the ku-band network nara institute of science and technology ai3 nara noc team umeda toshiyuki
TRANSCRIPT
The Ku-band Network
Nara Institute of Science and Technology
AI3 Nara NOC Team
UMEDA Toshiyuki
The state of Nara NOC
Aug 15-16, All equipment to the new room Cold Dry and Clean room All router and modem have few troubles
The new cables are introduced. The receiving signal power is higher than before
The measurement of the receiving signal power
The signal power from ITB, AIT and NAIST (9/1 - 9/30)
From NAIST is a return signal power We measured the network unavailable time.
The C/N of the receiving power is under 6dB
The receive signal power
ITB 761min is under 6dB(C/N) 98.24% is available
AIT 250min is under 6dB(C/N) 99.41% is available
The receive signal power (2)
NAIST 54.5min is under 6dB(C/N) 99.87% is available
The signal power chart
The problems
ITB The receiving signal power is variable
AIT The receiving signal power is very variable The receiving signal power is a little low
How to solve the problems
Please ask Mr. Mizuno
1 1:13:30 - 1 8:00:00 (406.5min) 1 12:41:00 - 1 12:48:00 (7min) 1 13:05:30 - 1 13:12:00 (6.5min) 20 9:43:00 - 20 10:39:30 (56.5min) 20 17:14:00 - 20 17:40:00 (26.5min) 20 19:27:30 - 20 19:28:00 (0.5min) 22 15:27:30 - 15:35:30 (8min) 23 17 : 47 : 00 17: 48 : 30 1min30sec 24 06 : 05 : 30 06: 06 : 00 30sec 24 14 : 18 : 30 15 : 16 : 00 57min30sec 24 16 : 09 : 30 16: 14 : 30 5min 25 13 : 21 : 00 16 : 04 : 30 163min30sec 29 19 : 22 : 00 19: 43 : 30 21min30sec