the koffler institute

32
Client: UNIVERSITY OF TORONTO 172 Saint George Street Toronto, ON M5R 0A3 Contractor: BIRD CONSTRUCTION CO. Suite 206, 5405 Eglinton Ave. W. Etobicoke, ON M9C 5KR Structural: BANERJEE & ASSOCIATES LTD. 206 Town Centre Blvd, Suite 102 Markham, ON L3R 8H8 Mechanical & Electrical: MCW CONSULTANTS LTD. 156 Front Street. W. Suite 600 Toronto, ON M5J 2L6 Civil & Landscape: MMM GROUP 100 Commerce Valley Dr. W. Thornhill, ON L3T 0A1 N S MODERN DESIGNS 123 Fake Street Faketown, ON Prepared by: Shawn Aguilera Neil Singh Nirvani Sohan SHERIDAN COLLEGE Faculty of Applied Science & Technology Architectural Technology Architectural Studio 4 ARCH 30043 Winter 2014 V. Picicci

Upload: neil-singh

Post on 21-Jul-2016

225 views

Category:

Documents


0 download

DESCRIPTION

 

TRANSCRIPT

Page 1: The Koffler Institute

Client:

UNIVERSITY OF TORONTO

172 Saint George Street

Toronto, ON

M5R 0A3

Contractor:

BIRD CONSTRUCTION CO.

Suite 206, 5405 Eglinton Ave. W.

Etobicoke, ON

M9C 5KR

Structural:

BANERJEE & ASSOCIATES LTD.

206 Town Centre Blvd, Suite 102

Markham, ON

L3R 8H8

Mechanical & Electrical:

MCW CONSULTANTS LTD.

156 Front Street. W. Suite 600

Toronto, ON

M5J 2L6

Civil & Landscape:

MMM GROUP

100 Commerce Valley Dr. W.

Thornhill, ON

L3T 0A1

N S MODERN DESIGNS

123 Fake Street

Faketown, ON

Prepared by:

Shawn Aguilera

Neil Singh

Nirvani Sohan

SHERIDAN COLLEGE

Faculty of Applied Science

& Technology

Architectural Technology

Architectural Studio 4

ARCH 30043

Winter 2014

V. Picicci

Page 2: The Koffler Institute

Item

1

Name of Practice:

N S Modern Designs123 Fake StreetFaketown, ON

Name of Project:

Koffler InstituteUniversity of Toronto

Location:

569 Spadina CrescentToronto, ONM5S 2J7Canada

Ontario Building Code 2012Data Matrix Parts 3 or 9

Building Code Reference

ProjectDescription:

Major Occupancy:

Building Area (m²):

Gross Area:

Number ofStoreys:Number of Streets/ Access Routes: 3

Building Classification(s):

Sprinkler System Proposed:

Standpipe Required:

Fire Alarm Required:

Water Service/ Supply is Adequate:

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

High Building: 3.2.6.

Permitted Construction:

Barrier-free Design:

Actual Construction:

Mezzanine(s) Area (m²): N/A

Occupant Load based on:

Hazardous Substances:

Required FireResistanceRating(F.R.R.)

18

19 Spatial Separation - Construction of Exterior Walls

20 Plumbing Fixture Requirements:

21 Others:

11.1 to 11.4 1.1.2.[ A ] 1.1.2.[ A ] & 9.10.1.3.

Part 11 Part 3 Part 9New

Addition

AlterationChange of Use

A B C D E F

New 695 Total 695Existing N/A

New 1990 Total 1990Existing N/A

Below Grade 1Above Grade 3

3.2.2.24.

Entire Building

Selected Compartments

Selected Floor Areas

Basement

Not Required

in lieu of Roof Rating

Yes No

Yes No

Yes No

Yes No

Non-CombustibleCombustible Both

Non-CombustibleCombustible Both

Design of Buildingm²/person

Basement Load N/AOccupancy N/A persons

1st Floor Load 230Occupancy A persons

2nd Floor Load 150Occupancy A persons

3rd Floor Load 100Occupancy D/ A persons

Yes No (Explain)

Yes No

Horizontal AssembliesF.R.R. (Hours)

Listed Design No.or Description (SG-2)

F.R.R. of SupportingMembers

Listed Design No.or Description (SG-2)

WallArea of

EBF (m²)L.D.(m)

L/H orH/L

PermittedMax.% ofOpenings

Proposed %of Openings

F.R.R.(Hours)

ListedDesign or

Description

Comb.Constr.

Comb. Constr.Nonc. Cladding

Non-comb.Constr.

Part 3 Part 9

Building Code Reference

OccupantLoad

BC TableNumber

FixturesRequired

FixturesProvided

Basement:Occupancy N/A

Occupancy

Occupancy A2

Occupancy

Occupancy A2

Occupancy

Occupancy A2

Occupancy D

1st Floor:

2nd Floor:

3rd Floor:

3.1.2.1.(1) 9.10.2.

1.4.1.2. [ A ]

1.4.1.2. [ A ]

1.4.1.2. [ A ] & 9.10.4.

9.10.20.

9.10.2.

9.10.8.2.

INDEX

N/A

9.10.18.

N/A

N/A

9.10.6.

9.10.4.1.

9.9.1.3.

9.5.2.

9.10.1.3.(4)

9.10.8.

9.10.9.

9.10.14.

1.4.1.2. [ A ]

1.4.1.2. [ A ]

1.4.1.2. [ A ] &3.2.1.1.3.2.2.10. & 3.2.5.

3.2.2.20.-.83.

3.2.2.20.-.83

INDEX

3.2.9.

3.2.4.

3.2.5.7.

3.2.6.

3.2.2.20.-.83

3.2.1.1.(3)-(8)

3.1.17.

3.8.

3.3.1.2. & 3.3.1.19.

3.2.2.20.-.83

3.2.1.4.

3.2.3.

3.2.1.5.

3.2.2.17.

Male/ Female Count @ 50% / 50%

References are to Division B unless noted[A] for Division A or [C] for Division C

3.2.2.53.

230

150

86

14

3.7.4.3.(15)

3.7.4.3.(15)

3.7.4.3.(15)

3.7.4.7.(2)

4 6

2 6

2 4

1 2

3.7.4.3.(15)

3.7.4.3.(15)

3.7.4.3.(15)

3.7.4.7.(2)

Floors 1 Hour

Roof 0 Hour

Mezzanine N/A

Floors 1 Hour

Roof 1 Hour

Mezzanine N/A

UL Des G262

UL Des P255

N/A

UL Des X528 ULC Des O503

UL Des X528 ULC Des O503

N/A

2.5North

East

South

West

5.0

5.3

4.2

1 Hour

1 Hour

1 Hour

1 Hour

Yes

Yes

Yes

Yes

No

No

No

No

No

No

No

No

388

388

431

445

>3:1

30%

>3:1

>3:1

>3:1

40%

40%

16% 7%

23%

17%

27%

SCALE

CHECKED BY:

DRAWN BY:

PROJECT DATE:

PROJECT #:

FILE NAME:

SHEET #:

DRAWING TITLE:

PROJECT INFO:

ARCHITECT'S SEAL:

REVISIONS ISSUED

GENERAL NOTES:

SHEET DATE:

D:\0214-004\0214-004_A-3D_Model_30043.rvt

0214-004

02/11/14

N. Singh S. Aguilera N. Sohan

V. Picicci

A001

University of Toronto: Koffler Institute

569 Spadina AvenueToronto ON

M5S 2J7

OBC Matrix & Sheet List

03/24/2014

Drawing List

SheetNumber Sheet Name

Sheet IssueDate Drawn By

A000 Cover 04/06/14 N. Singh S. Aguilera N. Sohan

A001 OBC Matrix & Sheet List 03/24/2014 N. Singh S. Aguilera N. Sohan

A002 Partition Schedule 03/24/14 N. Singh S. Aguilera N. Sohan

A003 Site Plan 04/13/14 N. Singh S. Aguilera N. Sohan

A004 Basement & Ground FloorFire Safety Diagram

04/12/14 Neil Singh

A005 Second Floor Fire SafetyDiagram

04/12/14 Shawn Aguilera

A006 Third Floor Fire SafetyDiagram

04/12/14 Nirvani Sohan

A101 Ground Floor Plan &Partial Basement Plan

03/23/2014 Neil Singh

A102 Second Floor Plan 03/23/2014 Shawn Aguilera

A103 Third Floor 03/23/2014 Nirvani Sohan

A111 Ground Floor ReflectedCeiling Plan

04/05/14 Neil Singh

A112 Second Floor ReflectedCeiling Plan

04/05/14 Shawn Aguilera

A113 Third Floor ReflectedCeiling Plan

04/05/14 Nirvani Sohan

A201 East Elevation 03/23/14 Neil Singh

A202 South Elevation 03/23/14 Nirvani Sohan

A203 West Elevation 03/23/14 Shawn Aguilera

A204 North Elevation 03/23/14 N. Singh S. Aguilera N. Sohan

A301 Building Section A 03/23/14 N. Singh S. Aguilera N. Sohan

A302 Building Section B 03/23/14 N. Singh S. Aguilera N. Sohan

A303 Building Section C 03/23/14 N. Singh S. Aguilera N. Sohan

A303a Partial Section C-1 04/01/14 N. Singh S. Aguilera N. Sohan

A303b Partial Section C-2 04/01/14 N. Singh S. Aguilera N. Sohan

A310 Wall Sections 03/30/14 N. Singh S. Aguilera N. Sohan

A311 Wall Sections 04/12/14 N. Singh S. Aguilera N. Sohan

A501 Section Details 04/12/14 N. Singh S. Aguilera N. Sohan

A502 Section Details 04/12/14 N. Singh S. Aguilera N. Sohan

A601 Door Schedule 04/12/14 N. Singh S. Aguilera N. Sohan

A602 Room Finish Schedule 04/12/14 N. Singh S. Aguilera N. Sohan

A700 Partial Stair Plans 03/24/2014 N. Singh S. Aguilera N. Sohan

A701 Stair No. 1 03/30/14 N. Singh S. Aguilera N. Sohan

A702 Stair No.2 03/31/14 N. Singh S. Aguilera N. Sohan

A703 Stair No. 3 03/31/14 N. Singh S. Aguilera N. Sohan

No. Description Date

Page 3: The Koffler Institute

EXTERIOR MASONRYCAVITY WALL w/BANDING

P1:

90mm FACE BRICK25mm AIR SPACE50mm EXTRUDED POLYSTYRENE

RIGID INSULATION190mm CONCRETE MASONRY UNITS

VAPOUR BARRIER25mm METAL FURRING13mm GYPSUM WALL BOARD

EXTERIOR CONCRETECAVITY WALLP2:

90mm FACE BRICK25mm AIR SPACE50mm EXTRUDED POLYSTYRENE

RIGID INSULATION190mm CAST-IN-PLACE CONCRETE

VAPOUR BARRIER

EXTERIOR CONCRETECAVITY WALL w/oBANDING

P3:

90mm FACE BRICK25mm AIR SPACE50mm EXTRUDED POLYSTYRENE

RIGID INSULATION190mm CAST-IN-PLACE CONCRETE

VAPOUR BARRIER

EXTERIOR DOUBLEMASONRY CAVITYWALL

P4:

90mm FACE BRICK25mm AIR SPACE

AIR BARRIER50mm EXTRUDED POLYSTYRENE

RIGID INSULATION190mm CONCRETE MASONRY UNITS50mm EXTRUDED POLYSTYRENE

RIGID INSULATION25mm AIR SPACE90mm FACE BRICK

EXTERIOR DOUBLE MASONRYCAVITY WALL w/ BANDINGP4a:

90mm FACE BRICK25mm AIR SPACE

AIR BARRIER50mm EXTRUDED POLYSTYRENE

RIGID INSULATION190mm CONCRETE MASONRY UNITS50mm EXTRUDED POLYSTYRENE

RIGID INSULATION25mm AIR SPACE90mm FACE BRICK

CONCRETE BANDINGBEAMP5:

90mm FACE BRICK25mm AIR SPACE50mm EXTRUDED POLYSTYRENE

RIGID INSULATION190mm CAST-IN-PLACE CONRETE

EXTERIOR WASHROOMWALLP6:

90mm FACE BRICK25mm AIR SPACE50mm EXTRUDED POLYSTYRENE

RIGID INSULATION190mm CONCRETE MASONRY UNITS

VAPOUR BARRIER5mm CERAMIC WALL TILE

TYPICAL INTERIORPARTITIONP7:

13mm GYPSUM WALL BOARD140mm METAL STUDS13mm GYPSUM WALL BOARD

2HRS INTERIOR FIRESEPARATION WALLP8:

13mm GYPSUM WALL BOARD25mm METAL FURRING190mm CONCRETE MASONRY UNITS25mm METAL FURRING13mm GYPSUM WALL BOARD

2HRS INTERIOR FIRESEPARATION, ONE SIDE FINISHP9:

13mm GYPSUM WALL BOARD25mm METAL FURRING190mm CONCRETE MASONRY UNITS

2HRS INTERIOR FIRESEPARATION WALL w/CERAMIC TILE FINISH

P9a:

13mm GYPSUM WALL BOARD25mm METAL FURRING190mm CAST-IN-PLACE CONCRETE5mm CERAMIC WALL TILE

STRUCTURALWASHROOM WALLP10:

190mm CONCRETE MASONRY UNITS5mm CERAMIC WALL TILE

TYPICAL PLUMBINGWALLP11:

5mm CERAMIC WALL TILE13mm GYPSUM WALL BOARD89mm METAL STUDS400mm AIR SPACE89mm METAL STUDS13mm GYPSUM WALL BOARD5mm CERAMIC WALL TILE

LAVATORY PLUMBINGWALLP12:

190MM CAST-IN-PLACE CONCRETE140mm METAL STUDS13mm GYPSUM WALL BOARD5mm CERAMIC WALL TILE

LAVATORY PLUMBINGWALL, FINSIH ON E.F.P12a:

13mm GYPSUM WALL BOARD25mm METAL FURRING190mm CAST-IN-PLACE CONCRETE140mm METAL STUDS13mm GYPSUM WALL BOARD

340mm EXTERIOR INSULATEDFOUNDATION WALLP14:

VAPOUR BARRIER340mm CAST-IN-PLACE CONCRETE

DAMPPROOFING MEMBRANE50mm EXPANDED POLYSTYRENE

RIGID INSULATION

200mm INTERIORBASEMENT WALLP15:

200mm CONCRETE MASONRY UNITS

200mm FOUNDATIONWALLP16:

200mm CAST-IN-PLACE CONCRETE

200mm EXTERIOR INSULATEDFOUNDATION WALLP17:

VAPOUR BARRIER200mm CAST-IN-PLACE CONCRETE

DAMP PROOFING MEMBRANE50mm EXPANDED POLYSTYRENE

RIGID INSULATION

SCALE

CHECKED BY:

DRAWN BY:

PROJECT DATE:

PROJECT #:

FILE NAME:

SHEET #:

DRAWING TITLE:

PROJECT INFO:

ARCHITECT'S SEAL:

REVISIONS ISSUED

GENERAL NOTES:

SHEET DATE:

1 : 20

D:\0214-004\0214-004_A-3D_Model_30043.rvt

0214-004

02/11/14

N. Singh S. Aguilera N. Sohan

V. Picicci

A002

University of Toronto: Koffler Institute

569 Spadina AvenueToronto ON

M5S 2J7

Partition Schedule

03/24/14

1 : 20

PARTITION SCHEDULE

No. Description Date

Page 4: The Koffler Institute

ZONING INFORMATION

ZONING CR 3.0

LOT 569

ADDRESS 569 SPADINA AVENUE

AREA OF PROPERTY 1139 SQ. M

AREA

BASEMENT

GROUND 685 SQ M.

SECOND 695 SQ M.

THIRD 610 SQ M.

GROSS FLOOR AREA 1990 SQ M.

TOTAL AREA ACADEMIC USE 697 SQ M.

LANDSCAPE AREA 122 SQ. M.

PAVED AREA 322 SQ. M.

LOADING SPACES EAST

ZONE 1

ZONE 2 ZONE 3

SCALE

CHECKED BY:

DRAWN BY:

PROJECT DATE:

PROJECT #:

FILE NAME:

SHEET #:

DRAWING TITLE:

PROJECT INFO:

ARCHITECT'S SEAL:

REVISIONS ISSUED

CONSTRUCTION NORTH TRUE NORTH

KEY PLAN:

GENERAL NOTES:

SHEET DATE:

1 : 200

D:\0214-004\0214-004_A-3D_Model_30043.rvtD:\0214-004\0214-004_A-3D_Model_30043.rvt

0214-004

02/11/14

N. Singh S. Aguilera N. Sohan

V. Picicci

A003

University of Toronto: Koffler Institute569 Spadina Avenue

Toronto ONM5S 2J7

Site Plan

04/13/14

No. Description Date

1 : 200

SITE PLAN1

Page 5: The Koffler Institute

UP

UP DN

UP

A204

1

A2011

A203 1

A202

1

A B

B

C

C

D E

F

G

H

J K

L

X

11

22

3

4

5

6

8

9

10

11

7

Y

17 m²

PROJECTION ROOM

111

21 m²

MECH. ROOM

110

8 m²

ELEC. ROOM

112

193 m²

AUDITORIUM

114

Occ. Load = 177

38 m²

STUDENT LOUNGE

104

Occ. Load = 20

25 m²

MAIN ENTRANCE

101

8 m²

WEST ENTRANCE

103 105 m²

MAIN CORRIDOR

113

84 m²

CLASSROOM 1

102

Occ. Load= 31

7 m²

SERVERY

105

Occ. Load = 27 m²

STORAGE

106

5 m²

JANITOR'S CLOSET

108

13 m²

M.W.R.

107

13 m²

W.W.R

109

SKYLIGHTABOVE

27 / 1000

35.

9m

GR

EA

TES

T D

IAG

ON

AL

DIS

TA

NC

E

DISTANCE BETWEEN EXITS = 19m

28.3m

28.4m

28.4m

18.7m

25.1m

WALK OFF GRILLE

WALK OFF GRILLE

R @24 175.0 mm

STAIR NO.2

STAIR NO. 1

STAIR NO. 3

1

A302

1

A301

1

A303

1

A701

1

A702

1

A703

1

A303a

2

A311

542855 4221 989 10004 1559 2244 4093 2845

1559

1559

1510

9483

4221

1397

2200

3736

2720

4981

1397

4620

4620

9799

8557

880

00.0 m

TRAVEL PATH TO EXIT

TRAVEL DISTANCE TO EXIT

1-HR F.R.R.

NOTES:

FLOOR ASSEMBLIES WILL HAVE 1HR FIRERESISTANCE RATING

DOORS IN FIRE RATED WALLS SHALL HAVE A F.R.R.OF 45MINS AND BE EQUIPPED WITH A MECHANICALCLOSING DEVICE

VISION PANES IN FIRE RATED DOORS SHALL BE WITHGEORGIAN WIRE GLASS

OCCUPANT LOAD INDICATED BASED ON SEATINGSCHEDULE PROVIDED BY OWNER

FIRE SAFETY LEGEND:

G H J K L

1

2

4

5

6

18 m²

MECHANICAL ROOM

003

18 m²

ELEC. & DATA ROOM

002

7 m²

MACHINE ROOM

004

44 m²

STORAGE ROOM

005

21 m²

CORRIDOR

001

15.9m

15.5m

1

A302

1

A701

ZONE 1

ZONE 2 ZONE 3

SCALE

CHECKED BY:

DRAWN BY:

PROJECT DATE:

PROJECT #:

FILE NAME:

SHEET #:

DRAWING TITLE:

PROJECT INFO:

ARCHITECT'S SEAL:

REVISIONS ISSUED

CONSTRUCTION NORTH TRUE NORTH

KEY PLAN:

GENERAL NOTES:

SHEET DATE:

As indicated

D:\0214-004\0214-004_A-3D_Model_30043.rvt

0214-004

02/11/14

Neil Singh

V. Picicci

A004

University of Toronto: Koffler Institute569 Spadina Avenue

Toronto ONM5S 2J7

Basement & Ground Floor Fire Safety Diagram

04/12/14

1 : 100

GROUND FLOOR F.S.D.1

No. Description Date

1 : 100

BASEMENT F.S.D.2

Page 6: The Koffler Institute

DN

UP

UP

UP

DN

A B

B

C

C

D E

F

G

H

J K

L

X

1

2

3

4

5

8

9

10

11

7

Y

105 m²

SEMINAR ROOM 3

205

Occ. Load = 44

103 m²

SEMINAR ROOM 2

204

Occ. Load = 44

51 m²

CONFERENCE ROOM

207

Occ. Load = 27

78 m²

SEMINAR ROOM 1

202

Occ. Load = 34

24 m²

DECK

206

6 m²

CLOSET

203

13 m²

M.W.R

209

12 m²

W.W.R

208

R @24 175.0 mm

R @24 175.0 mm

97 m²

CORRIDOR

201

10 m²

ELEC. ROOM

210

8 m²

STORAGE

211

R @24 175.0 mm

STAIR NO. 2

5 m²

JANITOR'S CLOSET

212

STAIR NO. 1

STAIR NO. 3

35.4

m

GR

EATEST D

IAG

ON

AL

DIS

TAN

CE

29.0 m

24.4 m

DIS

TAN

CE B

ETW

EEN

EXIT

S=2

4.4

m

14.8 m

19.3m

1

A302

1

A301

1

A303

1

A701

1

A702

1

A703

1

A303a

00.0 m

TRAVEL PATH TO EXIT

TRAVEL DISTANCE TO EXIT

1-HR F.R.R.

NOTES:

FLOOR ASSEMBLIES WILL HAVE 1HR FIRERESISTANCE RATING

DOORS IN FIRE RATED WALLS SHALL HAVE A F.R.R.OF 45MINS AND BE EQUIPPED WITH A MECHANICALCLOSING DEVICE

VISION PANES IN FIRE RATED DOORS SHALL BE WITHGEORGIAN WIRE GLASS

OCCUPANT LOAD INDICATED BASED ON SEATINGSCHEDULE PROVIDED BY OWNER

FIRE SAFETY LEGEND:

ZONE 1

ZONE 2 ZONE 3

SCALE

CHECKED BY:

DRAWN BY:

PROJECT DATE:

PROJECT #:

FILE NAME:

SHEET #:

DRAWING TITLE:

PROJECT INFO:

ARCHITECT'S SEAL:

REVISIONS ISSUED

CONSTRUCTION NORTH TRUE NORTH

KEY PLAN:

GENERAL NOTES:

SHEET DATE:

As indicated

D:\0214-004\0214-004_A-3D_Model_30043.rvt

0214-004

02/11/14

Shawn Aguilera

V. Picicci

A005

University of Toronto: Koffler Institute569 Spadina Avenue

Toronto ONM5S 2J7

Second Floor Fire Safety Diagram

04/12/14

1 : 100

SECOND FLOOR F.S.D.1

No. Description Date

Page 7: The Koffler Institute

DN

UP

A204

1

A2011

A203 1

A202

1

A B

B

C

C

D E

F

G

H

J K

L

X

1

2

3

4

5

6

8

9

10

11

7

Y

A B

B

C

C

D E

F

G

H

J K

L

X

1

2

3

4

5

6

8

9

10

11

12

7

4x

Y

R @24 175.0 mm

STAIR NO.2

R @24 175.0 mm

STAIR NO. 1

86005975

7025

134 m²LIBRARY

317

Occ. Load = 72

31 m²MECH. ROOM

301

13 m²OFFICE

302

Occ. Load=1

13 m²OFFICE

303

Occ. Load=1

13 m²OFFICE

304

Occ. Load=1

35 m²OPEN OFFICE AREA

305

Occ. Load=5

16 m²OFFICE

306

Occ. Load=2

11 m²OFFICE

307

Occ. Load=1

12 m²OFFICE

308

Occ. Load=1

13 m²W.W.R

309

13 m²M.W.R

310

5 m²J.C

311

21 m²MAIL ROOM

313

Occ. Load=2

LOBBY

314

SOUTH FOYER

315

NORTH FOYER

316

28 m²STUDENT LOUNGE

312

Occ. Load=15

22.4m

ONE-H

ALF OF E

XIT D

ISTANCE

35.9

mEXIT

DIS

TANCE

22.6m

11.4m

14.4m

19.5m26.2m

23.6m

15m

BELOW

1

A302

1

A301

1

A303

1

A701

1

A702

1

A303a

00.0 m

TRAVEL PATH TO EXIT

TRAVEL DISTANCE TO EXIT

1-HR F.R.R.

NOTES:

FLOOR ASSEMBLIES WILL HAVE 1HR FIRERESISTANCE RATING

DOORS IN FIRE RATED WALLS SHALL HAVE A F.R.R.OF 45MINS AND BE EQUIPPED WITH A MECHANICALCLOSING DEVICE

VISION PANES IN FIRE RATED DOORS SHALL BE WITHGEORGIAN WIRE GLASS

OCCUPANT LOAD INDICATED BASED ON SEATINGSCHEDULE PROVIDED BY OWNER

FIRE SAFETY LEGEND:

ZONE 1

ZONE 2 ZONE 3

SCALE

CHECKED BY:

DRAWN BY:

PROJECT DATE:

PROJECT #:

FILE NAME:

SHEET #:

DRAWING TITLE:

PROJECT INFO:

ARCHITECT'S SEAL:

REVISIONS ISSUED

CONSTRUCTION NORTH TRUE NORTH

KEY PLAN:

GENERAL NOTES:

SHEET DATE:

As indicated

D:\0214-004\0214-004_A-3D_Model_30043.rvt

0214-004

02/11/14

Nirvani Sohan

V. Picicci

A006

University of Toronto: Koffler Institute569 Spadina Avenue

Toronto ONM5S 2J7

Third Floor Fire Safety Diagram

04/12/14

1 : 100

THIRD FLOOR F.S.D.1

No. Description Date

Page 8: The Koffler Institute

UP

UP DN

UP

A204

1

A2011

A203 1

A202

1

A B

B

C

C

D E

F

G

H

J K

L

X

11

22

3

4

5

6

8

9

10

11

7

Y

542855 4221 989 10004 1559 2244 4093 2845

1559

1559

1510

9483

4221

1397

2200

3736

2720

4981

1397

4620

4620

9799

8557

880

R 2890

17 m²

PROJECTION ROOM

111

21 m²

MECH. ROOM

110

8 m²

ELEC. ROOM

112

193 m²

AUDITORIUM

114

Occ. Load = 177

38 m²

STUDENT LOUNGE

104

Occ. Load = 20

25 m²

MAIN ENTRANCE

101

8 m²

WEST ENTRANCE

103 105 m²

MAIN CORRIDOR

113

84 m²

CLASSROOM 1

102

Occ. Load= 31

7 m²

SERVERY

105

Occ. Load = 27 m²

STORAGE

106

5 m²

JANITOR'S CLOSET

108

13 m²

M.W.R.

107

13 m²

W.W.R

109

108

110

109

107

111

103

118

117

104

112

114113115

102

105106

P2

P4

P1

P1P3

P1

P3

P3

P3P3

P3

P1

P1

P1

P3

P3

P3P1

P1

P1 P6 P2P2

P7

P9

P9

P7

P7

P9

P9

P9

P9

P9

P9

P9

P9

P12

P11

P12

P10

P7

P7

P10

P9

P10

P10

P7

P9

P9

P9

P9

P9

0

200

350

500

650

27 / 1000

-1750

-2200

-1900

-1600

-1300

-1000

-700

-400-100

200

50

-250

-550

-850

-1150

-1450

-1750

-2050

393 4316 6001100

1060 TYP.

6347230

2730340 3249

6183534

345 2655 355

155 1

830

385

2055

895

230

4627

1972

1950

1950

3438

7777

1690

7044

7887

1900

706

750

449626172655

318

299 1

900

870

2700 1781 915 1647 915 584

P7

1404 915373 370

1830170

2862

1118 915 710

266

2888

3383

266

2737

W02

W02

W01

W01

501 7

00

1291

3486

R 2503

1772

341

1730

341

1772

520

700

C1

101

8129

R @24 175.0 mm

STAIR NO.2

STAIR NO. 1

119

STAIR NO. 3

C1

C1

116

C1

1

A302

1

A301

1

A303

2

A700

5

A700

1

A701

1

A702

1

A703

1

A303a

2

A311

G J K L

1

2

4

5

6

003 002

001

005

004

18 m²

MECHANICAL ROOM

003

18 m²

ELEC. & DATA ROOM

002

7 m²

MACHINE ROOM

004

44 m²

STORAGE ROOM

005

21 m²

CORRIDOR

001

P15P15

P15 P15

P14

P14

P14

P14

P14

P14

P17

P14

P14

P14 P14

P15

P15

P16

P16

P16

P15 P16

1

A302

R @23 139.1 mm

1559 2244 4093 2845 1640

3736

2720

4981

1397

3697 200 3674 200 2550 440

11968

2797 200 1695 200 4467 762

200 440

4951

200

900

200

1

A700

1

A701

ZONE 1

ZONE 2 ZONE 3

SCALE

CHECKED BY:

DRAWN BY:

PROJECT DATE:

PROJECT #:

FILE NAME:

SHEET #:

DRAWING TITLE:

PROJECT INFO:

ARCHITECT'S SEAL:

REVISIONS ISSUED

CONSTRUCTION NORTH TRUE NORTH

KEY PLAN:

GENERAL NOTES:

SHEET DATE:

1 : 100

D:\0214-004\0214-004_A-3D_Model_30043.rvt

0214-004

02/11/14

Neil Singh

V. Picicci

A101

University of Toronto: Koffler Institute569 Spadina Avenue

Toronto ONM5S 2J7

Ground Floor Plan & Partial Basement Plan

03/23/2014 1 : 100

GROUND FLOOR1

No. Description Date

1 : 100

BASEMENT PLAN2

Page 9: The Koffler Institute

DN

UP

UP

UP

DN

A B

B

C

C

D E

F

G

H

J K

L

X

1

2

3

4

5

8

9

10

11

7

Y

105 m²

SEMINAR ROOM 3

205

Occ. Load = 44

103 m²

SEMINAR ROOM 2

204

Occ. Load = 44

51 m²

CONFERENCE ROOM

207

Occ. Load = 27

78 m²

SEMINAR ROOM 1

202

Occ. Load = 34

24 m²

DECK

206

6 m²

CLOSET

203

13 m²

M.W.R

209

12 m²

W.W.R

208

212

213

205

208

201

202

203

211

209

207

210

W01

W01

W01

W01

W01W01

P2

P2

P1

P1

P3

P3

P1

P3P9

P8

P7

P12

P3

P1

P3

P3

P7

P3

P3

P4

P4

P9

P9

P9

P7

P7

P9

P7P7

P9

P11

P10

P10

P4P4a

P1

P4

P2

P9

P10

P9

P7

P6

P2

P9

P9

P3

P3

R @24 175.0 mm

R @24 175.0 mm

97 m²

CORRIDOR

201

10 m²

ELEC. ROOM

210

8 m²

STORAGE

211

R @24 175.0 mm

2864

8987

266327

00

11749

1392

23739224

2946

2238

6192

10796

61905606

5654 6324

3406

8353

2454

1111

2327

3641

1110

2946

7305

2605

7866

1450

1842

4641

1688

1500

1510

2238

2725

1472 4551

2854

2560

P12a

P9a

P8

P9

P9

5 m²

JANITOR'S CLOSET

212

1326

1326

49595760

R 3140

P9P9

P9

P9

P94400

4400

1775

4400

4400

2300

9849

4400

4400

2825

4400

W02

W02

204

206

214

1

A302

1

A301

1

A303

3

A700

6

A700

1

A701

1

A702

1

A703

1

A303a

ZONE 1

ZONE 2 ZONE 3

SCALE

CHECKED BY:

DRAWN BY:

PROJECT DATE:

PROJECT #:

FILE NAME:

SHEET #:

DRAWING TITLE:

PROJECT INFO:

ARCHITECT'S SEAL:

REVISIONS ISSUED

CONSTRUCTION NORTH TRUE NORTH

KEY PLAN:

GENERAL NOTES:

SHEET DATE:

1 : 100

D:\0214-004\0214-004_A-3D_Model_30043.rvt

0214-004

02/11/14

Shawn Aguilera

V. Picicci

A102

University of Toronto: Koffler Institute569 Spadina Avenue

Toronto ONM5S 2J7

Second Floor Plan

03/23/2014

1 : 100

SECOND FLOOR1

No. Description Date

Page 10: The Koffler Institute

DN

UP

A204

1

A2011

A203 1

A202

1

A B

B

C

C

D E

F

G

H

J K

L

X

1

2

3

4

5

6

8

9

10

11

7

Y

R @24 175.0 mm

STAIR NO.2

R @24 175.0 mm

STAIR NO. 1

86005975

7025

134 m²LIBRARY

317

Occ. Load = 72

31 m²MECH. ROOM

301

13 m²OFFICE

302

Occ. Load=1

13 m²OFFICE

303

Occ. Load=1

13 m²OFFICE

304

Occ. Load=1

35 m²OPEN OFFICE AREA

305

Occ. Load=5

16 m²OFFICE

306

Occ. Load=2

11 m²OFFICE

307

Occ. Load=1

12 m²OFFICE

308

Occ. Load=1

13 m²W.W.R

309

13 m²M.W.R

310

5 m²J.C

311

21 m²MAIL ROOM

313

Occ. Load=2

LOBBY

314

SOUTH FOYER

315

NORTH FOYER

316

305

303

302

315

316

301

307

308 309 310

317

306

313

304

311

W01

W01

W01W01

W01

W01

W01

W01

W01

W01

W01

W02

W02

P1

P2

P6

P1

P1

P1

P1

P1

P7

P7

P9

P9

P7

P7

P9

P1

P10

P12

P7

P7

P7P7

P7

C1

P10 P10

P10

P7

P11

C1

P9 P8

P8

P2C1

C1

P2

P1

P7 P9

P7

P1

P2

P1 P2

P9

P8

P10

P8

P1

C1

C1

P2

99844910

2830

2725

2900

4731

2837

2807

1021

2238

900 2278

3201

2203 2682

2653

5640 1900 2252

850

1900

2768 1137 1900 1114

P9

443900

1955

1042

2480

1333

1544900

3705

P9

P9

P9

P9

1307

1251

2855

2032

2833

4329

2890

1117

28 m²STUDENT LOUNGE

312

Occ. Load=15

P9

314

P9

3340

312

P6

P9

4903

3075

900

900

900

165

170

4282

4621

755

1

A302

1

A301

1

A303

4

A700

7

A700

1

A701

1

A702

1

A303a

ZONE 1

ZONE 2 ZONE 3

SCALE

CHECKED BY:

DRAWN BY:

PROJECT DATE:

PROJECT #:

FILE NAME:

SHEET #:

DRAWING TITLE:

PROJECT INFO:

ARCHITECT'S SEAL:

REVISIONS ISSUED

CONSTRUCTION NORTH TRUE NORTH

KEY PLAN:

GENERAL NOTES:

SHEET DATE:

1 : 100

D:\0214-004\0214-004_A-3D_Model_30043.rvt

0214-004

02/11/14

Nirvani Sohan

V. Picicci

A103

University of Toronto: Koffler Institute569 Spadina Avenue

Toronto ONM5S 2J7

Third Floor

03/23/2014 1 : 100

THIRD FLOOR1

No. Description Date

Page 11: The Koffler Institute

A204

1

A2011

A203 1

A202

1

A B

B

C

C

D E

F

G

H

J K L

X

1

2

3

4

5

6

8

9

10

11

11

7

Y

AUDITORIUM

114

MECH. ROOM

110

W.W.R

109 M.W.R.

107

JANITOR'S CLOSET

108

SERVERY

105 STORAGE

106

STUDENT LOUNGE

104

MAIN ENTRANCE

101

WEST ENTRANCE

103

MAIN CORRIDOR

113

ELEC. ROOM

112

PROJECTION ROOM

111

MECH. ROOM

110

CLASSROOM 1

102

450 x 260 OPEN ENDRETURN AIR DUCT INCEILING SPACE

400 x 200 RETURN AIROPENINGS ABOVE CEILING

2-500 x 380 OPEN END RETURNAIR DUCT IN CEILING SPACE

500

x 48

0 S

UPPLY

AIR

SHAFT

IN S

LAB C

/W F

IRE D

AM

PERS

500 x 460 OPEN ENDDUCT IN CEILING SPACE

400 x 200 RETURN AIR OPENINGS ABOVE CEILING

500

x 50

0 RETU

RN A

IR O

PENIN

GS

IN S

LAB C

/W F

IRE D

AMPER

S

A.F.F.

GWB on Mtl Stud

3300 mm

U/N

A.F.F.

600 x 1200mm GRID

3300 mm

1

A302

1

A301

1

A303

1

A701

1

A702

1

A703

1

A303a

2

A311

MECHANICAL

ELECTRICAL

FIRE PROTECTION

WASHROOM EXHAUST REGISTER

600 x 600 SQUARE SUPPLY DIFFUSER

300 x 300 SQUARE SUPPLY DIFFUSER

600 x 600 SQUARE RETURN REGISTER

DUCT OPENING IN CEILING SPACE

FLAT ROUND CEILING LIGHT

EMERGENCY LIGHT w/ EXIT SIGN

INTERIOR ASYMMETRICAL LIGHTWALL SCONE

EXTERIOR UPLIGHT WALL SCONE

1200 TWO-LAMP LINEAR PENDANTLIGHT

LINEAR VALANCE WASHROOMLIGHTING

UPRIGHT CEILING MOUNTEDSPRINKLER HEAD

LIGHTING FIXTURES NOTES:

ALL WALL MOUNTED EMERGENCY LIGHTING HEADS SHALLBE MOUNTED 2400mm A.F.F. UNLESS OTHERWISE NOTED.

ALL STAIRWELL WALL MOUNTED SCONES SHALL BEMOUNTED 2400mm A.F.F. UNLESS OTHERWISE NOTED.

ALL ROTUNDA UPLIGHTING SHALL BE MOUNTED 4400mmA.F.F. UNLESS OTHERWISE NOTED.

ALL SERVICE ROOM LIGHTING SHALL BE SUSPENDED AT2400mm A.F.F. UNLESS OTHERWISE NOTED

RCPs LEGEND

G H J K L

1

2

4

5

6

Y

MECHANICAL ROOM

003

ELEC. & DATA ROOM

002

STORAGE ROOM

005

CORRIDOR

001

MACHINE ROOM

004

A.F.F.

Exposed Ceiling (Unfinished)

2400 mm

1

A302

1

A701

ZONE 1

ZONE 2 ZONE 3

SCALE

CHECKED BY:

DRAWN BY:

PROJECT DATE:

PROJECT #:

FILE NAME:

SHEET #:

DRAWING TITLE:

PROJECT INFO:

ARCHITECT'S SEAL:

REVISIONS ISSUED

CONSTRUCTION NORTH TRUE NORTH

KEY PLAN:

GENERAL NOTES:

SHEET DATE:

As indicated

D:\0214-004\0214-004_A-3D_Model_30043.rvt

0214-004

02/11/14

Neil Singh

V. Picicci

A111

University of Toronto: Koffler Institute569 Spadina Avenue

Toronto ONM5S 2J7

Ground Floor Reflected Ceiling Plan

04/05/14

1 : 100

GROUND FLOOR1

No. Description Date

1 : 100

BASEMENT2

Page 12: The Koffler Institute

A204

1

A2011

A203 1

A202

1

A B

B

C

C

D E

F

G

H

J K

L

X

1

2

3

4

5

6

8

9

10

11

V

714

Y

450 x 230 OPEN ENDRETURN AIR DUCT INCEILING SPACE

500 x 300 OPENEND DUCT INCEILING SPACE

500 x 300 OPENEND DUCT INCEILING SPACE

DECK

206

CONFERENCE ROOM

207

M.W.R

209

W.W.R

208

CORRIDOR

201

CLOSET

203

SEMINAR ROOM 2

204

SEMINAR ROOM 3

205

STORAGE

211

JANITOR'S CLOSET

212

ELEC. ROOM

210

350 x 250 OPENEND DUCT INCEILING SPACE

340 x 300 UP SANITARYEXHAUST DUCT UP C/WFIRE DAMPER IN SLAB

SEMINAR ROOM 1

202

1

A302

1

A301

1

A303

1

A701

1

A702

1

A703

1

A303a

MECHANICAL

ELECTRICAL

FIRE PROTECTION

WASHROOM EXHAUST REGISTER

600 x 600 SQUARE SUPPLY DIFFUSER

300 x 300 SQUARE SUPPLY DIFFUSER

600 x 600 SQUARE RETURN REGISTER

DUCT OPENING IN CEILING SPACE

FLAT ROUND CEILING LIGHT

EMERGENCY LIGHT w/ EXIT SIGN

INTERIOR ASYMMETRICAL LIGHTWALL SCONE

EXTERIOR UPLIGHT WALL SCONE

1200 TWO-LAMP LINEAR PENDANTLIGHT

LINEAR VALANCE WASHROOMLIGHTING

UPRIGHT CEILING MOUNTEDSPRINKLER HEAD

LIGHTING FIXTURES NOTES:

ALL WALL MOUNTED EMERGENCY LIGHTING HEADS SHALLBE MOUNTED 2400mm A.F.F. UNLESS OTHERWISE NOTED.

ALL STAIRWELL WALL MOUNTED SCONES SHALL BEMOUNTED 2400mm A.F.F. UNLESS OTHERWISE NOTED.

ALL ROTUNDA UPLIGHTING SHALL BE MOUNTED 4400mmA.F.F. UNLESS OTHERWISE NOTED.

ALL SERVICE ROOM LIGHTING SHALL BE SUSPENDED AT2400mm A.F.F. UNLESS OTHERWISE NOTED

RCPs LEGEND

ZONE 1

ZONE 2 ZONE 3

SCALE

CHECKED BY:

DRAWN BY:

PROJECT DATE:

PROJECT #:

FILE NAME:

SHEET #:

DRAWING TITLE:

PROJECT INFO:

ARCHITECT'S SEAL:

REVISIONS ISSUED

CONSTRUCTION NORTH TRUE NORTH

KEY PLAN:

GENERAL NOTES:

SHEET DATE:

As indicated

D:\0214-004\0214-004_A-3D_Model_30043.rvt

0214-004

02/11/14

Shawn Aguilera

V. Picicci

A112

University of Toronto: Koffler Institute569 Spadina Avenue

Toronto ONM5S 2J7

Second Floor Reflected Ceiling Plan

04/05/14

1 : 100

SECOND FLOOR1

No. Description Date

Page 13: The Koffler Institute

A204

1

A2011

A203 1

A202

1

A B

B

C

C

D E

F

G

H

J K L

L

X

1

2

3

4

5

6

8

9

10

11

7

Y

500 X 1080RETURN AIRDUCT

EXHAUST OPENINGIN ROOF TO EXHAUST FAN

500 X 1060RETURN AIR DUCT 500 X 1060

SUPPLY AIR DUCT

500 X 1060SUPPLY AIRSHAFTFROM ROOF

LIBRARY

317

OFFICE

302

OFFICE

303

OFFICE

304

OPEN OFFICE AREA

305

OFFICE

306

OFFICE

307

OFFICE

308

W.W.R

309

M.W.R

310

MAIL ROOM

313

STUDENT LOUNGE

312

MECH. ROOM

301

J.C

311

500 X 200OPEN ENDRETURN AIR DUCT

400 X 200OPEN ENDRETURN AIR DUCT

500 X 200OPEN ENDRETURN AIR DUCT

400 X 200OPEN ENDRETURN AIR DUCT

1

A302

1

A301

1

A303

1

A303a

MECHANICAL

ELECTRICAL

FIRE PROTECTION

WASHROOM EXHAUST REGISTER

600 x 600 SQUARE SUPPLY DIFFUSER

300 x 300 SQUARE SUPPLY DIFFUSER

600 x 600 SQUARE RETURN REGISTER

DUCT OPENING IN CEILING SPACE

FLAT ROUND CEILING LIGHT

EMERGENCY LIGHT w/ EXIT SIGN

INTERIOR ASYMMETRICAL LIGHTWALL SCONE

EXTERIOR UPLIGHT WALL SCONE

1200 TWO-LAMP LINEAR PENDANTLIGHT

LINEAR VALANCE WASHROOMLIGHTING

UPRIGHT CEILING MOUNTEDSPRINKLER HEAD

LIGHTING FIXTURES NOTES:

ALL WALL MOUNTED EMERGENCY LIGHTING HEADS SHALLBE MOUNTED 2400mm A.F.F. UNLESS OTHERWISE NOTED.

ALL STAIRWELL WALL MOUNTED SCONES SHALL BEMOUNTED 2400mm A.F.F. UNLESS OTHERWISE NOTED.

ALL ROTUNDA UPLIGHTING SHALL BE MOUNTED 4400mmA.F.F. UNLESS OTHERWISE NOTED.

ALL SERVICE ROOM LIGHTING SHALL BE SUSPENDED AT2400mm A.F.F. UNLESS OTHERWISE NOTED

RCPs LEGEND

ZONE 1

ZONE 2 ZONE 3

SCALE

CHECKED BY:

DRAWN BY:

PROJECT DATE:

PROJECT #:

FILE NAME:

SHEET #:

DRAWING TITLE:

PROJECT INFO:

ARCHITECT'S SEAL:

REVISIONS ISSUED

CONSTRUCTION NORTH TRUE NORTH

KEY PLAN:

GENERAL NOTES:

SHEET DATE:

As indicated

D:\0214-004\0214-004_A-3D_Model_30043.rvt

0214-004

02/11/14

Nirvani Sohan

V. Picicci

A113

University of Toronto: Koffler Institute569 Spadina Avenue

Toronto ONM5S 2J7

Third Floor Reflected Ceiling Plan

04/05/14

1 : 100

THIRD FLOOR1

No. Description Date

Page 14: The Koffler Institute

GROUND FLOOR

200

SECOND FLOOR

4400

12345689

THIRD FLOOR

8600

T/O STEEL DECK

12800

T/O PARAPET

13588

T/O ROTUNDA

17859

GRADE

0

W01

W02

101

W01

118 115

M1M1M1

PC

P2P1P1

P1 P3 P1

W01

W02

W01

P2

B1 B1 B1

M1B2

M1B2

M1B2

CP CP

W01W02 W02

W01

116

P1

P1 P1

P1 P2

1

A302

1

A301

T/O BASEMENT FOOTING

-3800

T/O BASEMENT SLAB

-3000

1

A702

1

A703

B2

CP

M1

PC

B1 90mm BRICK VENEER COURSE

90mm BRICK VENEER SOLDIER COURSE

SPANDREL COPPER PANEL

200mm CONCRETE MASONRY UNITS

PRE CAST CONRETE

MATERIAL LEGEND:

SCALE

CHECKED BY:

DRAWN BY:

PROJECT DATE:

PROJECT #:

FILE NAME:

SHEET #:

DRAWING TITLE:

PROJECT INFO:

ARCHITECT'S SEAL:

REVISIONS ISSUED

GENERAL NOTES:

SHEET DATE:

1 : 100

D:\0214-004\0214-004_A-3D_Model_30043.rvt

0214-004

02/11/14

Neil Singh

V. Picicci

A201

University of Toronto: Koffler Institute

569 Spadina AvenueToronto ON

M5S 2J7

East Elevation

03/23/14

1 : 100

EAST ELEVATION1

No. Description Date

Page 15: The Koffler Institute

GROUND FLOOR

200

SECOND FLOOR

4400

A B C D E G H J K L

THIRD FLOOR

8600

T/O STEEL DECK

12800

T/O PARAPET

13588

T/O ROTUNDA

17859

GRADE

0

M1 M1 M1 M1W01

P3P9P9

P1 P1 P3 P3

W01

P3P3

M1B2 B2

M1

W01 W01 W01 W01 W01 W01

1

A303

T/O BASEMENT FOOTING

-3800

T/O BASEMENT SLAB

-3000

1

A701

1

A303a

B2

CP

M1

PC

B1 90mm BRICK VENEER COURSE

90mm BRICK VENEER SOLDIER COURSE

SPANDREL COPPER PANEL

200mm CONCRETE MASONRY UNITS

PRE CAST CONRETE

MATERIAL LEGEND:

SCALE

CHECKED BY:

DRAWN BY:

PROJECT DATE:

PROJECT #:

FILE NAME:

SHEET #:

DRAWING TITLE:

PROJECT INFO:

ARCHITECT'S SEAL:

REVISIONS ISSUED

GENERAL NOTES:

SHEET DATE:

1 : 100

D:\0214-004\0214-004_A-3D_Model_30043.rvt

0214-004

02/11/14

Nirvani Sohan

V. Picicci

A202

University of Toronto: Koffler Institute

569 Spadina AvenueToronto ON

M5S 2J7

South Elevation

03/23/14

1 : 100

SOUTH ELEVATION1

No. Description Date

Page 16: The Koffler Institute

GROUND FLOOR

200

SECOND FLOOR

4400

1 2 3 4 5 6 8 9

THIRD FLOOR

8600

T/O STEEL DECK

12800

T/O PARAPET

13588

T/O ROTUNDA

17859

GRADE

0

P1 P1P3

PC

M1M1 M1

106

P1P3 P3 P1P3P3

W01 W01

P4

P4a

213212

M1B2

M1B2

M1B2

W01 W01 W01 W01 W01 W01

1

A302

1

A301

T/O BASEMENT FOOTING

-3800

T/O BASEMENT SLAB

-3000

1

A702

1

A703

B2

CP

M1

PC

B1 90mm BRICK VENEER COURSE

90mm BRICK VENEER SOLDIER COURSE

SPANDREL COPPER PANEL

200mm CONCRETE MASONRY UNITS

PRE CAST CONRETE

MATERIAL LEGEND:

SCALE

CHECKED BY:

DRAWN BY:

PROJECT DATE:

PROJECT #:

FILE NAME:

SHEET #:

DRAWING TITLE:

PROJECT INFO:

ARCHITECT'S SEAL:

REVISIONS ISSUED

GENERAL NOTES:

SHEET DATE:

1 : 100

D:\0214-004\0214-004_A-3D_Model_30043.rvt

0214-004

02/11/14

Shawn Aguilera

V. Picicci

A203

University of Toronto: Koffler Institute

569 Spadina AvenueToronto ON

M5S 2J7

West Elevation

03/23/14

1 : 100

WEST ELEVATION1

No. Description Date

Page 17: The Koffler Institute

GROUND FLOOR

200

SECOND FLOOR

4400

ABCDEGHJKL

THIRD FLOOR

8600

T/O STEEL DECK

12800

T/O PARAPET

13588

T/O ROTUNDA

17859

GRADE

0

M1 M1

P4 P6 P1

P6 P1P1 P2

P3

212 213

W01 W01

M1

M1B2

W01

1

A303

T/O BASEMENT FOOTING

-3800

T/O BASEMENT SLAB

-3000

1

A701

1

A303a

B2

CP

M1

PC

B1 90mm BRICK VENEER COURSE

90mm BRICK VENEER SOLDIER COURSE

SPANDREL COPPER PANEL

200mm CONCRETE MASONRY UNITS

PRE CAST CONRETE

MATERIAL LEGEND:

SCALE

CHECKED BY:

DRAWN BY:

PROJECT DATE:

PROJECT #:

FILE NAME:

SHEET #:

DRAWING TITLE:

PROJECT INFO:

ARCHITECT'S SEAL:

REVISIONS ISSUED

GENERAL NOTES:

SHEET DATE:

1 : 100

D:\0214-004\0214-004_A-3D_Model_30043.rvt

0214-004

02/11/14

N. Singh S. Aguilera N. Sohan

V. Picicci

A204

University of Toronto: Koffler Institute

569 Spadina AvenueToronto ON

M5S 2J7

North Elevation

03/23/14

1 : 100

NORTH ELEVATION1

No. Description Date

Page 18: The Koffler Institute

GROUND FLOOR

200

SECOND FLOOR

4400

A B C D E G H J K L

THIRD FLOOR

8600

T/O STEEL DECK

12800

T/O PARAPET

13588

T/O ROTUNDA

17859

GRADE

0

1

A303

T/O BASEMENT FOOTING

-3800

T/O BASEMENT SLAB

-3000

OFFICE

304

MAIN CORRIDOR

113

WEST ENTRANCE

103

MAIN ENTRANCE

101

1

A701

304 307

308W01 W01

204

205 211

102112108107105106

A.F.F.

600 x 1200mm grid

3300 mm A.F.F.

Gypsum Ceiling

3300 mm

A.F.F.

GWB on Mtl Stud

3300 mm

A.F.F.

600 x 600mm grid

3300 mm

788

1600

2200

4200

800

3200

600

CORRIDOR

201

713

175

900

1200

2100

165

350

385

1192

2108

165

300

435

1090

2210

200

1800

1250

600

600

600

700

200

2200

700

800

500

2200

700

800

1000

2800

200

1550

300

1350

250

600

1087

3390

810

5415

2110

175

1550

250

300

300

1550

300

600

3200

1

A303a

1

A310

P1

P3

P3

SCALE

CHECKED BY:

DRAWN BY:

PROJECT DATE:

PROJECT #:

FILE NAME:

SHEET #:

DRAWING TITLE:

PROJECT INFO:

ARCHITECT'S SEAL:

REVISIONS ISSUED

GENERAL NOTES:

SHEET DATE:

1 : 50

D:\0214-004\0214-004_A-3D_Model_30043.rvt

0214-004

02/11/14

N. Singh S. Aguilera N. Sohan

V. Picicci

A301

University of Toronto: Koffler Institute

569 Spadina AvenueToronto ON

M5S 2J7

Building Section A

03/23/14

1 : 50

SECTION A1

No. Description Date

Page 19: The Koffler Institute

GROUND FLOOR

200

SECOND FLOOR

4400

A B C D E G

H

J K L

THIRD FLOOR

8600

T/O STEEL DECK

12800

T/O PARAPET

13588

GRADE

0

1

A303

T/O BASEMENT FOOTING

-3800

T/O BASEMENT SLAB

-3000

CONFERENCE ROOM

207

SEMINAR ROOM 3

205

SEMINAR ROOM 2

204

AUDITORIUM

114

MECH. ROOM

110

MAIN CORRIDOR

113

SERVERY

105

STORAGE

106

CORRIDOR

001

MACHINE ROOM

004

LIBRARY

317

1

A701

C1

308 310

208211213

112

001004

W01 W01

A.F.F.

600 x 1200mm grid

3300 mm A.F.F.

600 x 1200mm grid

3300 mmA.F.F.

Gypsum Ceiling

3300 mm

A.F.F.

600 x 1200mm grid

3300 mmA.F.F.

?

?A.F.F.

600 x 1200mm grid

3300 mmA.F.F.

600 x 1200mm grid

3300 mm

A.F.F.

GWB on Mtl Stud

3300 mmA.F.F.

GWB on Mtl Stud

3300 mmA.F.F.

GWB on Mtl Stud

3300 mm

002

118117

4588

788

900

3300

900

900

2700

600

892

2108

200

250

600

192

810

1268

1219

813

697

3503

1500

200

300

1850

3300

1075

1090

2210

165

735

1090

2210

140

760

1090

2210

200

892

2108

200

250

600

1

A303a

2

A310

SCALE

CHECKED BY:

DRAWN BY:

PROJECT DATE:

PROJECT #:

FILE NAME:

SHEET #:

DRAWING TITLE:

PROJECT INFO:

ARCHITECT'S SEAL:

REVISIONS ISSUED

GENERAL NOTES:

SHEET DATE:

1 : 50

D:\0214-004\0214-004_A-3D_Model_30043.rvt

0214-004

02/11/14

N. Singh S. Aguilera N. Sohan

V. Picicci

A302

University of Toronto: Koffler Institute

569 Spadina AvenueToronto ON

M5S 2J7

Building Section B

03/23/14

1 : 50

SECTION B1

No. Description Date

Page 20: The Koffler Institute

GROUND FLOOR

200

SECOND FLOOR

4400

12389 7

THIRD FLOOR

8600

T/O STEEL DECK

12800

T/O PARAPET

13588

GRADE

0

1

A302

1

A301

T/O BASEMENT FOOTING

-3800

T/O BASEMENT SLAB

-3000

LIBRARY

317OFFICE

302

OFFICE

303

OFFICE

304

SEMINAR ROOM 2

204

AUDITORIUM

114

WEST ENTRANCE

103 ELEC. ROOM

112

DECK

206

SEMINAR ROOM 3

205

1

A702

1

A703

W01 W01C1

W01

W01 W01

106

212

A.F.F.

600 x 1200mm grid

3300 mm

A.F.F.

GWB on Mtl Stud

3300 mm

A.F.F.

600 x 1200mm grid

3300 mm A.F.F.

600 x 1200mm grid

3300 mm

A.F.F.

600 x 1200mm grid

3300 mm A.F.F.

600 x 1200mm grid

3300 mm

R @24 175.0 mm

R @24 175.0 mm

R @24 175.0 mm

1075

700

650

900

700

2200

1950

0400

4110

300

200

1500

1

A311

1011

OPEN OFFICE AREA

305

OFFICE

307

A.F.F.

600 x 1200mm grid

3300 mm

A.F.F.

600 x 1200mm grid

3300 mm

A.F.F.

600 x 1200mm GRID

3300 mm

317

W01

CLASSROOM 1

102

SCALE

CHECKED BY:

DRAWN BY:

PROJECT DATE:

PROJECT #:

FILE NAME:

SHEET #:

DRAWING TITLE:

PROJECT INFO:

ARCHITECT'S SEAL:

REVISIONS ISSUED

GENERAL NOTES:

SHEET DATE:

1 : 100

D:\0214-004\0214-004_A-3D_Model_30043.rvt

0214-004

02/11/14

N. Singh S. Aguilera N. Sohan

V. Picicci

A303

University of Toronto: Koffler Institute

569 Spadina AvenueToronto ON

M5S 2J7

Building Section C

03/23/14

1 : 100

SECTION C1

No. Description Date

Page 21: The Koffler Institute

GROUND FLOOR

200

SECOND FLOOR

4400

12389 7

THIRD FLOOR

8600

T/O STEEL DECK

12800

T/O PARAPET

13588

GRADE

0

1

A302

1

A301

T/O BASEMENT FOOTING

-3800

T/O BASEMENT SLAB

-3000

1

A702

1

A703

LIBRARY

317

OFFICE

302

OFFICE

303

OFFICE

304

SEMINAR ROOM 2

204

AUDITORIUM

114

WEST ENTRANCE

103

ELEC. ROOM

112

DECK

206SEMINAR ROOM 3

205

W01 W01

C1

W01

W01 W01

106

212

A.F.F.

600 x 1200mm grid

3300 mm

A.F.F.

GWB on Mtl Stud

3300 mm

A.F.F.

600 x 1200mm grid

3300 mm A.F.F.

600 x 1200mm grid

3300 mm

A.F.F.

600 x 1200mm grid

3300 mm A.F.F.

600 x 1200mm grid

3300 mm

R @24 175.0 mm

R @24 175.0 mm

R @24 175.0 mm

1075

700

650

900

700

2200

1950

0400

4110

300

200

1500

SCALE

CHECKED BY:

DRAWN BY:

PROJECT DATE:

PROJECT #:

FILE NAME:

SHEET #:

DRAWING TITLE:

PROJECT INFO:

ARCHITECT'S SEAL:

REVISIONS ISSUED

GENERAL NOTES:

SHEET DATE:

1 : 50

D:\0214-004\0214-004_A-3D_Model_30043.rvt

0214-004

02/11/14

N. Singh S. Aguilera N. Sohan

V. Picicci

A303a

University of Toronto: Koffler Institute

569 Spadina AvenueToronto ON

M5S 2J7

Partial Section C-1

04/01/14

1 : 50

SECTION C-11

No. Description Date

Page 22: The Koffler Institute

1011

OPEN OFFICE AREA

305

OFFICE

307

A.F.F.

600 x 1200mm grid

3300 mm

A.F.F.

600 x 1200mm grid

3300 mm

A.F.F.

600 x 1200mm GRID

3300 mm

317

W01

2

A501

CLASSROOM 1

102

SEMINAR ROOM 1

202

SCALE

CHECKED BY:

DRAWN BY:

PROJECT DATE:

PROJECT #:

FILE NAME:

SHEET #:

DRAWING TITLE:

PROJECT INFO:

ARCHITECT'S SEAL:

REVISIONS ISSUED

GENERAL NOTES:

SHEET DATE:

1 : 50

D:\0214-004\0214-004_A-3D_Model_30043.rvt

0214-004

02/11/14

N. Singh S. Aguilera N. Sohan

V. Picicci

A303b

University of Toronto: Koffler Institute

569 Spadina AvenueToronto ON

M5S 2J7

Partial Section C-2

04/01/14

1 : 50

SECTION C-21

No. Description Date

Page 23: The Koffler Institute

GROUND FLOOR200

SECOND FLOOR4400

C

THIRD FLOOR8600

T/O STEEL DECK12800

T/O PARAPET13588

GRADE0

OFFICE304

WEST ENTRANCE103 GROUND FLOOR

200

SECOND FLOOR4400

A B C

THIRD FLOOR8600

T/O STEEL DECK12800

T/O PARAPET13588

GRADE0

T/O BASEMENT FOOTING-3800

T/O BASEMENT SLAB-3000

AUDITORIUM114

SEMINAR ROOM 2204

LIBRARY317

1A502

1A501

SCALE

CHECKED BY:

DRAWN BY:

PROJECT DATE:

PROJECT #:

FILE NAME:

SHEET #:

DRAWING TITLE:

PROJECT INFO:

ARCHITECT'S SEAL:

REVISIONS ISSUED

GENERAL NOTES:

SHEET DATE:

1 : 20

D:\0214-004\0214-004_A-3D_Model_30043.rvt

0214-004

02/11/14

N. Singh S. Aguilera N. Sohan

V. Picicci

A310

University of Toronto: Koffler Institute569 Spadina Avenue

Toronto ONM5S 2J7

Wall Sections

03/30/14 1 : 20WALL SECTION A

1 1 : 20WALL SECTION B

2

No. Description Date

Page 24: The Koffler Institute

GROUND FLOOR200

SECOND FLOOR4400

12

THIRD FLOOR8600

T/O STEEL DECK12800

T/O PARAPET13588

GRADE0

T/O BASEMENT FOOTING-3800

T/O BASEMENT SLAB-3000

AUDITORIUM114

DECK206

SEMINAR ROOM 3205

LIBRARY317

1800

3288

900

2230

670

400

677

3523

1950

650

2150

300

GROUND FLOOR200

GRADE0

3A502

2A502

SCALE

CHECKED BY:

DRAWN BY:

PROJECT DATE:

PROJECT #:

FILE NAME:

SHEET #:

DRAWING TITLE:

PROJECT INFO:

ARCHITECT'S SEAL:

REVISIONS ISSUED

GENERAL NOTES:

SHEET DATE:

1 : 20

D:\0214-004\0214-004_A-3D_Model_30043.rvt

0214-004

02/11/14

N. Singh S. Aguilera N. Sohan

V. Picicci

A311

University of Toronto: Koffler Institute569 Spadina Avenue

Toronto ONM5S 2J7

Wall Sections

04/12/14

1 : 20WALL SECTION C

1

1 : 20WALL SECTION D

2

No. Description Date

Page 25: The Koffler Institute

C

T/O STEEL DECK

12800

T/O PARAPET

13588

50mm GRAVEL4 PLY BUILT UP ROOF MEMBRANE75mm RIGID INSULATION38mm METAL DECKINGC/W 90mm CONCRETE TOPPINGW FLANGE BEAM

BLOCKING

CANT STRIP

BASE FLASHING

CAP FLASHING

COUNTER FLASHING

ANCHOR BOLT

CONCRETE COPING

SECOND FLOOR

4400

11

90mm BRICK VENEER25mm AIR SPACE

AIR BARRIER50mm RIGID INSULATION

190mm CONCRETE MASONRY UNITSVAPOUR BARRIER

25mm METAL FURRING13mm GYPSUM WALL BOARD

BRICK TIE

LINTEL BEAM

BRICK REVEAL COURSE

W FLANGE BEAM

38mm STEEL DECKING C/W90mm CONCRETE TOPPING

BRICK SOLDIER COURSE

13mm GYPSUM WALL BOARD SUSPENDEDCEILING ON 25mm METAL FURRING

REBAR

SCALE

CHECKED BY:

DRAWN BY:

PROJECT DATE:

PROJECT #:

FILE NAME:

SHEET #:

DRAWING TITLE:

PROJECT INFO:

ARCHITECT'S SEAL:

REVISIONS ISSUED

GENERAL NOTES:

SHEET DATE:

1 : 5

D:\0214-004\0214-004_A-3D_Model_30043.rvt

0214-004

02/11/14

N. Singh S. Aguilera N. Sohan

V. Picicci

A501

University of Toronto: Koffler Institute

569 Spadina AvenueToronto ON

M5S 2J7

Section Details

04/12/14

1 : 5

PARAPET AT THIRD FLOOR ROOF1

1 : 5

EXTERIOR WALL AT SECOND FLOOR2

No. Description Date

Page 26: The Koffler Institute

GROUND FLOOR

200

A

GRADE

0

390mm FIBRE REINFORCED POUREDCONCRETE FOUNDATION WALL

BASE COURSEMETAL FLASHING

90mm BRICK VENEER25mm AIR SPACE

AIR BARRIER50mm RIGID INSULATION

190mm CONCRTE MASONRY UNITSVAPOUR BARRIER

25mm METAL FURRING13mm GYPSUM WALL BOARD

DOWEL

BACKFILL

WEEPING COURSE

50mm RIGID INSULATION

BRICK TIE

90mm BRICK VENEER25mm AIR SPACEAIR BARRIER50mm RIGID INSULATION190mm CONCRETE MASONRY UNITSVAPOUR BARRIER25mm METAL FURRING13mm GYPSUM WALL BOARD

BRICK BEYOND

METAL FLASHING

WINDOW HEAD FRAME

REVEAL BRICK COURSE

GLAZING

REINFORCEDLINTEL BEAM

L ANGLE

13mm GYPSUM WALL BOARD25mm METAL FURRING

VAPOUR BARRIER190mm CONCRETE MASONRY UNITS

50mm RIGID INSULATIONAIR BARRIER

25mm AIR SPACE90mm CONCRTE MASONRY UNITS

GLAZING

CONCRETE MASONRYUNITS BEYOND

BRICK TIE

BRICK BEYOND

WINDOW SILL FRAME

SCALE

CHECKED BY:

DRAWN BY:

PROJECT DATE:

PROJECT #:

FILE NAME:

SHEET #:

DRAWING TITLE:

PROJECT INFO:

ARCHITECT'S SEAL:

REVISIONS ISSUED

GENERAL NOTES:

SHEET DATE:

1 : 5

D:\0214-004\0214-004_A-3D_Model_30043.rvt

0214-004

02/11/14

N. Singh S. Aguilera N. Sohan

V. Picicci

A502

University of Toronto: Koffler Institute

569 Spadina AvenueToronto ON

M5S 2J7

Section Details

04/12/14

1 : 5

EXTERIOR WALL AT FOUNDATION1

1 : 5

WINDOW HEAD AT PUNCHED OPENING2

1 : 5

WINDOW SILL AT PUNCHED OPENING3

No. Description Date

Page 27: The Koffler Institute

Door Schedule

Mark

Door Frame Hardware

DoorType

Level Description Hinge Height Width Thickness Material Glazing Finish Fire Rating Type Height Width Thickness Material Finish Lockset Finish Closer Floor Stop Vision Pane Kick Plate Comments

001 19 Basement 0762 x 2032mm RH 2032 762 38 Composite Core Yes Paint 45 mins 19 2082 812 115 Aluminium Paint Knob Lock Stainless Yes None Georgian Wire Yes None

002 19 Basement 0762 x 2032mm LH 2032 762 38 Composite Core No Paint 45 mins 19 2082 812 115 Aluminium Paint Knob Lock Stainless No None No No None

003 19 Basement 0762 x 2032mm LH 2032 762 38 Composite Core No Paint 45 mins 19 2082 812 115 Aluminium Paint Knob Lock Stainless No None No No None

004 19 Basement 0762 x 2032mm RH 2032 762 38 Composite Core No Paint 45 mins 19 2082 812 115 Aluminium Paint Knob Lock Stainless No None No No None

005 19 Basement 0762 x 2032mm RH 2032 762 38 Composite Core No Paint 45 mins 19 2082 812 115 Aluminium Paint Knob Lock Stainless No None No No None

101 27 Ground Floor Store Front Double Door LHR/RHR 2385 1700 45 Georgian Wire Yes N/A 45 mins 27 2435 1750 150 Aluminium Brushed Panic Bar Brushed Yes Door Mounted N/A Yes Weatherstrip

102 29 Ground Floor 1730 x 2032mm LHR/RHR 2032 1730 45 Glass Yes N/A None 29 2082 1780 115 Aluminium Brushed Panic Bar Brushed Yes Door Mounted N/A Yes None

103 15 Ground Floor 0915 x 2134mm LH 2134 915 38 Composite Core No Wood Veneer 45 mins 15 2184 965 115 Aluminium Brushed Pull + Push Plate Brushed Yes Wall Mounted No No None

104 15 Ground Floor 0915 x 2134mm LHR 2134 915 38 Composite Core Yes Wood Veneer 45 mins 15 2184 965 115 Aluminium Brushed Panic Bar Brushed Yes Door Mounted Georgian Wire Yes None

105 27 Ground Floor Store Front Double Door LHR/RHR 2070 1850 45 Glass Yes N/A None 27 2120 1900 115 Aluminium Brushed Panic Bar Brushed Yes Door Mounted N/A Yes None

106 27 Ground Floor Store Front Double Door LHR/RHR 2365 1810 45 Georgian Wire Yes N/A 45 mins 27 2415 1860 150 Aluminium Brushed Panic Bar Brushed Yes None N/A Yes Weatherstrip

107 15 Ground Floor 0915 x 2134mm RH 2134 915 38 Composite Core No Wood Veneer 45 mins 15 2184 965 115 Aluminium Brushed Knob Lock Brushed Yes Wall Mounted No No None

108 26 Ground Floor 1830 x 2134mm LHR/RHR 2134 1830 38 Composite Core No Wood Veneer 45 mins 26 2184 1880 115 Aluminium Brushed Panic Bar Brushed Yes Door Mounted No Yes None

109 15 Ground Floor 0915 x 2134mm RH 2134 915 38 Composite Core No Wood Veneer None 15 2184 965 115 Aluminium Brushed Knob Lock Brushed No Wall Mounted No No None

110 26 Ground Floor 1830 x 2134mm LHR/RHR 2134 1830 38 Composite Core No Wood Veneer 45 mins 26 2184 1880 115 Aluminium Brushed Panic Bar Brushed Yes Door Mounted No Yes None

111 15 Ground Floor 0915 x 2134mm LH 2134 915 38 Composite Core No Wood Veneer None 15 2184 965 115 Aluminium Brushed Knob Lock Brushed Yes Door Mounted No No None

112 15 Ground Floor 0915 x 2134mm RH 2134 915 38 Composite Core No Wood Veneer 45 mins 15 2184 965 115 Aluminium Brushed Pull + Push Plate Brushed Yes Floor Mounted No Yes Louvered Insert

113 15 Ground Floor 0915 x 2134mm RH 2134 915 38 Composite Core No Wood Veneer 45 mins 15 2184 965 115 Aluminium Brushed Knob Lock Brushed Yes Door Mounted No No None

114 15 Ground Floor 0915 x 2134mm RH 2134 915 38 Composite Core No Wood Veneer 45 mins 15 2184 965 115 Aluminium Brushed Pull + Push Plate Brushed Yes Floor Mounted No Yes Louvered Insert

115 15 Ground Floor 0915 x 2134mm RH 2134 915 38 Composite Core Yes Wood Veneer 45 mins 15 2184 965 115 Aluminium Brushed Panic Bar Brushed Yes Door Mounted Georgian Wire Yes None

116 37 Ground FloorM_Curtain Wall Sgl

GlassLHR 2075 900 45 Glazing Georgian Wire N/A 45 mins 37 2125 950 150 Aluminum Brushed Panic Bars Brushed Yes Wall Mounted Yes Yes Weatherstrip

117 19 Ground Floor 0762 x 2032mm LH 2032 762 38 Hollow Core Yes Wood Veneer None 19 2082 812 115 Aluminium Brushed Passage Brushed No Floor Mounted Yes Yes None

118 15 Ground Floor 0915 x 2134mm LH 2134 915 38 Composite Core No Paint 45 mins 15 2184 965 150 Aluminium Paint Knob Lock Brushed No Door Mounted No No Weatherstrip

119 33 Ground FloorM_Curtain Wall Sgl

GlassRHR 2085 1037 45 Georgian Wire Georgian Wire N/A 45 mins 33 2135 1087 150 Aluminium Brushed Panic Bar Brushed Yes N/A Georgian Wire Yes Weatherstrip

201 22 Second Floor 0915 x 2134mm LH 2134 915 38 Composite Core Yes Paint 45 mins 22 2184 965 115 Aluminium Brushed Panic Bar Brushed Yes Wall Mounted Georgian Wire Yes None

202 15 Second Floor 0915 x 2134mm LH 2134 915 38 Composite Core Yes Wood Veneer 45 mins 15 2184 965 115 Aluminium Brushed Lever Brushed Yes Floor Mounted Georgian Wire No None

203 26 Second Floor 0915 x 2032mm LHR 2032 915 38 Composite Core Yes Wood Veneer 45 mins 26 2082 965 115 Aluminium Brushed Pull + Push Plate Brushed Yes Floor Mounted Georgeian Wire No None

204 26 Second Floor 0915 x 2032mm RH 2032 915 38 Composite Core Yes Wood Veneer 45 mins 26 2082 965 115 Aluminium Brushed Pull + Push Plate Brushed Yes Floor Mounted Georgian Wire No None

205 15 Second Floor 0915 x 2134mm RH 2134 915 38 Composite Core No Wood Veneer 45 mins 15 2184 965 115 Aluminium Brushed Knob Lock Brushed Yes Wall Mounted No No None

206 26 Second Floor 0915 x 2032mm LH 2032 915 38 Composite Core Yes Wood Veneer 45 mins 26 2082 965 115 Aluminium Brushed Pull + Push Plate Brushed Yes Floor Mounted Georgian Wire No None

207 15 Second Floor 0915 x 2134mm RH 2134 915 38 Hollow Core No Wood Veneer None 15 2184 965 115 Aluminium Brushed Knob Lock Brushed No Floor Mounted No No None

208 22 Second Floor 0915 x 2134mm RHR 2134 915 38 Hollow Core No Wood Veneer None 22 2184 965 115 Aluminium Brushed Lever Brushed No Wall Mounted No No None

209 15 Second Floor 0915 x 2134mm LH 2134 915 38 Composite Core No Wood Veneer 45 mins 15 2184 965 115 Aluminium Brushed Pull + Push Plate Brushed Yes Wall Mounted No Yes Louvered Insert

210 15 Second Floor 0915 x 2134mm RH 2134 915 38 Composite Core No Wood Veneer 45 mins 15 2184 965 115 Aluminium Brushed Knob Lock Brushed Yes Wall Mounted No No None

211 15 Second Floor 0915 x 2134mm RH 2134 915 38 Composite Core No Wood Veneer 45 mins 15 2184 965 115 Aluminium Brushed Pull + Push Plate Brushed Yes Wall Mounted No Yes Louvered Inset

212 22 Second Floor 0915 x 2134mm RHR 2134 915 38 Composite Core No Painted Metal 45 mins 22 2184 965 150 Aluminium Paint Panic Bar Brushed Yes None No Yes Weatherstrip

213 22 Second Floor 0915 x 2134mm LHR 2134 915 38 Composite Core No Painted Metal 45 mins 22 2184 965 150 Aluminium Paint Panic Bar Brushed Yes None No Yes Weatherstrip

214 26 Second Floor 0915 x 2032mm RH 2032 915 38 Composite Core Yes Paint 45 Mins 26 2082 965 115 Aluminium Brushed Panic Bar Brushed Yes Door Mounted Georgian Wire Yes None

301 22 Third Floor 900mm LHR 2134 900 38 Composite Core Georgian Wire Paint 45 mins 22 2184 950 115 Aluminum Brushed Panic Bars Brushed Yes Wall Mounted Yes Yes None

302 22 Third Floor 900mm RH 2134 900 38 Veneer No Wood Veneer None 22 2184 950 115 Aluminum Brushed Thumb Lock Brushed No Floor Mounted No No None

303 22 Third Floor 900mm LH 2134 900 38 Veneer No Wood Veneer None 22 2184 950 115 Aluminum Brushed Thumb Lock Brushed No Floor Mounted No No None

304 22 Third Floor 900mm LHR 2134 900 38 Veneer No Wood Veneer None 22 2184 950 115 Aluminum Brushed Thumb Lock Brushed No Floor Mounted No No None

305 22 Third Floor 900mm LH 2134 900 38 Veneer No Wood Veneer None 22 2184 950 115 Aluminum Brushed Thumb Lock Brushed No Floor Mounted No No None

306 22 Third Floor 900mm RH 2134 900 38 Composite Core No Paint 45 mins 22 2184 950 115 Aluminum Brushed Knob Lock Brushed Yes Wall Mounted No No None

307 29 Third Floor Store Front Double Door LHR/RHR 2075 1982 38 Glazing Georgian Wire N/A 45 mins 29 2125 2032 115 Aluminum Brushed Lever Brushed No Floor Mounted Yes No None

308 22 Third Floor 900mm LH 2134 900 38 Composite Core No Paint 45 mins 22 2184 950 115 Aluminum Brushed Pull + Push Plate Brushed Yes Floor Mounted No Yes Louvered Insert

309 22 Third Floor 900mm LH 2134 900 38 Composite Core No Paint 45 mins 22 2184 950 115 Aluminum Brushed Lever Brushed Yes Floor Mounted No Yes None

310 22 Third Floor 900mm RH 2134 900 38 Composite Core No Paint 45 mins 22 2184 950 115 Aluminum Brushed Pull + Push Plate Brushed Yes Floor Mounted No Yes Louvered Insert

311 22 Third Floor 900mm LH 2134 900 38 Composite Core Georgian Wire Paint 45 mins 22 2184 950 115 Aluminum Brushed Panic Bars Brushed Yes Wall Mounted Yes Yes None

312 22 Third Floor 900mm RH 2134 900 38 Veneer No Wood Veneer None 22 2184 950 115 Aluminum Brushed Thumb Lock Brushed No Floor Mounted No No None

313 22 Third Floor 900mm RH 2134 900 38 Veneer No Wood Veneer None 22 2184 950 115 Aluminum Brushed Thumb Lock Brushed No Floor Mounted No No None

314 29 Third Floor Store Front Double Door LHR/RHR 2075 1750 38 Glazing Georgian Wire N/A 45 mins 29 2125 2032 115 Aluminum Brushed Lever Brushed No Floor Mounted Yes No None

315 22 Third Floor 900mm RH 2134 900 38 Veneer No Wood Veneer None 22 2184 950 115 Aluminum Brushed Thumb Lock Brushed No Floor Mounted No No None

316 22 Third Floor 900mm LH 2134 900 38 Veneer No Wood Veneer None 22 2184 950 115 Aluminum Brushed Thumb Lock Brushed No Floor Mounted No No None

317 22 Third Floor 900mm RH 2134 900 38 Veneer No Wood Veneer None 22 2184 950 115 Aluminum Brushed Thumb Lock Brushed No Floor Mounted No No None

SCALE

CHECKED BY:

DRAWN BY:

PROJECT DATE:

PROJECT #:

FILE NAME:

SHEET #:

DRAWING TITLE:

PROJECT INFO:

ARCHITECT'S SEAL:

REVISIONS ISSUED

GENERAL NOTES:

SHEET DATE:

D:\0214-004\0214-004_A-3D_Model_30043.rvt

0214-004

02/11/14

N. Singh S. Aguilera N. Sohan

V. Picicci

A601

University of Toronto: Koffler Institute

569 Spadina AvenueToronto ON

M5S 2J7

Door Schedule

04/12/14

No. Description Date

Page 28: The Koffler Institute

Room Finish Schedule

RoomNumber

Level Name Floor AreaOccupant

LoadWall Finish Ceiling Finish Floor Finish Base Finish Trim Finish Comments

001 Basement Corridor 21 m² N/A Unfinished Concrete Exposed Structure Unfinished Concrete None None

002 Basement Electrical & Data Room 18 m² N/A Unfinished Concrete Exposed Structure Unfinished Concrete None None

003 Basement Mechanical Room 18 m² N/A Unfinished Concrete Exposed Structure Unfinished Concrete None None

004 Basement Elevator Machine Room 7 m² N/A Unfinished Concrete Exposed Structure Unfinished Concrete None None

005 Basement Storage 44 m² N/A Unfinished Concrete Exposed Structure Unfinished Concrete None None

101 Ground Floor Main Entrance 25 m² N/A Glazing & Gypsum N/A Ceramic Tile & Walk-off Mat Ceramic Tile Rail Trim

102 Ground Floor Classroom 1 84 m² 31 Gypsum Acoustic Carpet Carpet None

103 Ground Floor West Entrance 8 m² N/A Glazing & Gypsum Gypsum Walk-off Mat Ceramic Tile Rail Trim

104 Ground Floor Student Lounge 38 m² 20 Gypsum Gypsum Ceramic Tile Ceramic Tile None

105 Ground Floor Servery 7 m² 2 Gypsum Gypsum Quarry Tile Quarry Tile None

106 Ground Floor Storage 7 m² N/A Gypsum Gypsum Quarry Tile Quarry Tile None

107 Ground Floor Men's Washroom 13 m² N/A Ceramic Tile Gypsum Quarry Tile Quarry Tile None

108 Ground Floor Janitor's Closet 5 m² N/A Unfinished Concrete Exposed Structure Quarry Tile Quarry Tile None

109 Ground Floor Women's Washroom 13 m² N/A Ceramic Tile Gypsum Quarry Tile Quarry Tile None

110 Ground Floor Mechanical Room 21 m² N/A Unfinished Concrete Exposed Structure Quarry Tile Quarry Tile None

111 Ground Floor Projection Room 17 m² N/A Gypsum Gypsum Quarry Tile Quarry Tile None

112 Ground Floor Electrical Room 8 m² N/A Unfinished Concrete Exposed Structure Unfinished Concrete None None

113 Ground Floor Corridor 105 m² N/A Gypsum Gypsum Ceramic Tile Ceramic Tile Rail Trim & Crown Moulding

114 Ground Floor Auditorium 193 m² 177 Gypsum Gypsum Carpet Carpet Rail Trim & Crown Moulding

201 Second Floor Corridor 97 m² N/A Gypsum Gypsum Carpet Carpet Rail Trim

202 Second Floor Seminar Room 1 78 m² 34 Gypsum Acoustic Carpet Carpet Rail Trim

203 Second Floor Closet 6 m² N/A Gypsum Acoustic Carpet Carpet N/A

204 Second Floor Seminar Room 2 103 m² 44 Gypsum Acoustic Carpet Carpet Rail Trim

205 Second Floor Seminar Room 3 105 m² 44 Gypsum Acoustic Carpet Carpet Rail Trim

206 Second Floor Deck 24 m² N/A Brick N/A Wood N/A N/A

207 Second Floor Conference Room 51 m² 27 Gypsum Acoustic Carpet Carpet Crown Moulding

208 Second Floor Women's Washroom 12 m² N/A Ceramic Tile Gypsum Quarry Tile Quarry Tile N/A

209 Second Floor Men's Washroom 13 m² N/A Ceramic Tile Gypsum Quarry Tile Quarry Tile N/A

210 Second Floor Electrical Room 10 m² N/A Unfinished Unfinished Quarry Tile Quarry Tile N/A

211 Second Floor Storage 8 m² N/A Unfinished Unfinished Quarry Tile Quarry Tile N/A

212 Second Floor Janitor's Closet 5 m² N/A Unfinished Unfinished Quarry Tile Quarry Tile N/A

301 Third Floor Mechanical Room 31 m² N/A Unfinished Concrete Gypsum Unfinished Concrete Quarry Tile N/A

302 Third Floor Office 13 m² 1 Gypsum Acoustic Carpet Carpet Rail

303 Third Floor Office 13 m² 1 Gypsum Acoustic Carpet Carpet Rail

304 Third Floor Office 13 m² 1 Gypsum Acoustic Carpet Carpet Rail

305 Third Floor Open Office Area 35 m² 5 Gypsum and Curtain Acoustic Carpet Carpet Rail

306 Third Floor Office 16 m² 2 Gypsum Acoustic Carpet Carpet Rail

307 Third Floor Office 11 m² 1 Gypsum Acoustic Carpet Carpet Rail

308 Third Floor Office 12 m² 1 Gypsum Acoustic Carpet Carpet Rail

309 Third Floor Women's Washroom 13 m² N/A Ceramic Tile Gypsum Quarry Tile Quarry Tile N/A

310 Third Floor Men's Washroom 13 m² N/A Ceramic Tile Gypsum Quarry Tile Quarry Tile N/A

311 Third Floor Janitor's Closet 5 m² N/A Unfinished Concrete Gypsum Quarry Tile Quarry Tile N/A

312 Third Floor Student Lounge 28 m² 15 Gypsum Acoustic Carpet Carpet Rail

313 Third Floor Mail Room 21 m² 2 Gypsum Acoustic Carpet Carpet N/A

314 Third Floor Lobby 104 m² N/A Gypsum Gypsum Carpet Carpet N/A

315 Third Floor South Foyer N/A N/A Gypsum Gypsum Carpet Carpet N/A

316 Third Floor North Foyer N/A N/A Gypsum Gypsum Carpet Carpet N/A

317 Third Floor Library 134 m² 72 Curtain and Gypsum Acoustic Carpet Carpet N/A

SCALE

CHECKED BY:

DRAWN BY:

PROJECT DATE:

PROJECT #:

FILE NAME:

SHEET #:

DRAWING TITLE:

PROJECT INFO:

ARCHITECT'S SEAL:

REVISIONS ISSUED

GENERAL NOTES:

SHEET DATE:

D:\0214-004\0214-004_A-3D_Model_30043.rvt

0214-004

02/11/14

N. Singh S. Aguilera N. Sohan

V. Picicci

A602

University of Toronto: Koffler Institute

569 Spadina AvenueToronto ON

M5S 2J7

Room Finish Schedule

04/12/14

No. Description Date

Page 29: The Koffler Institute

UP DN

UP

UP DN DN

UPUP UP

UP

J K

1

2

4

115

2655 355

STAIR NO. 1

1000

690

623

1

A701

BC

9

10

104

P3

P9

350

500

650

7044

R @24 175.0 mm

STAIR NO.2

119

C1

1

A303

782

1

A702

J K

1

2

4

R @24 175.0 mm

1450 18

42

STAIR NO. 1

214

1

A701

J K

1

2

4

R @24 175.0 mm

STAIR NO. 1

311P8

2653

1

A701

B C

9

10

P9

P3

P3

P7

R @24 175.0 mm

STAIR NO. 2

25601775

2825

1

A303

1

A702

B C

9

10

R @24 175.0 mm

STAIR NO.2

86005975

7025

317

P9

P2

P2

1544

900

1

A303

1

A702

J K

1

2

4001

P15

P15

P14

P15

1

A701

ZONE 1

ZONE 2 ZONE 3

SCALE

CHECKED BY:

DRAWN BY:

PROJECT DATE:

PROJECT #:

FILE NAME:

SHEET #:

DRAWING TITLE:

PROJECT INFO:

ARCHITECT'S SEAL:

REVISIONS ISSUED

CONSTRUCTION NORTH TRUE NORTH

KEY PLAN:

GENERAL NOTES:

SHEET DATE:

1 : 50

D:\0214-004\0214-004_A-3D_Model_30043.rvt

0214-004

02/11/14

N. Singh S. Aguilera N. Sohan

V. Picicci

A700

University of Toronto: Koffler Institute569 Spadina Avenue

Toronto ONM5S 2J7

Partial Stair Plans

03/24/2014

1 : 50STAIR NO.1 1st FLOOR

2

1 : 50STAIR NO.2 1st FLOOR

5

1 : 50STAIR NO.1 2nd FLOOR

3 1 : 50STAIR NO.1 3rd FLOOR

4

1 : 50STAIR NO.2 2nd FLOOR

6 1 : 50STAIR NO.2 3rd FLOOR

7

1 : 50STAIR NO.1 BASEMENT

1

No. Description Date

Page 30: The Koffler Institute

GROUND FLOOR

200

SECOND FLOOR

4400

1 2 4

THIRD FLOOR

8600

GRADE

0

T/O BASEMENT SLAB

-3000

R @24 175.0 mm

R @24 175.0 mm

4200

4200

3200

R @23 139.1 mm

825

1100

2275

825

1100

2275

291

1100

1809

1100

SCALE

CHECKED BY:

DRAWN BY:

PROJECT DATE:

PROJECT #:

FILE NAME:

SHEET #:

DRAWING TITLE:

PROJECT INFO:

ARCHITECT'S SEAL:

REVISIONS ISSUED

GENERAL NOTES:

SHEET DATE:

1 : 20

D:\0214-004\0214-004_A-3D_Model_30043.rvt

0214-004

02/11/14

N. Singh S. Aguilera N. Sohan

V. Picicci

A701

University of Toronto: Koffler Institute

569 Spadina AvenueToronto ON

M5S 2J7

Stair No. 1

03/30/14

1 : 20

STAIR NO. 11

No. Description Date

Page 31: The Koffler Institute

GROUND FLOOR

200

SECOND FLOOR

4400

THIRD FLOOR

8600

GRADE

0

1

A303

1575

1100

1050

2050

1097

1053

475

1100

4200

4200

R @24 175.0 mm

R @24 175.0 mm

1

A303a

SCALE

CHECKED BY:

DRAWN BY:

PROJECT DATE:

PROJECT #:

FILE NAME:

SHEET #:

DRAWING TITLE:

PROJECT INFO:

ARCHITECT'S SEAL:

REVISIONS ISSUED

GENERAL NOTES:

SHEET DATE:

1 : 20

D:\0214-004\0214-004_A-3D_Model_30043.rvt

0214-004

02/11/14

N. Singh S. Aguilera N. Sohan

V. Picicci

A702

University of Toronto: Koffler Institute

569 Spadina AvenueToronto ON

M5S 2J7

Stair No.2

03/31/14

1 : 20

STAIR NO. 21

No. Description Date

Page 32: The Koffler Institute

GROUND FLOOR

200

SECOND FLOOR

4400

DE

GRADE

0

1

A303

R @24 175.0 mm

2100

2100

W01 W01

213212

1

A303a

SCALE

CHECKED BY:

DRAWN BY:

PROJECT DATE:

PROJECT #:

FILE NAME:

SHEET #:

DRAWING TITLE:

PROJECT INFO:

ARCHITECT'S SEAL:

REVISIONS ISSUED

GENERAL NOTES:

SHEET DATE:

1 : 20

D:\0214-004\0214-004_A-3D_Model_30043.rvt

0214-004

02/11/14

N. Singh S. Aguilera N. Sohan

V. Picicci

A703

University of Toronto: Koffler Institute

569 Spadina AvenueToronto ON

M5S 2J7

Stair No. 3

03/31/14

1 : 20

STAIR NO. 31

No. Description Date