Most test automation projects never die—they just become a mess and are redone. Initial solutions that start well and are full of promise often end up as brittle and unmaintainable monsters consuming more effort than they save. Political feuds can flourish as different automation solutions compete for attention and dominance. Tests become inefficient in both execution time and resource usage. Disillusionment ensues, projects are redefined, and the cycle begins again. Surely we can learn how to avoid such trouble on the next project. Michael Stahl has analyzed automation projects and identified recognizable failure patterns—mushrooming, duplication, going for the numbers, and others. Michael describes these patterns, suggests how to detect them early, and shares ways to avoid or mitigate them. Whether your team is just starting on test automation—or is already in full flight—you’ll take back ideas to improve the chances of achieving success in your test automation efforts.

TRANSCRIPT

Page 1: The Pathologies of Failed Test Automation Projects

W3 Test Automation

5/1/2013 11:30:00 AM

The Pathologies of Failed Test

Automation Projects

Presented by:

Michael Stahl

Intel

Brought to you by:

340 Corporate Way, Suite 300, Orange Park, FL 32073

888-268-8770 ∙ 904-278-0524 ∙ [email protected] ∙ www.sqe.com

Page 2: The Pathologies of Failed Test Automation Projects

Michael Stahl

Michael Stahl is a software validation architect at Intel, working with a team that validates Intel's graphics hardware drivers. In this role, Michael defines testing strategies and work methodologies for test teams, and tests part of the product himself - the work he enjoys most. As a twenty-two year veteran and senior engineer, he has been witness to what works - and what doesn’t - in test strategies, communications, and automation. An avid teacher, Michael enjoys sharing his observations with others. Contact Michael at [email protected] and review previous conference presentations on his website testprincipia.com.

Page 3: The Pathologies of Failed Test Automation Projects

Based, in part, on work done with Alon Linetzki, Best Testing (www.best-testing.com)

The Pathologies of failed

Test Automation Projects

Michael Stahl, Intel Apr 2013

Page 4: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

• Automation failure patterns

• What can we do?

• Summary

On the Menu… 2

Based, in part, on work done with Alon Linetzki, Best Testing (www.best-testing.com)

Page 5: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Disclaimers

Names and brands referenced herein may be claimed as the property of

third parties

The views expressed in this presentation are solely my own, and do not in any manner represent the views of my employer

Information in this presentation is provided “AS IS” without any warranties or representations of any kind

Page 6: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Once upon a time…

A common automation story… 4

Mr. Otto Mate Cool!

Can you make it…

Otto’s Team

I can automate my work!...

Page 7: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

5

Mr. Otto Mate

Perfect!

Can you add…

Otto’s Team

Piece of cake!

Mr. Mann a. Ger

What a wonderful

world!...

A common automation story…

Page 8: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

6

Mr. Otto Mate

Otto! The

last release

fails!... Otto’s Team

Arggghhh! Fix Fix Fix

Mr. Mann a. Ger

Makes sense… Sir! I need time! I need help!

… and mates

A common automation story…

Page 9: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

7

Mr. Otto Mate … and mates

… and mates

… and mates

A common automation story…

Page 10: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

… and mates

… and mates

8

Mr. Oto Mate … and mates

Let’s REDESIGN!!!

#$&@***!!!

Mr. Mann a. Ger

A common automation story…

Page 11: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

A pattern emerges…

9

Page 12: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Pattern #1: Mushrooming

Page 13: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

11

Stage 1 – Small & Local

Single User / Developer

Simple Tool

A pattern…

Page 14: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Stage 2 – Generalization

12 12

Multiple Users / Single Developer

Enhanced Tool

A pattern…

Page 15: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

13 13

A pattern…

Multiple Users &

Developers

Complicated Tool

Stage 3 – Staffing

Page 16: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

14 14

A pattern…

Test Case

Management

Multiple Users &

Developers

Stage 4 – Non-core features

Page 17: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

15 15

A pattern…

Stage 5 – Overload

Arghhh!

Page 18: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Pattern #2: The Competition

16

Page 19: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Team B

Pattern #2 – The Competition (ver. 1) 17

Team A

Page 20: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Team B

Pattern #2 – The Competition (ver. 2) 18

Team A

Team C

Team D !!!

Page 21: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Team B

Pattern #2 – The Competition (ver. 3) 19

Team A

Team C

Team D

!!!

!!!

!!! …

Page 22: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Pattern #3: The Night Run Fallacy

Page 23: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Pattern #3 – The Night Run Fallacy 21

Page 24: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Pattern #3 – The Night Run Fallacy 22

Night Time

Test Time

Page 25: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Pattern #3 – The Night Run Fallacy 23

Add a snapshot – or a movie snippet – of PAVE

Corporate Truism:

It’s easier to get budget for machines than for more testers

Page 26: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Pattern #3 – The Night Run Fallacy 24

Add a snapshot – or a movie snippet – of PAVE

Page 27: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Pattern #3 – The Night Run Fallacy 25

Test Automation Truism:

Machines create work for more testers

Page 28: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

The Tragedy of the Commons

multiple individuals…

will ultimately deplete a shared limited resource…

even when it is not in their long-term interest

Garrett Hardin, Science, 1968

Page 29: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Pattern #4: Going for the Numbers

Page 30: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

28

Page 31: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

29

Pattern #5 – Going for the Numbers

Page 32: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Robustness is Invisible

30

Pattern #4 – Going for the Numbers

Page 33: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Pattern #5: The Magician Apprentice Syndrome

Page 34: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Pattern# 5 – The Magician Apprentice 32

Page 35: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

33

Recap: The Patterns

Mushrooming

The Competition

The Night time Fallacy

Going for the Numbers

The Magician Apprentice

Page 36: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

So... 34

What can we do?

Page 37: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Are the patterns… 35

Unavoidable ??

Page 38: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Counter measures 36

Page 39: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Mushrooming 37

Page 40: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

How to use this information?

GPS Locate the stage you are at

Get directions for the way out

Map

Start right and avoid

the wrong turns

38

Alert Signals & Counter Measures

Page 41: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Alert Signals 39

Page 42: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

40

Alert Signals

Page 43: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Failing the project

Failing the project

Failing the project

Failing the project

Failing the project

41

Alert Signals

Page 44: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Single feature test tool?

The creator is the user?

“Skunk works”?

Key words: “Tool”

“Utility”

42

Alert Signals: Stage 1 Small, local, feature-centered

Page 45: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Ensure the following… and relax:

Code control

Documentation User Manual (Usage line…)

“Green” in the code

High level design

43

Counter Measures: Stage 1 Small, local, feature-centered

Page 46: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Additional features?

Multiple users?

Automation web site?

>25% of the tester’s time?

Key words: “Use by other testers”

“Common Libraries”

44

Alert Signals: Stage 2 Generalization

Page 47: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

45

Counter Measures: Stage 2 Generalization

“The hardest part of building a software system is deciding

precisely what to build... No other part of the work so cripples

the resulting system if done wrong. No other part is more

difficult to rectify later” - Fred P. Brooks (author of “The Mythical Man-Month”)

Page 48: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Stage 1 measures

Strategy

Architecture

Lightweight PM Version control

Scope control

Bugs & Requests database

46

Counter Measures: Stage 2 Generalization

Page 49: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Alert Signals: Stage 3

Requests for additional heads?

Automation F2F?

Tool-related delays in execution?

Key words: “Tool Owner”; “Automation team”

“Framework”; “Infrastructure”

“Roll back”

“Bug fix release”

47 Institutionalization and staffing

Page 50: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

48 48

Page 51: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Stage 1, 2 counter measures

Management level decision time Programming language

Framework focus

Code and release management

Acceptance tests

Skillset development

Metrics

49 Institutionalization and staffing

Counter Measures: Stage 3

Page 52: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Counter Measures: Stage 3

Metrics suggestions

Automation framework quality Number of false fails

Framework’s test results; Bug trends

ROI Number of runs

Invested effort by type (new,

maintenance, rewrite)

Number of bugs found by Automation (?)

50 Institutionalization and staffing

Page 53: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Generic features?

Test log wading?

False fails?

Key words: “test suite / cycle generation”

“robustness enhancement”

“setup issues”

51

Alert Signals: Stage 4 Change of focus: Technology Management

Page 54: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Stage 1, 2, 3 counter measures

Build VS Buy

Re-architect Core / Non-Core

Solid infrastructure

Influence upstream Testability hooks

Design for Test (automation)

52

Counter Measures: Stage 4 Change of focus: Technology Management

Page 55: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Stage 4 – Non-core features

Build VS Buy?

(hint: Buy)

See: http://www.stickyminds.com/s.asp?F=S17601_COL_2

Counter Measures: Stage 4

Page 56: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Build (VS Buy) if… Competitive edge

Existing expertize

Core competency

Cheaper; Faster

Good use of resources

Acceptable risk

Long term support

54

Counter Measures: Stage 4 Change of focus: Technology Management

Main source: Allen Eskelin http://www.informit.com/articles/article.aspx?p=21775

Page 57: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Maintenance & logistics overload?

Limitations overplay?

Loss of credibility?

Stage 1 initiatives?

Key words “Did it fail in manual test?”

“Architecture limitation”

“refactoring”; “redesign”

“…I can write a small program…”

55

Alert Signals: Stage 5 Maintenance overload; Re-design

Page 58: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Loss of credibility

56

Alert Signals: Stage 5 Maintenance overload; Re-design

Page 59: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Options:

Continue…

Give up problematic areas

Partial return to Stage 1

“We value Robustness over New Features”

Prepare for re-design – with a new map...

57

Counter Measures: Stage 5 Maintenance overload; Re-design

Page 60: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

GPS

Locate the stage you are at

Get directions for the way out

Be alert for Alerts

Identify your stage

Analyze your situation

Implement Counter

Measures

How to Use this information? 58

Page 61: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Plan your trip

Be alert for Alerts

Analyze your situation

Implement Counter

Measures

How to Use this information? 59

Map

Start right and avoid

the wrong turns

Page 62: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

The Competition 60

Page 63: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Pattern #2 – The Competition (ver. 1) 61

Salvageable up to stage 2

Stage 3 and up: Merge the teams

EOL both tools

Start a 3rd

Page 64: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Pattern #2 – The Competition (ver. 2) 62

Plugin Architecture

Page 65: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Pattern #2 – The Competition (ver. 3) 63

Fix the main problem

Accept, encourage Stage 1 stuff…

Maintaining vigil:

Avoid ver.1 pattern

Page 66: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

The Night Run Fallacy 64

Page 67: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Pattern #3 – The Night Run Fallacy 65

Never forget test time, test efficiency

Balance test skills VS automation skills

Allocate machines or machine time

65

65

65

Page 68: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Going for the Numbers 66

Page 69: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Pattern #4 – Going for the Numbers 67

Change how you count “Done”

Page 70: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

The Magician Apprentice Syndrome 68

Page 71: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Pattern# 6 – The Magician Apprentice 69

http://www.youtube.com/watch?v=zlnz1rSJj7Y

Page 72: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Pattern# 6 – The Magician Apprentice 70

Automation should not necessarily mimic humans…

… it should get the job done

Page 73: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Pattern# 6 – The Magician Apprentice 71

http://www.youtube.com/watch?v=qDVYIT85ntg

Page 74: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Pattern# 5 – The Magician Apprentice 72

Holistic approach VS “test after test”

Re-think, re-strategize, re-evaluate before automating

Identify Actions, Keywords (KDT)

Page 75: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Summary 73

Page 76: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

74

The Patterns

Mushrooming

The Competition

The Night time Fallacy

Going for the Numbers

The Magician Apprentice

Page 77: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

The patterns are pervasive

Almost inevitable

Awareness is key (engineers; managers)

Driven by organizational and human nature

The solution is only partially technical

75

Summary

Page 78: The Pathologies of Failed Test Automation Projects

© Michael Stahl, 2013, all rights reserved

Thank You!

Questions time…