 02-Nov-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The Princess Elisabeth Station Closing the network · 2020. 6. 18. · 1 The Princess Elisabeth Station COMNAP Energy Management Workshop “Energy concept” Johan Berte ‐08/08/2010

1

The Princess Elisabeth StationCOMNAP Energy Management Workshop

“Energy concept”

Johan Berte ‐ 08/08/2010BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

www.antarcticstation.org

Closing the networkSOUTH AFRICA (CPT)

1100 km

Network:

• Logistics• Logistics• Science• SAR

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

Operations range: science

• Starting point for field expeditions up to 200 km

• Stand‐alone facilities for observations : geomagnetic, ionosphere gravimetric GPS

200 km

ionosphere, gravimetric, GPS measurements, seismic …

• Climatology, glaciology, microbiology …

Utsteinen

Sør RondanePlateau

BELARE 2004/5 : Building site selection

RidgeGlacier

Prevailing wind East

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

Selected site:  Utsteinen nunatakLatitude = 71° 57’ 1.15781” SLongitude = 23° 20’ 48.72511” EElevation = 1397.4382 m

0

0.2

0.4

0.6

0.8

1

1.2

1.4N

NNE

NE

ENE

E

ESE

SE

SSE

S

SSW

SW

WSW

W

WNW

NW

NNW

-30

-25

-20

-15

-10

-5

0

BELARE 2004/5  Building site studies

-40

-35

-30

12/19/2004 2/7/2005 3/29/2005 5/18/2005 7/7/2005 8/26/2005 10/15/2005 12/4/2005

Tm (degC)Tx (degC)Tn (degC)

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

Site: island concept

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

• Protective mountain range in East• Prevailing wind: incoming from glacier (wind modelling)• Station East from research area 

Page 2: The Princess Elisabeth Station Closing the network · 2020. 6. 18. · 1 The Princess Elisabeth Station COMNAP Energy Management Workshop “Energy concept” Johan Berte ‐08/08/2010

2

Site layout

(1)

(3)

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

1. Main building2. Garage/storage3. SATCOM4. Wind farm5. Vehicle fuel depot

(2)(3)

(4)

(5)

Energy?

Sources: 3E

• Production• Storage• Distribution• Management

Wind Turbines

• Proven Energy 6kW• 9 x 6kW at 15m/s• 60m/s +• All year production• Yearly average 7m/s

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

Solar panels (PV)

• Solar PV panels on the main building: 114 panels• Installed power: 14,82 kW (130Wp/panel)• Orientation: N/NE/E/SE/S/W

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

• Solar PV panels on the garage building: 288 panels• Installed power: 37,44 kW (130Wp/panel)• Orientation: N

Solar panels (PV)

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

Solar thermal systems

Snow melting (STS‐S2):• 10 Panels: TUBO 12 CPC (vacuum tubes)

Sanitary & cogeneration bioreactors (STS‐S1):• 18 Panels: TUBO 12 CPC (vacuum tubes)

• +/‐ 25 kW equivalent

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

Page 3: The Princess Elisabeth Station Closing the network · 2020. 6. 18. · 1 The Princess Elisabeth Station COMNAP Energy Management Workshop “Energy concept” Johan Berte ‐08/08/2010

3

Solar passive: heating and light conditions

• Office• 15 December

• 12:00

• No clouds

Overheating• Solar passive• Heat dissipation 

activities

Control• Window layout• Ergonomic

P h l i l• Psychological

InteriorSolar passive: daylight

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

Solar passive: daylight

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

Energy?

Sources: 3E

• Production• Storage• Distribution• Management

Battery room

Master of masters Sunny Island

4 x 3 SMA Sunny Islands Mounted on moveable structures

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

STS‐S1 Thermal mass

Snow melting (STS‐S2): • 1 Reservoir: CONUS 502 (500L)

Sanitary & cogeneration 

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

bioreactors (STS‐S1):• 3 Reservoirs: SOLUS 560L (3 x 500L)

Page 4: The Princess Elisabeth Station Closing the network · 2020. 6. 18. · 1 The Princess Elisabeth Station COMNAP Energy Management Workshop “Energy concept” Johan Berte ‐08/08/2010

4

Energy?

Sources: 3E

• Production• Storage• Distribution• Management

Grid architecture

ControllerSMA

BMS

GS

GENSETS 3 x 400V + N

DC

BIP

V L

1

DC

BIP

V L

2

DC

BIP

V L

3

DC

SAPV

L1

DC

SAPV

L2

DC

SAPV

L3

PLCSchneider

solar energy

GS

Automatic opening/closing &Synchro check

AC AC AC AC AC AC

LOADS

+400kVA

AC

DC

2000

Ah

3pha

se

AC

DC

2000

Ah

3pha

se

AC

DC

2000

Ah

3pha

se

Sunny Island 4 x

Net stabilisator

AC

DC

AC

DC

DC

AC

DC

AC

6kWpL1

6kWpL2

Wind turbines 3 x 3 (9 total)

AC

DC

DC

AC

6kWpL3

DumpLOADS

6kW

AC

DC

2000

Ah

3pha

se

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

Battery/inverter architecture

Inverters:

• Make: SMA

• 4 x 3 SMA Sunny Islands type 5048 for island opperation

• Biderectional battery inverter  

• Mounted on moveable structures

• One master of masters

• 4 battery clustersy

Batteries:

• Make: HOPPECKE 

• Type: 10 OPZV 1000                   

• Stationary lead battery 48 Vcc, (2X 24 éléments)

• 1000 Ah/10 h/20°C/ /1,8 V/elem

• 4 Clusters of 48 elements => 8000Ah

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

EMC Electric grid quality

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

Energy?

Sources: 3E

• Production• Storage• Distribution• Management

Design process: dynamic simulations

• Real time behaviour of components• Correct sizing of each component• Sensitivity analysis• Simulation of failures

250

300TColOut MWMTot TSto3

4250 4300 4350 4400 4450 4500 4550

0

50

100

150

200

250 TSto3 MMWLoa QCol 100*LevMWTanV.PWMEle

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

Page 5: The Princess Elisabeth Station Closing the network · 2020. 6. 18. · 1 The Princess Elisabeth Station COMNAP Energy Management Workshop “Energy concept” Johan Berte ‐08/08/2010

5

Demand Power Management System

• Active control of loads

• Based on energy reserve

• Batteries

• Wind

• Solar• Solar

• Based on variable priorities

• Genset assistence if needed

• Low batteries

• Emergency

• Heavy tooling (off gird)

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

Operation Modes

Kitchen

OfficeOffice

Time

kitchen

OfficeKitchen

Living room

Time BasedEvent

Based

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

Centralized controller PLC

Centralized controller (PLC)

HVAC  management module

Water treatment module

……

Demand Power management module

• Remote controlled switching units, • demand measurements,• user’s requests, • alarms, …

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

LED Flashing Status

“Idle“ state

1 pulse / 30 sec

4 stage controller

Blocked

Idle

“Pending” state

1 pulse / sec

“ON” state but with

demand below

detection threshold.

1 OFF pulse / 30 sec

Pending

On

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

Energy management; consecutive steps :

• Battery SOC 60% to 90% => Normal “Operation modes”: Low priority users or limited in time or refused by the system.

/ “ ll ”

Overproduction

• Battery SOC = +/‐ 90% =>“Full power mode”: No time constraints on individual users.

• Battery SOC (State of Charge) => +/‐ 100% + “Full power mode”: “useful dump loads” (snowmelter, heating etc.)

• Further increase in energy => frequency shift (going higher) to slow down electric production.

Scada

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

Page 6: The Princess Elisabeth Station Closing the network · 2020. 6. 18. · 1 The Princess Elisabeth Station COMNAP Energy Management Workshop “Energy concept” Johan Berte ‐08/08/2010

6

Remote monitoring

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

Design process: methodology

• Parallel process• Form follows function• 11 designs to start• 37 terrain integrations• Trade off process• Trade‐off process• Tradition versus new

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

Design

Building concept

Energy concept User scenarios

solutions

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

Wind

A hybrid typology (C‐1)

Hybrid building:• Living module• Storage module• Concentric layout

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

Main building (C‐2)• Space requirements gravity‐driven systems • Aerodynamics• Ergonomic requirements• Construction 

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

Main building (C‐3)

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

Page 7: The Princess Elisabeth Station Closing the network · 2020. 6. 18. · 1 The Princess Elisabeth Station COMNAP Energy Management Workshop “Energy concept” Johan Berte ‐08/08/2010

7

2006: design freeze

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

Aerodynamic CFD modeling

• 60m/s design wind speed• +/‐ 2000kg/m²• No lift

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

Aerodynamic CFD modeling

Reference Final DesignOctagonalBF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

Snow erosion/accumulation• Long term => Excess erosion (!)

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

Main Building

NORTH

WEST

EAST

SOUTH

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

Conceptual design: materials?Now• Steel …• Sandwich panels ….• Composites …

Past • Wood ….

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

Page 8: The Princess Elisabeth Station Closing the network · 2020. 6. 18. · 1 The Princess Elisabeth Station COMNAP Energy Management Workshop “Energy concept” Johan Berte ‐08/08/2010

8

Wood engineering

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

Construction/transport/recuperation

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

Testing

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

Wood construction

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

Test assembly

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

09/2007

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

Page 9: The Princess Elisabeth Station Closing the network · 2020. 6. 18. · 1 The Princess Elisabeth Station COMNAP Energy Management Workshop “Energy concept” Johan Berte ‐08/08/2010

9

Anchoring

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

Wood structure

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

Frame

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

Page 10: The Princess Elisabeth Station Closing the network · 2020. 6. 18. · 1 The Princess Elisabeth Station COMNAP Energy Management Workshop “Energy concept” Johan Berte ‐08/08/2010

10

2008/9 Target:

Active systemsInterior finishingStartup 2008/9

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

WSU

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

HVAC

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

Black

Recycledwater tank UVUV

Cl2Cl2

Meltedsnow tank

Cl2Cl2

UVUVToilets

Kitchen grinder

Drinkingwater

SnowmelterSnowmelter

Ceramic

WTU

Black water tank

Greywater tank

Anaerobicreactor

Aerobic reactor

LaundryShowers

Solar boilerSolar boiler

Toilets

Showers

AC

Kitchen sink, dishwasher

Ceramicmembrane

Polymermembrane

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx

WTU

• Anaerobic & aerobic reactors

BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx BF3.ISA.PR.24.v0_Comnap Energy Management Workshop.pptx