The New JerseyNonstructural Strategies
Point System(NSPS)
2011 Low Impact Development Symposium
Storm Water Management Consulting, LLC
Storm Water Management Consulting, LLC
NJDEP SWM Rules (NJAC 7:8)
Issued Jointly with NJDEP Municipal Stormwater Regulation Program (NJAC 7:14) in 2004 Developed in Response to 1999 EPA
Final Phase II Stormwater Rules SWM Rules Address Phase II Rules’
Post-Construction Stormwater Management Requirements
Storm Water Management Consulting, LLC
NJDEP SWM Rules (NJAC 7:8) Four Primary Design Requirements: Stormwater Quality Standards Stormwater Quantity Standards Groundwater Recharge Standards Nonstructural Stormwater Strategies
Storm Water Management Consulting, LLC
Nonstructural Stormwater Management Strategies
From NJAC 7:8-5.2 (a):
“Stormwater management measures for major developments shall be developed to meet the erosion control, groundwater recharge, stormwater runoff quantity, and stormwater runoff quality standards at NJAC 7:8 – 5.4 and 5.5.”
Storm Water Management Consulting, LLC
Nonstructural StormwaterManagement Strategies
“To the maximum extent practicable, these standards shall be met by incorporating nonstructural stormwater management strategies at NJAC 7:8-5.3 into the design.”
Storm Water Management Consulting, LLC
Nonstructural Stormwater Management Strategies
From NJAC 7:8-5.3 (b):
Nonstructural Strategies shall:1. Protect Areas that Provide Water Quality
or are Susceptible to Erosion2. Minimize, Break Up, and/or Disconnect
Impervious Surfaces3. Maximize Protection of Natural Drainage
Features and Vegetation
Storm Water Management Consulting, LLC
Nonstructural Stormwater Management Strategies
Nonstructural Strategies shall:4. Minimize Decrease in TC5. Minimize Land Disturbance, Clearing,
and Grading6. Minimize Soil Compaction7. Provide Low Maintenance Vegetation8. Provide Vegetated Conveyance Systems9. Provide Pollutant Source Controls
Storm Water Management Consulting, LLC
Nonstructural StormwaterManagement Strategies
Since 2004 Issuance of SWM Rules, Defining “Maximum Extent Practicable” Requirement has been Difficult Question: How Much Nonstructural is
Enough? Response: Nonstructural Strategies
Points System
Storm Water Management Consulting, LLC
Nonstructural StrategiesPoint System (NSPS)
NSPS can be Used to: Directly Demonstrate Compliance
with “Maximum Practicable” Requirement Provide Objective Basis of
Discussion of Project Compliance Provide Basis for Contention of
Nonstructural Infeasibility
Storm Water Management Consulting, LLC
Nonstructural StrategiesPoint System (NSPS)
NJDEP Policies for NSPS Use: Achieving Required NSPS Points
Sufficient for Approval of Proposed Nonstructural Strategies Failing to Achieve Required NSPS
Points CANNOT be used as Basis of Denial
Storm Water Management Consulting, LLC
Theoretical Basis of NSPS
Goal of Nonstructural Stormwater Management: Maintain Existing Site Hydrology under Proposed Site Conditions Therefore, NSPS Uses Existing Site as
Basis for Determining Adequacy of Nonstructural Measures at Proposed Site
Storm Water Management Consulting, LLC
Theoretical Basis of NSPS
Time
Run
off R
ate
Existing Site
Proposed Site
Base NSPS Pointson Amount of VariationBetween Existing and
Proposed HydrographsOver Selected Time
Period?
Storm Water Management Consulting, LLC
Theoretical Basis of NSPS
NSPS Computes Nonstructural Site Points for Both Existing and Proposed Site Conditions NSPS Adequacy Determination Based
upon Achieving Required Percentage of Existing Site Points under Proposed Conditions
Storm Water Management Consulting, LLC
Theoretical Basis of NSPS
Required Percentage Based upon Project Size and State Planning Area Rationales: Greater Opportunity for
Nonstructural Measures on Larger Sites Greater Need to Maintain Existing
Hydrology in Environmentally Sensitive Zones
Storm Water Management Consulting, LLC
Total Project Size
Larger Projects must Achieve Greater Percentage of Existing Points than Smaller Ones Typical Project Size Ranges: Less than 2 Acres 2 to 10 Acres Greater than 10 Acres
Required Percentage Based upon Sliding Scale from 0.1 to 10+ Acres
Storm Water Management Consulting, LLC
Planning Area
Projects in ‘Higher’ Planning Areas must Achieve Greater Percentage of Existing Points than Ones in ‘Lower’ Planning Areas NSPS Planning Areas: PA-1, 2, 3, 4, 4B,
and 5 Required Percentages Shown on ‘Data
and Formulas’ Worksheet in NSPS
Storm Water Management Consulting, LLC
Required Point Ratios by Planning Area and Site Size
Planning Area: PA-1 PA-2 PA-3 PA-4 PA-4B PA-5
< 2 Acres 0.60 0.75 0.80 0.84 0.89 0.95
2 to10 Acres 0.69 0.84 0.89 0.93 0.98 1.04
> 10 Acres 0.80 0.95 1.00 1.04 1.09 1.15
Storm Water Management Consulting, LLC
Required Points by Planning Area and Site Size
50%
60%
70%
80%
90%
100%
110%
120%
Planning Area
% o
f Exi
stin
g Po
ints
Req
uire
d
<2 Acres2-10 Acres>10 Acres
1 2 3 4 54B
Storm Water Management Consulting, LLC
NSPS Points
Existing and Proposed NSPS Points Based upon: Site Soils Existing and Proposed Land
Uses/Land Covers Additional Proposed Nonstructural
Measures
Storm Water Management Consulting, LLC
Soils and Land Uses/Covers
For Same Soil: Lower Runoff Land Use/Cover Given More Points than Higher Runoff Land Use/Cover For Same Land Use/Cover: More
Pervious Soils Given More Points than Less Pervious Soils
Storm Water Management Consulting, LLC
NSPS Points for HSG A Soils
Land Use/Cover NSPS Points
Indigenous Woods 700
Meadow 650
Lawn 500
Directly Connected Impervious
0
Storm Water Management Consulting, LLC
NSPS Points for Indigenous Woods
HSG NSPS Points
A 700
B 463
C 322
D 253
Storm Water Management Consulting, LLC
Existing Soils and Uses/Covers
NSPS Points Based upon NRCS Curve Numbers (CNs) for Various Soils and Land Uses/Land Covers Complete Table of NSPS Points for
Soils and Land Uses/Covers on ‘Data and Formulas’ Worksheet in NSPS
Storm Water Management Consulting, LLC
Additional Nonstructural Measures
1. Amount of Impervious Cover Related Strategy: Minimize, Break Up,
and/or Disconnect Impervious Surfaces2. Amount of Disturbance Related Strategy: Minimize Land
Disturbance, Clearing, and Grading3. Extent of Vegetated Swales Related Strategy: Provide Vegetated
Conveyance Systems
Storm Water Management Consulting, LLC
Additional Nonstructural Measures
4. Clustering of Residential Lots Related Strategy: Minimize Land
Disturbance, Clearing, and Grading5. Lawn Grading with Lightweight
Equipment Related Strategy: Minimize Soil
Compaction
Storm Water Management Consulting, LLC
Step 1 – Basic Site Information
Total Site Area
Planning Areas
Storm Water Management Consulting, LLC
Step 2 – Existing Site Conditions
Most Land Use/Cover Categories from TR-55 Six Additional NSPS Categories:Wetlands and Stream BuffersWoods – Planted Ponds, Lakes, and Open Waters Porous and Permeable Paving Two Unconnected Impervious Areas
Storm Water Management Consulting, LLC
Step 3 – Proposed Site Conditions
Computed on Maximum AllowableImpervious Cover Table
2. Proposed Impervious Cover:Select “Table”
Storm Water Management Consulting, LLC
Step 3 – Proposed Site Conditions
3. Proposed Site Disturbance:
4. Proposed Vegetated Conveyance:
Storm Water Management Consulting, LLC
Step 3 – Proposed Site Conditions
5. Clustering:
6. Soil Compaction:
Storm Water Management Consulting, LLC
NSPS Results
NSPS Results
Total Proposed Site Points
Required Points Ratio
Proposed to Existing Points Ratio
Storm Water Management Consulting, LLC
NSPS Results
If Required NSPS Points Ratio Achieved:“Proposed Nonstructural Measures are Adequate” If Required NSPS Points Ration Not
Achieved:“Further Review of Proposed Nonstructural Measures is Necessary”
Nonstructural StrategiesPoint System (NSPS)
NSPS Used Successfully Since 2006 to Address “Maximum Extent Practicable” Requirement NSPS Used from Project Planning to
Final Design NSPS Used to Teach and Promote
Awareness of Nonstructural SWM New Version Expected by End of 2011
Storm Water Management Consulting, LLC
Joseph J. Skupien, PE, PPPresident
Storm Water Management Consulting, LLC1108 Old York Road
P.O. Box 727Ringoes, New Jersey 08551
Phone: 908-806-7700Fax: 908-806-7721
Storm Water Management Consulting, LLC