A Brief Overview

• The Problem• Our Solution• Evaluation Plan

 • Four Phases

o Staffingo Costs

• What is being provided and what is not• Risks and their mitigation• Funding/Budget

 • Conclusion

2

April 9th, 2009CS 410 Blue Group Spring 2009

Meet the Team

April 9th, 2009

3

CS 410 Blue Group Spring 2009

Overarching Problem     

Passenger needs are not addressed by mass

transportation systems.

4

April 9th, 2009CS 410 Blue Group Spring 2009

The Wait

Hampton Roads Transit (HRT) routes can have passengers wait anywhere from 30 minutes to an hour in suburban areas such as Chesapeake or Virginia Beach.

Source: http://www.gohrt.com/faresandinformation/busroutes/busroutes.html

5

April 9th, 2009CS 410 Blue Group Spring 2009

Inclement Weather & The Chase

On average there is precipitation 115 days a year in Virginia.

Source: http://www.met.utah.edu/jhorel/html/wx/climate/daysrain.html

Passengers not waiting in the designated bus stop areas are often overlooked by the bus driver.

6

April 9th, 2009CS 410 Blue Group Spring 2009

Heavy Passenger Loads & Bus Bunching

CS 410 Blue Group Spring 2009

In July, there are currently at least 55 festival events in Norfolk.

Source: http://www.festeventsva.org/calendar/current-events/

Routes like the Net in Norfolk and the Wave in Virginia Beach have buses running as close as 6 minutes apart.

April 9th, 2009

7

Missing the Bus

Causes:• Bus is Off Schedule• Passenger Late Arrival to Stop• Unaware of Real-time Schedules• Driver Unaware of Awaiting Customers

 Effects:• Schedule Problems • Lower Passenger Appreciation• Less Passengers• Less Revenue

8

April 9th, 2009CS 410 Blue Group Spring 2009

Regional Transit Need is Increasing

CS 410 Blue Group Spring 2009

• Hampton Roads has a population of 1.5 million• By 2025, Hampton Roads is projected for 2.5 million

 • Annual Ridership on HRT: 18.5 million• Buses in the HRT System: 343• Average bus capacity is currently only at 15%

 • Severe congestion is expected on 1,221 lane miles in Hampton

Roads in 2026

Source: http://www.hrtransit.org/pdf/hrtbrochure/HRT_Brochure.pdf              http://www.gohrt.com/pdf/strategicplan/Strategic%20Plan%20Final%20--%20November%202008.pdf

April 9th, 2009

9

A Proposed Solution: communicate2Me

CS 410 Blue Group Spring 2009

Increase coordination of passengers and drivers by providing real time bi-directional

information  

April 9th, 2009

10

The Solution

Real-time information for the driver such as: Prioritization of stops Number of commuters waiting at the next stop for

their route Accessible and convenient to end users Reasonable cost for transportation companies

11

April 9th, 2009CS 410 Blue Group Spring 2009

communicate2Me - The Solution

April 9th, 2009

12

CS 410 Blue Group Spring 2009

A Feasible Implementation

Passengers will be provided with methods to:•  Allow Stop Reservations via:

o Personal Computer and Web Siteo Cellular Phone / Short Message Service(SMS) Texting

 • Have notifications of changes in schedule

o SMS notification serviceo Email

Result:• Increases Coordination between driver and passenger

 

13

April 9th, 2009CS 410 Blue Group Spring 2009

April 9th, 2009

Benefits

CS 410 Blue Group Spring 2009

Passengers:• Better Service• More Interaction• Greater Satisfaction

 Bus Drivers:• Warning of Waiting Passengers• Increased Awareness of Future Loads• More Efficient Routes

14

Evaluation Plan

• Time o Measured against baseline project plan

• Cost o Measured against budget plan per phase

• Scope o Measured against requirements document

• Quality o Measured by customer and end user

satisfaction

April 9th, 2009

15

CS 410 Blue Group Spring 2009

{phase 0} - concept (60 days)

Milestones  Problem Area DevelopmentFeasibility ResearchMilestone SchedulingWebsite DevelopmentSBIR Proposals

Acceptance Criteria

Review Board Acceptance

April 9th, 2009

16

CS 410 Blue Group Spring 2009

{phase 0} - organizational chart

April 9th, 2009

17

CS 410 Blue Group Spring 2009

{phase i} - prototype (130 days)

Milestones

Prototype SpecificationsTest PlanUser ManualsProposalPrototype Construction Demonstration

Acceptance Criteria

Review Board Acceptance

April 9th, 2009

18

CS 410 Blue Group Spring 2009

{phase i} - prototype components

April 9th, 2009

19

CS 410 Blue Group Spring 2009

{phase i} - financials

April 9th, 2009

20

CS 410 Blue Group Spring 2009

{phase i} - hardware requirements

hardware qty   total

SMS & Web Server 1   $1,500Software Development Workstation 1   $2,000Cellular Phones 2   $800

       

overall hardware costs     $4,300

April 9th, 2009

21

CS 410 Blue Group Spring 2009

{phase ii} - critical design (1 year)

Milestones

Web InterfaceWeb Message Algorithm

SMS Gateway Development

Algorithm DevelopmentAlgorithm Testing

Transit InterfaceInterface Test

Acceptance Criteria Interfaces with Google Transit

Receives SMS Messages

Passes Tests

Connects with Transit Authority's Systems

April 9th, 2009

22

CS 410 Blue Group Spring 2009

{phase ii} - organizational chart

April 9th, 2009

23

CS 410 Blue Group Spring 2009

{phase ii} - major components

April 9th, 2009

24

CS 410 Blue Group Spring 2009

{phase ii} - financials

April 9th, 2009

25

CS 410 Blue Group Spring 2009

{phase ii} - hardware requirements

 hardware qty cost   Total

SMS Server 2 $1000.  $2,000

Web Server 1 $2000. $2,000

Algorithm Server 2 $2000. $4,000SMS Service / Credits (yearly) 1 $36,000   $36,000

        overall hardware costs       $44,000

April 9th, 2009

26

CS 410 Blue Group Spring 2009

{phase iii} - production & beyond

Milestones

Support Current Installations Improvement:    Modifications to Interface    Improvements to Algorithm        

Acceptance Criteria

Market Penetration Market Acceptance

Profitability

April 9th, 2009

27

CS 410 Blue Group Spring 2009

{phase iii} - organizational chart

April 9th, 2009

28

CS 410 Blue Group Spring 2009

{phase iii} - financials

April 9th, 2009

29

CS 410 Blue Group Spring 2009

in the box

• Service to set up and maintain: o Short Messaging Service gatewayso Web serverso Application servers

• Algorithm to communicate between end users and bus drivers

April 9th, 2009

30

CS 410 Blue Group Spring 2009

not in the box

• Buses• Wireless communication between buses

and Transit Center• Tracking system for buses (GPS, RFID)

April 9th, 2009

31

CS 410 Blue Group Spring 2009

who is the customer?

Initial customers:  Transportation • Hampton Roads Transit (HRT)• Metropolitan Transportation Authorities

 Future customers (Phase III+) Shipping• United States Postal Service (USPS)• United Parcel Service (UPS)

 Other Services• Cable• Utilities

 April 9th, 2009

32

CS 410 Blue Group Spring 2009

price point

 

April 9th, 2009

33

CS 410 Blue Group Spring 2009

Costs:

Yearly Cost to Customer: $400,000

Customer ROI:•Increases fuel mileage by 3%, saving $200,000 a year•Increases choice ridership, leading to more customers

April 9th, 2009

current competition

CS 410 Blue Group Spring 2009

34

risks & pitfalls

1. Interoperability problems

2. Latency Issues3. Abuse of the system4. SMS message costs 5. Phone incompatibility6. Transit operator

ignoring system 7. Down Time

April 9th, 2009

35

CS 410 Blue Group Spring 2009

risk mitigation

Interoperability: • Direct Communication with each Transit Authority's

technicians Latency:• Optimize Incoming SMS Processing Time• Synchronize Driver Updates based on Position

 Abuse of the System:• No way to mitigate without tracking passengers

 Transit Operator Ignoring System:• Education• Tracking of Requests to Pickups

April 9th, 2009

36

CS 410 Blue Group Spring 2009

budget

Funding Source: Department of Transportationo SBIR – Phase 1: $100,000o SBIR – Phase 2 : $650,000o SBIR –Phase 3: Small Business Loan/Venture Capatilists

http://www07.grants.gov/search/search.do;jsessionid=MgLfJcyflkGLZ3tLyF7Rj6GTJrn0PfTyyFvzsQtD1TNF10WzQqWS!-802466050?oppId=46140&flag2006=false&mode=VIEW

http://www.gohrt.com/pdf/budget/Budget_2009.pdf

April 9th, 2009

37

CS 410 Blue Group Spring 2009

cost to develop

• Phase 0:o  Free

• Phase 1:o Hardware Resources - $4,300.00o Personnel Resources - $14,525.00

• Phase 2:o Hardware Resources - $44,000.00o Personnel Resources - $443,114.00

• Phase 3:o Hardware Resources - $37,200.00o Personnel Resources - $286,860.00

   Total - $829,999.00  

April 9th, 2009

38

CS 410 Blue Group Spring 2009

breaking even

 

April 9th, 2009

39

CS 410 Blue Group Spring 2009

closing statements

Current Systems are One-Way: • Informing the passengers, not Interacting with them.

 communicate2Me promises to:• Connect Passengers with Drivers, and Vice Versa

 Each phase is feasible in terms of:• Cost• Requirements• Staffing