The Parts of a Wind turbine, Construction and Integration . Dr. Péter Kádár Óbuda University, Power System Department , Hungary kadar.peter@kvk . uni-obuda.hu. Draft. The elements of a wind turbine The construction of the wind power plant The building procedure - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/1.jpg)
Óbuda UniversityPower System Department
The Parts of a Wind turbine, Construction and Integration
Dr. Péter KádárÓbuda University, Power System Department, Hungary
![Page 2: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/2.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Draft
• The elements of a wind turbine• The construction of the wind power plant• The building procedure• Integration of wind energy into bulk power
systems
2
![Page 3: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/3.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Growing unit performance
Today:120-160 m 3,5-5 MW
3
![Page 4: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/4.jpg)
Óbuda UniversityPower System Department
Limits: the sky
Wind Turbine Construction - Wind energy integration - Patra, 2012
4
![Page 5: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/5.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Parts of a wind turbine
5
Low-med. volt. transformer
cable
steel tower
power electronics
gearbox
rotorblades
anemometer
generator
turning generator house
grid
![Page 6: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/6.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Foundation
6
![Page 7: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/7.jpg)
Óbuda UniversityPower System Department
Transportation
Wind Turbine Construction - Wind energy integration - Patra, 2012
7
![Page 8: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/8.jpg)
Óbuda UniversityPower System Department
Transportation
Wind Turbine Construction - Wind energy integration - Patra, 2012
8
![Page 9: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/9.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Craning
9
![Page 10: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/10.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Nacelle
10
![Page 11: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/11.jpg)
Óbuda UniversityPower System Department
Trends
Wind Turbine Construction - Wind energy integration - Patra, 2012
11
traditional up-to-date
Tower steel concrete
Height low high
Rpmsemi fixed
speedvariable speed
Cut in 3m/s 2,5m/s
![Page 12: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/12.jpg)
Óbuda UniversityPower System Department
E-40 – E-82
Wind Turbine Construction - Wind energy integration - Patra, 2012
12
![Page 13: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/13.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
New control paradigm: wind priority
Traditional control: Load demand -> generation control on the base of the demand
Wind priority: we let generate all the wind plant, and we produce some more by the request
Future: intelligent generation and load harmonisation (Demand Side Management)
13
![Page 14: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/14.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
New control paradigm: wind priority
Traditional:Control by the demand• E.g. steam
generation• Turbine• Generator
Wind:Control by the wind
speed and demand• rotor blades• generator
14
![Page 15: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/15.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Indirect and direct driving
15
![Page 16: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/16.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Connection of the generator to the grid
30 Hz 50 Hz
20 Hz 50 Hz
Appr. RPM900-1000changing
Fixed frequency (RPM)
16
![Page 17: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/17.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Control: pitch, P,Q
17
![Page 18: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/18.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Electrical connection: compact substation
18
![Page 19: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/19.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Connection to 20 kV
19
![Page 20: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/20.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Single line scheme
20
![Page 21: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/21.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
More details…
21
![Page 22: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/22.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Protection, measurements, settling, RTU
22
![Page 23: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/23.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Connection between the tower and the compact substation
23
![Page 24: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/24.jpg)
Óbuda UniversityPower System Department
Power, voltage level and topology
• 1 unit: cca. 2 MW (0,8 – 3,5 MW)• 20 kV for transmission 3-8 MW• Wind park: 20-30 units -> 110/120 kV• Special topologies: ring, tree, quadratic, meshed, etc.• Security – geography – economy – ecology
Wind Turbine Construction - Wind energy integration - Patra, 2012
24
![Page 25: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/25.jpg)
Óbuda UniversityPower System Department
Wind speed changesby Jensen
Wind Turbine Construction - Wind energy integration - Patra, 2012
25
![Page 26: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/26.jpg)
Óbuda UniversityPower System Department
„Wind shadow” – Wake effect decreasig speed – decreasing energy
(work of Javier Serrano)
Wind Turbine Construction - Wind energy integration - Patra, 2012
26
![Page 27: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/27.jpg)
Óbuda UniversityPower System Department
Micrositing - optimisation(work of Javier Serrano)
Wind Turbine Construction - Wind energy integration - Patra, 2012
27
![Page 28: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/28.jpg)
Óbuda UniversityPower System Department
Quadratic displacement, Burgenland, Austria
Wind Turbine Construction - Wind energy integration - Patra, 2012
28
![Page 29: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/29.jpg)
Óbuda UniversityPower System Department
Line on the hill edge
Wind Turbine Construction - Wind energy integration - Patra, 2012
29
![Page 30: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/30.jpg)
Óbuda UniversityPower System Department
Molina moderna de Aragón
Wind Turbine Construction - Wind energy integration - Patra, 2012
30
![Page 31: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/31.jpg)
Óbuda UniversityPower System Department
Wind metering tower
Wind Turbine Construction - Wind energy integration - Patra, 2012
31
![Page 32: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/32.jpg)
Óbuda UniversityPower System Department
Atienza, Spain
Wind Turbine Construction - Wind energy integration - Patra, 2012
32
![Page 33: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/33.jpg)
Óbuda UniversityPower System Department
Near Calatayud, Spain
Wind Turbine Construction - Wind energy integration - Patra, 2012
33
![Page 34: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/34.jpg)
Óbuda UniversityPower System Department
Near Calatayud, Spain
Wind Turbine Construction - Wind energy integration - Patra, 2012
34
![Page 35: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/35.jpg)
Óbuda UniversityPower System Department
Near Calatayud, Spain150 towers on this picture!
Wind Turbine Construction - Wind energy integration - Patra, 2012
35
![Page 36: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/36.jpg)
Óbuda UniversityPower System Department
Kefalonia, Greece
Wind Turbine Construction - Wind energy integration - Patra, 2012
36
![Page 37: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/37.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
MeasurementsCharacteristics, RPM, output power
Szélerőmű karakterisztika - induló szakasz
0
50
100
150
200
0 1 2 3 4 5 6 7
szélsebesség m/s
kW Szélerőmű kiadott teljesítménye
0
50
100
150
200
14:03:50 14:06:43 14:09:36 14:12:29 14:15:22 14:18:14 14:21:07
időkW
A szabályozott rotor fordulatszám
0
2
4
6
8
10
12
14
0 50 100 150 200
kiadott teljesítmény kW
n / p
erc
37
Cut in
RPM
Power out
![Page 38: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/38.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Niederland , Cabo Verde, Burgenland (A), Portugal
38
![Page 39: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/39.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Windpower plants in Hungary, 2006
39
![Page 40: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/40.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
V90
40
![Page 41: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/41.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Characteristics
41
![Page 42: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/42.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Rotor blade
V90 (~44 m) MD 77 (37,5 m)6,5 t!
Glassfiber – epoxiGrafit fiber
42
![Page 43: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/43.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
FL MD77
43
![Page 44: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/44.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
MD 77
44
![Page 45: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/45.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
E 48
45
![Page 46: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/46.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
E 48
46
![Page 47: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/47.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
E82
47
![Page 48: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/48.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Characteristics measurements
48
![Page 49: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/49.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
„Storm control”
49
![Page 50: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/50.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Comparison
50
![Page 51: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/51.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Bükkaranyos
51
![Page 52: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/52.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Erk
52
![Page 53: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/53.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Inota
53
![Page 54: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/54.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Kulcs
54
![Page 55: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/55.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Mezőtúr
55
![Page 56: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/56.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Mosonmagyaróvár -Levél
56
![Page 57: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/57.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Mosonszolnok
57
![Page 58: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/58.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Szápár
58
![Page 59: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/59.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Törökszentmiklós
59
![Page 60: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/60.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
System load <–> wind production
A hazai villamosenergia-rendszer terhelése 2005.12.14.
01000200030004000500060007000
1 3 5 7 9 11 13 15 17 19 21 23
óra
MW
Szélerőmű kiadott teljesítménye
0
50
100
150
200
14:03:50 14:06:43 14:09:36 14:12:29 14:15:22 14:18:14 14:21:07
idő
kW
60
![Page 61: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/61.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Balancing with CO2
61
![Page 62: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/62.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Feel the measure!
V27 – 225 kW E-40 600 kW E-48 800 kW
62
![Page 63: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/63.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Feel the measure!
MD-77 1,5 MW V-90 1,8 MW E-70 2 MW 63
![Page 64: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/64.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
How many tower represents 1000 MW?
• V27 225 kW 4444 pcs• E-40 600 kW 1666 pcs• E-48 800 kW 1250 pcs• MD-77 1,5 MW 666 pcs• V-90 1,8 MW 555 pcs• E-70 2 MW 500 pcs
A lot.
64
![Page 65: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/65.jpg)
Óbuda UniversityPower System Department
Wind energy integration
Wind Turbine Construction - Wind energy integration - Patra, 2012
65
![Page 66: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/66.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Energy production calculation
• If 1000 MW built in capacity operates in 1 year with 20 % usage ratio
• 365 days x 24 hours x 1000 MW x 0,2 % = 1.752.000 [MWh] = 1,752 TWh
• In Hungary it is only 4,47 % of the total consumption
• Not too much
66
![Page 67: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/67.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Power ratio
It is much!Forrás: A magyar villamosenergia-rendszer 2005. évi statisztikai adatai, MVM Zrt., 2006
67
![Page 68: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/68.jpg)
Óbuda UniversityPower System Department
How the wind blows
• BEWAG experiences: gradient 60 MW/h• 3 areas - 3 different wind blows• Local autobalancing in the windpark• Balancing between different areas
Wind Turbine Construction - Wind energy integration - Patra, 2012
68
A kimenő teljesítmény 10 perc múlva történő megváltozásának napi maximuma 330 MW beépített szélerőmű teljesítmény esetén
0
20
40
60
80
100
120
140
218 200 182 163 145 127 109 91 73 54 36 18 0
MW
Napo
k sz
áma
(éve
nte)
Koncentrált
Szétszórt
http://www.vrbpower.com/
![Page 69: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/69.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
69
Sudden stop of wind power plants
• Too strong wind (over 25-30 m/s)• Network faults• Frequency problems
Is it really problem to loose 200 MW? – daily eventsThe network flexibility must be raised!
• Diversification• Forecast
![Page 70: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/70.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
70
• Fault in Spain
• 2006.11.04.
• Storm in Denmark
![Page 71: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/71.jpg)
Óbuda UniversityPower System Department
2008. 04.01. operation - BEWAG
Wind Turbine Construction - Wind energy integration - Patra, 2012 71
![Page 72: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/72.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
72
The UTSIRA project
![Page 73: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/73.jpg)
Óbuda UniversityPower System Department
73
Hydrogen generation
On-site hidrogén előállító eszköz
Szélerőmű
Közlekedési felhasználás
Hidrogén kút
On-site hidrogén előállító eszköz
Szélerőmű
Szállítás
Szállítás
Wind Turbine Construction - Wind energy integration - Patra, 2012
![Page 74: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/74.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
74
Központi hidrogén előállító eszköz
Szélerőműpark
Szélerőmű
KÖF eloszt
ó hálóza
t
120 kV-os főelos
ztó hálóza
t Rendszerirányítói
szabályozás
Rendszerirányítói szabályozás
-4-3-2-10123456
1 3 5 7 9 11 13 15 17 19 21
Szél össztermelés
Rendszerirányítói többlet =Hidrogén átalakító fogyasztása
Hidrogén kút
Közlekedési felhasználás
Central hydrogen generation – system operatior control
Rendszerirányítói szabályozás
-4-3-2-10123456
1 3 5 7 9 11 13 15 17 19 21
Szél össztermelés
Rendszerirányítói többlet =Hidrogén átalakító fogyasztása
![Page 75: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/75.jpg)
Óbuda UniversityPower System Department
Where to find the control capacities?
Wind Turbine Construction - Wind energy integration - Patra, 2012
75Hotel Benczúr 2008.04.02.
Unused controllable capacities
Uncontrolled gas fired capacities
![Page 76: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/76.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
76
Co-control of gas engines and wind turbines
![Page 77: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/77.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
77
Wind generation + gas engine generation + balancing
Szélerőmű + gázmotor + tervezett kiegyenlítés
0
500
1000
1500
2000
2500
1 3 5 7 9 11 13 15 17 19 21 23
óra
kW
Előrejelzett szél termelésTényleges széltermelésTervezett kiegyenlítésGázmotor kiegyenlítésTermelési összeg
![Page 78: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/78.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
78
Load of the gas engine
A gázmotor terhelése
-20-10
0102030405060708090
1 3 5 7 9 11 13 15 17 19 21 23
óra
%
Csoport hiba %Gázmotor eltérés %Gázmotor tervezett % Gázmotor tényleges %
![Page 79: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/79.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
79
Control Center for Renewable Energy (CORE)
• Iberdrola• Toledo, Spain• Virtual power plant• Connection to the ISO• On-line control of the wind towers • Maitenance control
![Page 80: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/80.jpg)
Óbuda UniversityPower System Department
What helps the integration?
• Control of the windpark output• Diversification• Local control centers• Intraday power exchange
Wind Turbine Construction - Wind energy integration - Patra, 2012
81Szélenergia integrálás - aukciós szempontokGKM konzultáció 2008.04.16.
![Page 81: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/81.jpg)
Óbuda UniversityPower System Department
American plans…
Wind Turbine Construction - Wind energy integration - Patra, 2012
82
source: Ed DeMeo, Renewable Energy Consulting Services, Inc. UWIG techn. Workshop, 24 July, 2007, Anchorage, Alaska
![Page 82: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/82.jpg)
Óbuda UniversityPower System Department
Conclusion
• The wind technology is cleared, this is the high time of the application
• The hot topics are the off shore plants• The integration of the wind energy is the question of
decision• The present network structures was not planned and
implemented for the trade and renewable generation
Have a good work!
Wind Turbine Construction - Wind energy integration - Patra, 2012
83
![Page 83: The Parts of a Wind turbine, Construction and Integration](https://reader036.vdocuments.site/reader036/viewer/2022062501/56816948550346895de0d84f/html5/thumbnails/83.jpg)
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Thanks for the attention!