  • SEMINAR HIJAU

    THE PRACTICAL STEPS AND KEY

    CRITERIA IN ENERGY PERFORMANCE CONTRACTING

    Zaini Abdul Wahab

    MAESCO 4th July 2013

    Hotel Seri Malaysia, Ayer Keroh

    Melaka

  • Outline

    1. EPC Market Potentials

    2. The Practical Steps & Key Success Factors For Successful EPC Projects Implementation

    3. EPC Success Stories

    4. The Way Forward

  • Shared Saving Mechanism

    Adaptation from US Dept. of Energy, Measurement & Verification Guidelines, Version 3.0,

    time

    (year)

    Energy Bills

    During contract period

    Lower Energy

    Bill

    After Contract period

    Energy bill saved

    Before Contract Period

    Electricity bill

    before energy

    saving

    measures

    implementation

    Payment to

    ESCO

    Savings for the

    client

    Baseline

    Lower Energy

    Bill

    Savings for

    the client

    Implement EMS Develop & Plan

    EMS

  • Guaranteed Savings Model

    FACILITIE

    S OWNER ESCO BANK

    Project Design&

    Implementation

    Project Fees Loan

    Repayment

  • Shared-Savings Model

    FACILITI

    ES

    OWNER ESCO BANK

    Project Design&

    Implementation

    Loan

    Repayment

    EE

    PROJECT Energy saving share

    (90%-70%)

    Financing

    Energy saving share

    (10%-30%)

  • Energy Efficiency Market & Potentials in SEA

    Source: www.reexasia.com

  • Saving Potentials (USD) in SEA

    Clearly, the industrial and

    commercial sector s offers

    much higher savings potential Source: www.reexasia.com

  • EPC MARKET POTENTIALS IN MALAYSIA

  • Biggest Electricity Users For Government

    Buildings (Sep 2009 -Oct 2010)

    Hospitals, 20%

    Universities, 29%

    Ministries, 19%

    Others (States,

    Agencies), 32%

    Building Nos

    Total Consumption

    (kWh/year)

    Total Bill

    (RM/year)

    Hospitals 22 367,587,657 130,640,653

    Universities 25 543,961,738 193,324,002

    Ministries 25 360,592,831 128,154,692

    Others(States,

    Agencies) 56 603,464,085 214,471,136

    128 1,875,606,311 666,590,483

    Estimated Total TNB

    Bill for government

    buildings

    (Sep 2010-Aug 2011)

    Total

    Consumption(kWh/year)

    Total Bill(RM/year)

    7,896,508,329 2,726,767,394

    10% saving equals

    to about RM270

    millions /year

    Source:KeTTHA

  • EPC Market Potentials : Melaka

    No. Building

    Total Electricity

    Bill

    (RM/year)

    Total

    Consumption

    (kWh/year)

    1 Melaka Mall Complex Ayer Keroh 2,018,339 6,469,034

    2 Seri Negeri Chief Minister Department

    , Ayer Keroh 1,435,728 4,601,693

    3 MITC Complex, Ayer Keroh 980,085 3,141,299

    4 Wisma Negeri Building Ayer Keroh 1,095,472 2,547,610

    5 Graha Maju Building, Jln Hang Tuah 674,267 2,161,113

    6 Wisma PKMM Building, Ayer Keroh 646,924 2,073,473

    7 Digital Mall, Jln Hang Tuah 550,110 1,763,174

    8 Melaka Sentral Terminal Peringgit 735,193 1,709,750

    9 Putra Specialist Hospital 2,858,772 1,905,848

    Total 10,994,890 26,372,994

    Source: JIMAT

  • Potential Areas For EPC Projects

  • EPC Potentials : A Building Facilities in Melaka

    NO. Item

    MOTOR

    RUNNING NORMAL MODE ENERGY SAVING MODE

    ( Rated

    kW )

    ( Running

    kW ) kWh/Year

    Rate/Year

    (RM)

    Amount

    (kWh)

    Rate/Year

    (RM)

    SAVING

    (%)

    SAVING

    (RM/Year)

    1 CHWP 1

    18.5 19.1 165,024 70,960 107,266 46,124 35% 24,836 Old Block Chiller Room

    2 CHWP 2

    18.5 19.0 164,160 70,589 106,704 45,883 35% 24,706 New Block Chiller Room

    3 CDWP 1

    15 13.3 114,912 49,412 82,737 35,577 28% 13,835 Old Block Chiller Room

    4 CDWP 2

    18.5 15.3 132,192 56,843 95,178 40,927 28% 15,916 New Block Chiller Room

    Sub-Total 67 576,288 247,804 391,884 168,510 32% 79,294

    No Item Rated

    (kW)

    Actual

    kW

    Normal

    kWh/Year

    Saving Mode

    kWh/Year Saving % Saving kWh

    Saving

    (RM/Year)

    1 Chiller Old Blk 210 128 1,105,920 995,328 10% 427,991 47,555

    2 Chiller New Blk 210 115 993,600 914,112 8% 393,068 34,180

    Sub-Total 420 243 2,099,520 1,909,440 9.1% 821,059 81,734

    TOTAL HVAC SAVING 161,028

    Source: ESCO

  • EPC Potential:

    Shopping Complex in Melaka

    Total Lighting Saving = RM 116,253

    Total Maintenance Saving = RM 44,768

    Total Saving for HVAC = RM 270,231

    Total Annual Savings = RM 431,252

    18% from total annual

    electricity bill

    (Nov 2012-Feb 2013)

    Source: ESCO

  • The Practical Steps & Key

    Success Factors For Successful EPC Projects Implementation

  • The Key Steps

  • Confirm The Need!

    Understanding on EPC concept by the building owner

    The needs to adopt EPC model

    Self assessment

    Comparing energy benchmark

    Estimation of project costs & saving potentials

    Private investment & Risks transfer to ESCO - viable sharing ratio/%

    Opened or Closed Tender?

  • Scope of Services under EPC

    Project Funding & Financing Options

    Engineering & Economic Feasibility Studies

    Project Design, Engineering & Permitting

    Project Construction

    Project Commissioning

    Operation, spare parts & Maintenance

    Performance measurements & monitoring

  • Preparation

    Facility Profile Basic building information

    Floors & areas

    M&E equipment & system data

    Building materials information & data

    Energy consumption

    Define project & preliminary scope

    Evaluation criteria ESCOs

    EPC Project Proposals

  • Prequalification of ESCOs

    Qualifying criteria

    Own criteria must consider the nature of

    ESCO business for EPC

    Current criteria by ST is insufficient to

    determine the financial & technical capabilities

    of registered ESCOs

    Identify Potential ESCOs

  • Selection of ESCOs

    Experiences in EPC/Track Records in energy services

    Financial Strengths

    Management capacity in

    energy services

    Technical Competency &

    Expertise

    ESCO

    To secure

    financing & ensure

    sustainable

    operations

  • Issue Request for Proposal

  • Evaluation of Proposals

  • Example: Evaluation Score Sheet

  • Detailed Energy Audit

    Investment Grade

    Energy Audit

    Scope & schedule

    Findings

    Energy saving

    potentials analysis

    Projected annual cash

    flow

    Measurement,

    Monitoring &

    Verification of actual

    savings

  • EPC Contract Document

    Drafted by JKR for government buildings as reference To be customized based on requirements of each building owner

    Factors should be considered to reduce dispute in EPC Contract

    Obligations of owners & ESCOs

    Factors affecting savings performance

    Valuating savings uncertainty

    Minimum operating conditions

    Energy prices/tariff rates

    Verification by A third party

    Baseline modification/review(non-routine)

    Balancing uncertainty and costs

    Protection from risks by both parties

  • Project Implementation

    EPC Contract Negotiation &

    Signing

    Install permanent sub-meters

    Collect energy data to

    establish energy

    baseline values

    Improve & optimize energy

    consumption with proposed

    saving measures

    Measure & monitor actual

    energy savings achieved

    against agreed baseline values

  • Measurement, Monitoring &

    Verification

    For actual savings achieved

    Methodology/Protocol

    Baselines agreed

    Permanent metering (highly recommended)

  • Options For

    Energy Baseline & Saving Calculation

    Method Advantages Disadvantages

    Utility billing history Low cost Effects of weather ,

    occupancy, other

    changes may mask

    savings

    May be unreliable

    unless savings are

    significant compared to

    normal bill variation

    Data already available

    Independent data

    Represent all effects of

    ESMs

    Account for interactive

    effects

    System/Equipment

    sub-metering

    Isolate effects of ESMs

    Higher cost

    Misses interactive

    effects

    Very accurate for

    lighting measures

    Results are more

    predictable(low risk)

  • Baseline:

    Baseline year from electricity bill data (kWh)

    (kW

    h)

  • Example:

    Energy saving calculated by the difference between a

    baseline year and a subsequent year from electricity bill

    (kW

    h)

  • Baseline : Building Monthly Load Profile (kW) from sub -metering

    31

  • Baseline :

    Building monthly electricity consumption profile(kWh) from sub -metering

    32

  • Baseline :

    Building monthly load profile(kW) for AHU from sub -metering

    33

  • Baseline :

    Monthly electricity consumption profile(kWh) for AHU from sub -metering

    34

  • Example: Savings calculated based on actual

    measurement from sub -meters

  • Modifying/Reviewing Baseline

    To establish standards for changes which may reasonable expected to change energy consumption trend in the facility

    Occupied square footage, operating hours

    parameters other than the ESCO equipment

    Energy equipment, other than ESCO equipment, that malfunctions, or is repaired, or replaced in a manner that increases or decreases energy consumption;

    Other actions taken by the facility owner that may reduce or increase energy use; and,

    Discovery of an error in the original baseline, in which case the change would be retroactive

    Trust , good

    relationship &

    effective

    communication

    between ESCO &

    building owner is

    crucial to identify the

    needs to

    modify/review

    baseline!

  • Example: Monitoring & Measurements for Air

    Conditioning System

    Your Energy Management

    Specialist &

    Total Energy Conservation

    37