the member secretary, (industrial...

11
To, Date: 06.12.2018 The Member Secretary, (Industrial Committee-II) Ministry of Environment Forest & Climate Change, Govt. of India India Paryavaran Bhavan, Jorbagh, New Delhi-110003 Subject: Reply of EDS dated 11.12.18 against amendment in ToR application for the proposed project for the Proposed Greenfield Manufacturing unit of Herbal extracts, Active pharmaceutical ingredient, Biomolecules and Natural Food Colours at Plot-03, Sector-18, phase-3, Industrial Estate Barhi, District - Sonipat, Tehsil Gannaur, State Haryana. Proposal No - IA/HR/IND2/81580/2018 MOEF&CC File No - IA-J-11011/316/2018-IA-II(I) Dear Sir, Point wise reply of EDS observations is given below: S.No. Observation Reply 1 (1)Please submit the copy of Notification of the said industrial area. Environmental Clearance for the development of Industrial Estate and CETP at I.E. Barhi, Phase-III near Gannaur, District Sonepat, Haryana (under Category 8(b) project) was applied on 18.04.2012 & again on 08.08.2013. HSIIDC request MoEF&CC to consider the case of Environmental Clearance for the next meeting agenda along with the project chronology (Copy of the letter is attached as Annexure-1) Public hearing for the project was conducted on 07.11.2013 (copy of PH advertisement is attached as Annexure-2) & the case was heard in 104 th SEAC meeting dated 12.05.2014 & 76 th SEIAA meeting dated- 13.10.2014 (copy is attached as an Annexure-3) As the Haryana State Committee was dissolved the SEIAA has transferred the proposal to MoEF&CC for further actions vide memo no- SEIAA/HR/2015/378-381 dated- 24.03.2015. When the Haryana state committee was again reconstituted on 21.08.2015 thus the MoEF&CC transferred the file to SEAC/SEIAA dated 31.08.2015. The case was taken up in the 83 rd SEIAA meeting held on 28.09.2015 & Authority decided to refer back this case to SEAC due to shortcoming & after re-appraisal the case was again taken up in the 110 rd SEIAA meeting held on 02.02.2018 where the Authority decided to agree with the recommendations of SEAC to accord Environment Clearance to this project . (copy is attached as an Annexure-4) The Master Plan of the industrial area showing the location of the proposed project is also attached as an Annexure-5 We hope the above reply is satisfactory and we request you to grant us the amended TOR with exemption of Public hearing in view of the point no-(ii) of O.M. dated- 27 th April, 2018 (MOEF&CC). Thanking you, Authorized Signatory

Upload: others

Post on 20-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The Member Secretary, (Industrial Committee-II)environmentclearance.nic.in/writereaddata/modification/... · 2018. 12. 20. · advertisement is attached as Annexure-2) & the case

To, Date: 06.12.2018

The Member Secretary, (Industrial Committee-II)

Ministry of Environment Forest & Climate Change, Govt. of India

India Paryavaran Bhavan, Jorbagh, New Delhi-110003

Subject: Reply of EDS dated 11.12.18 against amendment in ToR application for the proposed project for the Proposed Greenfield Manufacturing unit of Herbal extracts, Active pharmaceutical ingredient, Biomolecules and Natural Food Colours at Plot-03, Sector-18, phase-3, Industrial Estate Barhi, District - Sonipat, Tehsil –Gannaur, State – Haryana.

Proposal No - IA/HR/IND2/81580/2018 MOEF&CC File No - IA-J-11011/316/2018-IA-II(I)

Dear Sir,

Point wise reply of EDS observations is given below:

S.No. Observation Reply

1

(1)Please submit the copy of Notification of the said industrial area.

Environmental Clearance for the development of Industrial Estate and CETP at I.E. Barhi, Phase-III near Gannaur, District –Sonepat, Haryana (under Category 8(b) project) was applied on 18.04.2012 & again on 08.08.2013.

HSIIDC request MoEF&CC to consider the case of Environmental Clearance for the next meeting agenda along with the project chronology (Copy of the letter is attached as Annexure-1)

Public hearing for the project was conducted on 07.11.2013 (copy of PH advertisement is attached as Annexure-2) & the case was heard in 104

th

SEAC meeting dated 12.05.2014 & 76th

SEIAA meeting dated- 13.10.2014 (copy is attached as an Annexure-3)

As the Haryana State Committee was dissolved the SEIAA has transferred the proposal to MoEF&CC for further actions vide memo no- SEIAA/HR/2015/378-381 dated- 24.03.2015. When the Haryana state committee was again reconstituted on 21.08.2015 thus the MoEF&CC transferred the file to SEAC/SEIAA dated 31.08.2015.

The case was taken up in the 83rd

SEIAA meeting held on 28.09.2015 & Authority decided to refer back this case to SEAC due to shortcoming & after re-appraisal the case was again taken up in the 110

rd SEIAA meeting held on

02.02.2018 where the Authority decided to agree with the recommendations of SEAC to accord Environment Clearance to this project. (copy is attached as an Annexure-4)

The Master Plan of the industrial area showing the location of the proposed project is also attached as an Annexure-5

We hope the above reply is satisfactory and we request you to grant us the amended TOR with exemption of Public hearing in view of the point no-(ii) of O.M. dated- 27

th April, 2018 (MOEF&CC).

Thanking you, Authorized Signatory

Page 2: The Member Secretary, (Industrial Committee-II)environmentclearance.nic.in/writereaddata/modification/... · 2018. 12. 20. · advertisement is attached as Annexure-2) & the case

HARYANA STATE POLLUTION CONTROL BOARD C-11, SECTOR-6, PANCHKULA

Website – www.hspcb.gov.in E-Mail - [email protected] Tele Fax No. – 0172-2577870-73

Notice For Public Hearing It is for the information of all concerned that M/s Haryana State Industrial & Infrastructural Development Corporation Ltd has proposed to develop an Industrial Estate, Phase- III in the revenue estate of Village Barhi, Tehsil Ganaur, District Sonepat, Haryana. The project is covered under the ambit of Environment Impact Assessment Notification No. S.O. 1533 (E) dated 14th Sep, 2006 issued by Ministry of Environment & Forest, Govt. of India, New Delhi and thus Environmental Clearance is mandatory for the proposed project. Accordingly the project proponent has applied to the concerned authority for Environmental Clearance.

As a part of procedure for seeking the Environmental clearance, as notified by the Ministry of Environment and Forest, Govt. of India, New Delhi vide Notification No. S.O. 1533 (E), dated 14.9.06, the project proponent mentioned above have applied to the Haryana State Pollution Control Board, for conducting a Public Hearing of its proposed Industrial Estate Project. Accordingly the Public Hearing for the above said project has been fixed on 07.11.2013 at 2.30 PM at the Project Site mentioned above.

Copies of executive summary of the project and EIA study report, submitted by the project proponent, are available in the Head Office of the Board as well as in the following offices, which can be perused during office hours, on any working day : -

1. Deputy Commissioner, Sonipat. 2. Regional Officer, Haryana State Pollution Control Board, Sonipat Region, Star Complex, Opposite General Hospital, Delhi Road, Sonipat 3. O/o Zila Parishad, Sonipat. 4. O/o Municipal Council, Sonipat 5. Joint Director, District Industries Centre, Sonipat

Notice is hereby given to all concerned, to file suggestions, views, comments and objections, if any, on the proposed project, to the Chairman, Haryana State Pollution Control Board, C-11, Sector -6, Panchkula as well as Regional Officer, Haryana State Pollution Control Board, Sonipat Region, Star Complex, Opposite General Hospital, Delhi Road, Sonipat (Haryana) within 30 days of the publication of this notice. Besides, a Public Hearing will also be held on the Date, Time & Venue mentioned above at the proposed site of the project, which can be attended by any person including Environmental Groups, bonafide residents and others, located at the project site/ sites of displacement / sites likely to be affected. Oral/Written suggestion, if any can also be made during the Public Hearing.

No TA/DA will be admissible for attending the Public Hearing.

Vijai Vardhan, IAS Chairman

KEEP HARYANA CLEAN AND POLLUTION FREE

IT Admin
Typewritten Text
IT Admin
Typewritten Text
IT Admin
Typewritten Text
IT Admin
Typewritten Text
ANNEXURE-2 (Copy of Public Hearing Advertisement)
IT Admin
Typewritten Text
IT Admin
Highlight
Page 3: The Member Secretary, (Industrial Committee-II)environmentclearance.nic.in/writereaddata/modification/... · 2018. 12. 20. · advertisement is attached as Annexure-2) & the case

1

List of the projects to be taken-up in the 110th meeting of SEIAA held on 02.02.2018 at 11.30 AM Sr

No.

File Number Address and Name of

Applicant.

Name of the Project and

Location

Date of

receipt of application

Action Taken by

the SEAC

Remarks

1 SEIAA/HR/15/ 107 SEIAA/HR/14/ 659

The Lalit Suri Education & Charitable Trust, Lower Ground Floor, World Trade Centre, Barakhamba Lane, New Delhi.

EC for construction of Lalit Suri Education & Charitable Trust, Food craft complex, Badkhal road, Faridabad, Haryana.

Transferred by MOEF on 31.08.2015

Recommended to SEIAA for de-list on 16.6.2017

2 SEIAA/HR/15/ 97 SEIAA/HR/2013/539

M/s Rurban Development Corporation Pvt. Ltd. Regd. Office 820, 8th floor, Wave Silver Tower, Sector-18, Noida-201301

EC for the development of Group Housing Colony “Rudco Golf Greens”located at Revenue Estates of Village Palwal, Sector-7, Palwal, Haryana

Transferred by MOEF on 31.08.2015

Recommended for De-list on 08.11.2016

3 SEIAA/HR/16/ 303

M/s. Haat Supreme Wastech Pvt. Ltd. VPO Bazida Jattan, Distt. Karnal-132001.

EC for proposed Common Bio Medical Waste Treatment Facility (CBWTF) located at Khatoni No. 157, Village Bazida Jatan, near railway crossing, Tehsil & District-Karnal, Haryana

21.11.2016 Recommended to SEIAA for further necessary action on 21.11.2017

4 SEIAA/HR/16/ 304

M/s Esskay Hygienic Services, VPO Bagwala, Teh. Barwala, Distt-Panchkula.

Environmental Clearance for proposed Common Bio-Medical Waste Treatment Facility (CBWTF) located at Khewat no 1, Khatoni no 1 kite. No 50, Tadadi No 314, village VPO Bagwala, Tehsil Barwala, District Panchkula, Haryana.

21.11.2016 Recommended to SEIAA for further necessary action on 21.11.2017

5 SEIAA/HR/16/ 308

Synergy Waste Management Pvt. Ltd., 517-518, 5th Floor D Mall, Sector-10, rohini West, New Delhi-110085

Environment Clearance for proposed Common Bio-Medical Waste Treatment Facility (CBWTF), at Plot no. 66, Roz Ka Meo Industrial area, Sohna, Mewat, Haryana

23.11.2016 Recommended to SEIAA for further necessary action on 21.11.2017

IT Admin
Typewritten Text
ANNEXURE-3 (Copy of 110 the SEIAA meeting)
IT Admin
Typewritten Text
IT Admin
Typewritten Text
Page 4: The Member Secretary, (Industrial Committee-II)environmentclearance.nic.in/writereaddata/modification/... · 2018. 12. 20. · advertisement is attached as Annexure-2) & the case

3

11 SEIAA/HR/15/11

HSIIDC, C- 13-14, Corporate Office Building, Sector-6, Panchkula- 134109, Haryana, India.

Environmental Clearance for the development of Industrial Estate and CETP at I.E. Barhi, Phase-III near Gannaur, District – Sonepat, Haryana (under Cateogory 8(b) project.

Transferred by MOEF on 31.08.2015

Recommended to SEIAA for EC on 04.06.2014 Again ecommended to SEIAA for EC on 23.01.2018

12 SEIAA/HR/17/ 345

M/s Emaar MGF Land Limited, Emaar MGF Business Park, MG Road, Sikanderpur Chowk, Sector-28, Gurgaon, Haryana-122002.

EC for expansion of “Commercial Complex” at Village Badshahpur, Sector-66, Gurgaon, Haryana.

07.09.2017 Recommended to SEIAA for EC on 23.01.2018

13 SEIAA/HR/17/ 348

M/s Bharat Petroleum corporation Limited Depot, Station Road, Near Double Fatak, Hisar, Haryana 125001

EC for proposed POL Depot at Village-Bir Hisar, Disttrict- Hisar, Haryana

22.09.2017 Recommended to SEIAA for approval of TOR on 23.01.2018

14 SEIAA/HR/17/ 359

M/s Active Promoters Pvt. Ltd. & Others, Emaar MGF Business Park, MG Road, Sikanderpur Chowk, Sector-28, Gurgaon, Haryana-122002

EC for “Expansion cum Modification” of I.T. Park project located at Village-Ghatta, Sector-61, Gurugram,Haryana

31.10.2017 Recommended to SEIAA for approval of TOR on 23.01.2018

15 SEIAA/HR/17/ 361

M/s Shri Colonizers & Developer Pvt. Ltd, S-14, IInd Floor, Jai Hind Commercial, B.N Road, Lucknow-226001.

EC for construction of “Affordale Group Housing scheme” at Sector-67-A, Gurugram, Haryana.

14.11.2017 Recommended to SEIAA for EC on 23.01.2018

16 SEIAA/HR/17/ 365

M/s Emperium Realty Pvt. Ltd, Two Horizon Centre, 618-619, 6th Floor, Corporatedge Service Office, Golf Course Road, DLF-5, Gurgaon-122002.

EC for proposed Affordable Group Housing Colony on an area measuring 5.08339 acres at Village Taraf Insar & Rajputan, Sector 1-A, Panipat, Haryana.

15.11.2017 Recommended to SEIAA for EC on 23.01.2018

IT Admin
Typewritten Text
IT Admin
Typewritten Text
ANNEXURE-3 (Copy of 110 the SEIAA meeting)
IT Admin
Highlight
IT Admin
Highlight
Page 5: The Member Secretary, (Industrial Committee-II)environmentclearance.nic.in/writereaddata/modification/... · 2018. 12. 20. · advertisement is attached as Annexure-2) & the case

1

Minutes of the 110th meeting of State Environment Impact Assessment Authority

held on. 2nd February, 2018 under the Chairmanship Sh. Bharat Bhushan IAS

(Retd.), Chairman, SEIAA held in the meeting room of office of SEIAA Haryana,

Sector-2 Panchkula, regarding Environmental Clearance under EIA Notification

dated 14.9.2006.

All the members are present. The project proposals as recommended by SEAC for

Environmental Clearance or otherwise and listed in the Agenda item circulated vide letter

No. 43 to 45 dated 16.01.2018 were discussed following decisions were taken:-

Item No.[1] Environmental Clearance for construction of Lalit Suri Education & Charitable Trust, Food craft complex, Badkhal road, Faridabad, Haryana by The Lalit Suri Education & Charitable Trust.

The case was lastly taken up in the 109th meeting of the SEIAA held on

22.12.2017 and the Authority unanimously opinion that it needs more time to study and

analyze the case, therefore it has been deferred for the next meeting.

In the today’s meeting after detailed deliberations the Authority

unanimously decided that it needs more time to study and analyse the case, therefore it

has been deferred for the next meeting.

Item No.[2] Environmental Clearance for the development of Group Housing Colony “Rudco Golf Greens”located at Revenue Estates of Village Palwal, Sector-7, Palwal, Haryana M/s Rurban Development Corporation Pvt. Ltd.

The case lastly considered in the 101st meeting of SEIAA held on

22.03.2017 and the Authority decided to defer this case with the decision that Sh. G. R.

Goyat Chairman SEAC and Sh. A. K. Bhatia, Member SEAC shall visit the site for

inspection and shall submit the report on the point as indicated above within 15 days

period.

The case has been taken up in the today’s meeting and as per the site

inspection report submitted by the sub-committee dated 14.12.2017 the authority decided

to go with recommendations of SEAC to de-list this case. It was also decided that the

decision of the Authority should be conveyed to the Project Proponent and copy of the

same be forwarded to the Haryana State Pollution Control Board, DGTCP, Haryana &

R.O. MOEF, GOI for information and necessary action.

Item No.[3] Environmental Clearance for proposed Common Bio Medical Waste Treatment Facility (CBWTF) located at Khatoni No. 157, Village BazidaJatan, near railway crossing, Tehsil & District-Karnal, Haryana by M/s. Haat Supreme Wastech Pvt. Ltd..

The case was lastly considered in the 106th meeting held on 07.09.2017 and

the Authority decided that the said project being the “Existing” may be exempted from

“Public Consultation/Hearing” as per the para 7(ii) dated 23rd Nov., 2016 of the MoEF

notification, 2006 subject to:

IT Admin
Typewritten Text
IT Admin
Typewritten Text
ANNEXURE-4 (Copy of MOM of 110th SEIAA meeting)
IT Admin
Typewritten Text
IT Admin
Typewritten Text
IT Admin
Typewritten Text
IT Admin
Typewritten Text
IT Admin
Highlight
Page 6: The Member Secretary, (Industrial Committee-II)environmentclearance.nic.in/writereaddata/modification/... · 2018. 12. 20. · advertisement is attached as Annexure-2) & the case

6

During discussion, it was revealed from the Site Inspection Report dated

23.08.2017 of Advisor, Northern Zonal Officer, Ministry of Environment, Forest &

Climate Change, Government of India wherein it is clearly mentioned in the conclusion

that the area proposed for expansion was under development. In the above said inspection

report there are 3 photographs which is showing construction in the proposed expansion

area. This is a clear case of violation of EIA Notification, 2006 since PP has started

construction in proposed expansion area prior to obtaining environment clearance.

In the today’s meeting after detailed deliberations the Authority was of the

unanimous opinion that it needs more time to study and analyse the case, therefore it has

been deferred for the next meeting.

Item No.[11] Environmental Clearance for the development of Industrial Estate and CETP at I.E. Barhi, Phase-III near Gannaur, District – Sonepat, Haryana (under Cateogory 8(b) project by HSIIDC.

The case was taken up in the 83rd meeting held on 28.09.2015 and it was

observed that the project proponent has failed to submit the permission for withdrawal of

Ground water and the Authority decided to refer back this case to SEAC with the advice

to re-appraise the project proposal in terms of deficiencies pointed out above and send its

recommendations within stipulated period as prescribed in the Notification.

In the today’s meeting it was found that the PP has submitted the

permission for withdrawal of Ground water from CGWA.

In view of the above the Authority decided to agree with the

recommendations of SEAC to accord Environment Clearance to this project.

Item No.[12] Environmental Clearance for expansion of “Commercial Complex” at Village Badshahpur, Sector-66, Gurgaon, Haryana by M/s Emaar MGF Land Limited,

The SEAC has recommended this project for Environmental Clearance

subject to stipulation stated therein. The Project Proponent has proposed the expansion of

“Commercial Complex” at Village Badshahpur, Sector-66, Gurgaon, Haryanaon a total

plot area of 9105.464 sqm (2.25 Acres). The total built up area shall be 41007.6 sqm

(existing 36439.033 sqm + expansion 4568.567 sqm). The project proposed shall

comprise of 1 Tower 4 Basement G + 18 Floors, Retail shops. The proposed project shall

have 153 Service apartment room (keys). The maximum height of the building shall be

83.55 meter. The total water requirement shall be 170 KLD. The fresh water requirement

shall be 102 KLD. The waste water generation shall be 106 KLD which will be treated in

the STP of 130 KLD capacity. The total power requirement shall be 3277.9 KW which

will be supplied by DHBVN. The Project Proponent has proposed to develop green belt

on 1859.84 sqm (25.50%) of project area (658.11 sqm Green Belt Plantations + 886.1

sqm Lawn + 201.22 sqm Peripheral Plantation + 109.72 sqm Avenue Plantation). The

Project Proponent proposed to construct 03 rain water harvesting pits. The solid waste

IT Admin
Typewritten Text
IT Admin
Typewritten Text
IT Admin
Typewritten Text
ANNEXURE-4 (Copy of MOM of 110th SEIAA meeting)
IT Admin
Highlight
IT Admin
Highlight
Page 7: The Member Secretary, (Industrial Committee-II)environmentclearance.nic.in/writereaddata/modification/... · 2018. 12. 20. · advertisement is attached as Annexure-2) & the case

M

IN

OR

M

I

N

O

R

T

O

G

A

N

N

A

U

R

TO

D

RAIN

N

O.6

BO

UN

DARY, EM

BAN

KM

EN

T BO

TTO

M (U

ND

EM

ARCATED

)

BO

UN

DARY (U

ND

EM

ARCATED

)

BOUNDARY OFPHASE -3

RAJPU

R

DISTRIBU

TARY

PHASE-2

H.T.PO

W

ER LIN

E (132KV)

H.T.PO

W

ER LIN

E (132KV)

SECTOR-14(RESIDENTIAL)

SECTOR-15(RESIDENTIAL)

SECTO

R-19

(IND

USTR

IAL)

SECTOR-14

T

O

L

A

L

H

E

R

I

H

.

T

.

P

O

W

E

R

L

I

N

E

O

N

P

Y

L

O

N

S

(

2

2

0

K

V

)

R

A

J

P

U

R

D

I

S

T

R

I

B

U

T

A

R

Y

H

.

T

.

P

O

W

E

R

L

I

N

E

O

N

P

Y

L

O

N

S

(

2

2

0

K

V

)

SECTOR-17(RESIDENTIAL)

PHASE-3

SECTOR-18(INDUSTRIAL)

R

A

J

P

U

R

D

I

S

T

R

I

B

U

T

A

R

Y

R

A

J

P

U

R

D

I

S

T

R

I

B

U

T

A

R

Y

SECTOR-22(INDUSTRIAL)

SECTOR-23(INDUSTRIAL)

IH-6

IH-5

IH-4

IH-3

IH-2

IH-1

IH-8

IH-9

IH-10

IH-12

IH-11

IH-7

SECTOR-24(INDUSTRIAL)

R

A

J

P

U

R

D

I

S

T

R

I

B

U

T

A

R

Y

MEGA FOOD PARK

SECTOR-16(RESIDENTIAL)

HSIIDCI.E. BARHI, PHASE -3

REVISED LAYOUT PLANTOTAL AREA OF BARHI PHASE-III

AREA STATEMENT (GENERAL INDUSTRY) IN ACRES

646.86 AC.

AREA UNDER INDUSTRIAL PLOTS 146.06

56.4719.75

16.606.07

43.14

4.35

19.81

AREA UNDER GROUP HOUSING SITESAREA UNDER COMMERCIAL USE

AREA RESERVED FOR INSTITUTIONAL PURPOSEAREA RESERVED FOR LABOUR HOUSING

AREA UNDER R&R RESIDENTIAL PLOTS

AREA UNDER COMMUNITY CENTRE (2 Nos)

AREA UNDER UTILITIES

12345678

10

238.12AREA UNDER GREEN BELTS, OPEN SPACES ANDROADS ETC.

N

9

LEGENDOPEN SPACESACQUISITION BOUNDARY

RELEASED LANDDRG. NO. HSIIDC/IPD/ 980, DATED:-07-08-15 VERSION-09

DETAIL OF INDUSTRIAL PLOTS (PHASE-III)S.NO. SIZE (in mtrs) TOTALAREA (IN AC.)

123456

1.0 AC. 5345 x 90

7

0.44 AC. 2730 x 60

8

0.25 AC. 6922.5 x 450.11 AC. 10815 x 30

277TOTAL

DETAIL OF GROUP HOUSING SITESS.NO. SIZE (Meters) TOTALAREA (Acres)

1 2.51 AC.01

50m wide

2 2.44 AC.02

56

SEC-22 SEC-23 SEC-24

108184

--27

--06

69------27--

------

2.20 AC. 01

01

01

160.99 AC.

25

50 x 80

3

56

10

12

Sqm.

989010150

TOTAL

8892

4000

0.74 AC. 40 x 75 3000

1.15 AC. 4645

1.20 AC. 4864

0101

78

1.05 AC. 42371.10 AC. 4438

019

1.00 AC. 4038

50m wide50m wide50m wide50m wide

0.95 AC. 50m wide11

3842 01

SEC-17

0102

40

01

01

01

--

25

010101

01

SEC-15

16

16--

----

------

--

------

AREA UNDER FLATTED FACTORIES 14.61

11

SEC-18

--60

----

531.56 AC. 70 x 90 --01 01-- --1.78 AC. 0660 x 120 ----06 --

86.5 X 112.8

----

1.25 AC. 014 5003 01----

NOTE:- THIS DRAWING SUPERCEDES DRG. NO. HSIIDC/IPD/956,DATED:-21/11/14

60 x 80 041.20 AC. 4800 04--

13

0.96 AC. 0643 x 90 ----06--

DETAIL OF RESIDENTIAL PLOTS/R & R PLOTS

2.50AREA RESERVED FOR SCHOOL

12

CATEGORY SIZE14 MARLA

TOTAL NO. OF PLOTS246

4 MARLA6 MARLA 155

86

10 MARLA 788 MARLA 144

3 MARLA 112

14m x 25m12m x 21m10m x 20m8.5m x 18m7m x 14m6m x 12.5m

821TOTAL

S.NO.123456

4.38AREA UNDER SUB-STATION

01116.2m WIDE ------ 01

DETAIL OF MEGA FOOD PARK (SECTOR-23)S.NO. SIZE (in mtrs) TOTALAREA (IN AC.)

1234 0.25 AC. 0822.5 x 45

0.44 AC. 30 x 60 440.87 AC. 0237 x 951.06 AC. 1845 x 95

5 0.33 AC. 02--4 0.25 AC. 1220 x 22.5

TOTAL 86

TOTAL AREA PLANNED 571.86

AREA STATEMENT OF MEGA FOOD PARK IN ACRES

AREA UNDER INDUSTRIAL PLOTS 44.49

1.781.78

1.041.04

1.781.78

AREA UNDER ADMIN COMPLEXAREA UNDER COLD STORE

AREA UNDER STEAM GENERATION AREA UNDER RAW GOODS WAREHOUSE

AREA UNDER SILOSAREA UNDER FINISHED GOODS WAREHOUSE

12345678

AREA UNDER SHED 1.33

0.8918.20

0.89AREA UNDER PACKING & SORTINGAREA UNDER GREEN BELTS, OPEN SPACES

AREA UNDER IQF/MA CHAMBER 678

AND ROADS ETC.

TOTAL AREA 75.00

5.50 AC.

5.02 AC.01

145m WIDE

4.68 AC.

01

90m WIDE4.85 AC. 0190m WIDE

----

-------- 01

01

01--

----5.11 AC.

01

101.7m WIDE

--------

01----

01---- 01--4.96 AC. 91.5m WIDE

2.31 AC. 01-- ------ 01

91011121314

DRAWN BY:-MANOJ KUMAR (-SD-)

A.T.P:- RAVISH JANI(-SD-)

D.T.P.:- DEVENDER PAL (-SD-)

C.T.P.:- ARVIND MEHTANI(-SD-)

DIRECTOR CONTROLLED AREA CUM M.D. HSIIDC:- VINEET GARG(-SD-)

ALLOTTED PLOTS

VACANT PLOTS

IT Admin
Highlight
IT Admin
Text Box
IT Admin
Highlight
IT Admin
Typewritten Text
IT Admin
Typewritten Text
PLOT No-3
IT Admin
Typewritten Text
IT Admin
Typewritten Text
IT Admin
Typewritten Text
IT Admin
Typewritten Text
IT Admin
Line
IT Admin
Typewritten Text
IT Admin
Typewritten Text
IT Admin
Typewritten Text
IT Admin
Typewritten Text
IT Admin
Typewritten Text
IT Admin
Typewritten Text
IT Admin
Typewritten Text
IT Admin
Typewritten Text
IT Admin
Typewritten Text
IT Admin
Typewritten Text
IT Admin
Typewritten Text
IT Admin
Typewritten Text
IT Admin
Typewritten Text
IT Admin
Typewritten Text
IT Admin
Typewritten Text
IT Admin
Typewritten Text
IT Admin
Typewritten Text
IT Admin
Typewritten Text
IT Admin
Typewritten Text
IT Admin
Typewritten Text
IT Admin
Typewritten Text
ANNEXURE-4 (MASTER PLAN MAP OF BARHI INDUSTRIAL AREA)
IT Admin
Typewritten Text
IT Admin
Typewritten Text
IT Admin
Typewritten Text
IT Admin
Highlight
IT Admin
Highlight
IT Admin
Highlight
Page 8: The Member Secretary, (Industrial Committee-II)environmentclearance.nic.in/writereaddata/modification/... · 2018. 12. 20. · advertisement is attached as Annexure-2) & the case

11/10/2018 Industrial Estates | HSIIDC, Government of Haryana Undertaking, India

http://hsiidc.org.in/industrial-estates 1/2

Home » Activities and Services » Infrastructure Development » Industrial Estates

Industrial EstatesAn industrial estate developed over an area upto 1500 acres at a particular place is defined as an Industrial Estate (IE).

List of IE developed/ being developed by HSIIDC is as follows:

Location: 57 kms from Delhi on the NH-1, near Gannaur in Sonepat District.

(Status - Planned & Developed).

Salient Features of IE Barhi

Total area of Industrial Estate (in acres) Year of establishment

Phase-I 275.25 Phase-I 1999

Phase-II 332.95 Phase-II 2007

Phase- III 646.86 Phase- III 2012

Total no. of carved out plots 1131

Allotted plots 704

Unallotted plots 427

Units in production 315

Main products being manufactured in theEstate: Mfg. of Textile, Dyeing & Washing

Facilities:

Industrial Estate with state of art infrastructure viz Roads Network, Portable Good Quality Water, Underground

Sewerage System etc.

Strom water drainage, Provision for CETP/ STP, Electricity from HVPN System

Convenience Shopping, Telecommunication Network, OHSR

Major Allottees and their details

Name of theallottee/PlotNo.

ProjectPlotSize

(sqm)

PresentStatus

InvestmentRs. in Cr. Employment Turnover

Rs. in Cr.

M/s KaicoDeer AbrasivePvt. Ltd. Dir.In Joo Yoon

Mfg. ofAbrasiveProducts

9000 Running 3.05 128 6.44

M/s EOCPolymersIndia Pvt. Ltd.

Mfg. of SBRLatexPolymerization& Adhesive

18000 Running 63.49 81 39.02

M/s ManoharFilaments Pvt.Ltd.

WeavingDyeing &Finishing

8174.83 Running 22.4 472 31.88

M/s SrishtiMetal Pvt.Ltd.

Fabrication ofTelecomeTowersShalters etc.

9000 Running 40.54 36 12.8

M/sParamountBlankets Pvt.Ltd.,

Mfg. of AcrylicKnittedBlankets

10800 Running 20 70 48

A Government of Haryana Undertaking

Haryana State Industrial & Infrastructure Development

Corporation Limited.

AA+

Skip to main content

Ambala

Bahadurgarh

Barhi (District Sonipat)

Advantage

Haryana

AboutUs

Activitiesand Services

Acts, Rules &Policies

Tenders andAdvertisement

s

Foreign Investment& NRI Cell

LatestAnnouncement

s

IT Admin
Typewritten Text
IT Admin
Typewritten Text
IT Admin
Typewritten Text
Page 9: The Member Secretary, (Industrial Committee-II)environmentclearance.nic.in/writereaddata/modification/... · 2018. 12. 20. · advertisement is attached as Annexure-2) & the case

11/10/2018 Industrial Estates | HSIIDC, Government of Haryana Undertaking, India

http://hsiidc.org.in/industrial-estates 2/2

Rate of allotment

Development Plans

Layout plans

List of Major Industrial Units: Seasons Textiles, Wooltex Industries, Kaico Deer, EOC Polymer India etc.

For guidelines governing, mode of allotment, offer of possession, period for completion of project and commencementof business, surrender/ resumption, leasing and renting, transfer etc. may refer to EMP 2015.

ResidentialRate of allotment

Layout Plans

For guidelines governing eligibility, mode of allotment, mode of payment etc. may refer to EMP 2015

InstitutionalRate of allotment

Layout Plans

For guidelines governing description of site, mode of allotment, mode of payment etc. may refer to EMP 2015

CommercialRate of allotment

Layout Plans

For guidelines governing description of site, mode of allotment, mode of payment etc. may refer to EMP 2015.

Barwala

Dharuhera

Faridabad

Growth Centre Saha

IIDC Sirsa

Kalka

Karnal

Khutana (Distrit Rohtak)

Kundli

Manakpur

Murthal

Narnaul (Informal Sector)

Panipat

Rai

Roz-Ka-Meo

Samalkha

Sonepat

Tohana and Jind

Udyog Vihar, Gurgaon

Yamunanagar

Page 10: The Member Secretary, (Industrial Committee-II)environmentclearance.nic.in/writereaddata/modification/... · 2018. 12. 20. · advertisement is attached as Annexure-2) & the case

Scanned by CamScanner

Page 11: The Member Secretary, (Industrial Committee-II)environmentclearance.nic.in/writereaddata/modification/... · 2018. 12. 20. · advertisement is attached as Annexure-2) & the case

Scanned by CamScanner