the installation and servicing of offshore wind farms

51
European Forum for Renewable Energy Sources The installation and servicing of offshore wind farms of offshore wind farms Kaj Lindvig, CSO, A2SEA A/S 16 th September 2010

Upload: dophuc

Post on 09-Feb-2017

249 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: The installation and servicing of offshore wind farms

European Forum for Renewable Energy Sources

The installation and servicing of offshore wind farmsof offshore wind farms

Kaj Lindvig, CSO, A2SEA A/S16th September 2010p

Page 2: The installation and servicing of offshore wind farms

A2SEA

• Started 1st July 2000

100% dedicated offshore wind• 100% dedicated offshore wind

• 4 (5) vessels, 230 employees, 85 mio Euro turnover

SEA ENERGY 2002

SEA JACK 200785 mio Euro turnover

• Owned 100% by Dong Energy

Si Wi d 49% i 2011

2002 2007

• Siemens Windpower 49% owner in 2011

• Installed 700 turbines, 300 foundationsSEA POWER SEA WORKER

20082002 2008

SEA INSTALLER SEA SERVER 2013

2

2012 2013

Page 3: The installation and servicing of offshore wind farms

Presentation Structure

• Foundations• 2002 – 2012 Market

• Foundation installation

• Turbines• Turbines

• Turbine installation

• Cables

• Cable Laying

• Other offshore activities

• The challenge

• Round Up

3

Page 4: The installation and servicing of offshore wind farms

Installed Capacity / MW per Country

25

Installed MW per country by the end of 2010

Year Installed Cap. MW acc.

No. ofTurbines 485

25

2002 222 1122004 476 263 3800128

1423

2006 849 3592008 1404 554

3800

1231

408128

2010 3500 12352012 7500 2330

1231

UK Denmark Netherlands Sweden Germany Belgium Ireland

4

Page 5: The installation and servicing of offshore wind farms

Offshore Wind 2002-2012

Frederikshavn

Blyth Offshore

Barrow OffshoreS

Utgrunden

Yttre Stengrund

Robin Rigg

Ormonde

Walney

G t M

Anholt

Burbo Bank Lillgrund

Nysted

Horns Rev 1North HoyleArklow Bank

SamsøOrmonde

Rhyl Flats

Gwynt y Mor

Lynn Inner DowsingLincs

Horns Rev 2

Rødsand 2 Baltic I

Sprogø

Alpha Ventus

Gr. Gabbard Prinses AmaliaEgmond an Zee

yLincs

Scroby SandsBard Offshore I Norder Gründe

Nordsee Ost

Kentish FlatsEgmond an Zee

Gunfleet SandsThanet Blight Bank

Thornton Bank

5

Page 6: The installation and servicing of offshore wind farms

Typical Offshore Installation

Hardware: Software:Foundations 15% Installation Foundations 5%Foundations 15% Installation Foundations 5%

Turbines 45% Installation Turbines 5%

Cables 15% Installation Cables 4%

Transformer Station 2% Trafic Control/HSE/Project Management 4%

Scour protection etc. 5%2.5-3.0 Mil. Euro/MW

6

2.5 3.0 Mil. Euro/MW

Page 7: The installation and servicing of offshore wind farms

Presentation Structure• 2002 – 2012 Market• Foundations

• Foundation installation

• Turbines• Turbines

• Turbine installation

• Cables

• Cable Laying

• Other offshore activities

• The challenge

• Round Up

7

Page 8: The installation and servicing of offshore wind farms

Off h F d tiOffshore Foundations

8

Page 9: The installation and servicing of offshore wind farms

Installation of Gravity Foundations

Nysted

Lillgrund

Thornton Bank

R d d IIRødsand II

Sprogø

Approx. 225 installed end of 2010

Photo: www.JanWinther.com

9

Page 10: The installation and servicing of offshore wind farms

Installation of Monopile FoundationsFoundationsHorns Rev I &II

Kentish Flats

Burbo Bank

BarrowKentish Flats

Scroby Sands

Prinses Amalia (Q7)

Barrow

Robin Rigg

Lynn Inner Dowsing

Egmond an Zee Rhyl Flats

Gunfleet Sands

Th tThanet

Arklow

North Hoyley

Greater Gabbard

Blight Bank

Baltic 1

Walney 1

Total approx 1000 installed end of 2010

10

Total approx. 1000 installed end of 2010

Page 11: The installation and servicing of offshore wind farms

Jackets, Tripod, Tripile

Bard

11

Page 12: The installation and servicing of offshore wind farms

Presentation Structure• 2002 – 2012 Market

• FoundationsFoundations

• Foundation installation

• Turbines

• Turbine installation

• Cables

• Cable Layingy g

• Other offshore activities

• The challenge• The challenge

• Round Up

12

Page 13: The installation and servicing of offshore wind farms

Installation and equipment

13

Page 14: The installation and servicing of offshore wind farms

Installation and equipment

HLV Svanen

Installation and equipment

14

Page 15: The installation and servicing of offshore wind farms

Installation and equipment

15

Page 16: The installation and servicing of offshore wind farms

Installation and equipment

16

Page 17: The installation and servicing of offshore wind farms

Presentation Structure• 2002 – 2012 Market

• FoundationsFoundations

• Foundation installation

• Turbine installation

• Turbines

• Cables

• Cable Laying• Cable Laying

• Other offshore activities

Th h ll• The challenge

• Round Up

17

Page 18: The installation and servicing of offshore wind farms

TurbinesSiemens 2.3M Units Weight1a Hub 32.31b Blades 9.21a + 1b Hub + Blades 602 Nacelle 823 Tower (approx ) 1303 Tower (approx.) 130(1+2+3) Total Assembly 246

Siemens 3.6M Units Weight1a Hub 42.41b Blades 17 21b Blades 17.21a + 1b Hub + Blades 952 Nacelle 1253 T ( ) 1803 Tower (approx.) 180(1+2+3) Total Assembly 400

18

Page 19: The installation and servicing of offshore wind farms

TurbinesVestas V90, 3MW Units Weight1a Hub 401b Blades 9+1b Blades 9+1a + 1b Hub + Blades 67+2 Nacelle 703 T ( ) 1103 Tower (approx.) 110(1+2+3) Total Assembly 247+

Vestas V112, 3MW Units Weight1a Hub 451b Blades 111b Blades 111a + 1b Hub + Blades 782 Nacelle 80+3 T ( ) 1303 Tower (approx.) 130(1+2+3) Total Assembly 288+

19

Page 20: The installation and servicing of offshore wind farms

TurbinesMultibrid 5M Units Weight1a Hub 621b Blades 49 51b Blades 49.51a + 1b Hub + Blades 111.52 Nacelle 2333 T ( ) 2003 Tower (approx.) 200(1+2+3) Total Assembly 544

Repower 6M Units Weight1a Hub 841b Blades 721b Blades 721a + 1b Hub + Blades 1562 Nacelle 3163 T 2853 Tower 285(1+2+3) Total Assembly 757

20

Page 21: The installation and servicing of offshore wind farms

Presentation Structure• 2002 – 2012 Market

• FoundationsFoundations

• Foundation installation

T bi• Turbines

• Turbine installation

• Cables

• Cable Layingy g

• Other offshore activities

• The challenge• The challenge

• Round Up

21

Page 22: The installation and servicing of offshore wind farms

Turbine Installations

22

Page 23: The installation and servicing of offshore wind farms

Turbine InstallationVestas 2.0MW/3.0MW

Siemens2.3MW

23

Page 24: The installation and servicing of offshore wind farms

Turbine Installation

Repower 5.0 MWFull Rotor Installation

Photo: With courtesy by Jan OelkerSiemens 3.6 MW Single Blade Installation

Photo: Project Burbo2006

24

Page 25: The installation and servicing of offshore wind farms

Feeding Offshore

25

Page 26: The installation and servicing of offshore wind farms

Presentation Structure• 2002 – 2012 Market

• FoundationsFoundations

• Foundation installation

T bi• Turbines

• Turbine installation

• Cable Laying

• Cables

• Other offshore activities

• The challengeThe challenge

• Round Up

26

Page 27: The installation and servicing of offshore wind farms

Offshore Turbines/Foundations

Interay cables

Transformer Station

Shore Cable (Transport)Shore Cable (Transport)

Shore Line

Transformer Station

Onshore Onshore Cable

Transformer StationDistribution of Power

27

Page 28: The installation and servicing of offshore wind farms

Presentation Structure• 2002 – 2012 Market

• FoundationsFoundations

• Foundation installation

T bi• Turbines

• Turbine installation

• Cables

• Cable laying

• Other offshore activities

• The challenge

• Round Up

28

Page 29: The installation and servicing of offshore wind farms

29

Page 30: The installation and servicing of offshore wind farms

Cable laying

30

Page 31: The installation and servicing of offshore wind farms

Presentation Structure• 2002 – 2012 Market

• FoundationsFoundations

• Foundation installation

T bi• Turbines

• Turbine installation

• Cables

• Cable laying

• Other offshore activities

• The challenge

• Round Up

31

Page 32: The installation and servicing of offshore wind farms

Service - Lifetime

32

Page 33: The installation and servicing of offshore wind farms

Service

33

Page 34: The installation and servicing of offshore wind farms

Crew vessels

M/V Thj lfM/V Thjalfe Catemaran

Service vessels

34

Page 35: The installation and servicing of offshore wind farms

Other vessels will be required as well…

Cable laying vessels

Personnel transfer vessels

T Tugs

Hotel ships

Totally 52 different vessels involved in Horns Rev II.

Totally up to 30 different vessels on the site at a time.

35

Page 36: The installation and servicing of offshore wind farms

Presentation Structure• 2002 – 2012 Market

• FoundationsFoundations

• Foundation installation

T bi• Turbines

• Turbine installation

• Cables

• Cable laying

• Other offshore activities

• The challenge• Round Up

36

Page 37: The installation and servicing of offshore wind farms

Future Selection of Harbour

• Decide the logistic flow for;

F d ti• Foundation installation

• Turbine installation• Turbine installation• Cable Installation

Cost / Time• Cost / Time

• Contingency

• Storage

Risk (delivery /• Risk (delivery / handling / damage)

Safety37

• Safety

Page 38: The installation and servicing of offshore wind farms

38

Page 39: The installation and servicing of offshore wind farms

Port Logistics

39

Page 40: The installation and servicing of offshore wind farms

Turbines

6,0 MW Turbine (Siemens/Vestas)Rotor diameter : 126 m;;Hub Height : 90 m;Total Weight at hub height (nacelle + blades) : 250-350 tons;Weight of tower : 500 tons;Weight of tower : 500 tons;

8,5 MW TurbineRotor diameter : 160 m;Rotor diameter : 160 m;Hub Height : 110 m;Total Weight at hub height (nacelle + blades) : 800 tons;W i ht f t 1000 tWeight of tower : 1000 tons;

10 MW turbine (Clipper)Rotor diameter : 150 meterHub height: 100 meter

40

Page 41: The installation and servicing of offshore wind farms

T biTurbines

• 3 – 5 – 6 MW• Vestas• SiemensSiemens• RePower• Multibrid• Gamesa• BARD• Alstrom• Alstrom• Nordex• 2-4 Chinese exporters

41

Page 42: The installation and servicing of offshore wind farms

A d f d ti l d diff tAnd foundations even larger and different …Photo Jos Beurskens

Photo Jos Beurskens Photo Jos Beurskens

42

Page 43: The installation and servicing of offshore wind farms

Floating Vessel Types

DP vessels from O&G sector for

piling operations

Floating heavy lift cranes & shear

leg cranesleg cranes

43

Page 44: The installation and servicing of offshore wind farms

N V lNew Vessels(from Oil & Gas)

Master Marine SeaJacks

44

Page 45: The installation and servicing of offshore wind farms

T i l d i f lTypical design of new vessels

45

Page 46: The installation and servicing of offshore wind farms

F d i t i t ll tiFrom design to installation

• Conceptual design 1 year• Basic design ½ year

• Detailed Design• Class Approval etc. 2-2½ year

C i• Construction

• Test ?Test ?

1st vessel ready in 3-4 years.

• Start 2011-2012 Usage2015-20162015 2016

46

Page 47: The installation and servicing of offshore wind farms

By 2015-2016?

• Deaper waters in Germany• Round 2½ in UK• Start Round 3 in UK

New Markets need the same• US market• US market• Canada• China

S th E47

• South Europe

Page 48: The installation and servicing of offshore wind farms

Presentation Structure• 2002 – 2012 Market

• FoundationsFoundations

• Foundation installation

T bi• Turbines

• Turbine installation

• Cables

• Cable laying

• Other offshore activities

• The challengeg

• Round Up

48

Page 49: The installation and servicing of offshore wind farms

Offshore wind - hardware• Grid / Cables / Transformers

• Distribution of 50 GW offshore wind in 2030

• Cable production

• Technology

• Foundations• Steel• Production facilities• New designs• Materials• Materials

• Turbines• Production• Development• Onshore - offshore

49

Page 50: The installation and servicing of offshore wind farms

Offshore wind - software• Harbours

• Germany• UKUK• Others

• VesselsI t ll ti• Installation

• Service• Other vessels

• Manpower / Know-how• NAREC, Newcastle UK• Bremen / Oldenburg GermanyBremen / Oldenburg, Germany• Esbjerg, Denmark• The Netherlands• From oil and gasFrom oil and gas• From shipping• Technical / engineering• Managers

50

g

Page 51: The installation and servicing of offshore wind farms