the old pottery, kennall vale

1
N F I R S T F L O O R - S C A L E 1 : 50 11 21 Bedroom Escape Velux Spa n of Jo ists 22mm T & G f l ooring grade chipboard, on joists @ 400mm centres. As per Engineers spec. Ceiling f i nished with 12.5mm plasterboard with skim coat plaster f i nish on vapour barrier. Fill the ceiling void with 100mm glass f i bre insulation. Bathroom walls to be fi lled with acoustic insulation. Bedroom Escape/ Seat Ensu ite Sun Pi pe High level Garden Ceiling mounted extract fan to discharge to soff i t. Fan to provide 15ltrs/sec fan to have a 5 minute Overrun. Handrail to be added to internal balcony. 1100mm in height with maximum gaps of 95mm. Existing window to be removed and new double glazed unit to be installed in new position. Sealed unit to acheive u-value of 1.8w/m2k. And toughened accordance with Part N of the Building Regulations. To be installed using prestressed concrete lintels designed by engineer. G R O U N D F L O O R - S C A L E 1 : 50 Kitchen SD SD HD Repoint and make good stonework to garage Wall mounted extractor fan to provide 60l/sec. External walls to consist of 200mm rough stone on the outer leaf and 100mm blockwork on inner leaf. RIW liquid membrane to be applied to outside face of blockwork. 50mm ventilated Cavity. Breather membrane attached to timberframe walling. 150mm timber frame section packed with 150mm Rockwool insulation.10mm Internal render base coat and skin coat plaster f i nish. New f l oor constructed with 22mm thick Oak f l oor boards on vapour barrier on 85mm Celotex tuff-R insulation laid on combined Visqueen DPM/ Radon Barrier on 150mm thick concrete f l oor incorporating a142 reinforcing mesh, slab laid on sand binding over 150mm thick well consolidated hardcore. New upvc windows, sealed units to acheive u-value of 1. 8w/m2k Utility Din ing Room Bedroom Gabion Baskets Gabion Baskets Bathroom walls to be fi lled with acoustic insulation. Wall mounted extractor fan to provide 15l/sec. SECTION A-A - S C A L E 1 : 50 Wa rd obe 22mm T & G f l ooring grade chipboard, on joists @ 400mm centres. As per Engineers spec. Ceiling f i nished with 12.5mm plasterboard with skim coat plaster f i nish on vapour barrier. Fill the ceiling void with 100mm glass f i bre insulation. Sun Pi pe Bridge to high level Garden. Constructed to specialist details. Encorporaing a 1100mm high handrail with maximum gaps of 95mm. Retaining handrail at 1100mm high with maximum gaps of 95mm as protection from high level garden. Permanent seat to be install to provide access to ecsape window. Construction to be agreed. WC Study Ensuite 9mm Pine f i nish laid on 22mm T and G f l ooring grade chipboard over 80mm 3XI insulation. A 1200 grade DPM over150mm Concrete slab laid over a second 1200grade DPM laid on 25mm sand binding over 250mm thick well consolidated hardcore. Stairs with 200mm rise and 245mm going. Storeroom Additional insullation to be added to existiing wall. 70mm celotex 3000R encased in timber studing, f i nished off with 9mm plasterboard, with Stairs with 200mm rise and 300mm going. SD Internal studs to be 75 x 50 timberstuds @ 400 cts.Clad both sides with 12.5mm Gyproc wall board 10. New velux, sky light to be f i tted with trickle air vent, providing more than 8000mm2 background ventilation. New Sanitary Fittings to be f i tted with the following :- -Bath to have 40mmリ UPVC waste with 50mm deep seal trap. -Basin to have 32mmリ UPVC waste with 75mm DST. -WC to have 100mmリ UPVC waste. -All to connect into new polypropylene manhole constructed over existing foul drainage run. 1. This draw in g is the co pyright of t he Architects and m ay not be reproduced w itho ut licence. 2. D o not scale off th is drawing - only f i g ured dim ension s a re to be w orked f rom. 3. All dimensio ns and levels are to be checke d on site by the C ontract or be fore the comme nce ment of any work and any discrepa ncies reported to th e Architect. 4. N o re spo nsibility can b e acce pted for errors arising on sit e due to un authorised va riations from the Arch itects drawings. 5. The C ontract or is recomm ended to visit the site befo re te ndering to ascertain all local conditions and restrictio ns likely to affect th e works. N o cla im s arising f rom f ailure to do so will be considered. 6. Tende rs must includ e for all w orks described or being a ppare nt on the drawings or can be reasonab ly inferred a s b ein g necessa ry fo r the prop er execution of the w orks. 7. This draw in g is for tow n planning an d build ing regu lations on ly and is not a com ple te working dra wing. 8. D epth, size and de sign o f founda tio ns sho wn are preliminary only, actua l fo undation, d epth, size and design m ay d iffe r dep ending on site conditions. notes amendments. date. client. project. drg . scale. date. drawn. Jo Kearsley proj. no. drg. no. rev. checked The Old Pottery Ponsanooth TR3 7HJ Proposed Plans and Elevations. 1:100 & 1:50 @ A1 January/ 2008 SPP 2007/2184/ 102 [email protected] Building Regulations Only HITECTS ARC Rev. A. 03.10.07 Minor amendments. Tel. (01872) 272723 & 560246 Trevissome Barn, Trevissome Park, Chiverton Cross Truro. TR4 8UN N O R T H E L E V A T I O N - S C A L E 1 : 1 0 0 S O U T H E L E V A T I O N - S C A L E 1 : 1 0 0 W E S T E L E V A T I O N - S C A L E 1 : 1 0 0 E A S T E L E V A T I O N - S C A L E 1 : 1 0 0 A A

Upload: future-village-limited

Post on 27-Jan-2016

224 views

Category:

Documents


0 download

DESCRIPTION

Total renovation of The Old Pottery, Kennall Vale, Ponsanooth, TRURO, Cornwall. The house is now doubled in size and we have opened it as a Bed and Breakfast. Call Caroline on 07974211841 for more details.

TRANSCRIPT

Page 1: The Old Pottery, Kennall Vale

N

F I R S T F L O O R - S C A L E 1 : 50

1121

Bedroom

Escape Velux

Span of Jo ists

22mm T & G f looring grade chipboard, on joists @ 400mm centres. As per Engineers spec.Ceiling f inished with 12.5mm plasterboard with skim coat plaster f inish on vapour barrier.Fill the ceiling void with 100mm glass f ibre insulation.

Bathroom walls to be f illed withacoust ic insulat ion.

Bedroom

Escape/ Seat

Ensuite

Sun Pipe

High level Garden

Ceiling mounted extract fan to discharge to soff it . Fan to provide 15ltrs/sec fan to have a 5 minute Overrun.

Handrail to be added to internal balcony.1100mm in height with maximum gaps of 95mm.

Existing window to be removed and new double glazed unit to be installed in new position. Sealed unit to acheive u-value of 1.8w/m2k. And toughened accordance with Part N of the Building Regulations. To be installed using prestressed concrete lintels designed by engineer.

G R O U N D F L O O R - S C A L E 1 : 50

Kitchen

SD

SD

HD

Repoint and makegood stonework to garage

Wall mounted extractor fan to provide 60l/sec.

External walls to consist of 200mm rough stone on the outer leaf and 100mm blockwork on inner leaf. RIW liquid membrane to be applied to outside face of blockwork. 50mm vent ilated Cavity. Breather membrane attached to timberframe walling. 150mm timber frame section packed with 150mm Rockwool insulation.10mm Internal render base coat and skin coat plaster f inish.

New f loor constructed with 22mm thick Oak f loor boards on vapour barrier on 85mm Celotex tuff-R insulation laid on combined Visqueen DPM/ Radon Barrier on 150mm thick concrete f loor incorporating a142 reinforcing mesh, slab laid on sand binding over 150mm thick well consolidated hardcore.

New upvc windows, sealed units to acheive u-value of 1.8w/m2k

Utility

Din ing Room

Bedroom

Gabion Baskets

Gab

ion

Bask

ets

Bathroom walls to be f illed withacoust ic insulat ion.

Wall mounted extractor fan to provide 15l/sec.

SECTION A-A - S C A L E 1 : 50

Wardobe

22mm T & G f looring grade chipboard, on joists @ 400mm centres. As per Engineers spec.Ceiling f inished with 12.5mm plasterboard with skim coat plaster f inish on vapour barrier.Fill the ceiling void with 100mm glass f ibre insulation.

Sun Pipe

Bridge to high level Garden. Constructed to specialist details. Encorporaing a 1100mm high handrail with maximum gaps of 95mm.

Retaining handrail at 1100mm high with maximum gaps of 95mm as protect ion from high level garden.

Permanent seat to be install to provide access to ecsape window. Construction to be agreed.

WC

Study

Ensuite

9mm Pine f inish laid on 22mm T and G f looring grade chipboard over 80mm 3XI insulation. A 1200 grade DPM over150mm Concrete slab laid over a second 1200grade DPM laid on 25mm sand binding over 250mm thick well consolidated hardcore.

Stairs with 200mm rise and 245mm going.

Storeroom

Additional insullation to be added to existiing wall. 70mm celotex 3000R encased in timber studing, f inished off with 9mm plasterboard, with

Stairs with 200mm rise and 300mm going.

SD

Internal studs to be 75 x 50 timberstuds @ 400 cts.Clad both sides with 12.5mm Gyproc wall board 10.

New velux, sky light to be f itted with trickle air vent, providing more than 8000mm2 background ventilation.

New Sanitary Fit tings to be f itted with the following :--Bath to have 40mmØ UPVC waste with 50mm deep seal trap.-Basin to have 32mmØ UPVC waste with 75mm DST.-WC to have 100mmØ UPVC waste.-All to connect into new polypropylene manhole constructed over exist ing foul drainage run.

1. This draw in g is the co pyright of t he Architects and m ay not be reproduced w itho ut licence.2. Do not scale off th is drawing - only f ig ured dim ension s a re to be worked f rom.3. All dimensio ns and levels are to be checke d on site by the Contract or be fore the comme nce ment of any work and any discrepa ncies reported to th e Architect.4. No re spo nsibility can b e acce pted for errors arising on sit e due to un authorised va riations from the Arch itects drawings.5. The Contract or is recomm ended to visit the site befo re te ndering to ascertain all local conditions and restrictio ns likely to affect th e works. No cla im s ar ising f rom f ailure to do so will be considered.6. Tende rs must includ e for all works described or being a ppare nt on the drawings or can be reasonab ly inferred a s b ein g necessa ry fo r the prop er execution of the works.7. This draw in g is for town planning an d build ing regu lations on ly and is not a com ple te working dra wing.8. Depth, size and de sign o f founda tio ns sho wn are preliminary only, actua l fo undation, d epth, size and design m ay d iffe r dep ending on site conditions.

notes

amendments. date.

client.

pro ject.

drg.

sca le.

date.

drawn.

Jo Kearsley

proj . no. drg. no. rev.

checked

The Old PotteryPonsanoothTR3 7HJ

Proposed Plans and Elevations.

1:100 & 1:50 @ A1January/ 2008SPP

2007/2184/ 102

[email protected]

Build

ing

Regu

latio

ns O

nly

H I T E CT SA R C

Rev. A. 03.10.07Minor amendments.

Tel. (01872) 272723 & 560246

Trevissome Barn, Trevissome Park, Chiverton CrossTruro. TR4 8UN

N O R T H E L E V A T I O N - S C A L E 1 : 1 0 0 S O U T H E L E V A T I O N - S C A L E 1 : 1 0 0 W E S T E L E V A T I O N - S C A L E 1 : 1 0 0E A S T E L E V A T I O N - S C A L E 1 : 1 0 0

A

A