the new jersey nonstructural strategies point system (nsps)...the new jersey nonstructural...

43
The New Jersey Nonstructural Strategies Point System (NSPS) 2011 Low Impact Development Symposium Storm Water Management Consulting, LLC

Upload: others

Post on 18-Mar-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

The New JerseyNonstructural Strategies

Point System(NSPS)

2011 Low Impact Development Symposium

Storm Water Management Consulting, LLC

Storm Water Management Consulting, LLC

NJDEP SWM Rules (NJAC 7:8)

Issued Jointly with NJDEP Municipal Stormwater Regulation Program (NJAC 7:14) in 2004 Developed in Response to 1999 EPA

Final Phase II Stormwater Rules SWM Rules Address Phase II Rules’

Post-Construction Stormwater Management Requirements

Storm Water Management Consulting, LLC

NJDEP SWM Rules (NJAC 7:8) Four Primary Design Requirements: Stormwater Quality Standards Stormwater Quantity Standards Groundwater Recharge Standards Nonstructural Stormwater Strategies

Storm Water Management Consulting, LLC

Nonstructural Stormwater Management Strategies

From NJAC 7:8-5.2 (a):

“Stormwater management measures for major developments shall be developed to meet the erosion control, groundwater recharge, stormwater runoff quantity, and stormwater runoff quality standards at NJAC 7:8 – 5.4 and 5.5.”

Storm Water Management Consulting, LLC

Nonstructural StormwaterManagement Strategies

“To the maximum extent practicable, these standards shall be met by incorporating nonstructural stormwater management strategies at NJAC 7:8-5.3 into the design.”

Storm Water Management Consulting, LLC

Nonstructural Stormwater Management Strategies

From NJAC 7:8-5.3 (b):

Nonstructural Strategies shall:1. Protect Areas that Provide Water Quality

or are Susceptible to Erosion2. Minimize, Break Up, and/or Disconnect

Impervious Surfaces3. Maximize Protection of Natural Drainage

Features and Vegetation

Storm Water Management Consulting, LLC

Nonstructural Stormwater Management Strategies

Nonstructural Strategies shall:4. Minimize Decrease in TC5. Minimize Land Disturbance, Clearing,

and Grading6. Minimize Soil Compaction7. Provide Low Maintenance Vegetation8. Provide Vegetated Conveyance Systems9. Provide Pollutant Source Controls

Storm Water Management Consulting, LLC

Nonstructural StormwaterManagement Strategies

Since 2004 Issuance of SWM Rules, Defining “Maximum Extent Practicable” Requirement has been Difficult Question: How Much Nonstructural is

Enough? Response: Nonstructural Strategies

Points System

Storm Water Management Consulting, LLC

Nonstructural StrategiesPoint System (NSPS)

NSPS can be Used to: Directly Demonstrate Compliance

with “Maximum Practicable” Requirement Provide Objective Basis of

Discussion of Project Compliance Provide Basis for Contention of

Nonstructural Infeasibility

Storm Water Management Consulting, LLC

Nonstructural StrategiesPoint System (NSPS)

NJDEP Policies for NSPS Use: Achieving Required NSPS Points

Sufficient for Approval of Proposed Nonstructural Strategies Failing to Achieve Required NSPS

Points CANNOT be used as Basis of Denial

Storm Water Management Consulting, LLC

Theoretical Basis

Storm Water Management Consulting, LLC

Theoretical Basis of NSPS

Goal of Nonstructural Stormwater Management: Maintain Existing Site Hydrology under Proposed Site Conditions Therefore, NSPS Uses Existing Site as

Basis for Determining Adequacy of Nonstructural Measures at Proposed Site

Storm Water Management Consulting, LLC

Theoretical Basis of NSPS

Time

Run

off R

ate

Existing Site

Proposed Site

Base NSPS Pointson Amount of VariationBetween Existing and

Proposed HydrographsOver Selected Time

Period?

Storm Water Management Consulting, LLC

Theoretical Basis of NSPS

NSPS Computes Nonstructural Site Points for Both Existing and Proposed Site Conditions NSPS Adequacy Determination Based

upon Achieving Required Percentage of Existing Site Points under Proposed Conditions

Storm Water Management Consulting, LLC

Theoretical Basis of NSPS

Required Percentage Based upon Project Size and State Planning Area Rationales: Greater Opportunity for

Nonstructural Measures on Larger Sites Greater Need to Maintain Existing

Hydrology in Environmentally Sensitive Zones

Storm Water Management Consulting, LLC

Total Project Size

Larger Projects must Achieve Greater Percentage of Existing Points than Smaller Ones Typical Project Size Ranges: Less than 2 Acres 2 to 10 Acres Greater than 10 Acres

Required Percentage Based upon Sliding Scale from 0.1 to 10+ Acres

Storm Water Management Consulting, LLC

Planning Area

Projects in ‘Higher’ Planning Areas must Achieve Greater Percentage of Existing Points than Ones in ‘Lower’ Planning Areas NSPS Planning Areas: PA-1, 2, 3, 4, 4B,

and 5 Required Percentages Shown on ‘Data

and Formulas’ Worksheet in NSPS

Storm Water Management Consulting, LLC

Required Point Ratios by Planning Area and Site Size

Planning Area: PA-1 PA-2 PA-3 PA-4 PA-4B PA-5

< 2 Acres 0.60 0.75 0.80 0.84 0.89 0.95

2 to10 Acres 0.69 0.84 0.89 0.93 0.98 1.04

> 10 Acres 0.80 0.95 1.00 1.04 1.09 1.15

Storm Water Management Consulting, LLC

Required Points by Planning Area and Site Size

50%

60%

70%

80%

90%

100%

110%

120%

Planning Area

% o

f Exi

stin

g Po

ints

Req

uire

d

<2 Acres2-10 Acres>10 Acres

1 2 3 4 54B

Storm Water Management Consulting, LLC

NSPS Points

Existing and Proposed NSPS Points Based upon: Site Soils Existing and Proposed Land

Uses/Land Covers Additional Proposed Nonstructural

Measures

Storm Water Management Consulting, LLC

Soils and Land Uses/Covers

For Same Soil: Lower Runoff Land Use/Cover Given More Points than Higher Runoff Land Use/Cover For Same Land Use/Cover: More

Pervious Soils Given More Points than Less Pervious Soils

Storm Water Management Consulting, LLC

NSPS Points for HSG A Soils

Land Use/Cover NSPS Points

Indigenous Woods 700

Meadow 650

Lawn 500

Directly Connected Impervious

0

Storm Water Management Consulting, LLC

NSPS Points for Indigenous Woods

HSG NSPS Points

A 700

B 463

C 322

D 253

Storm Water Management Consulting, LLC

Existing Soils and Uses/Covers

NSPS Points Based upon NRCS Curve Numbers (CNs) for Various Soils and Land Uses/Land Covers Complete Table of NSPS Points for

Soils and Land Uses/Covers on ‘Data and Formulas’ Worksheet in NSPS

Storm Water Management Consulting, LLC

Storm Water Management Consulting, LLC

Additional Nonstructural Measures

1. Amount of Impervious Cover Related Strategy: Minimize, Break Up,

and/or Disconnect Impervious Surfaces2. Amount of Disturbance Related Strategy: Minimize Land

Disturbance, Clearing, and Grading3. Extent of Vegetated Swales Related Strategy: Provide Vegetated

Conveyance Systems

Storm Water Management Consulting, LLC

Additional Nonstructural Measures

4. Clustering of Residential Lots Related Strategy: Minimize Land

Disturbance, Clearing, and Grading5. Lawn Grading with Lightweight

Equipment Related Strategy: Minimize Soil

Compaction

Storm Water Management Consulting, LLC

NSPS Program Input

Storm Water Management Consulting, LLC

Project Name and Description

Storm Water Management Consulting, LLC

Step 1 – Basic Site Information

Total Site Area

Planning Areas

Storm Water Management Consulting, LLC

Step 2 – Existing Site Conditions

Total Existing Site Points

Storm Water Management Consulting, LLC

Step 2 – Existing Site Conditions

Most Land Use/Cover Categories from TR-55 Six Additional NSPS Categories:Wetlands and Stream BuffersWoods – Planted Ponds, Lakes, and Open Waters Porous and Permeable Paving Two Unconnected Impervious Areas

Storm Water Management Consulting, LLC

Step 3 – Proposed Site Conditions

Storm Water Management Consulting, LLC

Step 3 – Proposed Site Conditions

Computed on Maximum AllowableImpervious Cover Table

2. Proposed Impervious Cover:Select “Table”

Storm Water Management Consulting, LLC

Maximum Impervious Cover Table

Storm Water Management Consulting, LLC

Step 3 – Proposed Site Conditions

3. Proposed Site Disturbance:

4. Proposed Vegetated Conveyance:

Storm Water Management Consulting, LLC

Step 3 – Proposed Site Conditions

5. Clustering:

6. Soil Compaction:

Storm Water Management Consulting, LLC

NSPS Results

Storm Water Management Consulting, LLC

NSPS Results

NSPS Results

Total Proposed Site Points

Required Points Ratio

Proposed to Existing Points Ratio

Storm Water Management Consulting, LLC

NSPS Results

If Required NSPS Points Ratio Achieved:“Proposed Nonstructural Measures are Adequate” If Required NSPS Points Ration Not

Achieved:“Further Review of Proposed Nonstructural Measures is Necessary”

Nonstructural StrategiesPoint System (NSPS)

NSPS Used Successfully Since 2006 to Address “Maximum Extent Practicable” Requirement NSPS Used from Project Planning to

Final Design NSPS Used to Teach and Promote

Awareness of Nonstructural SWM New Version Expected by End of 2011

Storm Water Management Consulting, LLC

Storm Water Management Consulting, LLC

More Information at:www.njstormwater.org

Joseph J. Skupien, PE, PPPresident

Storm Water Management Consulting, LLC1108 Old York Road

P.O. Box 727Ringoes, New Jersey 08551

Phone: 908-806-7700Fax: 908-806-7721

[email protected]

Storm Water Management Consulting, LLC