the morpho project
TRANSCRIPT
![Page 1: The MORPHO Project](https://reader030.vdocuments.site/reader030/viewer/2022012016/615ac1c3159252058f7c70f7/html5/thumbnails/1.jpg)
1
Dire
ctio
n -
Con
fére
nce
![Page 2: The MORPHO Project](https://reader030.vdocuments.site/reader030/viewer/2022012016/615ac1c3159252058f7c70f7/html5/thumbnails/2.jpg)
The MORPHO Project
TANGO Meeting Barcelonamay 2013
![Page 3: The MORPHO Project](https://reader030.vdocuments.site/reader030/viewer/2022012016/615ac1c3159252058f7c70f7/html5/thumbnails/3.jpg)
3
Dire
ctio
n -
Con
fére
nce
ONERA: the French Aerospace Lab
Innovation, expertise and long-term visionfor industry, French government and Europe
• A public entity created in 1946• Reporting to the Defence Ministry• 2,050 employees• 215 doctoral candidates and post-docs• 202 M€ budget• 35 M€ in investments• 60% contract-based business• Largest fleet of wind tunnels in Europe
3
![Page 4: The MORPHO Project](https://reader030.vdocuments.site/reader030/viewer/2022012016/615ac1c3159252058f7c70f7/html5/thumbnails/4.jpg)
4
Dire
ctio
n -
Con
fére
nce
ONERA’s Windtunnel Facilities
Modane-AvrieuxS1-S2-S3-S4-S4B
BD2-Turma
Toulouse
Paris
Lille
Salon de ProvenceLe Fauga-Mauzac
F1-F2-F4
ONERA Centers
Large Wind Tunnels
SaclayCEPRA19
![Page 5: The MORPHO Project](https://reader030.vdocuments.site/reader030/viewer/2022012016/615ac1c3159252058f7c70f7/html5/thumbnails/5.jpg)
5
Dire
ctio
n -
Con
fére
nce
Modane CenterS1MA continuous ø 8 m --> Mach 1.0 atmospheric
S2MA continuous 1.8 x 1.8 m2 0.2 < Mach < 3.1 PTmax ≤ 2.5 bar
S3MA blow down 0.76 x 0.80 m2 0.2 ≤ Mach ≤ 5.5 PTmax ≤ 7 bar
S4MA blow down ø 0.68 m / 1 m Mach = 6.4 / 10 / 12 PTmax ≤ 150 bar, TTmax = 1850 K
TURMA and various dedicated facilities (thrust measurement…)
Le Fauga-Mauzac Center
F1 continuous 4.5 x 3.5 m2 --> Mach 0.36 PTmax ≤ 4 bar
F2 continuous 1.4 x 1.8 m2 --> Mach 0.30 atmospheric
F4 arc jet high ø 0.43 / 0.67 /0.93 m Hi / Tra = 200 PTmax ≤ 800 barhigh enthalpy
Saclay (DGA-EP)
CEPRA 19 continuous, ø 2 m / 3 m 60 - 120 m/s aeroacousticfree jet
ONERA Wind Tunnel Division Main Facilities
![Page 6: The MORPHO Project](https://reader030.vdocuments.site/reader030/viewer/2022012016/615ac1c3159252058f7c70f7/html5/thumbnails/6.jpg)
Dire
ctio
n -
Con
fére
nce
Full-Model
Airbus A380 in F1
![Page 7: The MORPHO Project](https://reader030.vdocuments.site/reader030/viewer/2022012016/615ac1c3159252058f7c70f7/html5/thumbnails/7.jpg)
Dire
ctio
n -
Con
fére
nce
Half-Model
Airbus A340 in F1
![Page 8: The MORPHO Project](https://reader030.vdocuments.site/reader030/viewer/2022012016/615ac1c3159252058f7c70f7/html5/thumbnails/8.jpg)
Dire
ctio
n -
Con
fére
nce
Air Inlet Model
Air Inlet face and side wind
![Page 9: The MORPHO Project](https://reader030.vdocuments.site/reader030/viewer/2022012016/615ac1c3159252058f7c70f7/html5/thumbnails/9.jpg)
9
Dire
ctio
n -
Con
fére
nce
Main Measurement Data
Wind
LOCALPRESSURES
PRESSURE FIELD
NOISE
DEFORMATION
LOADSDrag
Lift
![Page 10: The MORPHO Project](https://reader030.vdocuments.site/reader030/viewer/2022012016/615ac1c3159252058f7c70f7/html5/thumbnails/10.jpg)
10
Dire
ctio
n -
Con
fére
nce
Model Load Measurement
Balance
Sting BalanceRange of diameter from 8mm to 210mm, Normal Force capacities ranging from 60N to 220,000N and axial force capacities from 100N to 27,000N
Assembly BalanceRotating Balance
![Page 11: The MORPHO Project](https://reader030.vdocuments.site/reader030/viewer/2022012016/615ac1c3159252058f7c70f7/html5/thumbnails/11.jpg)
11
Dire
ctio
n -
Con
fére
nce
Model Pressure Measurement
Static Pressure Taps Pressure Sensitive Paint
More than 1000 taps on the models
Sensors : • Druck, Entran, Bell and Howell, Digiquartz with the range from 1PSI to 3,500 PSI.• PSI units (48 and 64 ports) with a range 5, 15 and 30 PSI.• Kulite, thermally compensated for sensitivity and zero drift.
![Page 12: The MORPHO Project](https://reader030.vdocuments.site/reader030/viewer/2022012016/615ac1c3159252058f7c70f7/html5/thumbnails/12.jpg)
12
Dire
ctio
n -
Con
fére
nce
Model Deformation Measurement
Real-time 3D localisation of Model’s Markers
![Page 13: The MORPHO Project](https://reader030.vdocuments.site/reader030/viewer/2022012016/615ac1c3159252058f7c70f7/html5/thumbnails/13.jpg)
13
Dire
ctio
n -
Con
fére
nce
Flow Field Measurement
Particle Image Velocimetry
![Page 14: The MORPHO Project](https://reader030.vdocuments.site/reader030/viewer/2022012016/615ac1c3159252058f7c70f7/html5/thumbnails/14.jpg)
14
Dire
ctio
n -
Con
fére
nce
MORPHO Project
14
Objective: Build an open, generic, flexible, extendable, new software environment for all GMT’s Test facilities.
Main features: • Test Preparation• Test Execution• Test Monitoring• Test Data Management
Customer’s Benefits: Simpler and better integration of « innovative measurement systems »
(PIV, PSP, MDM, Acoustic, Wireless, etc.) Increase productivity: extensive use of « Men Machine Interfaces » allows
less « manual operations » and shorter system configuration time. A greater flexibility: generic device interfaces allow quick reconfiguration
and “on the fly” system integration. A greater reactivity: “on line” access to current and previous test data
helps the Test Engineer to take the right decisions.
![Page 15: The MORPHO Project](https://reader030.vdocuments.site/reader030/viewer/2022012016/615ac1c3159252058f7c70f7/html5/thumbnails/15.jpg)
15
Dire
ctio
n -
Con
fére
nce
Why TANGO ?
PIV
MDM
ACOUSTIC
PSP
PRESSURESEFFORTS
SCADA
DATABASE
GUI
GUI
DATABASE
SCADA
![Page 16: The MORPHO Project](https://reader030.vdocuments.site/reader030/viewer/2022012016/615ac1c3159252058f7c70f7/html5/thumbnails/16.jpg)
16
Dire
ctio
n -
Con
fére
nce
SCADA Market
Open Source :
Commercial products :
![Page 17: The MORPHO Project](https://reader030.vdocuments.site/reader030/viewer/2022012016/615ac1c3159252058f7c70f7/html5/thumbnails/17.jpg)
17
Dire
ctio
n -
Con
fére
nce
TEST DATABASEMODEL DATA
WT DATA
1717
GUI : an Integrated Test Environment
TEST MANAGER
MONITORING TOOLSDATA PROCESSING TOOL
main calculation workflow
TEST PLAYER
CHANNEL EDITOR
EXPORT TOOLS
WDFTARDISTecplotEtc.
![Page 18: The MORPHO Project](https://reader030.vdocuments.site/reader030/viewer/2022012016/615ac1c3159252058f7c70f7/html5/thumbnails/18.jpg)
18
Dire
ctio
n -
Con
fére
nce
MORPHO Project Status
18
SCHEDULE• First development step in F1 WindTunnel.
• Call for tenders in progress until July 2013(4 proposals received all based on TANGO)
• Progressive deployment to GMT from third quarter 2015.
![Page 19: The MORPHO Project](https://reader030.vdocuments.site/reader030/viewer/2022012016/615ac1c3159252058f7c70f7/html5/thumbnails/19.jpg)
19
Dire
ctio
n -
Con
fére
nce
TIME FOR QUESTIONS