the lep machine
DESCRIPTION
The LEP Machine. Steve Myers SL, CERN. LEP Lay-Out. Topics. Why is LEP so big? & Why is SC RF needed? Principal Performance Limitations History of LEP with Beam Some unexpected problems Some really unexpected events or Bed-time stories for your children and grand-children - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: The LEP Machine](https://reader034.vdocuments.site/reader034/viewer/2022051119/56812bca550346895d901fc7/html5/thumbnails/1.jpg)
S. Myers, Twelve years of beam in LEP, ...., LEP Fest 2000,CERN,(OUT-2000-139.ppt), October 2000.
The LEP Machine
Steve Myers SL, CERN
![Page 2: The LEP Machine](https://reader034.vdocuments.site/reader034/viewer/2022051119/56812bca550346895d901fc7/html5/thumbnails/2.jpg)
S. Myers, Twelve years of beam in LEP, ...., LEP Fest 2000,CERN,(OUT-2000-139.ppt), October 2000. 2
LEP Lay-Out
![Page 3: The LEP Machine](https://reader034.vdocuments.site/reader034/viewer/2022051119/56812bca550346895d901fc7/html5/thumbnails/3.jpg)
S. Myers, Twelve years of beam in LEP, ...., LEP Fest 2000,CERN,(OUT-2000-139.ppt), October 2000. 3
Topics Why is LEP so big? & Why is SC RF needed? Principal Performance Limitations History of LEP with Beam Some unexpected problems Some really unexpected events
or Bed-time stories for your children and grand-children Concluding Remarks
![Page 4: The LEP Machine](https://reader034.vdocuments.site/reader034/viewer/2022051119/56812bca550346895d901fc7/html5/thumbnails/4.jpg)
S. Myers, Twelve years of beam in LEP, ...., LEP Fest 2000,CERN,(OUT-2000-139.ppt), October 2000. 4
Why is LEP so Big? Why SC RF?
sh28
0
8b
sh
2RF
Cu lr11
EE
lrVP
sRF40
4b
0 sinV1EEU
tot
40
4b
0totscI
EEUIP
Losses due to Synchrotron Radiation
Power Dissipated in the walls of the Cu cavities
Power to Beam from the SC cavities.....So to minimise power you need to be as large as possible i.e. large radius. The radius for LEP1 was optimised for around 80GeV with Cu cavities
For sc cavities the power needed is “only” proportional to the 4th power of energy. NOTE to operate LEP at 103 GeV with copper cavities would have needed 1280 cavities and 160MW of RF power!! Impossible for many reasons
LHC For protons since E0 is a factor of 1836 higher, the RF power is not an issue and the bending radius can be made as low as is technically possible. i.e. High fields
E0 = .511MeV for electrons and 938.256 for protons
![Page 5: The LEP Machine](https://reader034.vdocuments.site/reader034/viewer/2022051119/56812bca550346895d901fc7/html5/thumbnails/5.jpg)
S. Myers, Twelve years of beam in LEP, ...., LEP Fest 2000,CERN,(OUT-2000-139.ppt), October 2000. 5
Principal Performance Limitations Beam Energy
RF Volts (Gradients) Optics to a much less extent
Luminosity Beam current Beam beam limit Beam size at the interaction point (*, emittance, ..)
Precision of the Energy calibration
![Page 6: The LEP Machine](https://reader034.vdocuments.site/reader034/viewer/2022051119/56812bca550346895d901fc7/html5/thumbnails/6.jpg)
S. Myers, Twelve years of beam in LEP, ...., LEP Fest 2000,CERN,(OUT-2000-139.ppt), October 2000. 6
History of LEP with Beam 1988: July 12: Octant test 1989:
July 14, First turn (15 minutes ahead of schedule!) August 13, First Collisions Aug13--Aug 18: Physics pilot run Aug 21--Sept 11: Machine Studies Sept 20-- Nov 5 Physics
1990--1994: Z physics 1995: Z + 65 & 70 GeV 1996: 80.5--86 GeV 1997: 91--92 GeV 1998: 94.5 GeV 1999: 96--102 GeV 2000: 102--104.4 GeV
Exciting period, But usually not very productive
But LEP closure is one year (maybe 2) behind schedule
![Page 7: The LEP Machine](https://reader034.vdocuments.site/reader034/viewer/2022051119/56812bca550346895d901fc7/html5/thumbnails/7.jpg)
S. Myers, Twelve years of beam in LEP, ...., LEP Fest 2000,CERN,(OUT-2000-139.ppt), October 2000. 7
1989 Start-UP The Economist August 19, 1989
“The results from California are impressive, especially as they come from a new and unique type of machine. They may provide a sure answer to the generation problem before LEP does. This explains the haste with which the finishing touches have been applied to LEP. The 27km-long device, six years in the making was transformed from inert hardware to working machine in just four weeks--- a prodigous feat, unthinkable anywhere but at CERN..............
........Even so, it was still not as quick as Dr. Carlo Rubbia, CERN’s domineering director-general might have liked”.
SLC
![Page 8: The LEP Machine](https://reader034.vdocuments.site/reader034/viewer/2022051119/56812bca550346895d901fc7/html5/thumbnails/8.jpg)
S. Myers, Twelve years of beam in LEP, ...., LEP Fest 2000,CERN,(OUT-2000-139.ppt), October 2000. 8
1989 Start-Up
![Page 9: The LEP Machine](https://reader034.vdocuments.site/reader034/viewer/2022051119/56812bca550346895d901fc7/html5/thumbnails/9.jpg)
S. Myers, Twelve years of beam in LEP, ...., LEP Fest 2000,CERN,(OUT-2000-139.ppt), October 2000. 9
![Page 10: The LEP Machine](https://reader034.vdocuments.site/reader034/viewer/2022051119/56812bca550346895d901fc7/html5/thumbnails/10.jpg)
S. Myers, Twelve years of beam in LEP, ...., LEP Fest 2000,CERN,(OUT-2000-139.ppt), October 2000. 10
Summary of Performance
Year int L Eb kb 2 kb Ib Peak Lumi y
(pb-1) (GeV) (mA) (10^30 cm-2 s-1) 1989 1.7 45.6 4 2.6 4 0.0171990 8.6 45.6 4 3.6 7 0.0201991 18.9 45.6 4 3.7 10 0.0271992 28.6 45.6 4/8 5.0 12 0.0271993 40.0 45.6 8 5.5 19 0.0401994 64.5 45.6 8 5.5 23 0.0471995 46.1 45.6 to 70 8/12 8.4 34 0.0301996 24.7 80.5 to 86 4 4.2 36 0.0401997 73.4 90 to 92 4 5.2 47 0.0551998 199.7 94.5 4 6.1 100 0.0751999 253.0 98 to 101 4 6.2 100 0.083
![Page 11: The LEP Machine](https://reader034.vdocuments.site/reader034/viewer/2022051119/56812bca550346895d901fc7/html5/thumbnails/11.jpg)
S. Myers, Twelve years of beam in LEP, ...., LEP Fest 2000,CERN,(OUT-2000-139.ppt), October 2000. 11
Modes of Operation
Year Optics Comments Bunch scheme 1989 60/60 LEP commissioned 4 on 4 1990 60/60 4 on 4 1991 60/60 90/90 optics tested 4 on 4 1992 90/90 Pretzel commissioned 4 on 4 / Pretzel 1993 90/60 Pretzel 1994 90/60 Pretzel 1995 90/60 tests at 65-68 GeV Bunch trains 1996 90/60 108/90 tested 4 on 4 1997 90/60 108/60 and 102/90 tested 4 on 4 1998 102/90 4 on 4 1999 102/90 4 on 4
Every Year was Different
![Page 12: The LEP Machine](https://reader034.vdocuments.site/reader034/viewer/2022051119/56812bca550346895d901fc7/html5/thumbnails/12.jpg)
S. Myers, Twelve years of beam in LEP, ...., LEP Fest 2000,CERN,(OUT-2000-139.ppt), October 2000. 12
Performance over the Years
![Page 13: The LEP Machine](https://reader034.vdocuments.site/reader034/viewer/2022051119/56812bca550346895d901fc7/html5/thumbnails/13.jpg)
S. Myers, Twelve years of beam in LEP, ...., LEP Fest 2000,CERN,(OUT-2000-139.ppt), October 2000. 13
Performance in 2000
![Page 14: The LEP Machine](https://reader034.vdocuments.site/reader034/viewer/2022051119/56812bca550346895d901fc7/html5/thumbnails/14.jpg)
S. Myers, Twelve years of beam in LEP, ...., LEP Fest 2000,CERN,(OUT-2000-139.ppt), October 2000. 14
Performance in 2000
![Page 15: The LEP Machine](https://reader034.vdocuments.site/reader034/viewer/2022051119/56812bca550346895d901fc7/html5/thumbnails/15.jpg)
S. Myers, Twelve years of beam in LEP, ...., LEP Fest 2000,CERN,(OUT-2000-139.ppt), October 2000. 15
Performance in 2000
![Page 16: The LEP Machine](https://reader034.vdocuments.site/reader034/viewer/2022051119/56812bca550346895d901fc7/html5/thumbnails/16.jpg)
S. Myers, Twelve years of beam in LEP, ...., LEP Fest 2000,CERN,(OUT-2000-139.ppt), October 2000. 16
Some Unexpected problems 97/98 shutdown
many RF antennae cables electrically damaged, some melted
Limitation on the beam current in 1998 bunch length dependent energy ramp modified to maximise the bunch length
Beam tube
damaged areaof cables
super insulation blanket
![Page 17: The LEP Machine](https://reader034.vdocuments.site/reader034/viewer/2022051119/56812bca550346895d901fc7/html5/thumbnails/17.jpg)
S. Myers, Twelve years of beam in LEP, ...., LEP Fest 2000,CERN,(OUT-2000-139.ppt), October 2000. 17
Heating of RF antennae cables
Room Temp.Test Cable
200.0
250.0
300.0
350.0
400.0
450.0
500.0
550.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0
Power [W]
Tem
p [K
]
200
523
Cold Cable extrapolated
From Measurements with beam
• antennes used for cavity control
• heated by coupling to beam
• 8W limit imposed
• 30 antennae in the last three weeks of running in 1998
![Page 18: The LEP Machine](https://reader034.vdocuments.site/reader034/viewer/2022051119/56812bca550346895d901fc7/html5/thumbnails/18.jpg)
S. Myers, Twelve years of beam in LEP, ...., LEP Fest 2000,CERN,(OUT-2000-139.ppt), October 2000. 18
Bunch Length Control during Ramp
4.0
4.5
5.0
5.5
6.0
6.5
7.0
7.5
8.0
8.5
13:48:00 13:50:53 13:53:46 13:56:38 13:59:31 14:02:24 14:05:17
Time
Beam
Cur
rent
/ Cab
le P
ower
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
Wig
gler
Fie
ld /1
0*Q
s / B
unch
Len
gth(
cm)
DC CurrentCablePowQsDwiggEwiggP3WiggP7WiggBunch Length
Fill 5300
![Page 19: The LEP Machine](https://reader034.vdocuments.site/reader034/viewer/2022051119/56812bca550346895d901fc7/html5/thumbnails/19.jpg)
S. Myers, Twelve years of beam in LEP, ...., LEP Fest 2000,CERN,(OUT-2000-139.ppt), October 2000. 19
Other Problems with cables
Where is the dirty rat who ate my cables?
![Page 20: The LEP Machine](https://reader034.vdocuments.site/reader034/viewer/2022051119/56812bca550346895d901fc7/html5/thumbnails/20.jpg)
S. Myers, Twelve years of beam in LEP, ...., LEP Fest 2000,CERN,(OUT-2000-139.ppt), October 2000. 20
Very Unexpected Problems: Moon
![Page 21: The LEP Machine](https://reader034.vdocuments.site/reader034/viewer/2022051119/56812bca550346895d901fc7/html5/thumbnails/21.jpg)
S. Myers, Twelve years of beam in LEP, ...., LEP Fest 2000,CERN,(OUT-2000-139.ppt), October 2000. 21
Very Unexpected Problems: Water
![Page 22: The LEP Machine](https://reader034.vdocuments.site/reader034/viewer/2022051119/56812bca550346895d901fc7/html5/thumbnails/22.jpg)
S. Myers, Twelve years of beam in LEP, ...., LEP Fest 2000,CERN,(OUT-2000-139.ppt), October 2000. 22
Noise on the Beam Energy
![Page 23: The LEP Machine](https://reader034.vdocuments.site/reader034/viewer/2022051119/56812bca550346895d901fc7/html5/thumbnails/23.jpg)
S. Myers, Twelve years of beam in LEP, ...., LEP Fest 2000,CERN,(OUT-2000-139.ppt), October 2000. 23
Very Unexpected Problem Influence on the beam energy
the moon, sun and tides the level of lake Geneva the amount of rain
AND the fast train.........
![Page 24: The LEP Machine](https://reader034.vdocuments.site/reader034/viewer/2022051119/56812bca550346895d901fc7/html5/thumbnails/24.jpg)
S. Myers, Twelve years of beam in LEP, ...., LEP Fest 2000,CERN,(OUT-2000-139.ppt), October 2000. 24
TGV induces current in LEP vacuum chamber
![Page 25: The LEP Machine](https://reader034.vdocuments.site/reader034/viewer/2022051119/56812bca550346895d901fc7/html5/thumbnails/25.jpg)
S. Myers, Twelve years of beam in LEP, ...., LEP Fest 2000,CERN,(OUT-2000-139.ppt), October 2000. 25
2900
3000
3100
3200
3300
3400
3500
3600
20/5
/99
27/5
/99
3/6/
99
10/6
/99
17/6
/99
24/6
/99
1/7/
99
8/7/
99
15/7
/99
22/7
/99
29/7
/99
5/8/
99
12/8
/99
19/8
/99
26/8
/99
2/9/
99
9/9/
99
16/9
/99
23/9
/99
30/9
/99
7/10
/99
14/1
0/99
21/1
0/99
28/1
0/99
4/11
/99
Date
MV Copper
SC
RF: pumping up the voltage
96 GeV
98 GeV
100 GeV101/100 GeV
Strategy to maximise physics time: Run at an energy where we have some RF margin Increase the RF voltage gradually When stable at sufficient voltage, increase the energy Drink the champagne Repeat as many times as possible...
But...keeping it there requires a huge effort!
![Page 26: The LEP Machine](https://reader034.vdocuments.site/reader034/viewer/2022051119/56812bca550346895d901fc7/html5/thumbnails/26.jpg)
S. Myers, Twelve years of beam in LEP, ...., LEP Fest 2000,CERN,(OUT-2000-139.ppt), October 2000. 26
0
5
10
15
20
25
30
Accelerating field [MV/m]
Num
ber o
f cav
ities
96 GeV100 GeV104 GeV
Distribution of cavity gradients (96 to 104 GeV)
96 GeV:Mean Nb/Cu6.1 MV/m
100 GeV:Mean Nb/Cu6.9 MV/m 104 GeV:
Mean Nb/Cu7.5 MV/m
![Page 27: The LEP Machine](https://reader034.vdocuments.site/reader034/viewer/2022051119/56812bca550346895d901fc7/html5/thumbnails/27.jpg)
S. Myers, Twelve years of beam in LEP, ...., LEP Fest 2000,CERN,(OUT-2000-139.ppt), October 2000. 27
With plenty of volts, we’re cruising...
After 2 days at 101 GeV ... available RF voltage 3510 MV margin 210 MV (2 klystrons can trip)
0
10
20
30
40
50
60
70
80
90
100
07-Oct 10:50 07-Oct 15:38 07-Oct 20:26 08-Oct 01:14 08-Oct 06:02 08-Oct 10:50
Lum
inos
ity/ 1
0+30
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
Bea
m C
urre
nt /m
A
AlephDelphiL3OpalIDC
![Page 28: The LEP Machine](https://reader034.vdocuments.site/reader034/viewer/2022051119/56812bca550346895d901fc7/html5/thumbnails/28.jpg)
S. Myers, Twelve years of beam in LEP, ...., LEP Fest 2000,CERN,(OUT-2000-139.ppt), October 2000. 28
0
10
20
30
40
50
60
70
80
90
100
04-Nov 00:00 04-Nov 02:24 04-Nov 04:48 04-Nov 07:12 04-Nov 09:36 04-Nov 12:00 04-Nov 14:24 04-Nov 16:48 04-Nov 19:12
Lum
inos
ity/ 1
0+3
0
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
Bea
m C
urre
nt /m
A
AlephDelphiL3OpalIDC
...with a few less, it’s less easy Still at 101 GeV...
but available RF voltage down to 3440 MV margin 140 MV (1 klystron can trip) This fill at 100 GeV
![Page 29: The LEP Machine](https://reader034.vdocuments.site/reader034/viewer/2022051119/56812bca550346895d901fc7/html5/thumbnails/29.jpg)
S. Myers, Twelve years of beam in LEP, ...., LEP Fest 2000,CERN,(OUT-2000-139.ppt), October 2000. 29
The RF group’s 1999 collection
Q: 102GeV: How did we get there?? A “by lowering luminosity and breaking cavities”.
Q: Can we go further?? A: “Yes, by further lowering the luminosity and breaking MORE
cavities”.
![Page 30: The LEP Machine](https://reader034.vdocuments.site/reader034/viewer/2022051119/56812bca550346895d901fc7/html5/thumbnails/30.jpg)
S. Myers, Twelve years of beam in LEP, ...., LEP Fest 2000,CERN,(OUT-2000-139.ppt), October 2000. 30
Oops!!
LEP repeatedly trips after 10 to 30 minutes. The time between trips decreases with time unless you do not try to switch on. Problem was on the sextupole chains
![Page 31: The LEP Machine](https://reader034.vdocuments.site/reader034/viewer/2022051119/56812bca550346895d901fc7/html5/thumbnails/31.jpg)
S. Myers, Twelve years of beam in LEP, ...., LEP Fest 2000,CERN,(OUT-2000-139.ppt), October 2000. 31
Some really unexpected events
QL10.L1Single Turn Stopper positrons
Could not get the beam to circulate more than 15 turns even with large bumps all around the ring. Use single turn orbit system and normalised the measurement.
![Page 32: The LEP Machine](https://reader034.vdocuments.site/reader034/viewer/2022051119/56812bca550346895d901fc7/html5/thumbnails/32.jpg)
S. Myers, Twelve years of beam in LEP, ...., LEP Fest 2000,CERN,(OUT-2000-139.ppt), October 2000. 32
Zoom sur Quadrupole
beer bottle
![Page 33: The LEP Machine](https://reader034.vdocuments.site/reader034/viewer/2022051119/56812bca550346895d901fc7/html5/thumbnails/33.jpg)
S. Myers, Twelve years of beam in LEP, ...., LEP Fest 2000,CERN,(OUT-2000-139.ppt), October 2000. 33
10 metres to the right
beer bottle
Unsociable sabotage: both bottles were empty!!
![Page 34: The LEP Machine](https://reader034.vdocuments.site/reader034/viewer/2022051119/56812bca550346895d901fc7/html5/thumbnails/34.jpg)
S. Myers, Twelve years of beam in LEP, ...., LEP Fest 2000,CERN,(OUT-2000-139.ppt), October 2000. 34
1996: Heineken Beam Stopper
![Page 35: The LEP Machine](https://reader034.vdocuments.site/reader034/viewer/2022051119/56812bca550346895d901fc7/html5/thumbnails/35.jpg)
S. Myers, Twelve years of beam in LEP, ...., LEP Fest 2000,CERN,(OUT-2000-139.ppt), October 2000. 35
Conclusions LEP was a challenge and a lot of effort and fun Physics output was exceptional (still waiting for
Higgs/SUSY)
I would like to take this final (hopefully not!) opportunity to sincerely thank all the people who have worked on the LEP and the detectors for their motivation, devotion and hard work. It has been a fantastic experience for all of us