Ministry of Natural Resources Ontario W8888-88476 TECK THE MINING ACT REPORT OF WORK l r.c*ro.q. 010 To the Recorder of .......^.^.f.^.?,.^^.?....,................................,.,...........................Mining Division l, name of Recorded Holder Ki rk land Lake , Ontario Prospector Licence V192 26 :\ 2 ftft * Office Address do hereby report the performance of .........T.............................. days of not before reported to be applied on the following contiguous claims Claim No. 548179 Days 20 20 20 20 20 ••••••* 20 Claim No. 548906 548484 ......... type of work Days 20 20 LARDER LAKE " "" MININO DlV.""" •"•••"NOY20W- | w o* i Tlfrl'9ilOfll|12il|fl2V4 i 548123 54.8124 548477 548478 All the work was performed on Mining Claim (s) . ^ (In the case of geological and/or geophysical survey (s) where more than 18 claims are involved attach o schedule) READ CAREFULLY: THE FOLLOWING INFORMATION IS REQUIRED BY THE MINING RECORDER. For Manual Work, Stripping or Opening up of Mines, Sinking Shafts or Other Actual Mining Operations - Names and addresses of the men who performed the work and the dates and hours of their employment. For Diamond ond other Core Drilling - Footage, No. and angle of holes ond diameter of core. Name and address of owner or operator of drill. Dates when drilling was done. Signed core log and sketch in duplicate. For Compressed Air or Other Power Driven or Mechanical Equipment Type of drill or equipment. Names and addresses of men engaged in operating equipment and the dates and hours of their employment. For Power Stripping - Type of equipment. Name and address of owner or operator. Amount expended. Dates on which work was done. Proof of actual cost must be submitted within 30 days of recording. With each of the above types of work sketches are required to show the location ond extent of the work in relation to the nearest claim post. In the cose of diamond or other core drilling the sketch must be submitted in duplicate. For Geophysicol, Geologicol, Geochemicol Surveys ond Expenditure Credits - the name of author of report. Covering dotes of survey (linecuiting ^ office). Type of instrument used. Total amount of expenditure. Technical reports, maps,expenditure breakdown, receipts must be filed in duplicate with the Minister within 60 days of recording. For Lond Survey - the name and address of Ontario Land surveyor. The Required Information is os Follgwsj (Attach o list if this space is insufficient) Owner and operator of Diamond Drill Patrick J. Harrington S son Martyn Harrington. Type of drill B.B.5 #1. Drill was moved to each location with small bulldozer tractor. Samples were taken with 3'SHLB4 Tube. But was not successful so 3 1 BW split spoon was used. Sampling was done under supervision of Heathwood Engineering of Kirkland Lake, Ontario. The Mining Act Certificate Verifying Report of Work f.'.A/vja.riT^,................................................................................................ .........4k..3.iL.)*l........i*^ (Post Office Address) hereby certify: 1. That l hove a personal ond intimate knowledge of the facts set forth in the report of work annexed here to, having performed the work or witnessed same during and/or after its completion. 2. That the annexed report is true. *"\ i \W. . IP..................19 .^......./..^*..^d!,..At;l.~*...^.../:..^.^ '""" * Signature 7 . ' 2 Of O t- \u os o. I- X R Of O 12 ui H y u. p Of lil U Of l Z J- Of o a. ui Of w* ui 3 g Ul u. O Of O D. UJ X Dated \ 768 (8/77) iRECORDc l REC. No.

Upload: vulien

Post on 25-May-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

Ministry ofNaturalResources

Ontario W8888-88476 TECK

THE MINING ACT REPORT OF WORK l r.c*ro.q.010

To the Recorder of .......^.^.f.^.?,.^^.?....,................................,.,...........................Mining Division

l,name of Recorded Holder

Ki rk land Lake , OntarioProspector Licence

V192 26 :\2 ftft * Office Address

do hereby report the performance of .........T.............................. days of

not before reported to be applied on the following contiguous claims

Claim No.

548179

Days

20

20

20

20

20••••••*

20

Claim No.

548906

548484

.........type of work

Days

20

20

LARDER LAKE" "" MININO DlV."""

•"•••"NOY20W- |w o* i

Tlfrl'9ilOfll|12il|fl2V4 i

548123

54.8124

548477

548478

All the work was performed on Mining Claim (s) . ^

(In the case of geological and/or geophysical survey (s) where more than 18 claims are involved attach o schedule)

READ CAREFULLY: THE FOLLOWING INFORMATION IS REQUIRED BY THE MINING RECORDER.

For Manual Work, Stripping or Opening up of Mines, Sinking Shafts or Other Actual Mining Operations - Names and

addresses of the men who performed the work and the dates and hours of their employment.

For Diamond ond other Core Drilling - Footage, No. and angle of holes ond diameter of core. Name and address of

owner or operator of drill. Dates when drilling was done. Signed core log and sketch in duplicate.

For Compressed Air or Other Power Driven or Mechanical Equipment

Type of drill or equipment. Names and addresses of men engaged in operating equipment and the dates and hours of

their employment.For Power Stripping - Type of equipment. Name and address of owner or operator. Amount expended. Dates on which

work was done. Proof of actual cost must be submitted within 30 days of recording.

With each of the above types of work sketches are required to show the location ond extent of the work in relation

to the nearest claim post. In the cose of diamond or other core drilling the sketch must be submitted in duplicate.

For Geophysicol, Geologicol, Geochemicol Surveys ond Expenditure Credits - the name of author of report. Covering

dotes of survey (linecuiting ^ office). Type of instrument used. Total amount of expenditure. Technical reports,

maps,expenditure breakdown, receipts must be filed in duplicate with the Minister within 60 days of recording.

For Lond Survey - the name and address of Ontario Land surveyor.

The Required Information is os Follgwsj (Attach o list if this space is insufficient)

Owner and operator of Diamond Drill Patrick J. Harrington S son

Martyn Harrington. Type of drill B.B.5 #1. Drill was moved to each

location with small bulldozer tractor. Samples were taken with 3'SHLB4

Tube. But was not successful so 3 1 BW split spoon was used. Sampling

was done under supervision of Heathwood Engineering of Kirkland Lake,

Ontario.

The Mining Act Certificate Verifying Report of Work

f.'.A/vja.riT^,................................................................................................

.........4k..3.iL.)*l........i*^(Post Office Address)

hereby certify:

1. That l hove a personal ond intimate knowledge of the facts set forth in the report of work annexed here

to, having performed the work or witnessed same during and/or after its completion.

2. That the annexed report is true. *"\ i

\W. .IP..................19 .^......./..^*..^d!,..At;l.~*...^.../:..^.^'""" * Signature 7 . '

2Of O t-

\u

os o.

I-

XROfO

12uiH

yu. pOf lil U

Of

lZ

J-Ofo a. uiOfw*

ui3 gUl

u.

O

Of O

D.

UJX

Dated\

768 (8/77)

iRECORDc l REC. No.

5537

5338 Young a

L 13035

^'o'f 2, 67 3 't

9073

528T9059

"65

L.

19071

B t

6919

2844

604T

1681

2860

35885587 ft

328T

uetf^*T^7~

is-m'#V^8tf5524

2311

'2570 l L.

e 2090

2380

li

2093209I 245!

W II ""8*6935 i

2298

2260 2261 J J

'2857 liHTTS^ /6935 //y,^

V' a .2874

wfciS

10 *

K(*4

^810^*-8551

L.

2823

L.

,289r**

*l* 4*V!a^lrMM

l--

i 2 4J

l .

5442TITIt

Jf"*1 -

\LL 1825-

L*-. 2101

T..^367655

2227

-\ H 1C. 708VHM^AL

TI900^

SuWt

TCTOt

'T C il^t

v. saaP"4Jit;-!*'' 1-' "••-.1^" y\ LE/r t iM .1Pjfevw

,.iA ,

^ )*U* v^^

^4*1KU ruN It

143*8 l

v^.^" ~'x " l ,- 'i.^'l

2891Wrkland Lake

HEAJHWOOD ENGINEERING ASSOCIATES LIMITEDTelex 067-82512 Box 190 Telephone (70S) 567-3295

Kirkland Lake, Ontario, Canada P2N 3H7

November 18th, 1980.

Ministry of Natural Resources, Mining Division, 4 Government Road, East, Kirkland Lake, Ontario.

Dear Gentlemen:

Re; Teck TownshipClaims #548123, 548124, 548178, 548179, 548477,

548478, 548479, 548480, 548481, 548483, 548484, 548485, 548486 and 548906

This letter will serve to verify that Heathwood Engineering Associates Limited supervised sampling activities performed by Patrick Harrington during the months of August and September 1980 on the above mentioned claims. Our fee, as evidenced by the attached invoice, totalled $l,974.12. Copies of correspondence relating to our supervision are also attached.

A daily log was kept, but was turned over to Mr. Alan Matte, a member of the group who currently hold the option on the claims.

If any additional information or clarification is required, please feel free to contact me.

Yours truly,

HEATHWOOD ENGINEERING ASSOCIATES LIMITED

encl.

September 3rd., 1980.

Mr. Jean Roquet, 2020 University Avenue, lith Floor, MONTREAL, Quebec. H3A 2A5

Dear Sir t

This letter is to certify that l, or a competent representative of this Company was on site at all tiroes to supervise the drilling and sampling of the Tack Hughes tailings from August 25, 1980 to August 30, 1980. Bach sample taken was quartered and put into four sample bags. One hag wfia then peraonally delivered to the Swastika Assay Office at the conclusion of each clay's work. The remaining three bags of each saroplo were turned over to Mr. A. Matt and Mr. b. Parent on September 2, 1980 and had been in my possession until that tima*

If any furtherninformation or clarification is required, please contact this office*

Yours truly,

HEATfMOOD ENGINEERING ASSOCIATES LIMITED

v,'JS/eg James Swanson, P. Eng,

l - Gen Pile - J,O. 5438 ~ Circ.

September 2nd, 1980.

Sidura Inc.,Mining Consultants,2020 University Street, lith Floor,MONTREAL, Quebec.Canada H3A 2A5

Attention; Mr. D, Parent

Dear Mr. Parent,

As requested by you, Heathwood is providing an intermediate engineer to supervise the sampling of tailings owned by the St. Jean group. The rate for our intermediate engineer is $28.00 per hour for 8 hrss. per day and 1~.V2 times this rate for overtime houx~s plus out-of-pocket expences.

Please sign the enclosed copy of this letter acknowledging the above arrangements.

Yours truly,

HEATHWOOD ENGINEERING ASSOCIATES LIMITED

Ryan,

Sidaia Inc.

D. Parent,

l - Gen Pile tar ^3. - J.O. 5439

L.-^y x - Circ.

Mr. Doug Parent, c/o Sidam Inc. f 2020 University Ave., lith Floor, Montreal, Quebec. H3A 2A5

September 5th, 19CO. Invoice No. 2503

Professional Services for period .ending Sept. 5/80

Job Ho.

5438 ~ Tailings Sampling Supervision

tena-Ddxate Engii-jeer Sr -IbdTi-iolwfist II 50-1/2 hrs ^ 28.00 1,414.00

Xnterifeoiate Engineer St ^technologist II 13-1/4 hrs ^ 42.00 5 D G. 5 O

Clerical 1/4 hr 3 14.50 _ ...J^.

1,974.12

No.

LA BANQUE ROYALE DU CANADASUCCURSALE PH L ET SHERBROOKE rf x ^

1100, RUE SHERBROOKE GUEST /VQ i/ ^ njP^LMONTREAL (QUEBEC)

/f f /3 3S/xtx^?rv?y A* //S2o c s rt fey *\77} s y/x"

GROUPE CROP IN TRUST) DOUARS

U 5'" 700'"

PATRICK J. HARRINGTONDIAMOND DRILLING CONTRACTOR

P.O. BOX 282 KIRKLAND LAKE, ONTARIO P2N 3H9 PHONE: ( 705) 567-6673

SeptemDor y, iy8o

Douglas parent, consultant Ltd.. I'/uy-lyV!? KG Kaisonneuve O c Montreal, P. Q. II3H 1^4

Dear Mr* Parent:

Please find, enclosed Dining for sampling dune on tailings in TecJfc Township. THIS Dining is as foilov/s:

Drill and two men g S bO.uO per. nr.Tractor.......... 15.00 per. nr.Truck.........*.. lu.uu per. nr.

i8 nrs. @ 58.50 pBr. nr............. SHelper 18 hrs. @ 57.1'-' per, nr.............. i2?.ooTrucking Tractor August 22.................. 25.uoTrucking Tractor Sept. i..................*. 25.uuuental on Spoon @ Sio.oo per. aay..,,....... 7o.uoi x 5' Koa.......**........*................ 41.001x5' JtiW Casing..........................o. 38.uoix3' SiieiDy Tube.......................... 16.002x2' Shelby Tuoe.......................... 25.003 hrs, btEu aard. Time. *...................... 75.oo

j?'or machinery ana Labor:Drm Time 5y hrs. 550.ou................. 2,y5o.ooTractor Time 3y hrs. @ 5515.00............... 585.0.0

TOTAL CuST...

Sincerely,

Mr. Patrick Harrington Diamond Drilling contractor

PATRICK J. HARRINGTONDIAMOND DRILLING CONTRACTOR

P.O. BOX 282 KIRKLAND LAKE, ONTARIO P2N 3H9

\ Q k VA C O M

o 2. o utvixoO \Tt UO

(YT1 , MN. O

t N G i K\ i: t" (\

S'^ , )'TU' M, }

-O ft P, -e M T

PHONE: (705) 567-6673

. c)

\y\e tv^e rmcx ea o n* o a m \ o. Y r\ GA c

h H Vj H ']

\ or Vo o rV

/iA\'^ \ K)

^ - s H ^ 4 rt, \ . ^ 4 ^ s ei; - s 4 fe

b\ t) ^

O . o D

h t';j iVj \ ^ b

. \o

A t

-C)0

^ A U\D t (X O \

P

We,

O ^

^.oo1O f\ M D V-V-A) .N\ 'o

-V.

11- DO

o f^ (M ?, s . o o

x r, ' r\ v) D KM. t v, o o 4 \ .00

i-\ i c. o ott 2^ . 2.0

X5 . Do

. . D '7ix- oo

PATRICK J. HARRINGTONDIAMOND DRILLING CONTRACTOR

P.O. BOX 282 KIRKLAND LAKE, ONTARIO P2N 3H9 PHONE: (705) 567-6673

(J 80'

Zoic UW\M^S\TH ST.\T\e UDO

r Wtx^e. Vv M ^ e N)c\ 0 c a (ebv i W n\ze,\ \ w \)o\ce. W,ON) fNTY\ \ rv \ PUY C\Cx\ rrcxS in TtCvx Tcx^fv

^S ~^u(\\rA MO*' S

4- u -~^- v t exow\~v 1\ \c. o o tfhi r Vo^ tx. "V? K \

l V4 i

L f\ PiOO ^. - D K\ t. v. t \V - \^ W r s M^-^ f'^ v\ r . ~ l*?,- lfe/1.10 -

NT \ r\ o - 2. 2 ^ --^ o TV. AT 7,ra .00 fte NT r\ o - 2. 2 ^ .00 - o. ODo - 2. 2 ^ .00 -"

\ \ x

"' e

o o

\\ Cko^P.TS Of fACy^o^Oiu B^ 1.^0

O-oo ^yi

T

PATRICK J. HARRINGTONDIAMOND DRILL CONTRACTOR

" ite jitj. Shift From j LJQ^—. To

Drilling at J3^LCJSZ~~3Z^^ Machine No. ,,,,,,,,,,,,,,....,,,,,.,,,..,.,. Hole No.

Core Type ......,..........................,..,....,.......................,................................,................_.........._.........

Depth of Hole Start of Shift ......,.,,.,,..,.,.,...,.,,,, End ...,......,,,...,,,,.,,,,,,,

Distance Drilled .......M......................................................................................................_.............,...

Control Drilling From .................................... To .................................... 20' D 10' D

Bit No. .........................,............ Type ...................................... Footage ~_............................

Conventional Test at

Tro-Pari Test at ...........

Acid Test at

........... ft.

,,,,,, ft.

..,,.,.. ft.

TIME DISTRIBUTION

BflHMg ..r.^.*7J^.(JLAxy,fe..,,,.,....,,K Hrs. ...................../.aL Man Hrs.

Piping .,................................................................... Hrs. ,,,.,...,,..,,,...,.,,, Man Hrs.

Running Mud ............................................................... Hrs. ..............,.................... Man Hrs.

Move and Setup .........,......................................... Hrs. ................................,, Man Hrs.

Pulling Casing ..............................,..,,.,.,........,........ Hrs. ..............._............... Man Hrs.

Cementing _...................................,.......................... Hrs. ......,............................ Man Hrs.

Washing Cement ...,.......................................... Hrs. .................................... Man Hrs.

Waiting on Cement To Set........................... Hrs. .....,,..,,...,,,,,,,,, Man Hrs.

Drilling Cement ...................................................... Hrs. .................................... Man Hrs.

Reaming ............................................,.............................. Hrs. .................................... Man Hrs.

Long Waterline .......................,............................ Hrs. ......,..............._...... Man Hrs.

Conventional Testing ,,,.,,,,,..,,,,,..,,,..,,. Hrs. .................................... Man Hrs.

Acid Testing .....,..,,.,,.,...,,,..,....,,..,,..,,,,B., Hrs. ,,...,,,,,,.,,....,.,,. Man Hrs.

Tro-Pari Testing ..,,.,.,,,,,..,,,.,,.,,,,,.,.,.., Hrs. ..,,,,,,.,,,..,,,,,... Man Hrs.

Waiting Time For Testing ...,,.,.,,..,.,.. Hrs. ......,.,.,,..,,,....,..,, Man Hrs.

Travelling ...............,....,.,..,...,................,.....,,...,.., Hrs. ....,........................... Man Hrs.

Walking Time ,.,,,,.,..,,,.,...,,,.....,.,,..,,,.,,, Hrs. ..,,,,,....,...,..,...,.,. Man Hrs.

Wedging .................................,...................................... Hrs. .................................... Man Hrs.

Repairing ..,,.,,,.....,,.,,,,.,,.,,,,.,,.,..,,.,.,,,,, Hrs. ..,,,,,,....,,..,,,.,., Man Hrs.

(What?) .,..,.,..,..,...,,.,,,,,,.....,......,,,,....,.,,..,..,.,.,._,....,.,,,,,_.,...,,.,,__,,..

Other .....................................................................s^.. Hrs. .................___ Man Hrs.

(What ?) \i!LAf]i~il!JLGsm^^ ............R. Foreman .(J'......f.....y^r^^^LJL^f^iA t ....... ...........................X. Hrs.

Runner ^ ..m~a.~..~ a~..~~..m...m....mmm.m~a.......... m..t....mma...m..m...~...m... am. ............... Hrs.Runner ..........................................................................j................................................................_ Hrs.

Helper X^-i^^^^ Hrs.Helper . .......,.,................,.......,...............,,......^ Hrs.Helper .,..,,..,,.,...,...,,.,,,.,,.,.,,.........,,......,.,,,,...,....,.^^ Hrs.

Cook (Cost Plus Hours Only) .................,.................................................................. Hrs.

NOTE: Total hours in Time Distribution must equal total hours worked.

COST-PLUS REPORT

Bedrock at.................................,.............. Start of Core ~...

Machine hours: ...S3.__... ._.............,.............._ .......

..,s2LTractor .......,...,,

Timberjack ,....

Diesel Oil .......,.

Stove Oil ........,,....,..,,....,,.

Casing Placed in Hole

,. hrs. .. hrs.gals.gals.

BombardierTruckR.P.M.

N ........B ..

AE ..,,,

Casing

N ..,,,

B ...,,.

A ...

E ...,...

x 1

x 1

.,.,,...,., X 1 H.,..., ______ ......

X 1 __ ... __

Lost or Damaged

,,..,,,,, x 1 ,,.,,..,,..,,...

,,.,,,,,. x 1 .....,,., ...,.......x 1

.......,........ X 1 .............. ......~

x 2 ,B....,,,,..

x 2 .... ........

x 2 ......H.............

x 2

x 2 -~................

x 2 . __ . x 2

x 2 . __ ....

. x 5 -,

. x 6 ...

. x 6 .,

. x B .,

. x 6 -.

. x 6 -.

. x B ..,

. x 6 -.

,..,.. _ ....., x 10

,................ x 10

,............ _ x 10

_ ... _ x 10

......... ..,... x 10

........,, _ x 10,...,....n __ x 10

,. x 10

Materials Used, Lost or Damaged re Overburden

Piping Rope ....,

8" Drive Pipe Adapters ........,...

Rods ~........................

Mud .,...,,,.....,,.,.,

Special Mud ..,.

Core Barrels .....

Length

,......._,....... 8" CouplingsI.M.I.ttlHl....l...MI,M V VWfTf*mm^*t

,................._, Type __:_..

...................... Type ~ ....nt,l,,.,.,,t,,,,,,,.,,H, m. f J.TU i*t M t MM J.M.I. M.

,._.....,......m Lbs....,._.... Lbs.._.......... .... Type...,...........H......H.......................H...,.M....H..M... Type

Mud Barrels ...................._.........._,.........._,.........._._,, Type ..,

Tricone , ,,.......,,...,.......,_.............,.............................._................ Type ^..

Hawthorne ~.................................................................................... Type ...Hoisting Cables .........................n.......................................,........... .... . ...-..-

Burlap .........................................H.H.................................................... Lbs. ~~^,. ^ 4/4^ C~JJXOO *"B *~ A? iffOther ^••••^^••••••.•••^•/t.fnJj.J.........^....4j)..l^.^.i!f......f.........Cemented at ......*. ...... ... ......~............M-.. ....~... .....H...~..Drilled Cement from ..........,......_......_,_.._ to ._.....,.... .......,

Cement used B........nn.a.n..........~....n~.n Bags *...

Length of Waterline .....,....................Stove Oil............

feet

Move from Hole ..,,,,,,,.,.,,,.,,...,,.,,.. to Hole

Length of Move ....M............................................................................. Miles

Wedged at.,..........................._......................Reamed from .............................................._,....... to

,... Type

feet

Gals.

or Feet ,. feet

Arc Cut From -,.

Machine Hours .,

Man Hours ...,........

ARC CUTTING ONLY

m...,,....,...,......,._.....,, To ~,....

DIAMOND TOOLS vType

Core Bit

ConcaveCasing Shoe

Size No. ^ Used TypeReam Shell

Mud Bit

Mud Shell

Size No. %Used

REMARKS

3 /IX/a *7xv-- L/U—

J O-ottcL

Approved by ,....... Engineer Foreman

USE RED PEN AND CARBON PAPER 1. Original copy to office 2. Second copy to engineer 8. Third copy for foreman

PATRICK J. HARRINGTONDIAMOND DRILL CONTRACTOR

From

Hole No. .....

ToDrilling at -.

Machine No.

Core Type ........................................................................,.......... _ ............................ __ .......................

Depth of Hole Start of Shift ..,..,,,.,.,,.,.,,.,...,.,,. End ......,...,,......,.,,,.,.,,,,

Distance Drilled ............,..................................................................... _ ....................... _ ...................

Control Drilling From .,,.,,..,,..,,.,.....,,, To ...,....,,,.,.,,,..,..,,. 20' D 10' Q

Bit No. .,,...,,.,.,,..,...,,.,..... Type .,,...,.,.,,.,,,,,..,,... Footage ~... _ ..,,,,....,,,,,.

Conventional Test at ....................................................................

Tro-Pari Test at ...,,,,.,,,,.,..,..,,,,...,,,,,,.,.,.,,,.,.,,,..,,

Acid Test at ~.........................................................................................

TIME DISTRIBUTION

Drilling ..,,.,...,,...,._,.,. ......,,,..,,,.,........,,., Hrs. .,.......

Piping ,........................................................................ Hrs. ..........

Running Mud ............,.................................................. Hrs. ..........

Move and Setup ,................,....................^...... Hrs. Q.......Pulling Casing .............................,.............................. Hrs. ..........,

Cementing ........._,....................................................... Hrs. ..........

Washing Cement ..,.,.,.,...,...,.,,....,.,,,..,,.,. Hrs. ,.........

Waiting on Cement To Set,.,,.,,,,,,..,... Hrs. ........,,

Drilling Cement ...,,..,.,,,.,,,,,.,...,.,..,..,,.,. Hrs. .....,...

Reaming .............................,......................................... Hrs. ........,,

..... ft.

.... ft.

,, ft.

.............. Man

,,,,..,, Man

,............. Man

,............. Man

,,,,.,... Man

,............. Man

,..,.,.,, Man

,.,,.,,, Man

,............ Man

,,,,,., Man

Long Waterline .............,.................................... Hrs. ..,.............................. Man

Conventional Testing ..,................................. Hrs. ................,................. Man

Acid Testing ,,,,,,,,.,,.,,.,.,.,.,,,,,,,,,,,,... Hrs. .,..,,,.,,,,,,,,,,,, Man

Tro-Pari Testing ..,,.....,..,.,,..,..,....,..,,,,..,.... Hrs. ,,,,.....,,,...,.,.,,,,, Man

Waiting Time For Testing .,,,,.,.,,,,,. Hrs. ,,.,..,,,,,,,,,,,,,. Man

Travelling .._,.....,,,,....,,,......,,,.,,.,.,,,,,, Hrs. ......,,,...,,,,,.,.,,,. Man

Walking Time .,,,,.,,.,,,,,.,,.,,.,.,,.,,,...,.,, Hrs. ,,,,,,,.,.,...,.,,,.., Man

Wedging ........................,............................................. Hrs. .....,........................... Man

Repairing ..................,................................................ Hrs. .........................,........ Man

(What?) ,....,..,.,,,,.,.,,,,,,,,,,,.,,,,.,,,,,...,,.,,,,,._,,,___,,..,,.,,..,,,

Other ._.....................................................................,... Hrs. _.........____ Man

(What?) R. Foreman A/....*..

Runner

Runner

Helper J*^.^.x3^fc^l^^^

Hrs.

Hrs.

Hrs.

Hrs.

Hrs.

Hrs.

Hrs.

Hrs.

Hrs.

Hrs.

Hrs.

Hrs.

Hrs.

Hrs. Hrs.

Hrs.

Hrs.

Hrs.

Hrs.

Hrs.

Hrs.

Hrs.

Hrs.

Hrs.

Hrs.Helper ......,.......................... ...............................

Helper B.................................................................................................................................................... Hrs.

Cook (Cost Plus Hours Only) ................................................,................................. Hrs.

NOTE: Total hours in Time Distribution must equal total hours worked.

COST-PLUS REPORTBedrock at...................,.........,..,,,...,... Start of Core

Machine hours: ..ffi............. ............................................,......Tractor ....................K!!..,........,, hrs. BombardierTimberjack ,,.,,,....,,,.,,..... hrs. Truck .Diesel Oil .,.,,..,,...,,,,...,.,.. gals. R.P.M..

Stove Oil .,,y,^?.,..,.,,., gals.

Casing Placed in Hole

B ....,.,,.,...,...., x l .,................. x 2 -.__._ x 5 ..

A ..,...,.,,,...,... x l ,.,.,.,._,.... x 2 ____ x 6 ..,

E ...................... x l ,...................... x 2 _..___ x 6 M.

Casing Lost or DamagedN .,,...,.,,,.,.,. x l ,.,.,...,,,.,..., x 2 __,._ x 6 M.

B ........................ x l ,,.,,,,.,,,.,, x 2 ..,.___~ x 5 ...

A ..,,.,.......,...., x l ...._,..., x 2 ...,...........,. x 5 ...

E ,....................... x l ,..................... x 2 _..._.... x 5

hrs.

hrs.

x 10

x 10

x 10

x 10

x 10

x 10

x 10

x 10

Materials Used, Lost or Damaged re OverburdenPiping Rope ._......,............................ Length -.

3" Drive Pipe _....._,............ 8" Couplings

Adapters ................._,........,.......... .,..... Type . .~.....

Rods . ........... Type ~ .." """""""""'""""""'" ~ li f** mwmMnwmm

Mud.,..,..,,.,.,.,.,,,,,...,,.,,,.....,,,.,..,,. Lbs.

Special Mud ...,...__,.,_.... Lbs. ~ .....___ Type -.

Core Barrels ............_.......m............__.......^_,.. _ Tvne ."•""•""""""""••"•"•""""'"•••"""""••••••""""" * f r *' "

Mud Barrels ....._.. . ........ . . Tyne"....................n....!...................!................................... ..fcJf/V W

Tricone ..._...........__..............._.u..........__............... Tvoe . ".".i"."n.tH.Il....ml.l.lllm(tmlVM.MttlMm..M*"t...il".llt"l.t * tf fv "

Hawthorne ..........................................................................K.......... Type -.

Hoisting Cables ..........._,._...................__,._._____....

Burlap ,._.............,................................_M._............K.............. Lbs. .

Other ~..........__,

Cemented atDrilled Cement from .__................_....._... to

Cement used ~....,...~.^....,..........M.....M.M.... Bags

Length of Waterline - _.......~....Stove Oil .................................W.....M........^........^............_._,............

Move from Hole .,,.,,,,,..,,,,.,,.,,,,,., to Hole ^^. .

Length of Move ................................_............................................. Miles

Wedged at .............M............................................................_......................Reamed from .....M.................. ,................................ to

feet

Type ,.,... feet ,,. Gals.

or Feet

,...... feet

ARC CUTTING

Arc Cut From ,................... _ .. _ ,..........

Machine Hours ......... ___ .....................

Man Hours ~......... . , . ., . ... .... ...... ......

ONLY

. To ......,,......,,.,,..,,.,.,,... ,

REMARKS

DIAMOND TOOLSType

Core Bit

ConcaveCasing Shoe

Size No. Ve Used TypeReam Shell

Mud Bit

Mud Shell

Size No. *fr Used

Approved by Engine Foreman

USE RED PEN AND CARBON PAPER 1. Original copy to office 2. Second copy to engineer S. Third copy for foreman

PATRICK J. HARRINGTONDIAMOND DRILL CONTRACTOR

Hole No. .,.

. Shift From ..i/J./TL,.:, To Drilling at - . Machine No. Core Type ....................................................... _ ........................................................................ _ ............

Depth of Hole Start of Shift ,....,,,,,,,,,,.,,,,,.,, End .,....,,,.,,,,.,..,,.,,...,Distance Drilled ...,............................................................................. _ ..........,.............. _ .....................

Control Drilling From ,,,,,,,,,.,,....,.,,... To ..,,,,,...,,.,,,,,,,.. 20' Q 10' DBit No. ... _ .............................. Type ...................................... Footage ~ _ ......,....................

Conventional Test at ......,,.,,,.,,......,.......,,..,.,....,..,,......Tro-Pari Test at ,,,,,,,,.,,,,,,,,,,..,,,,,.,,,,,.,,,,,,,,.., Acid Test at._,.__............,................................................

TIME DISTRIBUTIONDrilling .....,.,,,,,,,,,_,_.........,........................ Hrs. ,,,,Piping ,..........,.........,,,,,,,,,,.,,,.,,.....,,,",.,,,,.. Hrs. ........Running Mud ............................................,.................. Hrs. ......,Move and Setup ,.....,,..,,,,,,,,.,,..........Z..... Hrs. ........Pulling Casing ,,,,,,,,,,.,,,,,,..,,,,,...,,,.,., Hrs. ~..,Cementing .....................................................,............... Hrs. ...,...

Man Man Man Man Man Man

Washing Cement ,.,.,,,..,,,,,,.,.,,,,.,...,..... Hrs, ,.................................. ManWaiting on Cement To Set,..,,,.,,,.,,,.,. Hrs. .,,,.....,,,.,..,,..,..., ManDrilling Cement .,,...,..,,,,..,,,,...,...........,...., Hrs. ..............._............ ManReaming ...............................................,......................... Hrs. .......................,............ ManLong Waterline ,.,,,.,.,,,,,,,.,..,,,...,,,,,,,, Hrs. ,..,,,._,,_,,,, Man

Conventional Testing .......................................... Hrs. ,.,,.,,,..,,..,,,,,,., ManAcid Testing ,.,,,,,,,.,.,,,.,,.,.,,,,,,,.,.,..,,, Hrs. ,.,,,,,,,,,,,,,,,,, Man Tro-Pari Testing ,,,,..,,,.,,,,,,,,,,,,,,,,,... Hrs. .,,,,...,,,.,,.,.,,,., Man Waiting Time For Testing ........................ Hrs. ..,,.,.,..,,,,,,,,.,,., ManTravelling ..,...................,,,.,,....,...,,..,,,..,......,.... Hrs. ,,,.,,,....,,,,....,..,, Man

Walking Time ,,,,,,.,,,,,.,.,,,,.,..,,.,,,...,,, Hrs. ,,.,,,,,....,,..,...,,, ManWedging ,.,..,..,,..,,,,,.,,.,,,,,.,.,,,,,....,,.,........ Hrs. ..........,.................... ManRepairing ,..,,.,.,,.,,...,.,,,,,,,,,...,,,,.,,.,,,,, Hrs. ,.,,,..,,,...,,,,,,,, Man

(What?) ,.,,.,.,,,,,,,,,,,....,,,.,,,,,.,,.,,,.,,.,....,.,_,,....,,,,_......_,.,.Other ,,,,.,,,.,,,,,,,..,,,,.........._,...................... Hrs. ....__....__ Man

(What?) ^- X" \J S/ a "~,f T~* f?

R. Foreman /^^.^X^^*^Runner .,Runner ....^)............................................... ~ J.,

fjfcmSj JO .S ^ ^^ ' -*

Helper Helper

...... ft.

..., ft...... ft.

Hrs. Hrs. Hrs. Hrs. Hrs. Hrs.

Hrs.

Hrs. Hrs. Hrs. Hrs.

Hrs. Hrs. Hrs. Hrs. Hrs.

Hrs. Hrs. Hrs.

Hrs.

Hrs.Helper ,.._....._m^.^.~^~m..~~........................,...,.......m......,...m,,....*.,................* Hrs.Cook (Cost Plus Hours Only) .,..,,.,,..,,,,,,,,,,,,,.,,,,,,,,,.,,,,,.,,,,,, Hrs.

NOTE: Total hours in Time Distribution must equal total hours worked.

Truck R.P.M.

COST-PLUS REPORTBedrock at.,,,,.,,,,,,...,,.,.,,..,,,... Start of Core Machine hours: ..............................................,..........................Tractor _...fo........................... hrs. Bombardier

Timberjack ..,,,,.,,,,,,_ hrs. Diesel Oil .,,,,,,,,,,,,,,,,.. gals. Stove Oil ..._....................,...... gals.Casing Placed in HoleN ...........,.......... x l ....................... x 2B ........................ x l m..................... x 2A ....................,... x l ...,,.,,,,,,,, x 2

Casing Lost or DamagedN ,,,.,,,,,,,,, x l .........,.B .,.,,,,,......,,. x l -,,....,A ..,,....,..,,.,,. x l -,,,,..E ,,,,,,,,,,,, x l M..,....,Materials Used, Lost or Damaged re Overburden Piping Rope ..,,,,,,,,,,,,,,,,,,,,, Length .,,,,,,,,,.,

x 2 x 2 x 2 x 2

,.... x 6,.... x 6..... x 5,.,. x 6

,,, x 6 . x 6..... x 6.... x 5

hrs.

hrs.

x 10 x 10 x 10 x 10

x 10 x 10 x 10 x 10

8" Drive Pipe . Adapters .,,........,.Rods. ................._..Mud -,,..,...,,..,....,...Special Mud .,,,, Core Barrels .....,Mud Barrels ......

8" Couplings Type ...,

Type . . Lbs. - Lbs. ~ Type.,,

Type .,, Type .,

Tricone .___,.__....__,,,v........,-...~........_, Type .,,Hawthorne ....................................................................................... Type ...,Hoisting Cables ,,,,,......._,__._.,,,,,,,_H,_,._ .. .. ... .Burlap .,..,,,,,,,,,,,_,__,M,,.-,,,,.....,,.,.._,,,,., Lbs, -,,Other .,,,,,,.,_,,,,,,,,..,,,,._,...................................._.....,.....,.,.,_,Cemented at.,",..".,..,....,.,..,...",,.,,,.,,,,,,,,,,,,,,,,,,.,.,, ,,Drilled Cement from .,,_..,,,,,,....._.......,.., to .,,...,,,. .,,.,.Cement used _____.___ Bags ~,,,,,.,,

Length of Waterline.,..,.,.,..,.,,,....,.,..,,.,,Stove Oil.,,,...,,.,,,,,,,,..,,,,,,,,,,,,,,,,,,,,,,,,,,,,,.... Move from Hole .,..,,,,,.,,..,,.,,,.,,,.,, to Hole

Length of Move ..,,,,,,,,Z,,O,,/^,//-.^^,,,. MilesWedged at -,,.,,,.,,,_,._,,,,.,,,,,,,_i,.,,__....Reamed from ,,,,,,,,,,,,,,,,,,,._,........... to .,,,,,.,,.,,,,,,,,.....

,,,, feet

,, Type

,,,. feet ,., Gals.

or Feet ,.,, feet

ARC

Arc Cut From .,,,,,,

Machine Hours ,...........

Man Hours .

CUTTING ONLY

To

DIAMOND TOOLSType

Core Bit

ConcaveCasing Shoe

Size No. Ve Used TypeReam Shell

Mud Bit

Mud Shell

Size No. ^.Used

REMARKS

Jo /? jo

Approved by

USE RED PEN AND CARBON PAPER

,.. Engine

1. Original copy to office 2. Second copy to engln

Foreman

8. Third copy for foreman

PATRICK J. HARRINGTONDIAMOND DRILL CONTRACTOR

From J..,,,...,.. To

Hole No. ...Drilling at

Machine No.

Core^Type ^ . m^^,.m^^^mm^..~~~~^annm.^..^aa^m~^^...maanmmm~Depth of Hole Start of Shift .....,,,,,.,,.,.,,,....,,.., End ........,....

Distance Drilled .............................................................................. ra...........n....

Control Drilling From .,.,.,,,,.,.,.,,.,,,,. To ...,,,,..,,,,.,,,,,,, 20' D 10' D

Bit No. .................................,..... Type ...................................... Footage ~ _ ,............................

Conventional Test at ....^.-....-...—........^....^^—^.—-...^^^.^..^...^.^^ ft.

Tro-Pari Test at ^.^.^.^^^.^^.^^.^^^..^^^^.^.^^^.^ ft.

Acid Test at ^^^^^^^^^.^^^^-^^..^.-^^^^-^^^^^^^^^^.^^ ft.

TIME DISTRIBUTION

Drilling ..................................._..........,.................... Hrs. .............,................... Man Hrs.

Piping ................................................................................. Hrs. .................................... Man Hrs.

Running Mud ...,.................................................. Hrs. .......,.......................... Man Hrs.

Move and Setup . ...........................................j[..... Hrs. ....................../...CI... Man Hrs.Pulling Casing .,,,,,,.,..,,.......,.,,..,,..,.,,.,.,,. Hrs. ...,.....,.,,,,..,,,,.,.. Man Hrs.

Cementing _,..................................................... Hrs. ..,,.........,,.........,,.., Man Hrs.

Washing Cement ................................................... Hrs. ..................,,..,.,...,.. Man Hrs.

Waiting on Cement To Set...,.,,,.,,,,,,, Hrs. ......,,,..,,,,,,...,,,. Man Hrs.

Drilling Cement ...,...,...,,,,,,,.,:,n....,.,,,,,, Hrs. ...,,,,...,.....,,..,.,,, Man Hrs.

Reaming ,................................................................ Hrs. ......................,............ Man Hrs.

Long Waterline ........,........................................ Hrs. .........,........................ Man Hrs,

Conventional Testing ......,................................ Hrs. .................,................ Man Hrs.

Acid Testing ...,.......,,,.,,,,,...,,...,,,,...,,,,..., Hrs. .....,.,,......,,,..,,.,., Man Hrs.

Tro-Pari Testing ...,,.,..,......,,..,.,....,.,.,,.,,,, Hrs. ...,.,,.,.,,,...,,...,.... Man Hrs.

Waiting Time For Testing .....,................ Hrs. ,.........,.,,,,.,,.,..,, Man Hrs.

Travelling ..............,.,.,.......,..,.......,.,..........,,,,..,. Hrs. ......,........................... Man Hrs.

Walking Time .,.,.,.,..,.,,,,......,..,,,.,,,,.,.,,, Hrs. ,.,.,.,.,,.,..,,.,,,,., Man Hrs".'

Wedging ......,,,.......,,...,......,...........,................,,,,., Hrs. .....,......................... Man Hrs.

Repairing ........... ............................................... Hrs. .,.,,,.,,,.,,,,,.,,., Man Hrs.

(What?) .,...,..,,,..,,.,,,,,....,.,.,,.,,..,...,..,,,..,...,__.,.....,,,,__,....,....,.......,:.,...

Other ....,,.........,,...,....,.,,,...,....,.....,,,,,,,,..,,,, Hrs. ..,.....,....,,___ Man Hrs./*JTV —i A V\ W JlCLV t )

R. Foreman

Runner ..M...............................................,................................................................,....... ..,........... Hrs,Runner .yo.....,.......................,....................................................,...................^..,.......,..................,.. Hrs.

Helner ..,................... J.. .. ...... ...........,........ . . .. . . Hrs• *t*lt'v* l,.,.,.,H,..............,,,..,,f,.,,,,,,..,..,..,.,nt..llt.....l...,..,..,,,...,,,....,..,,,,,,..,,....,,,,.,,,..,,,,..i...,.,H,.,..,,.,.l.....ff * ** a t

Helper Hrs.

Helper., .............. ....,.. .......,...............,,....,, Hrs.

Cook (Cost Plus Hours Only) ,.,,...,.,,,...,,,...,,,...,,,.,,,..,...,.,,,,,,,,.,,, Hrs.

NOTE: Total hours in Time Distribution must equal total hours worked.

COST-PLUS REPORTBedrock at....................,........................... Start of Core

Machine hours: ..........,............ ........,..........................................Tractor ._...,.......,.............j5i.... hrs. BombardierTimberjack ...,.,,.,......,.. . hrs. Truck __.Diesel Oil ..,,...,..,.,.,,.,,^,gals. R.P.M. _, Stove Oil .,....,,,,,,,,,::.,1,. gals.Casing Placed in HoleN ...,,.,,.,,,,.. x l ,,...,,,....,,,.. x 2 ...B ..........,........... x l ...........,........... x 2 ...A .,,..,.,,,.,,... x l .....,.,_,.... x 2 ....E ...........,........... x l ,................_ x 2 ...Casing Lost or DamagedN ..,.,,.,,,,,.,. x l ..,.,.,,...,,,... x 2 ...B ..,,.,,..,.,..,, x l .,...,,,....,,... x 2 ,.......A ,...,.,,.,,..,... x l ~........_,.... x 2 ,..E ............,........... x l ............_,. x 2 .

x 5 .....x 6 ......x 6 ......x 5 ..,.

x 5 .~. x 5 ...,

...™... x 5 ....,,.™ x 5 ...,

Materials Used, Lost or Damaged re Overburden

Piping Rope -,

3" Drive Pipe

Adapters

Rods

MudSpecial Mud ...,,

Core Barrels ......

Mud Barrels ~....

Tricone ..... ............

Hawthorne ~........

Hoisting Cables

Burlap ....._........ .......Other ................____...,

Cemented atDrilled Cement from ., Cement usedLength of WaterlineStove Oil.........__..__................

, hrs.hrs.

gals.

x 10 x 10 x 10 x 10

x 10 x 10 x 10 x 10

Type ..., Type ... Type -, Type ,...

Lbs.

toBags ....

Move from Hole .,..,,,,.,,.,.,,,....,,.,,,, to Hole ........m...m..mLength of Move ~.........................u................................n........M... MilesWedged at _.................._..._.._............^.Reamed from ......,..................................................,. to ...........,

........... feet

,...... Type.._ feet ....,, Gals.

or Feet ,..,, feet

ARC

Arc Cut From

Machine Hours ...........~

Man Hours .

CUTTING ONLY

...................m _ .. To ...,,,,j.,,,..,.,,..,,.,, ",.,.

DIAMOND TOOLSType

Core Bit

ConcaveCasing Shoe

Size No. Ve Used TypeReam Shell

Mud Bit

Mud Shell

Size No. Ve Used

REMARKS

Approved by

USE RED PEN AND CARBON PAPER

,.mm Engineer Foreman

1. Original copy to office 2. Second copy to engineer 3. Third copy for foreman

PATRICK J. HARRINGTONDIAMOND DRILL CONTRACTOR

.. Shift From /g.m. To Drilling at ../Z..C.fc.....,^#J..A,.J.M.fr..-S.

Machine No. ,,.,,,,,,...,..,,,..,...,,,,,,,..,, Hole No.

Core Type ,....,,,...,,,,....,,,,,.,,,.,,,,.,.......,,,,,,,,,,..,.^

Depth of Hole Start of Shift .......................................... End ..........................................

Distance Drilled ^^^....^..^.^^...^^^^^..^^^.^^^^^^^^.^^^..^Control Drilling From .,,,,,,,...,,,.,...,,, To .,,...,,.,.,..,,,,,...... 20' D 10' D

Bit No..,.,..,,,,,,,,,,,...,..., Type ...,.,,,...,,.,,,.,,,..,.. Footage __,,,,,.,.,..,.,,.,

Conventional Test at ,.^m ........ nn.. m...^..............m...... am. m..am..^.mm..m^..,....,.... ft.Tro-Pari Test at ...,.,,..,.,.,,,....,.,,,,.,,,..,,,,,.,.,.,,,,,....,,,,,,,......,,.,,,,,,.,,,,. ft.

Acid Test at ^..^^^^^^^..-^-^^^^^.^-.--..^^-^.^^^^^.^..^.^ ft.

TIME DISTRIBUTION

.,.................................^ Hrs. ...........................c^OMan Hrs.

Piping ,............................................................................ Hrs. ,............................... Man Hrs.

Running Mud ............,.................................................. Hrs. ..........................,........ Man Hrs.

Move and Setup ...........,.......................................... Hrs, .................................... Man Hrs.

Pulling Casing ...,..,,,,...,.,..,.....,,..,...,.,,.,,,,. Hrs. ....,,,,,,,,...,..,,,... Man Hrs.

Cementing .........,._.................................................., Hrs. ..................................., Man Hrs.

Washing Cement ..............................................,... Hrs. ...............................,... Man Hrs.

Waiting on Cement To Set..,,...,,...,,,,., Hrs. ..,..,.,,.,,,.,,,,,,,. Man Hrs.

Drilling Cement ......,.,,...,...,.........,,,.,.,.,,,, Hrs. ..,,..,,..,,......,..,,,.. Man Hrs.

Reaming ......,.......................................................... Hrs. ..................,................ Man Hrs.

Long Waterline ............,....................................... Hrs. ,.................................. Man Hrs.

Conventional Testing ,................................... Hrs. ,............................... Man Hrs.Acid Testing ...,,,,.,.,..,,,,......,.,,,..,,.,,,..,,.. Hrs. ,,,...,.,.,.,.,.,,,.,... Man Hrs.

Tro-Pari Testing .................................................,... Hrs. .................................... Man Hrs.Waiting Time For Testing ..........,........... Hrs. ...,,...,.,,,.,.,...,..,, Man Hrs.

Travelling ,,.,,...,,,,.,.,,,,,.,,,,,,.,,..,,.,...,,, Hrs. ,,..,,,.,,,..,,,,,,,. Man Hrs.

Walking Time .,,.,,,.,,,,.,,,..,.,.,,,,,,.,,,..,. Hrs. ,,.,..,,,.,,.,,,..,.,, Man Hrs.

Wedging ..,,,,,,,,,,,,,.....,,,.,,,,,,,,,.,,,,,,..,. Hrs. .,..,,...,,,....,,,,..,.. Man Hrs.

Repairing ,...,,,.....,..,,,,.,.,,,,,,,,,.,,,.,.,..,..,. Hrs. ...,,,..,,..,,....,.,.,,,. Man Hrs.

(What?) .................................M.... ^

Other ...............,..............................._........................... Hrs. ...............__._ Man Hrs.

(What?) ...y*-*.......R. Foreman (..*.. lt!3tXZtaf^Runner .......................,........................................._............/L......................................................... Hrs.

Helper . //.*....^fafa3*d-Att^^ Hrs.

Helper ....................,..............................._........_........... ..................................._.........,........ Hrs.Helper ~.....................,................................:....:...............,,..,.............,...........,............,.,..,,.......,...,.......... Hrs.

Cook (Cost Plus Hours Only) .,.,,,,,,,..,..,,,,.,....,.,,.,.,,,,,,..,,.,,,,,,., Hrs.

NOTE: Total hours in Time Distribution must equal total hours worked.

COST-PLUS REPORTBedrock at..,....................................._ Start of Core

Machine hours: /..D.................._...............................~...

Tractor .........,...,-.....^L............ hrs. Bombardier

Timberjack ...,..,,.~...,..,,...... hrs. TruckDiesel Oil ..............fi. ....... gals. R.P.M.Stove Oil .............................i...... galsi

Casing Placed In Hole

B ...........,........... x l ....

E ,.,,..,,,,,...., x l ...,....,...,,,

Casing Lost or DamagedN ,....,,.,....,,,. x lB .................... x l

A ... ..... . x lE ....... ..... . x l

hrs.

x 2 ...,x 2 ...,.x 2 ......x 2 ...,

x 6 ....,,...x 5 ..,,,....x 6 H..........x 5 __ .

x 2 x 2 x 2 x 2

x 5 x 5 x 5 x 5

x 10 x 10 x 10 x 10

x 10 x 10 x 10 x 10

Materials Used, Lost or Damaged re OverburdenPiping Rope ... 8" Drive Pipe Adapters .........,,Rods.Mud.Special MudCore Barrels .......................,__......,......._. _,.,_ Type .^"~~* ™"""""""""""i"™""""i'"™"i*i""t"i*mi*"HMt*nti,mm. A f fV MX

Mud Barrels ........_........................................_._,._,._,. Type ...

Tricone _..................._...............................,......__..._.... Type ..,

Hawthorne ._................. ..........._..................._._..._....... Type ...,

Hoisting Cables ___..._..........................._____ . .......Burlap ~...................................................................._,.. ... ..,........ Lbs. ...

Other ...............__......,....,,..,,.,.__,.....,,....,_.....,........................__.

Cemented at.............,,...,....,,_,....,,.....,,..,,,_,,....,,.,.,,.,,,Drilled Cement from ~.............................................. to

Cement used _____,___ Bags .....~-.Length of Waterline ................ ...,.,....,..,Stove Oil.....,.................................................._.......,..................Move from Hole ............................................ to Hole __ . _ ...

Length of Move ....................................................................,...,,.,,. Miles

Wedged at ..................... _ ....... __ . _ ........,... _ ......... __Reamed from .......... _ ........ _ ,. __ ............ to .................................

. feet... ~...

,.. Type.,,... feet..... Gals.__ .........or Feet

........ feet

Arc Cut From

Machine Hours

Man Hours .....,...

ARC CUTTING ONLY

...,..,,....,...,......,,_,..., To .......

DIAMOND TOOLSType

Core Bit

ConcaveCasing Shoe

Size No. Ve Used TypeReam Shell

Mud Bit

Mud Shell

Size No. %Used

REMARKS

~ 3 f GO

Approved by ~...~

USE RED PEN AND CARBON PAPER

Foreman

1. Original copy to office 2. Second copy to engineer 8. Third copy for foreman

PATRICK J. HARRINGTONDIAMOND DRILL CONTRACTOR

ite ftU.^MSWi\ti From L3^OUXi ToDrilling at -..,^!^^LfeC.jCC,...Machine No. ,,,,,,,,,,,,,,,.,,,,,,,,,,,,, Hole No.,

Core Type .,,,,,,,,,,,,,,,,,,,,,,,,,,,Depth of Hole Start of Shift ,,,,,,,,,,,.,,,,,.,,,, End .,,,,,,,,,,,,,,,,.,,,,Distance Drilled ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,_,,,,,,,,,.,,,,_,,,,,,,,,.Control Drilling From ,,,,,,,,,,,,,,,,,, To ,,,,,,,,,,,,,,,,,, 20' D 10' DBit No. ,,....,,,,,,,,,,,,,,, Type ,,.,,,,.,.,,,,,,,,,,., Footage

Conventional Test at ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,.,.,,,,,,,,,,,,,.,,,,,.,,,,.,, ft.Tro-Pari Test at ,,,,,,,,,.,,,,,,,_,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, ft.

Acid Test at .,,,,,_,,,,,,,,,,,,,,,...,,,,,,,,,,,,,,,,,.,,,,,,,,,,,,,,,,,,,,,,,,,, ft.

TIME DISTRIBUTION

.............................,.............^f... Hrs. ,.....,,,.....,.,.,f..S3t...., Man Hrs.

Piping ,,,,,,,,,,,,,,,,,,,,,...,,,,.,,,,.,,,.,......... Hrs. ,,,,,,,,,,,,,,,,,, Man Hrs.Running Mud ,,,,,,.,,,,,,,,,,,,,,,,,,,,,,,,, Hrs. ,,.,,,,,_,,,,,,,, Man Hrs.Move and Setup ,,,,,,,,,,,,,,,,,,,,,,,,,,, Hrs. ,,,,,,,,,,,,,,,,,, Man Hrs.Pulling Casing ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Hrs. ,,,,,,,,,,,,,,,,,, Man Hrs.Cementing ,.,,,.,,,,,,,,,,,,,,.,,,,,,,,,,,.,,,, Hrs. ,,,,,,,,,,,,,,,,,, Man Hrs.

Washing Cement ,,,,,,,,,,,,,.,,.,,,,,.,,,, Hrs. ,,,,,,,,,,,,,,,,,, Man Hrs.Waiting on Cement To Set,,,,,,,,,.,,,, Hrs. .,,,,,,,,,,,,,,.,,, Man Hrs.Drilling Cement ,,,,,,,,,,,,,,,,,,,,,,,,,,, Hrs. ,,,,,,,,,,,,,,,,,, Man Hrs.Reaming .,.,..,,,,,,,,,,,,,,,,,,,.,,,,,,,,,,,,,, Hrs. ,,,,,,,,,,,,,,,,,, Man Hrs.Long Waterline ,,,.,,,,,,,.,,,,,,,,,,,,,.,,,, Hrs. ,,,,,,,.,,,,,.,,,,, Man Hrs.Conventional Testing ,,,,,,,,,,,,,,,,,,,,, Hrs. ,,,,,,,,,,,,,,,,,, Man Hrs.Acid Testing ,,,,,,,.,,,,,,,.,,.,.,,,,,,,,.,,,, Hrs. .,,,,,,,,,,,,,,,,,. Man Hrs.

Tro-Pari Testing .,,,,.,.,,,,.,,,,,,,,,,,,,,,, Hrs. ,,,,,,,,,,,,,,,,,, Man Hrs.Waiting Time For Testing ,,,,,,,,.,,,, Hrs. ,.,,,,,,.,,,,,,,,,, Man Hrs.Travelling ..,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Hrs. ,,,,,,,,,,.,,,,,,., Man Hrs.Walking Time ,,,,,.,..,,,,,,,.,,,,,,.,,.,,,,,, Hrs. ,,,,,,,,,,,,,,,,,, Man Hrs.Wedging ,,,,,,,,,,,,,,,,,,,,,,.,,,,,,,,.,,.,,,, Hrs. ,,,,,,,,,,,,,,,,,, Man Hrs.

Repairing ~,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Hrs. ,,.,,,,,.,,,,,,,,,, Man Hrs,(What?) ,,,.,,.,.,,,,,,,,,,,,,,,,,,,,,,,,,,,.,,.,,,,.,m,,,,,,,,,,....,,,,,,,,,,,,,,,,,,

Other .,.,,,,,,,..,,,,,,.,,,,,,,,,,.,,,,,,,,,,,,, Hrs. .,,,,,,_ ,__ Man Hrs,(What?) .x*Tk A

R. Foreman ,{^,,,*JX^^l(C^'!r:^";:^ Hrs. Runner .,,,,,..,,,,,,,,,,.,,,,,,..,..,,,,,..,,,,,,,,,,,,y,,,,,,,,,,,,,,,,,,,,,,,,,,,, Hrs.

Helper ,.,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,.,,,,,.l,,,,,,,,,,,,,,,,,_,,,,,,,,,,,,,,,,,. Hrs.Helper ..._,,,,,,,,,,,,,,,,,,,,,,,.,,,,,,,,,,,,,,,,,,,,,,,,,,.,._,,,,,,,,,,,,,,,,, Hrs.Cook (Cost Plus Hours Only) .,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,.,,,, Hrs.

NOTE: Total hours in Time Distribution must equal total hours worked.

COST-PLUS REPORTBedrock at,,.,,,,,,,,,,,,,,,.,,,,,.. Start of Core -......~.Machine hours: ?................ ,,,,,,,.,......,.,,,.,,,,..,,,,,,,,,,

Tractor .................~ff?.——, hrs. Bombardier .,,~Timberjack ,,,,,,.,,,,,,_ hrs. Truck , .....,,,,,Diesel Oil .,,,,,,ZCL,,, gals. R.P.M. .___.,, Stove Oil .,,,,,,,,,,,,,,,,,, gals. Casing Placed in Hole

,. hrs., hrs.gals.

N .......B .,,,.A ,,,,E ..CasingN -,,,B ..AE ..,,

x 1,,,,,,,, x 1 .....,, _ ....,.............. x 1 __ ,. _ ,,.

,.,,.,,,, X 1 ™,,,,..,,,,.

Lost or Damaged,,,,,,,, x 1 .,.,.,.,,,,.,..,,,,,,,, X 1 -,,,,,,,,,,.

x 1 .,. .,....,,,. ... X 1 -,,,,,,........

. x 2 .....,..,,

. x 2 __ .

. x 2 .,,,..,,.,

. x 2 ,~,.,..,.

. x 2 ...,,,,,

. x 2 __ ..,

. x 2 .,,,.,,,,, x 2 . __ ,

...,.... x 5 .....,,...iiiima x 5,..mm x 6 . _ ,.,....... x 6 __ ,

,....... x 6 -..., _ ,™... x 6 ,.,...,,,,,™. x 6 .,...,,,,— x 6 ... ——

...,,,. x 10, _ x 10. _ x 10__ x 10

,.,,... x 10. _ x 10__ x 10. _ x 10

Materials Used, Lost or Damaged re OverburdenPiping Rope ............8" Drive Pipe .....,.Adapters ,...,,,,....,,

Length .,.,,,... . 3" Couplings

. Type .. . Type ^ ,, . Lbs. ...,,......,,,.,Lbs. -..,... Type.....

Type -,.

Type -,. Type .,. Type ....

Lbs.

Mud ....................Special Mud ,.,,_,, Core Barrels

Mud Barrels , Tricone .._,. Hawthorne _,,,,., Hoisting Cables ,,, Burlap ,,,,,,,,,,,,,,., Other -,,,,,,,,...,.,,,,.

Cemented atDrilled Cement from __,.

Cement used

Length of WaterlineStove Oil............._,,,,,,,.,., ,,,...,,,,,_,,.,,,,,^.^.Move from Hole .,,..,,,,,,,,,,,..,,,,,,, to Hole

Length of Move ,,.,,,,,,,,,.,,,,,.,,,,,,,_,,,,,..,,...,,,,... Miles

Wedged at...,,,.,,,,,....,.,_,....,...,,,,.,,,,.__,..,,_....Reamed from ~.,,,,..,.,..,..,,.,,,,,,,,,,,,,,, to ...,,,,,,,.,,,,.,,,,...

toBags

,,, feet

, Type ..... feet , Gals.

or Feet ....m. feet

Arc Cut From

Machine Hours

Man Hours ,.,,.,

ARC CUTTING ONLY

.,,,,,,,,,,,,,,,...,,,,,,, To ......,

DIAMOND TOOLSType

Core Bit

ConcaveCasing Shoe

Size No. Vo Used TypeReam Shell

Mud Bit

Mud Shell

Size No. "ft Used

REMARKS

Approved by ,., ,.,...,.,,,.,_,.,,,,,,,,,.,.,,,,,,,.,,,..,,,

USE RED PEN AND CARBON PAPER

,,.. Engineer Foreman

1. Original copy to office 2. Second copy to engineer 8. Third copy for foreman

PATRICK J. HARRINGTONDIAMOND DRILL CONTRACTOR

From J LKL To Drilling at ^...^ Machine No. .,.,..,,,,,,,,,,....,,,.,.,,,,,,, HoleCore Type ^.-.^^^^.^..^^^..Depth of Hole Start of Shift ,,,,,,,,,,,,,,...,,...,, End .,.....,.,,,.,,.,,.,,.,,,,.

Distance Drilled ................................................................................................................_................Control Drilling From ,,....,,,..,,,,.,...,,, To ,.,,,,,,,,.,,.,.,,.,, 20' D 10' Q

Bit No,,._.............................. Type ....................,................ Footage ~_.........,..................

Conventional Test at ................................................i................................................................. ft.

Tro-Pari Test at ^m^^maa^m^...m^^^.mm^m.mmnm. mmn. m .m. ft.

Acid Test at ^^^^^^^--^-.^^.^.^^..^--^^^^^^^^^^^^^^.^^ ft.

TIME DISTRIBUTION

^tjj^S^,/^,^.L/^.<^.,............,..^llrB. .....,...........cd..Q. Man Hrs.

Piping .........,....................................................................... Hrs. .................................... Man Hrs.

Running Mud ............................................................... Hrs. ................................... Man Hrs.

Move and Setup ....................,.............................. Hrs. ..................,..,........,, Man Hrs.

Pulling Casing ,,.,.,,,,.,...,,,,,.,,,.,.,.,,,,,,., Hrs. .....,,,,,,,.,..,,....,,. Man Hrs.

Cementing ,.................................................................... Hrs. ........................,........... Man Hrs.

Washing Cement ................................................... Hrs. .................................... Man Hrs.

Waiting on Cement To Set,,.,.....,.......,,.. Hrs. .................................... Man Hrs.

Drilling Cement .,,.,,,,,,,,.,,,.,.,,,.,,,.,,.... Hrs. .,,,,.,,,,..,..,.,,.,, Man Hrs.Reaming ...................................................................... Hrs. .................................... Man Hrs.

Long Waterline ....................................................,... Hrs. .....................,............. Man Hrs.

Conventional Testing ..,.....,...,,..,,......,..,.,,. Hrs. ......,.......................... Man Hrs.Acid Testing ,,,,..,,,,,.....,,..,..,,,,,,,,,,,...., Hrs. ...,,,,.,,,,,,,,.,,,. Man Hrs.

Tro-Pari Testing ,..,,,....,.,,.,,..,,.,..,,.,,,,,, Hrs. .,,..,,.,,,.,..,....,,... Man Hrs.Waiting Time For Testing ..,.,,,.,,,,,, Hrs. ...............,.................. Man Hrs.Travelling ..................,.................................................. Hrs. _.............,................. Man Hrs.

Walking Time .,,..,...,..,.,,,,.......,,..,,...,,.,,.... Hrs. ................. ............. Man Hrs.Wedging ............,.......................................................... Hrs. ..................,................ Man Hrs.

Repairing ....,.,.,......,,,,,..,.,.,.,,,,,,,.,,,,,.,.,, Hrs. .,,..,,,.,,,,,,.,,,... Man Hrs.

(What?) .,...,.,....,,.......,.,,,.,.,....,,.,,,.....,.,,,.,.,.,,_......_,__,....,....,.... B.,...,..

(What?) -..^................-.y.y.........m^^^__.,...

R. Foreman { ^J^^f^gS^^^^l^^ Hrs.

Runner M.....^...................,...^......y............................1 ................UMM^^y.......................................... Hrs.Runner y2:ffl...f....^3tftf,-fZ3*!3**idi,! ^ Hrs.

Helper ^...............................................n..............................^...................._............................... Hrs.

Helper ........................................................................n....................................................................... Hrs.

Helper ...................................................................................................................M............................... Hrs.

Cook (Cost Plus Hours Only) ....,..,,,..,,,,..,,,,,,,.,,.,,.,,,.,.,,.,,..,.,,..., Hrs.

NOTE: Total hours in Time Distribution must equal total hours worked.

COST-PLUS REPORTBedrock at................,............................. Start of Core ....

Tractor ..............

Timberjack ,.Diesel Oil ........Stove 051 .........

Casing PlacedN ..,,,,.,,.,...,B .,,,,,.,.,,.,...A ,..,,,..,,,..,..E .......................

........,..^f:.......,. hrs. Bombardier ~.....................

.............j............... hrs. Truck ~ .........................,.....

,/^B?......... gals. R.P.M. ......., _ .,, ,,...,.............. ,. ..., . .. gals.

i in Holex 1 ..,,,,.,.,..,,,x 1 m,.,,,,,,,,.x 1 ...,.,,.,...,.,.x 1 ,.,,,,,.,,,...

. x 2 .....,

. x 2 .,.,

. x 2 .....,

. x 2 ....,

,,,...,..,,,,,,,,, X 5 M..........O.X

x 5, KM 1 111*411 It! tH X V HMIfltolll***!

__ ........ x 5 ... ..........

Casing Lost or DamagedN .,.,..,,,.,,.,..B ....,..................A .........,............E ...................M.

x 1 ...,,.,,....,...,x 1 ............,.......x 1 m,,,. _ .,,x 1 .,,,,,.,,,.,..

. x 2 ...,

. x 2 ,...

. x 2 ..,,

. x 2 ....,

,.,,....,..,.. x 6 _ ,. . .......... . x 6 ...,,.,.,..,.,.............. x 6 .,.,,,,,.,___ x 6 ..., ~.

x 10 x 10 x 10 x 10

x 10 x 10 x 10 x 10

Materials Used, Lost or Damaged re OverburdenPiping Rope ~.......................................... Length ..............,.........8" Drive Pipe

Adapters Rpds. ........,Mud -,.,,,

3" Couplings ,

Special Mud ,, Core Barrels ~...........

Mud Barrels -_........Tricone .........................Hawthorne ~...............Hoisting Cables ,.., Burlap ..........i.................Other M........-M..~~Cemented at ...,............Drilled Cement from ^ Cement used . -~.. .

. Lbs. Lbs. -.... Type.

Type,

Type, Type, Type,

Lbs.

..... toBags

Length of WaterlineStove Oil ............~....... .....M... ...Move from Hole ~.....,.,...,.,.,.Length of Move ...............................,.............................

Wedged at ............................................H.............,,....Reamed from .......................... ...,............................. to

,.... feet

Type ...,... feet ,,, Gals.

...,. to Hole..... Miles or Feet.,,..... .................. feet

ARC CUTTING ONLY

Arc Cut From ............................................... To

Machine Hours ...........,...............................................

Man Hours .....,..................................................................

DIAMOND TOOLSType

Core Bit

ConcaveCasing Shoe

Size No. 9fc Used TypeReam Shell

Mud Bit

Mud Shell

Size No. 9i Used

REMARKS

/rt a / tie 2^ A/

Approved by W.,.W,........,.,,.......,,.M,.....,,...^..."....^..,,,.,,HMH..M-"......~,.

USE RED PEN AND CARBON PAPER

Foreman

1. Original copy to office 2. Second copy to engineer 3. Third copy for foreman

PATRICK J. HARRINGTONDIAMOND DRILL CONTRACTOR

Shift From fijflJttX . To Drilling at MJ3Q^JK...J^ Machine No. .....,.................................................. Hole No. .........................................................

Core Type xmnmaamam^..amnm^^aa~^aa^^.a^^aammmmmmmmmammma.,mmm.m..m Depth of Hole Start of Shift .,,.,,.,,,,,,,,.,,,,..,.. End ...,....,.,.,...,,,,,..,,.,,Distance Drilled ..._.........,...........................................................................................__................

Control Drilling From ...,,,,,,.,,,,,,...,., To ...,..,....,,...,.,...,.,,, 20' D 10" DBit No. _.....,........................ Type ...................................... Footage .............,........................

Conventional Test at .........................,................................................................_................... ft.Tro-Pari Test at ^..^.n..nm^.m.^^m.mamm. a.... nm. mmanmnmmmm.....mmm.. ma..m..., tt.Acid Test at,......__,..,,,,,..........,...,,...,.........,.....,........,......_,....,,..,,..,..,,..,.,....... ft.

TIME DISTRIBUTION

CttHng ^0.m#jL.*.ALCu.............S?. Hrs. ,...,,.,,,.,,,.^^Man Hrs.

Piping ........,,.,,..,,,,,,.,,,,,...,...,.......,....,,....,...... Hrs. .,,.,,...,..,,,.,,...,,. Man Hrs.Running Mud ......,........................................................ Hrs. ................................... Man Hrs.

Move and Setup ...................................................... Hrs. .......................,............ Man Hrs.

Pulling Casing .,................................................. Hrs. ......,......................... Man Hrs.

Cementing ...,.............................................................. Hrs. ..............,,.....,,,..,,. Man Hrs.

Washing Cement ..........,..................................... Hrs. .............,..,,....,...,.... Man Hrs.Waiting on Cement To Set.......................... Hrs. .....,...,.,,,,..,,,,,.., Man Hrs.

Drilling Cement ,..................................................... Hrs. ..............._,............... Man Hrs.

Reaming ........,........................................................... Hrs. ........,......................... Man Hrs.Long Waterline .......................,............................ Hrs. ....,........................... Man Hrs.

Conventional Testing .,,,,,,,,,.,,,,.,,.,..,.. Hrs. .,..,.,....,.,,,,,,,,., Man Hrs.Acid Testing .,....,..,.,,..,.,,.,.,,.,,..,,,,,,,,..... Hrs. ................................. Man Hrs.

Tro-Pari Testing ...,.................................................. Hrs. ................,.................. Man Hrs.

Waiting Time For Testing ,,,,,,.,,,,... Hrs. ,.,.,.,,.,,.,,,,,,,., Man Hrs.Travelling .,....,......,,.,,,....,,,.....,,,.,...,,,.,,.,, Hrs. ...,.,,,..,.,.,,,...,,., Man Hrs.

Walking Time ,,,,,,,..,,,,,,,,...,,.,,,,,,,,,., Hrs. .,.,...,..,,,...,,.,,,,. Man Hrs.

Wedging ,,,.,.,,,,,,,,.,.,.,,.,,.,..,,.,,,,,...,.,.,, Hrs. ,,,.,..,,...,,.,.,.,.,, Man Hrs.Repairing ..................,............................................. Hrs. ......,.....,.,.,.,.,,,,,, Man Hrs.

(What?) ...........,...,................,..,,..,,..,,....,..,...... ......._...,,,.,__,,.,,_,,.,.,.....Other ...................................................................,............ Hrs. ............,........~............ Man Hrs.

(What?) *!sr;a......... . .................._.............i........../'........._....................._,..,..,..mR. ForemaiC^^x*;:^^ i::"k^^ Hrs-j *Runner ...........,..................................................._......................._...........................,..._.......... Hrs.Runner , .....fH)........,...........,........e .:..j..,,......................r ........,...,,.....,.i........................................... Hrs.

Helper ..^fe^^^X^^^^ Hrs.Helper ...................................................................._................/l..................................................... Hrs.Helper ................................................,......................,........................................................,................~ Hrs.Cook (Cost Plus Hours Only) .,,,,...,.,..,....,,,,...,.....,,,,,,.,,,,,,,.,..,,,., Hrs.

NOTE: Total hours in Time Distribution must equal total hours worked.

COST-PLUS REPORT..............,........... Start of Core

BombardierTruckR.P.M.

X 1 M...I......I........U.

...................... X 1 .

.,,....,..,,,,., x 1 ,.....,..,....,,,.ng Lost or Damaged

x 1,.,,.,,,,,.,, x 1 .,,,,.,....,,..............,,.,....,... X 1 ........................

.,,....,..,,,.... x 1 ...,......,..,..,.

x 2x 2x 2x 2

x 2x 2x 2x 2

_ ....,...... x 6 .,... _ __ x 5 ......,................. x 6 ...™................ x 5 .

^..................,. X t H

J / 6......H.........J.H. K O M

__ . __ x 5 .™.,,...,m....... x 5 .

,, _ , _ ....., x 10,........... __ x 10,....,.....,.,,, x 10,. _ ,..m.,. x 10

™,, _ ..,, x 10)...,,,, _ x 10.....,. _ .,... x 10,,. ____ x 10

Bedrock at...........Machine hours:

Tractor ..............wl............ hrs.co

Timberjack ,.........G--~~ hrs.Diesel Oil .....,.............................. gals.Stove Oil ...........,........................ gals.Casing Placed in Hole

NBAECiNBAEMaterials Used, Lost or Damaged re OverburdenPiping Rope3" Drive Pipe .,

Adapters .............,Rods. .......................Mud .,.,,.....,,....,..

Special Mud .., Core Barrels ., Mud Barrels Tricone .,, ... Hawthorne Hoisting Cables ............Burlap .............._.............,Other ..............,._,.....,...,

Cemented atDrilled Cement from Cement used

Length of WaterlineStove Oil..............._._...............,

hrs. hrs.

Lbs.

feetto

Bags ~.. ....... Type,....,, feet,...... Gals.

Move from Hole .,.,,,.,.,,.,,,.,,..,.,.,..., to Hole _,

Length of Move ............................................_......................,........... MilesWedged at..................,............._..........................._......,_...,Reamed from ........................................................... to ..........,............

or Feet .... feet

ARC CUTTING ONLY

Arc Cut From ....................._._...........,. To _..

Machine Hours M..................................................................

Man Hours .............,....................................................._........

DIAMOND TOOLSType

Core Bit

ConcaveCasing Shoe

Size No. Ve Used TypeReam Shell

Mud Bit

Mud Shell

Size No. *k Used

REMARKS-/s /[A a fi a rt

Approved by m

USE RED PEN AND CARBON PAPER

Foreman

1. Original copy to office 2. Second copy to engineer 8. Third copy for foreman

PATRICK J. HARRINGTONDIAMOND DRILL CONTRACTOR

Shift From ,..M..ti(\....... ToDriWng *t .............".g.h..,,....??^Machine No. .,,,,,.,...,,.,..,,,.,.,.,,..,,,.,,. Hole No. Z^,.**,.^ Core Type ,,,.,,,,...,..,,,,,,.,,.,..,..,,,....,...,o,,.,....,,,.,.,/.,,^Depth of Hole Start of Shift ...........................,.............. End .......,.............................

Distance Drilled , .......................................................................,,......................:,............._.............Control Drilling From .,............................... To .....................,............ 20' Q 10'

Bit No. ....................................... Type ...................................... Footage ..........................,.....

COST-PLUS REPORT

Bedrock at........................,....................... Start of Core .

Machine hours: ...fei............ ......,.............................................

Tractor .............,....,..*5............. hrs. BombardierTimberjack .,......,.....,,...,,. hrs. Truck ......

Diesel Oil .........J..,@........... gals. R.P.M. .............

Stove Oil ..,.,,.,,.,.....,..,,..,, gals.

Casing Placed in Hole

~ hrs.,. h ra.

gals.

Conventional Test atTro-Pari Test at ....... .. ......................................,...............................Acid Test at ~ ...... . .....................,....................................

TIME DISTRIBUTION

UnilliBii- .S#.tZ\.a.L*.irt.f*...,...,,.,,,,,,(S,, Hrs, ,.,,,,.,,

..............., .. ...... ft.

ft,.,,,,.,,..,.,.,.,.,,,,, ft.

...J....A. Man Hrs.

N ...,...B ......

A .......,E ...,...

CasingN ........

B ........A ......,

x 1 ,

............ x 1 ...... _ .x 1 .. .. .

................ x 1 .......................Lost or Damaged,,,,,,,.. x 1 ..,................

x 1

.,.,,....,... x 1 ...,..,.,.,.,,.....

. x 2 . ...............

. x 2 . __

. x 2 .,........,,

. x 2 -,.,.......,,...,

x 2

x 2

. x 2 ...,.,.,,,,.,....

. x B .........

. x 6 ,.......

. x 5 .. .. x 6 -, ..

. x 6 - .....

. x 6 ..........

. x 5 ,.......

x 10.... _ x 10

,...,,.,, x 10

.,,.,,.... x 10

, _ .... x 10

...,. _ x 10

.,..,,.,.. x 10

Piping .,.................................................................. Hrs. .,,,.,,.,....,..........,,.. Man Hrs.

Running Mud ............................................................... tirs. ................................... Man Hrs.

Move and Setup ...,................................................ Hrs. .................................... Man Hrs.

Pulling Casing ,...,,.,,,..,,.,,,,.,.,..,,....,..,,,,. Hrs. .....,.,....,..,...,..,.,,.. Man Hrs.

Cementing ........._...................................................... Hrs. .................................... Man Hrs.

Washing Cement ..........................................,....... Hrs. .................................... Man Hrs.

Waiting on Cement To Set........................... Hrs. ......,............................ Man Hrs.

Drilling Cement ...,..,,.,,.,.,,,....,.,,,,,..,.,,, Hrs. .,,,,.,,,,..,..,.,,,,. Man Hrs.Reaming ........................................................................... Hrs. ,_............................... Man Hrs.Long Waterline ............,...................,,...,....,,,,., Hrs. ......,............................ Man Hrs.

Conventional Testing ...,,,,,,,,,.,.,...,,,,,, Hrs. .,.,,,,,..,,.,,.....,,.. Man Hrs.

Acid Testing .,,.,,,,,,,,,,..,.,..,.,.,....,,..,,,.,. Hrs. .,..,,,,,...,.,,..,...,.. Man Hrs.

Tro-Pari Testing .,.,.,.,...,....,,.,,,.....,,.,,,,,, Hrs. .,.,,,,,,,..,.,,...,.., Man Hrs.Waiting Time For Testing ...........,.......... Hrs. .,...,,,.,,..,,,,,,,,, Man Hrs.

Travelling ,...._...................................,..................... Hrs. .................................... Man Hrs.

Walking Time ..,................................................... Hrs. ,................................. Man Hrs.Wedging ...,,.....,...,....,...............,,..,,...,,,,,,..,,.,. Hrs. .,,,,.,,,,,.,,.,,,,.. Man Hrs.Repairing _.................................................................. Hrs, .................................... Man Hrs.

(What?) ..,,,,,...,.,,,.,,.,..,,,.,,,,..,,,,,,,.,.,,__... ,......,,,___,...,.....,.,,...,.......

Other ..........................,..................................................... Hrs. ,..............____ Man Hrs.

(What?) .....ftp........R. Foreman ....vJ^X^tfz^^^^^ Hrs.Runner ..........................................................._..........................C.................................................... Hrs.

Kunner IILJA........^...............!*....^...............*.....................^..................^..,.,,,.,,,,..................!.**.... Hrs.

Helper J^i^.....X^^ fc^^ Hrs.

Helper ..................................................................._.........,........^....,.............................,......,...,...... Hrs.

Helper .........._..............................................................................................n....................................... Hrs.

Cook (Cost Plus Hours Only) ................................................,................................. Hrs.

NOTE: Total hours in Time Distribution must equal total hours worked.

E ........................ x l ........,.............. x 2 M...... ___ x 5

Materials Used, Lost or Damaged re OverburdenPiping Rope ........................................... Length M.. .................

8" Drive Pipe .,,.. ,,.,.....,,,,....., 8" Couplings

Adapters ....,............................................. TypeRods, .....................,~ ....... _ ....... _ ,. _ . Type

Mud .....,.....,,,........,.....,....,.,,,.....,.,,..,. Lbs. ........ __ . ___ ..

Special Mud _ ... __ . __ .. Lbs. _ .. __ Type ..

Core Barrels _ ... _ ...... _ , _ ........K. __ ,.. _ . _ ........ Type .

Mud Barrels ...... _ .......... _ ......... _ ......... _ ,.............. _ Type .

Tricone ......................................................................, _ .....,.......... Type ..— . .VVB*V no....fP.i....-.t..."..f.t..f."Oftl.1...0l.".tlllttV.ltolllllltll*H.ttllMt.lllKM'll* * f f V H

Hawthorne ...... _ .......................... _ ............... _ . _ .,..... Type ..Hoisting Cables ,........... _ ........................................... _ , _ .....~......... _ ...Burlap . .... . . Lbs.Other ,..J...^yCemented at ......,.Drilled Cement from Cement used•vv...w..v — wv^-

Length of Waterline --.. _ ... __ ................... .........Stove Oil ............,. _ ,....,..,,..,,m.....,.....,,, _ .,.....,..., ____ .....,.Move from Hole .........,.................................. to Hole _ .

Length of Move ....................,........... _ ,.............................................. MilesWedged at .............,.~. _ . _ . _ ............. ___ .. _ .....Reamed from .......................... ...............,................. to ................,.....................

x 10

toBasrs ~...WMQH •Htx

,.,, feet~ .., ...~. ..... Typext** *- f fr v

.. _ feet, Gals.

, ~~.~........or Feet

........ feet

ARC CUTTING ONLY

Arc Cut From .....,

Machine Hours .,...

Man Hours -...._,

To

DIAMOND TOOLSType

Core Bit

ConcaveCasing Shoe

Size No. ^ Used TypeReam Shell

Mud Bit

Mud Shell

Size No. 9iUsed

REMARKS

Approved by M... .-..............................,_..................................

USE RED PEN AND CARBON PAPER 1. Original copy to office 2. Second copy to engineer

Foreman

Third copy for foreman