Ministry ofNaturalResources
Ontario W8888-88476 TECK
THE MINING ACT REPORT OF WORK l r.c*ro.q.010
To the Recorder of .......^.^.f.^.?,.^^.?....,................................,.,...........................Mining Division
l,name of Recorded Holder
Ki rk land Lake , OntarioProspector Licence
V192 26 :\2 ftft * Office Address
do hereby report the performance of .........T.............................. days of
not before reported to be applied on the following contiguous claims
Claim No.
548179
Days
20
20
20
20
20••••••*
20
Claim No.
548906
548484
.........type of work
Days
20
20
LARDER LAKE" "" MININO DlV."""
•"•••"NOY20W- |w o* i
Tlfrl'9ilOfll|12il|fl2V4 i
548123
54.8124
548477
548478
All the work was performed on Mining Claim (s) . ^
(In the case of geological and/or geophysical survey (s) where more than 18 claims are involved attach o schedule)
READ CAREFULLY: THE FOLLOWING INFORMATION IS REQUIRED BY THE MINING RECORDER.
For Manual Work, Stripping or Opening up of Mines, Sinking Shafts or Other Actual Mining Operations - Names and
addresses of the men who performed the work and the dates and hours of their employment.
For Diamond ond other Core Drilling - Footage, No. and angle of holes ond diameter of core. Name and address of
owner or operator of drill. Dates when drilling was done. Signed core log and sketch in duplicate.
For Compressed Air or Other Power Driven or Mechanical Equipment
Type of drill or equipment. Names and addresses of men engaged in operating equipment and the dates and hours of
their employment.For Power Stripping - Type of equipment. Name and address of owner or operator. Amount expended. Dates on which
work was done. Proof of actual cost must be submitted within 30 days of recording.
With each of the above types of work sketches are required to show the location ond extent of the work in relation
to the nearest claim post. In the cose of diamond or other core drilling the sketch must be submitted in duplicate.
For Geophysicol, Geologicol, Geochemicol Surveys ond Expenditure Credits - the name of author of report. Covering
dotes of survey (linecuiting ^ office). Type of instrument used. Total amount of expenditure. Technical reports,
maps,expenditure breakdown, receipts must be filed in duplicate with the Minister within 60 days of recording.
For Lond Survey - the name and address of Ontario Land surveyor.
The Required Information is os Follgwsj (Attach o list if this space is insufficient)
Owner and operator of Diamond Drill Patrick J. Harrington S son
Martyn Harrington. Type of drill B.B.5 #1. Drill was moved to each
location with small bulldozer tractor. Samples were taken with 3'SHLB4
Tube. But was not successful so 3 1 BW split spoon was used. Sampling
was done under supervision of Heathwood Engineering of Kirkland Lake,
Ontario.
The Mining Act Certificate Verifying Report of Work
f.'.A/vja.riT^,................................................................................................
.........4k..3.iL.)*l........i*^(Post Office Address)
hereby certify:
1. That l hove a personal ond intimate knowledge of the facts set forth in the report of work annexed here
to, having performed the work or witnessed same during and/or after its completion.
2. That the annexed report is true. *"\ i
\W. .IP..................19 .^......./..^*..^d!,..At;l.~*...^.../:..^.^'""" * Signature 7 . '
2Of O t-
\u
os o.
I-
XROfO
12uiH
yu. pOf lil U
Of
lZ
J-Ofo a. uiOfw*
ui3 gUl
u.
O
Of O
D.
UJX
Dated\
768 (8/77)
iRECORDc l REC. No.
5537
5338 Young a
L 13035
^'o'f 2, 67 3 't
9073
528T9059
"65
L.
19071
B t
6919
2844
604T
1681
2860
35885587 ft
328T
uetf^*T^7~
is-m'#V^8tf5524
2311
'2570 l L.
e 2090
2380
li
2093209I 245!
W II ""8*6935 i
2298
2260 2261 J J
'2857 liHTTS^ /6935 //y,^
V' a .2874
wfciS
10 *
K(*4
^810^*-8551
L.
2823
L.
,289r**
*l* 4*V!a^lrMM
l--
i 2 4J
l .
5442TITIt
Jf"*1 -
\LL 1825-
L*-. 2101
T..^367655
2227
-\ H 1C. 708VHM^AL
TI900^
SuWt
TCTOt
'T C il^t
v. saaP"4Jit;-!*'' 1-' "••-.1^" y\ LE/r t iM .1Pjfevw
,.iA ,
^ )*U* v^^
^4*1KU ruN It
143*8 l
HEAJHWOOD ENGINEERING ASSOCIATES LIMITEDTelex 067-82512 Box 190 Telephone (70S) 567-3295
Kirkland Lake, Ontario, Canada P2N 3H7
November 18th, 1980.
Ministry of Natural Resources, Mining Division, 4 Government Road, East, Kirkland Lake, Ontario.
Dear Gentlemen:
Re; Teck TownshipClaims #548123, 548124, 548178, 548179, 548477,
548478, 548479, 548480, 548481, 548483, 548484, 548485, 548486 and 548906
This letter will serve to verify that Heathwood Engineering Associates Limited supervised sampling activities performed by Patrick Harrington during the months of August and September 1980 on the above mentioned claims. Our fee, as evidenced by the attached invoice, totalled $l,974.12. Copies of correspondence relating to our supervision are also attached.
A daily log was kept, but was turned over to Mr. Alan Matte, a member of the group who currently hold the option on the claims.
If any additional information or clarification is required, please feel free to contact me.
Yours truly,
HEATHWOOD ENGINEERING ASSOCIATES LIMITED
encl.
September 3rd., 1980.
Mr. Jean Roquet, 2020 University Avenue, lith Floor, MONTREAL, Quebec. H3A 2A5
Dear Sir t
This letter is to certify that l, or a competent representative of this Company was on site at all tiroes to supervise the drilling and sampling of the Tack Hughes tailings from August 25, 1980 to August 30, 1980. Bach sample taken was quartered and put into four sample bags. One hag wfia then peraonally delivered to the Swastika Assay Office at the conclusion of each clay's work. The remaining three bags of each saroplo were turned over to Mr. A. Matt and Mr. b. Parent on September 2, 1980 and had been in my possession until that tima*
If any furtherninformation or clarification is required, please contact this office*
Yours truly,
HEATfMOOD ENGINEERING ASSOCIATES LIMITED
v,'JS/eg James Swanson, P. Eng,
l - Gen Pile - J,O. 5438 ~ Circ.
September 2nd, 1980.
Sidura Inc.,Mining Consultants,2020 University Street, lith Floor,MONTREAL, Quebec.Canada H3A 2A5
Attention; Mr. D, Parent
Dear Mr. Parent,
As requested by you, Heathwood is providing an intermediate engineer to supervise the sampling of tailings owned by the St. Jean group. The rate for our intermediate engineer is $28.00 per hour for 8 hrss. per day and 1~.V2 times this rate for overtime houx~s plus out-of-pocket expences.
Please sign the enclosed copy of this letter acknowledging the above arrangements.
Yours truly,
HEATHWOOD ENGINEERING ASSOCIATES LIMITED
Ryan,
Sidaia Inc.
D. Parent,
l - Gen Pile tar ^3. - J.O. 5439
L.-^y x - Circ.
Mr. Doug Parent, c/o Sidam Inc. f 2020 University Ave., lith Floor, Montreal, Quebec. H3A 2A5
September 5th, 19CO. Invoice No. 2503
Professional Services for period .ending Sept. 5/80
Job Ho.
5438 ~ Tailings Sampling Supervision
tena-Ddxate Engii-jeer Sr -IbdTi-iolwfist II 50-1/2 hrs ^ 28.00 1,414.00
Xnterifeoiate Engineer St ^technologist II 13-1/4 hrs ^ 42.00 5 D G. 5 O
Clerical 1/4 hr 3 14.50 _ ...J^.
1,974.12
No.
LA BANQUE ROYALE DU CANADASUCCURSALE PH L ET SHERBROOKE rf x ^
1100, RUE SHERBROOKE GUEST /VQ i/ ^ njP^LMONTREAL (QUEBEC)
/f f /3 3S/xtx^?rv?y A* //S2o c s rt fey *\77} s y/x"
GROUPE CROP IN TRUST) DOUARS
U 5'" 700'"
PATRICK J. HARRINGTONDIAMOND DRILLING CONTRACTOR
P.O. BOX 282 KIRKLAND LAKE, ONTARIO P2N 3H9 PHONE: ( 705) 567-6673
SeptemDor y, iy8o
Douglas parent, consultant Ltd.. I'/uy-lyV!? KG Kaisonneuve O c Montreal, P. Q. II3H 1^4
Dear Mr* Parent:
Please find, enclosed Dining for sampling dune on tailings in TecJfc Township. THIS Dining is as foilov/s:
Drill and two men g S bO.uO per. nr.Tractor.......... 15.00 per. nr.Truck.........*.. lu.uu per. nr.
i8 nrs. @ 58.50 pBr. nr............. SHelper 18 hrs. @ 57.1'-' per, nr.............. i2?.ooTrucking Tractor August 22.................. 25.uoTrucking Tractor Sept. i..................*. 25.uuuental on Spoon @ Sio.oo per. aay..,,....... 7o.uoi x 5' Koa.......**........*................ 41.001x5' JtiW Casing..........................o. 38.uoix3' SiieiDy Tube.......................... 16.002x2' Shelby Tuoe.......................... 25.003 hrs, btEu aard. Time. *...................... 75.oo
j?'or machinery ana Labor:Drm Time 5y hrs. 550.ou................. 2,y5o.ooTractor Time 3y hrs. @ 5515.00............... 585.0.0
TOTAL CuST...
Sincerely,
Mr. Patrick Harrington Diamond Drilling contractor
PATRICK J. HARRINGTONDIAMOND DRILLING CONTRACTOR
P.O. BOX 282 KIRKLAND LAKE, ONTARIO P2N 3H9
\ Q k VA C O M
o 2. o utvixoO \Tt UO
(YT1 , MN. O
t N G i K\ i: t" (\
S'^ , )'TU' M, }
-O ft P, -e M T
PHONE: (705) 567-6673
. c)
\y\e tv^e rmcx ea o n* o a m \ o. Y r\ GA c
h H Vj H ']
\ or Vo o rV
/iA\'^ \ K)
^ - s H ^ 4 rt, \ . ^ 4 ^ s ei; - s 4 fe
b\ t) ^
O . o D
h t';j iVj \ ^ b
. \o
A t
-C)0
^ A U\D t (X O \
P
We,
O ^
^.oo1O f\ M D V-V-A) .N\ 'o
-V.
11- DO
o f^ (M ?, s . o o
x r, ' r\ v) D KM. t v, o o 4 \ .00
i-\ i c. o ott 2^ . 2.0
X5 . Do
. . D '7ix- oo
PATRICK J. HARRINGTONDIAMOND DRILLING CONTRACTOR
P.O. BOX 282 KIRKLAND LAKE, ONTARIO P2N 3H9 PHONE: (705) 567-6673
(J 80'
Zoic UW\M^S\TH ST.\T\e UDO
r Wtx^e. Vv M ^ e N)c\ 0 c a (ebv i W n\ze,\ \ w \)o\ce. W,ON) fNTY\ \ rv \ PUY C\Cx\ rrcxS in TtCvx Tcx^fv
^S ~^u(\\rA MO*' S
4- u -~^- v t exow\~v 1\ \c. o o tfhi r Vo^ tx. "V? K \
l V4 i
L f\ PiOO ^. - D K\ t. v. t \V - \^ W r s M^-^ f'^ v\ r . ~ l*?,- lfe/1.10 -
NT \ r\ o - 2. 2 ^ --^ o TV. AT 7,ra .00 fte NT r\ o - 2. 2 ^ .00 - o. ODo - 2. 2 ^ .00 -"
\ \ x
"' e
o o
\\ Cko^P.TS Of fACy^o^Oiu B^ 1.^0
O-oo ^yi
T
PATRICK J. HARRINGTONDIAMOND DRILL CONTRACTOR
" ite jitj. Shift From j LJQ^—. To
Drilling at J3^LCJSZ~~3Z^^ Machine No. ,,,,,,,,,,,,,,....,,,,,.,,,..,.,. Hole No.
Core Type ......,..........................,..,....,.......................,................................,................_.........._.........
Depth of Hole Start of Shift ......,.,,.,,..,.,.,...,.,,,, End ...,......,,,...,,,,.,,,,,,,
Distance Drilled .......M......................................................................................................_.............,...
Control Drilling From .................................... To .................................... 20' D 10' D
Bit No. .........................,............ Type ...................................... Footage ~_............................
Conventional Test at
Tro-Pari Test at ...........
Acid Test at
........... ft.
,,,,,, ft.
..,,.,.. ft.
TIME DISTRIBUTION
BflHMg ..r.^.*7J^.(JLAxy,fe..,,,.,....,,K Hrs. ...................../.aL Man Hrs.
Piping .,................................................................... Hrs. ,,,.,...,,..,,,...,.,,, Man Hrs.
Running Mud ............................................................... Hrs. ..............,.................... Man Hrs.
Move and Setup .........,......................................... Hrs. ................................,, Man Hrs.
Pulling Casing ..............................,..,,.,.,........,........ Hrs. ..............._............... Man Hrs.
Cementing _...................................,.......................... Hrs. ......,............................ Man Hrs.
Washing Cement ...,.......................................... Hrs. .................................... Man Hrs.
Waiting on Cement To Set........................... Hrs. .....,,..,,...,,,,,,,,, Man Hrs.
Drilling Cement ...................................................... Hrs. .................................... Man Hrs.
Reaming ............................................,.............................. Hrs. .................................... Man Hrs.
Long Waterline .......................,............................ Hrs. ......,..............._...... Man Hrs.
Conventional Testing ,,,.,,,,,..,,,,,..,,,..,,. Hrs. .................................... Man Hrs.
Acid Testing .....,..,,.,,.,...,,,..,....,,..,,..,,,,B., Hrs. ,,...,,,,,,.,,....,.,,. Man Hrs.
Tro-Pari Testing ..,,.,.,,,,,..,,,.,,.,,,,,.,.,.., Hrs. ..,,,,,,.,,,..,,,,,... Man Hrs.
Waiting Time For Testing ...,,.,.,,..,.,.. Hrs. ......,.,.,,..,,,....,..,, Man Hrs.
Travelling ...............,....,.,..,...,................,.....,,...,.., Hrs. ....,........................... Man Hrs.
Walking Time ,.,,,,.,..,,,.,...,,,.....,.,,..,,,.,,, Hrs. ..,,,,,....,...,..,...,.,. Man Hrs.
Wedging .................................,...................................... Hrs. .................................... Man Hrs.
Repairing ..,,.,,,.....,,.,,,,.,,.,,,,.,,.,..,,.,.,,,,, Hrs. ..,,,,,,....,,..,,,.,., Man Hrs.
(What?) .,..,.,..,..,...,,.,,,,,,.....,......,,,,....,.,,..,..,.,.,._,....,.,,,,,_.,...,,.,,__,,..
Other .....................................................................s^.. Hrs. .................___ Man Hrs.
(What ?) \i!LAf]i~il!JLGsm^^ ............R. Foreman .(J'......f.....y^r^^^LJL^f^iA t ....... ...........................X. Hrs.
Runner ^ ..m~a.~..~ a~..~~..m...m....mmm.m~a.......... m..t....mma...m..m...~...m... am. ............... Hrs.Runner ..........................................................................j................................................................_ Hrs.
Helper X^-i^^^^ Hrs.Helper . .......,.,................,.......,...............,,......^ Hrs.Helper .,..,,..,,.,...,...,,.,,,.,,.,.,,.........,,......,.,,,,...,....,.^^ Hrs.
Cook (Cost Plus Hours Only) .................,.................................................................. Hrs.
NOTE: Total hours in Time Distribution must equal total hours worked.
COST-PLUS REPORT
Bedrock at.................................,.............. Start of Core ~...
Machine hours: ...S3.__... ._.............,.............._ .......
..,s2LTractor .......,...,,
Timberjack ,....
Diesel Oil .......,.
Stove Oil ........,,....,..,,....,,.
Casing Placed in Hole
,. hrs. .. hrs.gals.gals.
BombardierTruckR.P.M.
N ........B ..
AE ..,,,
Casing
N ..,,,
B ...,,.
A ...
E ...,...
x 1
x 1
.,.,,...,., X 1 H.,..., ______ ......
X 1 __ ... __
Lost or Damaged
,,..,,,,, x 1 ,,.,,..,,..,,...
,,.,,,,,. x 1 .....,,., ...,.......x 1
.......,........ X 1 .............. ......~
x 2 ,B....,,,,..
x 2 .... ........
x 2 ......H.............
x 2
x 2 -~................
x 2 . __ . x 2
x 2 . __ ....
. x 5 -,
. x 6 ...
. x 6 .,
. x B .,
. x 6 -.
. x 6 -.
. x B ..,
. x 6 -.
,..,.. _ ....., x 10
,................ x 10
,............ _ x 10
_ ... _ x 10
......... ..,... x 10
........,, _ x 10,...,....n __ x 10
,. x 10
Materials Used, Lost or Damaged re Overburden
Piping Rope ....,
8" Drive Pipe Adapters ........,...
Rods ~........................
Mud .,...,,,.....,,.,.,
Special Mud ..,.
Core Barrels .....
Length
,......._,....... 8" CouplingsI.M.I.ttlHl....l...MI,M V VWfTf*mm^*t
,................._, Type __:_..
...................... Type ~ ....nt,l,,.,.,,t,,,,,,,.,,H, m. f J.TU i*t M t MM J.M.I. M.
,._.....,......m Lbs....,._.... Lbs.._.......... .... Type...,...........H......H.......................H...,.M....H..M... Type
Mud Barrels ...................._.........._,.........._,.........._._,, Type ..,
Tricone , ,,.......,,...,.......,_.............,.............................._................ Type ^..
Hawthorne ~.................................................................................... Type ...Hoisting Cables .........................n.......................................,........... .... . ...-..-
Burlap .........................................H.H.................................................... Lbs. ~~^,. ^ 4/4^ C~JJXOO *"B *~ A? iffOther ^••••^^••••••.•••^•/t.fnJj.J.........^....4j)..l^.^.i!f......f.........Cemented at ......*. ...... ... ......~............M-.. ....~... .....H...~..Drilled Cement from ..........,......_......_,_.._ to ._.....,.... .......,
Cement used B........nn.a.n..........~....n~.n Bags *...
Length of Waterline .....,....................Stove Oil............
feet
Move from Hole ..,,,,,,,.,.,,,.,,...,,.,,.. to Hole
Length of Move ....M............................................................................. Miles
Wedged at.,..........................._......................Reamed from .............................................._,....... to
,... Type
feet
Gals.
or Feet ,. feet
Arc Cut From -,.
Machine Hours .,
Man Hours ...,........
ARC CUTTING ONLY
m...,,....,...,......,._.....,, To ~,....
DIAMOND TOOLS vType
Core Bit
ConcaveCasing Shoe
Size No. ^ Used TypeReam Shell
Mud Bit
Mud Shell
Size No. %Used
REMARKS
3 /IX/a *7xv-- L/U—
J O-ottcL
Approved by ,....... Engineer Foreman
USE RED PEN AND CARBON PAPER 1. Original copy to office 2. Second copy to engineer 8. Third copy for foreman
PATRICK J. HARRINGTONDIAMOND DRILL CONTRACTOR
From
Hole No. .....
ToDrilling at -.
Machine No.
Core Type ........................................................................,.......... _ ............................ __ .......................
Depth of Hole Start of Shift ..,..,,,.,.,,.,.,,.,...,.,,. End ......,...,,......,.,,,.,.,,,,
Distance Drilled ............,..................................................................... _ ....................... _ ...................
Control Drilling From .,,.,,..,,..,,.,.....,,, To ...,....,,,.,.,,,..,..,,. 20' D 10' Q
Bit No. .,,...,,.,.,,..,...,,.,..... Type .,,...,.,.,,.,,,,,..,,... Footage ~... _ ..,,,,....,,,,,.
Conventional Test at ....................................................................
Tro-Pari Test at ...,,,,.,,,,.,..,..,,,,...,,,,,,.,.,.,,,.,.,,,..,,
Acid Test at ~.........................................................................................
TIME DISTRIBUTION
Drilling ..,,.,...,,...,._,.,. ......,,,..,,,.,........,,., Hrs. .,.......
Piping ,........................................................................ Hrs. ..........
Running Mud ............,.................................................. Hrs. ..........
Move and Setup ,................,....................^...... Hrs. Q.......Pulling Casing .............................,.............................. Hrs. ..........,
Cementing ........._,....................................................... Hrs. ..........
Washing Cement ..,.,.,.,...,...,.,,....,.,,,..,,.,. Hrs. ,.........
Waiting on Cement To Set,.,,.,,,,,,..,... Hrs. ........,,
Drilling Cement ...,,..,.,,,.,,,,,.,...,.,..,..,,.,. Hrs. .....,...
Reaming .............................,......................................... Hrs. ........,,
..... ft.
.... ft.
,, ft.
.............. Man
,,,,..,, Man
,............. Man
,............. Man
,,,,.,... Man
,............. Man
,..,.,.,, Man
,.,,.,,, Man
,............ Man
,,,,,., Man
Long Waterline .............,.................................... Hrs. ..,.............................. Man
Conventional Testing ..,................................. Hrs. ................,................. Man
Acid Testing ,,,,,,,,.,,.,,.,.,.,.,,,,,,,,,,,,... Hrs. .,..,,,.,,,,,,,,,,,, Man
Tro-Pari Testing ..,,.....,..,.,,..,..,....,..,,,,..,.... Hrs. ,,,,.....,,,...,.,.,,,,, Man
Waiting Time For Testing .,,,,.,.,,,,,. Hrs. ,,.,..,,,,,,,,,,,,,. Man
Travelling .._,.....,,,,....,,,......,,,.,,.,.,,,,,, Hrs. ......,,,...,,,,,.,.,,,. Man
Walking Time .,,,,.,,.,,,,,.,,.,,.,.,,.,,,...,.,, Hrs. ,,,,,,,.,.,...,.,,,.., Man
Wedging ........................,............................................. Hrs. .....,........................... Man
Repairing ..................,................................................ Hrs. .........................,........ Man
(What?) ,....,..,.,,,,.,.,,,,,,,,,,,.,,,,.,,,,,...,,.,,,,,._,,,___,,..,,.,,..,,,
Other ._.....................................................................,... Hrs. _.........____ Man
(What?) R. Foreman A/....*..
Runner
Runner
Helper J*^.^.x3^fc^l^^^
Hrs.
Hrs.
Hrs.
Hrs.
Hrs.
Hrs.
Hrs.
Hrs.
Hrs.
Hrs.
Hrs.
Hrs.
Hrs.
Hrs. Hrs.
Hrs.
Hrs.
Hrs.
Hrs.
Hrs.
Hrs.
Hrs.
Hrs.
Hrs.
Hrs.Helper ......,.......................... ...............................
Helper B.................................................................................................................................................... Hrs.
Cook (Cost Plus Hours Only) ................................................,................................. Hrs.
NOTE: Total hours in Time Distribution must equal total hours worked.
COST-PLUS REPORTBedrock at...................,.........,..,,,...,... Start of Core
Machine hours: ..ffi............. ............................................,......Tractor ....................K!!..,........,, hrs. BombardierTimberjack ,,.,,,....,,,.,,..... hrs. Truck .Diesel Oil .,.,,..,,...,,,,...,.,.. gals. R.P.M..
Stove Oil .,,y,^?.,..,.,,., gals.
Casing Placed in Hole
B ....,.,,.,...,...., x l .,................. x 2 -.__._ x 5 ..
A ..,...,.,,,...,... x l ,.,.,.,._,.... x 2 ____ x 6 ..,
E ...................... x l ,...................... x 2 _..___ x 6 M.
Casing Lost or DamagedN .,,...,.,,,.,.,. x l ,.,.,...,,,.,..., x 2 __,._ x 6 M.
B ........................ x l ,,.,,,,.,,,.,, x 2 ..,.___~ x 5 ...
A ..,,.,.......,...., x l ...._,..., x 2 ...,...........,. x 5 ...
E ,....................... x l ,..................... x 2 _..._.... x 5
hrs.
hrs.
x 10
x 10
x 10
x 10
x 10
x 10
x 10
x 10
Materials Used, Lost or Damaged re OverburdenPiping Rope ._......,............................ Length -.
3" Drive Pipe _....._,............ 8" Couplings
Adapters ................._,........,.......... .,..... Type . .~.....
Rods . ........... Type ~ .." """""""""'""""""'" ~ li f** mwmMnwmm
Mud.,..,..,,.,.,.,.,,,,,...,,.,,,.....,,,.,..,,. Lbs.
Special Mud ...,...__,.,_.... Lbs. ~ .....___ Type -.
Core Barrels ............_.......m............__.......^_,.. _ Tvne ."•""•""""""""••"•"•""""'"•••"""""••••••""""" * f r *' "
Mud Barrels ....._.. . ........ . . Tyne"....................n....!...................!................................... ..fcJf/V W
Tricone ..._...........__..............._.u..........__............... Tvoe . ".".i"."n.tH.Il....ml.l.lllm(tmlVM.MttlMm..M*"t...il".llt"l.t * tf fv "
Hawthorne ..........................................................................K.......... Type -.
Hoisting Cables ..........._,._...................__,._._____....
Burlap ,._.............,................................_M._............K.............. Lbs. .
Other ~..........__,
Cemented atDrilled Cement from .__................_....._... to
Cement used ~....,...~.^....,..........M.....M.M.... Bags
Length of Waterline - _.......~....Stove Oil .................................W.....M........^........^............_._,............
Move from Hole .,,.,,,,,..,,,,.,,.,,,,,., to Hole ^^. .
Length of Move ................................_............................................. Miles
Wedged at .............M............................................................_......................Reamed from .....M.................. ,................................ to
feet
Type ,.,... feet ,,. Gals.
or Feet
,...... feet
ARC CUTTING
Arc Cut From ,................... _ .. _ ,..........
Machine Hours ......... ___ .....................
Man Hours ~......... . , . ., . ... .... ...... ......
ONLY
. To ......,,......,,.,,..,,.,.,,... ,
REMARKS
DIAMOND TOOLSType
Core Bit
ConcaveCasing Shoe
Size No. Ve Used TypeReam Shell
Mud Bit
Mud Shell
Size No. *fr Used
Approved by Engine Foreman
USE RED PEN AND CARBON PAPER 1. Original copy to office 2. Second copy to engineer S. Third copy for foreman
PATRICK J. HARRINGTONDIAMOND DRILL CONTRACTOR
Hole No. .,.
. Shift From ..i/J./TL,.:, To Drilling at - . Machine No. Core Type ....................................................... _ ........................................................................ _ ............
Depth of Hole Start of Shift ,....,,,,,,,,,,.,,,,,.,, End .,....,,,.,,,,.,..,,.,,...,Distance Drilled ...,............................................................................. _ ..........,.............. _ .....................
Control Drilling From ,,,,,,,,,.,,....,.,,... To ..,,,,,...,,.,,,,,,,.. 20' Q 10' DBit No. ... _ .............................. Type ...................................... Footage ~ _ ......,....................
Conventional Test at ......,,.,,,.,,......,.......,,..,.,....,..,,......Tro-Pari Test at ,,,,,,,,.,,,,,,,,,,..,,,,,.,,,,,.,,,,,,,,.., Acid Test at._,.__............,................................................
TIME DISTRIBUTIONDrilling .....,.,,,,,,,,,_,_.........,........................ Hrs. ,,,,Piping ,..........,.........,,,,,,,,,,.,,,.,,.....,,,",.,,,,.. Hrs. ........Running Mud ............................................,.................. Hrs. ......,Move and Setup ,.....,,..,,,,,,,,.,,..........Z..... Hrs. ........Pulling Casing ,,,,,,,,,,.,,,,,,..,,,,,...,,,.,., Hrs. ~..,Cementing .....................................................,............... Hrs. ...,...
Man Man Man Man Man Man
Washing Cement ,.,.,,,..,,,,,,.,.,,,,.,...,..... Hrs, ,.................................. ManWaiting on Cement To Set,..,,,.,,,.,,,.,. Hrs. .,,,.....,,,.,..,,..,..., ManDrilling Cement .,,...,..,,,,..,,,,...,...........,...., Hrs. ..............._............ ManReaming ...............................................,......................... Hrs. .......................,............ ManLong Waterline ,.,,,.,.,,,,,,,.,..,,,...,,,,,,,, Hrs. ,..,,,._,,_,,,, Man
Conventional Testing .......................................... Hrs. ,.,,.,,,..,,..,,,,,,., ManAcid Testing ,.,,,,,,,.,.,,,.,,.,.,,,,,,,.,.,..,,, Hrs. ,.,,,,,,,,,,,,,,,,, Man Tro-Pari Testing ,,,,..,,,.,,,,,,,,,,,,,,,,,... Hrs. .,,,,...,,,.,,.,.,,,., Man Waiting Time For Testing ........................ Hrs. ..,,.,.,..,,,,,,,,.,,., ManTravelling ..,...................,,,.,,....,...,,..,,,..,......,.... Hrs. ,,,.,,,....,,,,....,..,, Man
Walking Time ,,,,,,.,,,,,.,.,,,,.,..,,.,,,...,,, Hrs. ,,.,,,,,....,,..,...,,, ManWedging ,.,..,..,,..,,,,,.,,.,,,,,.,.,,,,,....,,.,........ Hrs. ..........,.................... ManRepairing ,..,,.,.,,.,,...,.,,,,,,,,,...,,,,.,,.,,,,, Hrs. ,.,,,..,,,...,,,,,,,, Man
(What?) ,.,,.,.,,,,,,,,,,,....,,,.,,,,,.,,.,,,.,,.,....,.,_,,....,,,,_......_,.,.Other ,,,,.,,,.,,,,,,,..,,,,.........._,...................... Hrs. ....__....__ Man
(What?) ^- X" \J S/ a "~,f T~* f?
R. Foreman /^^.^X^^*^Runner .,Runner ....^)............................................... ~ J.,
fjfcmSj JO .S ^ ^^ ' -*
Helper Helper
...... ft.
..., ft...... ft.
Hrs. Hrs. Hrs. Hrs. Hrs. Hrs.
Hrs.
Hrs. Hrs. Hrs. Hrs.
Hrs. Hrs. Hrs. Hrs. Hrs.
Hrs. Hrs. Hrs.
Hrs.
Hrs.Helper ,.._....._m^.^.~^~m..~~........................,...,.......m......,...m,,....*.,................* Hrs.Cook (Cost Plus Hours Only) .,..,,.,,..,,,,,,,,,,,,,.,,,,,,,,,.,,,,,.,,,,,, Hrs.
NOTE: Total hours in Time Distribution must equal total hours worked.
Truck R.P.M.
COST-PLUS REPORTBedrock at.,,,,.,,,,,,...,,.,.,,..,,,... Start of Core Machine hours: ..............................................,..........................Tractor _...fo........................... hrs. Bombardier
Timberjack ..,,,,.,,,,,,_ hrs. Diesel Oil .,,,,,,,,,,,,,,,,.. gals. Stove Oil ..._....................,...... gals.Casing Placed in HoleN ...........,.......... x l ....................... x 2B ........................ x l m..................... x 2A ....................,... x l ...,,.,,,,,,,, x 2
Casing Lost or DamagedN ,,,.,,,,,,,,, x l .........,.B .,.,,,,,......,,. x l -,,....,A ..,,....,..,,.,,. x l -,,,,..E ,,,,,,,,,,,, x l M..,....,Materials Used, Lost or Damaged re Overburden Piping Rope ..,,,,,,,,,,,,,,,,,,,,, Length .,,,,,,,,,.,
x 2 x 2 x 2 x 2
,.... x 6,.... x 6..... x 5,.,. x 6
,,, x 6 . x 6..... x 6.... x 5
hrs.
hrs.
x 10 x 10 x 10 x 10
x 10 x 10 x 10 x 10
8" Drive Pipe . Adapters .,,........,.Rods. ................._..Mud -,,..,...,,..,....,...Special Mud .,,,, Core Barrels .....,Mud Barrels ......
8" Couplings Type ...,
Type . . Lbs. - Lbs. ~ Type.,,
Type .,, Type .,
Tricone .___,.__....__,,,v........,-...~........_, Type .,,Hawthorne ....................................................................................... Type ...,Hoisting Cables ,,,,,......._,__._.,,,,,,,_H,_,._ .. .. ... .Burlap .,..,,,,,,,,,,,_,__,M,,.-,,,,.....,,.,.._,,,,., Lbs, -,,Other .,,,,,,.,_,,,,,,,,..,,,,._,...................................._.....,.....,.,.,_,Cemented at.,",..".,..,....,.,..,...",,.,,,.,,,,,,,,,,,,,,,,,,.,.,, ,,Drilled Cement from .,,_..,,,,,,....._.......,.., to .,,...,,,. .,,.,.Cement used _____.___ Bags ~,,,,,.,,
Length of Waterline.,..,.,.,..,.,,,....,.,..,,.,,Stove Oil.,,,...,,.,,,,,,,,..,,,,,,,,,,,,,,,,,,,,,,,,,,,,,.... Move from Hole .,..,,,,,.,,..,,.,,,.,,,.,, to Hole
Length of Move ..,,,,,,,,Z,,O,,/^,//-.^^,,,. MilesWedged at -,,.,,,.,,,_,._,,,,.,,,,,,,_i,.,,__....Reamed from ,,,,,,,,,,,,,,,,,,,._,........... to .,,,,,.,,.,,,,,,,,.....
,,,, feet
,, Type
,,,. feet ,., Gals.
or Feet ,.,, feet
ARC
Arc Cut From .,,,,,,
Machine Hours ,...........
Man Hours .
CUTTING ONLY
To
DIAMOND TOOLSType
Core Bit
ConcaveCasing Shoe
Size No. Ve Used TypeReam Shell
Mud Bit
Mud Shell
Size No. ^.Used
REMARKS
Jo /? jo
Approved by
USE RED PEN AND CARBON PAPER
,.. Engine
1. Original copy to office 2. Second copy to engln
Foreman
8. Third copy for foreman
PATRICK J. HARRINGTONDIAMOND DRILL CONTRACTOR
From J..,,,...,.. To
Hole No. ...Drilling at
Machine No.
Core^Type ^ . m^^,.m^^^mm^..~~~~^annm.^..^aa^m~^^...maanmmm~Depth of Hole Start of Shift .....,,,,,.,,.,.,,,....,,.., End ........,....
Distance Drilled .............................................................................. ra...........n....
Control Drilling From .,.,.,,,,.,.,.,,.,,,,. To ...,,,,..,,,,.,,,,,,, 20' D 10' D
Bit No. .................................,..... Type ...................................... Footage ~ _ ,............................
Conventional Test at ....^.-....-...—........^....^^—^.—-...^^^.^..^...^.^^ ft.
Tro-Pari Test at ^.^.^.^^^.^^.^^.^^^..^^^^.^.^^^.^ ft.
Acid Test at ^^^^^^^^^.^^^^-^^..^.-^^^^-^^^^^^^^^^.^^ ft.
TIME DISTRIBUTION
Drilling ..................................._..........,.................... Hrs. .............,................... Man Hrs.
Piping ................................................................................. Hrs. .................................... Man Hrs.
Running Mud ...,.................................................. Hrs. .......,.......................... Man Hrs.
Move and Setup . ...........................................j[..... Hrs. ....................../...CI... Man Hrs.Pulling Casing .,,,,,,.,..,,.......,.,,..,,..,.,,.,.,,. Hrs. ...,.....,.,,,,..,,,,.,.. Man Hrs.
Cementing _,..................................................... Hrs. ..,,.........,,.........,,.., Man Hrs.
Washing Cement ................................................... Hrs. ..................,,..,.,...,.. Man Hrs.
Waiting on Cement To Set...,.,,,.,,,,,,, Hrs. ......,,,..,,,,,,...,,,. Man Hrs.
Drilling Cement ...,...,...,,,,,,,.,:,n....,.,,,,,, Hrs. ...,,,,...,.....,,..,.,,, Man Hrs.
Reaming ,................................................................ Hrs. ......................,............ Man Hrs.
Long Waterline ........,........................................ Hrs. .........,........................ Man Hrs,
Conventional Testing ......,................................ Hrs. .................,................ Man Hrs.
Acid Testing ...,.......,,,.,,,,,...,,...,,,,...,,,,..., Hrs. .....,.,,......,,,..,,.,., Man Hrs.
Tro-Pari Testing ...,,.,..,......,,..,.,....,.,.,,.,,,, Hrs. ...,.,,.,.,,,...,,...,.... Man Hrs.
Waiting Time For Testing .....,................ Hrs. ,.........,.,,,,.,,.,..,, Man Hrs.
Travelling ..............,.,.,.......,..,.......,.,..........,,,,..,. Hrs. ......,........................... Man Hrs.
Walking Time .,.,.,.,..,.,,,,......,..,,,.,,,,.,.,,, Hrs. ,.,.,.,.,,.,..,,.,,,,., Man Hrs".'
Wedging ......,,,.......,,...,......,...........,................,,,,., Hrs. .....,......................... Man Hrs.
Repairing ........... ............................................... Hrs. .,.,,,.,,,.,,,,,.,,., Man Hrs.
(What?) .,...,..,,,..,,.,,,,,....,.,.,,.,,..,...,..,,,..,...,__.,.....,,,,__,....,....,.......,:.,...
Other ....,,.........,,...,....,.,,,...,....,.....,,,,,,,,..,,,, Hrs. ..,.....,....,,___ Man Hrs./*JTV —i A V\ W JlCLV t )
R. Foreman
Runner ..M...............................................,................................................................,....... ..,........... Hrs,Runner .yo.....,.......................,....................................................,...................^..,.......,..................,.. Hrs.
Helner ..,................... J.. .. ...... ...........,........ . . .. . . Hrs• *t*lt'v* l,.,.,.,H,..............,,,..,,f,.,,,,,,..,..,..,.,nt..llt.....l...,..,..,,,...,,,....,..,,,,,,..,,....,,,,.,,,..,,,,..i...,.,H,.,..,,.,.l.....ff * ** a t
Helper Hrs.
Helper., .............. ....,.. .......,...............,,....,, Hrs.
Cook (Cost Plus Hours Only) ,.,,...,.,,,...,,,...,,,...,,,.,,,..,...,.,,,,,,,,.,,, Hrs.
NOTE: Total hours in Time Distribution must equal total hours worked.
COST-PLUS REPORTBedrock at....................,........................... Start of Core
Machine hours: ..........,............ ........,..........................................Tractor ._...,.......,.............j5i.... hrs. BombardierTimberjack ...,.,,.,......,.. . hrs. Truck __.Diesel Oil ..,,...,..,.,.,,.,,^,gals. R.P.M. _, Stove Oil .,....,,,,,,,,,::.,1,. gals.Casing Placed in HoleN ...,,.,,.,,,,.. x l ,,...,,,....,,,.. x 2 ...B ..........,........... x l ...........,........... x 2 ...A .,,..,.,,,.,,... x l .....,.,_,.... x 2 ....E ...........,........... x l ,................_ x 2 ...Casing Lost or DamagedN ..,.,,.,,,,,.,. x l ..,.,.,,...,,,... x 2 ...B ..,,.,,..,.,..,, x l .,...,,,....,,... x 2 ,.......A ,...,.,,.,,..,... x l ~........_,.... x 2 ,..E ............,........... x l ............_,. x 2 .
x 5 .....x 6 ......x 6 ......x 5 ..,.
x 5 .~. x 5 ...,
...™... x 5 ....,,.™ x 5 ...,
Materials Used, Lost or Damaged re Overburden
Piping Rope -,
3" Drive Pipe
Adapters
Rods
MudSpecial Mud ...,,
Core Barrels ......
Mud Barrels ~....
Tricone ..... ............
Hawthorne ~........
Hoisting Cables
Burlap ....._........ .......Other ................____...,
Cemented atDrilled Cement from ., Cement usedLength of WaterlineStove Oil.........__..__................
, hrs.hrs.
gals.
x 10 x 10 x 10 x 10
x 10 x 10 x 10 x 10
Type ..., Type ... Type -, Type ,...
Lbs.
toBags ....
Move from Hole .,..,,,,.,,.,.,,,....,,.,,,, to Hole ........m...m..mLength of Move ~.........................u................................n........M... MilesWedged at _.................._..._.._............^.Reamed from ......,..................................................,. to ...........,
........... feet
,...... Type.._ feet ....,, Gals.
or Feet ,..,, feet
ARC
Arc Cut From
Machine Hours ...........~
Man Hours .
CUTTING ONLY
...................m _ .. To ...,,,,j.,,,..,.,,..,,.,, ",.,.
DIAMOND TOOLSType
Core Bit
ConcaveCasing Shoe
Size No. Ve Used TypeReam Shell
Mud Bit
Mud Shell
Size No. Ve Used
REMARKS
Approved by
USE RED PEN AND CARBON PAPER
,.mm Engineer Foreman
1. Original copy to office 2. Second copy to engineer 3. Third copy for foreman
PATRICK J. HARRINGTONDIAMOND DRILL CONTRACTOR
.. Shift From /g.m. To Drilling at ../Z..C.fc.....,^#J..A,.J.M.fr..-S.
Machine No. ,,.,,,,,,...,..,,,..,...,,,,,,,..,, Hole No.
Core Type ,....,,,...,,,,....,,,,,.,,,.,,,,.,.......,,,,,,,,,,..,.^
Depth of Hole Start of Shift .......................................... End ..........................................
Distance Drilled ^^^....^..^.^^...^^^^^..^^^.^^^^^^^^.^^^..^Control Drilling From .,,,,,,,...,,,.,...,,, To .,,...,,.,.,..,,,,,...... 20' D 10' D
Bit No..,.,..,,,,,,,,,,,...,..., Type ...,.,,,...,,.,,,.,,,..,.. Footage __,,,,,.,.,..,.,,.,
Conventional Test at ,.^m ........ nn.. m...^..............m...... am. m..am..^.mm..m^..,....,.... ft.Tro-Pari Test at ...,.,,..,.,.,,,....,.,,,,.,,,..,,,,,.,.,.,,,,,....,,,,,,,......,,.,,,,,,.,,,,. ft.
Acid Test at ^..^^^^^^^..-^-^^^^^.^-.--..^^-^.^^^^^.^..^.^ ft.
TIME DISTRIBUTION
.,.................................^ Hrs. ...........................c^OMan Hrs.
Piping ,............................................................................ Hrs. ,............................... Man Hrs.
Running Mud ............,.................................................. Hrs. ..........................,........ Man Hrs.
Move and Setup ...........,.......................................... Hrs, .................................... Man Hrs.
Pulling Casing ...,..,,,,...,.,..,.....,,..,...,.,,.,,,,. Hrs. ....,,,,,,,,...,..,,,... Man Hrs.
Cementing .........,._.................................................., Hrs. ..................................., Man Hrs.
Washing Cement ..............................................,... Hrs. ...............................,... Man Hrs.
Waiting on Cement To Set..,,...,,...,,,,., Hrs. ..,..,.,,.,,,.,,,,,,,. Man Hrs.
Drilling Cement ......,.,,...,...,.........,,,.,.,.,,,, Hrs. ..,,..,,..,,......,..,,,.. Man Hrs.
Reaming ......,.......................................................... Hrs. ..................,................ Man Hrs.
Long Waterline ............,....................................... Hrs. ,.................................. Man Hrs.
Conventional Testing ,................................... Hrs. ,............................... Man Hrs.Acid Testing ...,,,,.,.,..,,,,......,.,,,..,,.,,,..,,.. Hrs. ,,,...,.,.,.,.,.,,,.,... Man Hrs.
Tro-Pari Testing .................................................,... Hrs. .................................... Man Hrs.Waiting Time For Testing ..........,........... Hrs. ...,,...,.,,,.,.,...,..,, Man Hrs.
Travelling ,,.,,...,,,,.,.,,,,,.,,,,,,.,,..,,.,...,,, Hrs. ,,..,,,.,,,..,,,,,,,. Man Hrs.
Walking Time .,,.,,,.,,,,.,,,..,.,.,,,,,,.,,,..,. Hrs. ,,.,..,,,.,,.,,,..,.,, Man Hrs.
Wedging ..,,,,,,,,,,,,,.....,,,.,,,,,,,,,.,,,,,,..,. Hrs. .,..,,...,,,....,,,,..,.. Man Hrs.
Repairing ,...,,,.....,..,,,,.,.,,,,,,,,,.,,,.,.,..,..,. Hrs. ...,,,..,,..,,....,.,.,,,. Man Hrs.
(What?) .................................M.... ^
Other ...............,..............................._........................... Hrs. ...............__._ Man Hrs.
(What?) ...y*-*.......R. Foreman (..*.. lt!3tXZtaf^Runner .......................,........................................._............/L......................................................... Hrs.
Helper . //.*....^fafa3*d-Att^^ Hrs.
Helper ....................,..............................._........_........... ..................................._.........,........ Hrs.Helper ~.....................,................................:....:...............,,..,.............,...........,............,.,..,,.......,...,.......... Hrs.
Cook (Cost Plus Hours Only) .,.,,,,,,,..,..,,,,.,....,.,,.,.,,,,,,..,,.,,,,,,., Hrs.
NOTE: Total hours in Time Distribution must equal total hours worked.
COST-PLUS REPORTBedrock at..,....................................._ Start of Core
Machine hours: /..D.................._...............................~...
Tractor .........,...,-.....^L............ hrs. Bombardier
Timberjack ...,..,,.~...,..,,...... hrs. TruckDiesel Oil ..............fi. ....... gals. R.P.M.Stove Oil .............................i...... galsi
Casing Placed In Hole
B ...........,........... x l ....
E ,.,,..,,,,,...., x l ...,....,...,,,
Casing Lost or DamagedN ,....,,.,....,,,. x lB .................... x l
A ... ..... . x lE ....... ..... . x l
hrs.
x 2 ...,x 2 ...,.x 2 ......x 2 ...,
x 6 ....,,...x 5 ..,,,....x 6 H..........x 5 __ .
x 2 x 2 x 2 x 2
x 5 x 5 x 5 x 5
x 10 x 10 x 10 x 10
x 10 x 10 x 10 x 10
Materials Used, Lost or Damaged re OverburdenPiping Rope ... 8" Drive Pipe Adapters .........,,Rods.Mud.Special MudCore Barrels .......................,__......,......._. _,.,_ Type .^"~~* ™"""""""""""i"™""""i'"™"i*i""t"i*mi*"HMt*nti,mm. A f fV MX
Mud Barrels ........_........................................_._,._,._,. Type ...
Tricone _..................._...............................,......__..._.... Type ..,
Hawthorne ._................. ..........._..................._._..._....... Type ...,
Hoisting Cables ___..._..........................._____ . .......Burlap ~...................................................................._,.. ... ..,........ Lbs. ...
Other ...............__......,....,,..,,.,.__,.....,,....,_.....,........................__.
Cemented at.............,,...,....,,_,....,,.....,,..,,,_,,....,,.,.,,.,,,Drilled Cement from ~.............................................. to
Cement used _____,___ Bags .....~-.Length of Waterline ................ ...,.,....,..,Stove Oil.....,.................................................._.......,..................Move from Hole ............................................ to Hole __ . _ ...
Length of Move ....................................................................,...,,.,,. Miles
Wedged at ..................... _ ....... __ . _ ........,... _ ......... __Reamed from .......... _ ........ _ ,. __ ............ to .................................
. feet... ~...
,.. Type.,,... feet..... Gals.__ .........or Feet
........ feet
Arc Cut From
Machine Hours
Man Hours .....,...
ARC CUTTING ONLY
...,..,,....,...,......,,_,..., To .......
DIAMOND TOOLSType
Core Bit
ConcaveCasing Shoe
Size No. Ve Used TypeReam Shell
Mud Bit
Mud Shell
Size No. %Used
REMARKS
~ 3 f GO
Approved by ~...~
USE RED PEN AND CARBON PAPER
Foreman
1. Original copy to office 2. Second copy to engineer 8. Third copy for foreman
PATRICK J. HARRINGTONDIAMOND DRILL CONTRACTOR
ite ftU.^MSWi\ti From L3^OUXi ToDrilling at -..,^!^^LfeC.jCC,...Machine No. ,,,,,,,,,,,,,,,.,,,,,,,,,,,,, Hole No.,
Core Type .,,,,,,,,,,,,,,,,,,,,,,,,,,,Depth of Hole Start of Shift ,,,,,,,,,,,.,,,,,.,,,, End .,,,,,,,,,,,,,,,,.,,,,Distance Drilled ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,_,,,,,,,,,.,,,,_,,,,,,,,,.Control Drilling From ,,,,,,,,,,,,,,,,,, To ,,,,,,,,,,,,,,,,,, 20' D 10' DBit No. ,,....,,,,,,,,,,,,,,, Type ,,.,,,,.,.,,,,,,,,,,., Footage
Conventional Test at ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,.,.,,,,,,,,,,,,,.,,,,,.,,,,.,, ft.Tro-Pari Test at ,,,,,,,,,.,,,,,,,_,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, ft.
Acid Test at .,,,,,_,,,,,,,,,,,,,,,...,,,,,,,,,,,,,,,,,.,,,,,,,,,,,,,,,,,,,,,,,,,, ft.
TIME DISTRIBUTION
.............................,.............^f... Hrs. ,.....,,,.....,.,.,f..S3t...., Man Hrs.
Piping ,,,,,,,,,,,,,,,,,,,,,...,,,,.,,,,.,,,.,......... Hrs. ,,,,,,,,,,,,,,,,,, Man Hrs.Running Mud ,,,,,,.,,,,,,,,,,,,,,,,,,,,,,,,, Hrs. ,,.,,,,,_,,,,,,,, Man Hrs.Move and Setup ,,,,,,,,,,,,,,,,,,,,,,,,,,, Hrs. ,,,,,,,,,,,,,,,,,, Man Hrs.Pulling Casing ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Hrs. ,,,,,,,,,,,,,,,,,, Man Hrs.Cementing ,.,,,.,,,,,,,,,,,,,,.,,,,,,,,,,,.,,,, Hrs. ,,,,,,,,,,,,,,,,,, Man Hrs.
Washing Cement ,,,,,,,,,,,,,.,,.,,,,,.,,,, Hrs. ,,,,,,,,,,,,,,,,,, Man Hrs.Waiting on Cement To Set,,,,,,,,,.,,,, Hrs. .,,,,,,,,,,,,,,.,,, Man Hrs.Drilling Cement ,,,,,,,,,,,,,,,,,,,,,,,,,,, Hrs. ,,,,,,,,,,,,,,,,,, Man Hrs.Reaming .,.,..,,,,,,,,,,,,,,,,,,,.,,,,,,,,,,,,,, Hrs. ,,,,,,,,,,,,,,,,,, Man Hrs.Long Waterline ,,,.,,,,,,,.,,,,,,,,,,,,,.,,,, Hrs. ,,,,,,,.,,,,,.,,,,, Man Hrs.Conventional Testing ,,,,,,,,,,,,,,,,,,,,, Hrs. ,,,,,,,,,,,,,,,,,, Man Hrs.Acid Testing ,,,,,,,.,,,,,,,.,,.,.,,,,,,,,.,,,, Hrs. .,,,,,,,,,,,,,,,,,. Man Hrs.
Tro-Pari Testing .,,,,.,.,,,,.,,,,,,,,,,,,,,,, Hrs. ,,,,,,,,,,,,,,,,,, Man Hrs.Waiting Time For Testing ,,,,,,,,.,,,, Hrs. ,.,,,,,,.,,,,,,,,,, Man Hrs.Travelling ..,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Hrs. ,,,,,,,,,,.,,,,,,., Man Hrs.Walking Time ,,,,,.,..,,,,,,,.,,,,,,.,,.,,,,,, Hrs. ,,,,,,,,,,,,,,,,,, Man Hrs.Wedging ,,,,,,,,,,,,,,,,,,,,,,.,,,,,,,,.,,.,,,, Hrs. ,,,,,,,,,,,,,,,,,, Man Hrs.
Repairing ~,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Hrs. ,,.,,,,,.,,,,,,,,,, Man Hrs,(What?) ,,,.,,.,.,,,,,,,,,,,,,,,,,,,,,,,,,,,.,,.,,,,.,m,,,,,,,,,,....,,,,,,,,,,,,,,,,,,
Other .,.,,,,,,,..,,,,,,.,,,,,,,,,,.,,,,,,,,,,,,, Hrs. .,,,,,,_ ,__ Man Hrs,(What?) .x*Tk A
R. Foreman ,{^,,,*JX^^l(C^'!r:^";:^ Hrs. Runner .,,,,,..,,,,,,,,,,.,,,,,,..,..,,,,,..,,,,,,,,,,,,y,,,,,,,,,,,,,,,,,,,,,,,,,,,, Hrs.
Helper ,.,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,.,,,,,.l,,,,,,,,,,,,,,,,,_,,,,,,,,,,,,,,,,,. Hrs.Helper ..._,,,,,,,,,,,,,,,,,,,,,,,.,,,,,,,,,,,,,,,,,,,,,,,,,,.,._,,,,,,,,,,,,,,,,, Hrs.Cook (Cost Plus Hours Only) .,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,.,,,, Hrs.
NOTE: Total hours in Time Distribution must equal total hours worked.
COST-PLUS REPORTBedrock at,,.,,,,,,,,,,,,,,,.,,,,,.. Start of Core -......~.Machine hours: ?................ ,,,,,,,.,......,.,,,.,,,,..,,,,,,,,,,
Tractor .................~ff?.——, hrs. Bombardier .,,~Timberjack ,,,,,,.,,,,,,_ hrs. Truck , .....,,,,,Diesel Oil .,,,,,,ZCL,,, gals. R.P.M. .___.,, Stove Oil .,,,,,,,,,,,,,,,,,, gals. Casing Placed in Hole
,. hrs., hrs.gals.
N .......B .,,,.A ,,,,E ..CasingN -,,,B ..AE ..,,
x 1,,,,,,,, x 1 .....,, _ ....,.............. x 1 __ ,. _ ,,.
,.,,.,,,, X 1 ™,,,,..,,,,.
Lost or Damaged,,,,,,,, x 1 .,.,.,.,,,,.,..,,,,,,,, X 1 -,,,,,,,,,,.
x 1 .,. .,....,,,. ... X 1 -,,,,,,........
. x 2 .....,..,,
. x 2 __ .
. x 2 .,,,..,,.,
. x 2 ,~,.,..,.
. x 2 ...,,,,,
. x 2 __ ..,
. x 2 .,,,.,,,,, x 2 . __ ,
...,.... x 5 .....,,...iiiima x 5,..mm x 6 . _ ,.,....... x 6 __ ,
,....... x 6 -..., _ ,™... x 6 ,.,...,,,,,™. x 6 .,...,,,,— x 6 ... ——
...,,,. x 10, _ x 10. _ x 10__ x 10
,.,,... x 10. _ x 10__ x 10. _ x 10
Materials Used, Lost or Damaged re OverburdenPiping Rope ............8" Drive Pipe .....,.Adapters ,...,,,,....,,
Length .,.,,,... . 3" Couplings
. Type .. . Type ^ ,, . Lbs. ...,,......,,,.,Lbs. -..,... Type.....
Type -,.
Type -,. Type .,. Type ....
Lbs.
Mud ....................Special Mud ,.,,_,, Core Barrels
Mud Barrels , Tricone .._,. Hawthorne _,,,,., Hoisting Cables ,,, Burlap ,,,,,,,,,,,,,,., Other -,,,,,,,,...,.,,,,.
Cemented atDrilled Cement from __,.
Cement used
Length of WaterlineStove Oil............._,,,,,,,.,., ,,,...,,,,,_,,.,,,,,^.^.Move from Hole .,,..,,,,,,,,,,,..,,,,,,, to Hole
Length of Move ,,.,,,,,,,,,.,,,,,.,,,,,,,_,,,,,..,,...,,,,... Miles
Wedged at...,,,.,,,,,....,.,_,....,...,,,,.,,,,.__,..,,_....Reamed from ~.,,,,..,.,..,..,,.,,,,,,,,,,,,,,, to ...,,,,,,,.,,,,.,,,,...
toBags
,,, feet
, Type ..... feet , Gals.
or Feet ....m. feet
Arc Cut From
Machine Hours
Man Hours ,.,,.,
ARC CUTTING ONLY
.,,,,,,,,,,,,,,,...,,,,,,, To ......,
DIAMOND TOOLSType
Core Bit
ConcaveCasing Shoe
Size No. Vo Used TypeReam Shell
Mud Bit
Mud Shell
Size No. "ft Used
REMARKS
Approved by ,., ,.,...,.,,,.,_,.,,,,,,,,,.,.,,,,,,,.,,,..,,,
USE RED PEN AND CARBON PAPER
,,.. Engineer Foreman
1. Original copy to office 2. Second copy to engineer 8. Third copy for foreman
PATRICK J. HARRINGTONDIAMOND DRILL CONTRACTOR
From J LKL To Drilling at ^...^ Machine No. .,.,..,,,,,,,,,,....,,,.,.,,,,,,, HoleCore Type ^.-.^^^^.^..^^^..Depth of Hole Start of Shift ,,,,,,,,,,,,,,...,,...,, End .,.....,.,,,.,,.,,.,,.,,,,.
Distance Drilled ................................................................................................................_................Control Drilling From ,,....,,,..,,,,.,...,,, To ,.,,,,,,,,.,,.,.,,.,, 20' D 10' Q
Bit No,,._.............................. Type ....................,................ Footage ~_.........,..................
Conventional Test at ................................................i................................................................. ft.
Tro-Pari Test at ^m^^maa^m^...m^^^.mm^m.mmnm. mmn. m .m. ft.
Acid Test at ^^^^^^^--^-.^^.^.^^..^--^^^^^^^^^^^^^^.^^ ft.
TIME DISTRIBUTION
^tjj^S^,/^,^.L/^.<^.,............,..^llrB. .....,...........cd..Q. Man Hrs.
Piping .........,....................................................................... Hrs. .................................... Man Hrs.
Running Mud ............................................................... Hrs. ................................... Man Hrs.
Move and Setup ....................,.............................. Hrs. ..................,..,........,, Man Hrs.
Pulling Casing ,,.,.,,,,.,...,,,,,.,,,.,.,.,,,,,,., Hrs. .....,,,,,,,.,..,,....,,. Man Hrs.
Cementing ,.................................................................... Hrs. ........................,........... Man Hrs.
Washing Cement ................................................... Hrs. .................................... Man Hrs.
Waiting on Cement To Set,,.,.....,.......,,.. Hrs. .................................... Man Hrs.
Drilling Cement .,,.,,,,,,,,.,,,.,.,,,.,,,.,,.... Hrs. .,,,,.,,,,..,..,.,,.,, Man Hrs.Reaming ...................................................................... Hrs. .................................... Man Hrs.
Long Waterline ....................................................,... Hrs. .....................,............. Man Hrs.
Conventional Testing ..,.....,...,,..,,......,..,.,,. Hrs. ......,.......................... Man Hrs.Acid Testing ,,,,..,,,,,.....,,..,..,,,,,,,,,,,...., Hrs. ...,,,,.,,,,,,,,.,,,. Man Hrs.
Tro-Pari Testing ,..,,,....,.,,.,,..,,.,..,,.,,,,,, Hrs. .,,..,,.,,,.,..,....,,... Man Hrs.Waiting Time For Testing ..,.,,,.,,,,,, Hrs. ...............,.................. Man Hrs.Travelling ..................,.................................................. Hrs. _.............,................. Man Hrs.
Walking Time .,,..,...,..,.,,,,.......,,..,,...,,.,,.... Hrs. ................. ............. Man Hrs.Wedging ............,.......................................................... Hrs. ..................,................ Man Hrs.
Repairing ....,.,.,......,,,,,..,.,.,.,,,,,,,.,,,,,.,.,, Hrs. .,,..,,,.,,,,,,.,,,... Man Hrs.
(What?) .,...,.,....,,.......,.,,,.,.,....,,.,,,.....,.,,,.,.,.,,_......_,__,....,....,.... B.,...,..
(What?) -..^................-.y.y.........m^^^__.,...
R. Foreman { ^J^^f^gS^^^^l^^ Hrs.
Runner M.....^...................,...^......y............................1 ................UMM^^y.......................................... Hrs.Runner y2:ffl...f....^3tftf,-fZ3*!3**idi,! ^ Hrs.
Helper ^...............................................n..............................^...................._............................... Hrs.
Helper ........................................................................n....................................................................... Hrs.
Helper ...................................................................................................................M............................... Hrs.
Cook (Cost Plus Hours Only) ....,..,,,..,,,,..,,,,,,,.,,.,,.,,,.,.,,.,,..,.,,..., Hrs.
NOTE: Total hours in Time Distribution must equal total hours worked.
COST-PLUS REPORTBedrock at................,............................. Start of Core ....
Tractor ..............
Timberjack ,.Diesel Oil ........Stove 051 .........
Casing PlacedN ..,,,,.,,.,...,B .,,,,,.,.,,.,...A ,..,,,..,,,..,..E .......................
........,..^f:.......,. hrs. Bombardier ~.....................
.............j............... hrs. Truck ~ .........................,.....
,/^B?......... gals. R.P.M. ......., _ .,, ,,...,.............. ,. ..., . .. gals.
i in Holex 1 ..,,,,.,.,..,,,x 1 m,.,,,,,,,,.x 1 ...,.,,.,...,.,.x 1 ,.,,,,,.,,,...
. x 2 .....,
. x 2 .,.,
. x 2 .....,
. x 2 ....,
,,,...,..,,,,,,,,, X 5 M..........O.X
x 5, KM 1 111*411 It! tH X V HMIfltolll***!
__ ........ x 5 ... ..........
Casing Lost or DamagedN .,.,..,,,.,,.,..B ....,..................A .........,............E ...................M.
x 1 ...,,.,,....,...,x 1 ............,.......x 1 m,,,. _ .,,x 1 .,,,,,.,,,.,..
. x 2 ...,
. x 2 ,...
. x 2 ..,,
. x 2 ....,
,.,,....,..,.. x 6 _ ,. . .......... . x 6 ...,,.,.,..,.,.............. x 6 .,.,,,,,.,___ x 6 ..., ~.
x 10 x 10 x 10 x 10
x 10 x 10 x 10 x 10
Materials Used, Lost or Damaged re OverburdenPiping Rope ~.......................................... Length ..............,.........8" Drive Pipe
Adapters Rpds. ........,Mud -,.,,,
3" Couplings ,
Special Mud ,, Core Barrels ~...........
Mud Barrels -_........Tricone .........................Hawthorne ~...............Hoisting Cables ,.., Burlap ..........i.................Other M........-M..~~Cemented at ...,............Drilled Cement from ^ Cement used . -~.. .
. Lbs. Lbs. -.... Type.
Type,
Type, Type, Type,
Lbs.
..... toBags
Length of WaterlineStove Oil ............~....... .....M... ...Move from Hole ~.....,.,...,.,.,.Length of Move ...............................,.............................
Wedged at ............................................H.............,,....Reamed from .......................... ...,............................. to
,.... feet
Type ...,... feet ,,, Gals.
...,. to Hole..... Miles or Feet.,,..... .................. feet
ARC CUTTING ONLY
Arc Cut From ............................................... To
Machine Hours ...........,...............................................
Man Hours .....,..................................................................
DIAMOND TOOLSType
Core Bit
ConcaveCasing Shoe
Size No. 9fc Used TypeReam Shell
Mud Bit
Mud Shell
Size No. 9i Used
REMARKS
/rt a / tie 2^ A/
Approved by W.,.W,........,.,,.......,,.M,.....,,...^..."....^..,,,.,,HMH..M-"......~,.
USE RED PEN AND CARBON PAPER
Foreman
1. Original copy to office 2. Second copy to engineer 3. Third copy for foreman
PATRICK J. HARRINGTONDIAMOND DRILL CONTRACTOR
Shift From fijflJttX . To Drilling at MJ3Q^JK...J^ Machine No. .....,.................................................. Hole No. .........................................................
Core Type xmnmaamam^..amnm^^aa~^aa^^.a^^aammmmmmmmmammma.,mmm.m..m Depth of Hole Start of Shift .,,.,,.,,,,,,,,.,,,,..,.. End ...,....,.,.,...,,,,,..,,.,,Distance Drilled ..._.........,...........................................................................................__................
Control Drilling From ...,,,,,,.,,,,,,...,., To ...,..,....,,...,.,...,.,,, 20' D 10" DBit No. _.....,........................ Type ...................................... Footage .............,........................
Conventional Test at .........................,................................................................_................... ft.Tro-Pari Test at ^..^.n..nm^.m.^^m.mamm. a.... nm. mmanmnmmmm.....mmm.. ma..m..., tt.Acid Test at,......__,..,,,,,..........,...,,...,.........,.....,........,......_,....,,..,,..,..,,..,.,....... ft.
TIME DISTRIBUTION
CttHng ^0.m#jL.*.ALCu.............S?. Hrs. ,...,,.,,,.,,,.^^Man Hrs.
Piping ........,,.,,..,,,,,,.,,,,,...,...,.......,....,,....,...... Hrs. .,,.,,...,..,,,.,,...,,. Man Hrs.Running Mud ......,........................................................ Hrs. ................................... Man Hrs.
Move and Setup ...................................................... Hrs. .......................,............ Man Hrs.
Pulling Casing .,................................................. Hrs. ......,......................... Man Hrs.
Cementing ...,.............................................................. Hrs. ..............,,.....,,,..,,. Man Hrs.
Washing Cement ..........,..................................... Hrs. .............,..,,....,...,.... Man Hrs.Waiting on Cement To Set.......................... Hrs. .....,...,.,,,,..,,,,,.., Man Hrs.
Drilling Cement ,..................................................... Hrs. ..............._,............... Man Hrs.
Reaming ........,........................................................... Hrs. ........,......................... Man Hrs.Long Waterline .......................,............................ Hrs. ....,........................... Man Hrs.
Conventional Testing .,,,,,,,,,.,,,,.,,.,..,.. Hrs. .,..,.,....,.,,,,,,,,., Man Hrs.Acid Testing .,....,..,.,,..,.,,.,.,,.,,..,,,,,,,,..... Hrs. ................................. Man Hrs.
Tro-Pari Testing ...,.................................................. Hrs. ................,.................. Man Hrs.
Waiting Time For Testing ,,,,,,.,,,,... Hrs. ,.,.,.,,.,,.,,,,,,,., Man Hrs.Travelling .,....,......,,.,,,....,,,.....,,,.,...,,,.,,.,, Hrs. ...,.,,,..,.,.,,,...,,., Man Hrs.
Walking Time ,,,,,,,..,,,,,,,,...,,.,,,,,,,,,., Hrs. .,.,...,..,,,...,,.,,,,. Man Hrs.
Wedging ,,,.,.,,,,,,,,.,.,.,,.,,.,..,,.,,,,,...,.,.,, Hrs. ,,,.,..,,...,,.,.,.,.,, Man Hrs.Repairing ..................,............................................. Hrs. ......,.....,.,.,.,.,,,,,, Man Hrs.
(What?) ...........,...,................,..,,..,,..,,....,..,...... ......._...,,,.,__,,.,,_,,.,.,.....Other ...................................................................,............ Hrs. ............,........~............ Man Hrs.
(What?) *!sr;a......... . .................._.............i........../'........._....................._,..,..,..mR. ForemaiC^^x*;:^^ i::"k^^ Hrs-j *Runner ...........,..................................................._......................._...........................,..._.......... Hrs.Runner , .....fH)........,...........,........e .:..j..,,......................r ........,...,,.....,.i........................................... Hrs.
Helper ..^fe^^^X^^^^ Hrs.Helper ...................................................................._................/l..................................................... Hrs.Helper ................................................,......................,........................................................,................~ Hrs.Cook (Cost Plus Hours Only) .,,,,...,.,..,....,,,,...,.....,,,,,,.,,,,,,,.,..,,,., Hrs.
NOTE: Total hours in Time Distribution must equal total hours worked.
COST-PLUS REPORT..............,........... Start of Core
BombardierTruckR.P.M.
X 1 M...I......I........U.
...................... X 1 .
.,,....,..,,,,., x 1 ,.....,..,....,,,.ng Lost or Damaged
x 1,.,,.,,,,,.,, x 1 .,,,,.,....,,..............,,.,....,... X 1 ........................
.,,....,..,,,.... x 1 ...,......,..,..,.
x 2x 2x 2x 2
x 2x 2x 2x 2
_ ....,...... x 6 .,... _ __ x 5 ......,................. x 6 ...™................ x 5 .
^..................,. X t H
J / 6......H.........J.H. K O M
__ . __ x 5 .™.,,...,m....... x 5 .
,, _ , _ ....., x 10,........... __ x 10,....,.....,.,,, x 10,. _ ,..m.,. x 10
™,, _ ..,, x 10)...,,,, _ x 10.....,. _ .,... x 10,,. ____ x 10
Bedrock at...........Machine hours:
Tractor ..............wl............ hrs.co
Timberjack ,.........G--~~ hrs.Diesel Oil .....,.............................. gals.Stove Oil ...........,........................ gals.Casing Placed in Hole
NBAECiNBAEMaterials Used, Lost or Damaged re OverburdenPiping Rope3" Drive Pipe .,
Adapters .............,Rods. .......................Mud .,.,,.....,,....,..
Special Mud .., Core Barrels ., Mud Barrels Tricone .,, ... Hawthorne Hoisting Cables ............Burlap .............._.............,Other ..............,._,.....,...,
Cemented atDrilled Cement from Cement used
Length of WaterlineStove Oil..............._._...............,
hrs. hrs.
Lbs.
feetto
Bags ~.. ....... Type,....,, feet,...... Gals.
Move from Hole .,.,,,.,.,,.,,,.,,..,.,.,..., to Hole _,
Length of Move ............................................_......................,........... MilesWedged at..................,............._..........................._......,_...,Reamed from ........................................................... to ..........,............
or Feet .... feet
ARC CUTTING ONLY
Arc Cut From ....................._._...........,. To _..
Machine Hours M..................................................................
Man Hours .............,....................................................._........
DIAMOND TOOLSType
Core Bit
ConcaveCasing Shoe
Size No. Ve Used TypeReam Shell
Mud Bit
Mud Shell
Size No. *k Used
REMARKS-/s /[A a fi a rt
Approved by m
USE RED PEN AND CARBON PAPER
Foreman
1. Original copy to office 2. Second copy to engineer 8. Third copy for foreman
PATRICK J. HARRINGTONDIAMOND DRILL CONTRACTOR
Shift From ,..M..ti(\....... ToDriWng *t .............".g.h..,,....??^Machine No. .,,,,,.,...,,.,..,,,.,.,.,,..,,,.,,. Hole No. Z^,.**,.^ Core Type ,,,.,,,,...,..,,,,,,.,,.,..,..,,,....,...,o,,.,....,,,.,.,/.,,^Depth of Hole Start of Shift ...........................,.............. End .......,.............................
Distance Drilled , .......................................................................,,......................:,............._.............Control Drilling From .,............................... To .....................,............ 20' Q 10'
Bit No. ....................................... Type ...................................... Footage ..........................,.....
COST-PLUS REPORT
Bedrock at........................,....................... Start of Core .
Machine hours: ...fei............ ......,.............................................
Tractor .............,....,..*5............. hrs. BombardierTimberjack .,......,.....,,...,,. hrs. Truck ......
Diesel Oil .........J..,@........... gals. R.P.M. .............
Stove Oil ..,.,,.,,.,.....,..,,..,, gals.
Casing Placed in Hole
~ hrs.,. h ra.
gals.
Conventional Test atTro-Pari Test at ....... .. ......................................,...............................Acid Test at ~ ...... . .....................,....................................
TIME DISTRIBUTION
UnilliBii- .S#.tZ\.a.L*.irt.f*...,...,,.,,,,,,(S,, Hrs, ,.,,,,.,,
..............., .. ...... ft.
ft,.,,,,.,,..,.,.,.,.,,,,, ft.
...J....A. Man Hrs.
N ...,...B ......
A .......,E ...,...
CasingN ........
B ........A ......,
x 1 ,
............ x 1 ...... _ .x 1 .. .. .
................ x 1 .......................Lost or Damaged,,,,,,,.. x 1 ..,................
x 1
.,.,,....,... x 1 ...,..,.,.,.,,.....
. x 2 . ...............
. x 2 . __
. x 2 .,........,,
. x 2 -,.,.......,,...,
x 2
x 2
. x 2 ...,.,.,,,,.,....
. x B .........
. x 6 ,.......
. x 5 .. .. x 6 -, ..
. x 6 - .....
. x 6 ..........
. x 5 ,.......
x 10.... _ x 10
,...,,.,, x 10
.,,.,,.... x 10
, _ .... x 10
...,. _ x 10
.,..,,.,.. x 10
Piping .,.................................................................. Hrs. .,,,.,,.,....,..........,,.. Man Hrs.
Running Mud ............................................................... tirs. ................................... Man Hrs.
Move and Setup ...,................................................ Hrs. .................................... Man Hrs.
Pulling Casing ,...,,.,,,..,,.,,,,.,.,..,,....,..,,,,. Hrs. .....,.,....,..,...,..,.,,.. Man Hrs.
Cementing ........._...................................................... Hrs. .................................... Man Hrs.
Washing Cement ..........................................,....... Hrs. .................................... Man Hrs.
Waiting on Cement To Set........................... Hrs. ......,............................ Man Hrs.
Drilling Cement ...,..,,.,,.,.,,,....,.,,,,,..,.,,, Hrs. .,,,,.,,,,..,..,.,,,,. Man Hrs.Reaming ........................................................................... Hrs. ,_............................... Man Hrs.Long Waterline ............,...................,,...,....,,,,., Hrs. ......,............................ Man Hrs.
Conventional Testing ...,,,,,,,,,.,.,...,,,,,, Hrs. .,.,,,,,..,,.,,.....,,.. Man Hrs.
Acid Testing .,,.,,,,,,,,,,..,.,..,.,.,....,,..,,,.,. Hrs. .,..,,,,,...,.,,..,...,.. Man Hrs.
Tro-Pari Testing .,.,.,.,...,....,,.,,,.....,,.,,,,,, Hrs. .,.,,,,,,,..,.,,...,.., Man Hrs.Waiting Time For Testing ...........,.......... Hrs. .,...,,,.,,..,,,,,,,,, Man Hrs.
Travelling ,...._...................................,..................... Hrs. .................................... Man Hrs.
Walking Time ..,................................................... Hrs. ,................................. Man Hrs.Wedging ...,,.....,...,....,...............,,..,,...,,,,,,..,,.,. Hrs. .,,,,.,,,,,.,,.,,,,.. Man Hrs.Repairing _.................................................................. Hrs, .................................... Man Hrs.
(What?) ..,,,,,...,.,,,.,,.,..,,,.,,,,..,,,,,,,.,.,,__... ,......,,,___,...,.....,.,,...,.......
Other ..........................,..................................................... Hrs. ,..............____ Man Hrs.
(What?) .....ftp........R. Foreman ....vJ^X^tfz^^^^^ Hrs.Runner ..........................................................._..........................C.................................................... Hrs.
Kunner IILJA........^...............!*....^...............*.....................^..................^..,.,,,.,,,,..................!.**.... Hrs.
Helper J^i^.....X^^ fc^^ Hrs.
Helper ..................................................................._.........,........^....,.............................,......,...,...... Hrs.
Helper .........._..............................................................................................n....................................... Hrs.
Cook (Cost Plus Hours Only) ................................................,................................. Hrs.
NOTE: Total hours in Time Distribution must equal total hours worked.
E ........................ x l ........,.............. x 2 M...... ___ x 5
Materials Used, Lost or Damaged re OverburdenPiping Rope ........................................... Length M.. .................
8" Drive Pipe .,,.. ,,.,.....,,,,....., 8" Couplings
Adapters ....,............................................. TypeRods, .....................,~ ....... _ ....... _ ,. _ . Type
Mud .....,.....,,,........,.....,....,.,,,.....,.,,..,. Lbs. ........ __ . ___ ..
Special Mud _ ... __ . __ .. Lbs. _ .. __ Type ..
Core Barrels _ ... _ ...... _ , _ ........K. __ ,.. _ . _ ........ Type .
Mud Barrels ...... _ .......... _ ......... _ ......... _ ,.............. _ Type .
Tricone ......................................................................, _ .....,.......... Type ..— . .VVB*V no....fP.i....-.t..."..f.t..f."Oftl.1...0l.".tlllttV.ltolllllltll*H.ttllMt.lllKM'll* * f f V H
Hawthorne ...... _ .......................... _ ............... _ . _ .,..... Type ..Hoisting Cables ,........... _ ........................................... _ , _ .....~......... _ ...Burlap . .... . . Lbs.Other ,..J...^yCemented at ......,.Drilled Cement from Cement used•vv...w..v — wv^-
Length of Waterline --.. _ ... __ ................... .........Stove Oil ............,. _ ,....,..,,..,,m.....,.....,,, _ .,.....,..., ____ .....,.Move from Hole .........,.................................. to Hole _ .
Length of Move ....................,........... _ ,.............................................. MilesWedged at .............,.~. _ . _ . _ ............. ___ .. _ .....Reamed from .......................... ...............,................. to ................,.....................
x 10
toBasrs ~...WMQH •Htx
,.,, feet~ .., ...~. ..... Typext** *- f fr v
.. _ feet, Gals.
, ~~.~........or Feet
........ feet
ARC CUTTING ONLY
Arc Cut From .....,
Machine Hours .,...
Man Hours -...._,
To
DIAMOND TOOLSType
Core Bit
ConcaveCasing Shoe
Size No. ^ Used TypeReam Shell
Mud Bit
Mud Shell
Size No. 9iUsed
REMARKS
Approved by M... .-..............................,_..................................
USE RED PEN AND CARBON PAPER 1. Original copy to office 2. Second copy to engineer
Foreman
Third copy for foreman