Joe Senior – PMO ManagerRicardo Vazquez Roman – HVDC Engineer

IFA2 Project Update

Page 2: The National HVDC Centre - IFA2 Project Update · 2019. 7. 12. · Microsoft PowerPoint - IFA2 Stakeholders_HVDC Forum.pptx - Last saved by user Author: Christopher.Smith3 Created

Contents

• What is IFA2• Project Update• Stakeholder Engagement

• Converter Station• Airfield• Offshore Works

• Key Learnings

Page 3: The National HVDC Centre - IFA2 Project Update · 2019. 7. 12. · Microsoft PowerPoint - IFA2 Stakeholders_HVDC Forum.pptx - Last saved by user Author: Christopher.Smith3 Created

What is IFA2?

3

• 1000MW• VSC Symmetrical monopole• +/-320kV XLPE

• 235km DC • 208km offshore• 25km onshore [FR]• 2km onshore [GB]

• 10km AC [GB]• 6km offshore• 4km onshore

• EPC Contracts awarded April 2017• Operational 2020

Page 4: The National HVDC Centre - IFA2 Project Update · 2019. 7. 12. · Microsoft PowerPoint - IFA2 Stakeholders_HVDC Forum.pptx - Last saved by user Author: Christopher.Smith3 Created

Project Update – Converter (UK)

4

UK Converter station (Daedalus) - Aerial View

Page 5: The National HVDC Centre - IFA2 Project Update · 2019. 7. 12. · Microsoft PowerPoint - IFA2 Stakeholders_HVDC Forum.pptx - Last saved by user Author: Christopher.Smith3 Created

Project Update – Converter (FR)

5

FR converter station (Tourbe) - Aerial View

Page 6: The National HVDC Centre - IFA2 Project Update · 2019. 7. 12. · Microsoft PowerPoint - IFA2 Stakeholders_HVDC Forum.pptx - Last saved by user Author: Christopher.Smith3 Created

Project Update – Cable Works

6

Wing of a complete Fairey Barracuda Aircraft (1943) discovered on the Cable Route.

Offshore Campaigns began in 2019. Cables loaded on the Cable Enterprise in Pikkala, Finland.

UK Onshore Cables Civil works complete. Progressing into Cable pull and jointing.

UK Landfall works in preparation for AC and DC Cable installation.

Page 7: The National HVDC Centre - IFA2 Project Update · 2019. 7. 12. · Microsoft PowerPoint - IFA2 Stakeholders_HVDC Forum.pptx - Last saved by user Author: Christopher.Smith3 Created

Stakeholders ‐ Location

7

Outline Planning Application

Daedalus Converter – Reserved Matters Application

Page 8: The National HVDC Centre - IFA2 Project Update · 2019. 7. 12. · Microsoft PowerPoint - IFA2 Stakeholders_HVDC Forum.pptx - Last saved by user Author: Christopher.Smith3 Created

Stakeholders ‐ Location

8

Page 9: The National HVDC Centre - IFA2 Project Update · 2019. 7. 12. · Microsoft PowerPoint - IFA2 Stakeholders_HVDC Forum.pptx - Last saved by user Author: Christopher.Smith3 Created

Stakeholders ‐ Airfield

9

Page 10: The National HVDC Centre - IFA2 Project Update · 2019. 7. 12. · Microsoft PowerPoint - IFA2 Stakeholders_HVDC Forum.pptx - Last saved by user Author: Christopher.Smith3 Created

Stakeholders ‐ Airfield

10

Page 11: The National HVDC Centre - IFA2 Project Update · 2019. 7. 12. · Microsoft PowerPoint - IFA2 Stakeholders_HVDC Forum.pptx - Last saved by user Author: Christopher.Smith3 Created

Stakeholders ‐ Offshore

11

Page 12: The National HVDC Centre - IFA2 Project Update · 2019. 7. 12. · Microsoft PowerPoint - IFA2 Stakeholders_HVDC Forum.pptx - Last saved by user Author: Christopher.Smith3 Created

Key Learnings

1. Proactive with communications

2. Identify and acknowledge Stakeholder concerns and demonstrate that you have taken them into consideration where possible. 

3. Build up relations to a point where those objecting to the project can work with you to mitigate and minimise the impact. 