The Green Brewery

Andreas WernerBrewmaster

November 2015

Page 2: The Green Brewery Andreas Werner Brewmaster November 2015

Der Weg zur GRÜNEN-BRAUEREI

Göss Brewery, Leoben, Austria

• In Words:

–We want to cover our energy-demand from renewable energy sources.

Bre

wery

Pre

sen

tati

on

Page 3: The Green Brewery Andreas Werner Brewmaster November 2015

Der Weg zur GRÜNEN-BRAUEREI

Key Figures Göss Brewery

• Since 1860• Volume produced: 1 mhl/a• 55 FTE• Bottles, KEG´s 40/60%• 6 Beer-types, seasonal beers• Market-leader in Austria

Bre

wery

Pre

sen

tati

on

Page 4: The Green Brewery Andreas Werner Brewmaster November 2015

Der Weg zur GRÜNEN-BRAUEREI

Key Figures Göss Brewery

Bre

wery

Pre

sen

tati

on

Page 5: The Green Brewery Andreas Werner Brewmaster November 2015

Der Weg zur GRÜNEN-BRAUEREI

Energy and WaterContinous Improvement Water (hl/hl)

Bre

wery

Pre

sen

tati

on

2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 20150.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

WATER

WATER

Page 6: The Green Brewery Andreas Werner Brewmaster November 2015

Der Weg zur GRÜNEN-BRAUEREI

Energy and WaterContinous Improvement Electricity (kWh/hl)

Bre

wery

Pre

sen

tati

on

Electricity from the grid is certified green energy

2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 20150.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

ELEL ren.

Page 7: The Green Brewery Andreas Werner Brewmaster November 2015

Der Weg zur GRÜNEN-BRAUEREI

Energy and WaterContinous Improvement Thermal (MJ/hl)

Bre

wery

Pre

sen

tati

on

2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 20150.00

20.00

40.00

60.00

80.00

100.00

120.00

THTH ren.COMB

Page 8: The Green Brewery Andreas Werner Brewmaster November 2015

Der Weg zur GRÜNEN-BRAUEREI

The way towards the Green Brewery

• Our way to the green brewery began in 2006…

• First commitment

Inn

ovati

on

Start: 2006

Page 9: The Green Brewery Andreas Werner Brewmaster November 2015

Der Weg zur GRÜNEN-BRAUEREI

The Way towards Green Brewery

2006

Vision 2006

CO2 Erdgas

Biertreber,nachwachsende Biogas ausFeststoffe, AbwasserReststoffe

Fernwärme MM Sonne

Targ

et

Sett

ing

Page 10: The Green Brewery Andreas Werner Brewmaster November 2015

Der Weg zur GRÜNEN-BRAUEREI

The way towards the green brewery

• In Words:

–We want to cover our energy-demand from renewable energy sources and have no natural gas consumption.Ta

rget

Sett

ing

Page 11: The Green Brewery Andreas Werner Brewmaster November 2015

Der Weg zur GRÜNEN-BRAUEREI

The Way towards the Green Brewery

It began with small steps…

On

ce U

pon

a T

ime…

Page 12: The Green Brewery Andreas Werner Brewmaster November 2015

Der Weg zur GRÜNEN-BRAUEREI

First Steps…

Anaerobic wast water plant with biogas Production

Th

ere

is a

Bio

gas

reacto

r

Seit 1997

Page 13: The Green Brewery Andreas Werner Brewmaster November 2015

Der Weg zur GRÜNEN-BRAUEREI

First Steps…

Utilisation of biogas from breweries‘ waste water; subtitutes 10% of our natural gas consumption

Seit 2005

Th

ere

is a

Bio

gas

reacto

r

Page 14: The Green Brewery Andreas Werner Brewmaster November 2015

Der Weg zur GRÜNEN-BRAUEREI

First Steps…

• Spent Grain Burning– Own patent

20% natural gas reduction

Not

alw

ays o

n T

rack…

2002 – 2005

Page 15: The Green Brewery Andreas Werner Brewmaster November 2015

Der Weg zur GRÜNEN-BRAUEREI

Green Brewery 1

The first Step together with Partners from Industry

Feasibility studies in 3 breweries

Calculation models for the brewing industryWe n

eed

to k

now

th

e

Deta

ils

2005-2007

Page 16: The Green Brewery Andreas Werner Brewmaster November 2015

Der Weg zur GRÜNEN-BRAUEREI

Green Brewery 1P

art

ners

hip

wit

h I

nd

ustr

y

an

d H

igh

-Sch

ools

2005-2007

Energie Steiermark

Joanneum Research

AEE Intec

ESF Friesenbichler

Fischer Apparatebau

Page 17: The Green Brewery Andreas Werner Brewmaster November 2015

Der Weg zur GRÜNEN-BRAUEREI

Green Brewery 1

2005-2007

Sankeys for each department

We n

eed

to k

now

th

e

Deta

ils

Page 18: The Green Brewery Andreas Werner Brewmaster November 2015

Der Weg zur GRÜNEN-BRAUEREI

Green Brewery 1

2005-2007Balances for all losses

We n

eed

to k

now

th

e

Deta

ils

Page 19: The Green Brewery Andreas Werner Brewmaster November 2015

Der Weg zur GRÜNEN-BRAUEREI

Green Brewery 1S

tyri

an

En

erg

y A

ward

2005-2007

• Award-winning…– Styrian Energy Award– Monika Polster Price for

energy (5.000 €)

Page 20: The Green Brewery Andreas Werner Brewmaster November 2015

Der Weg zur GRÜNEN-BRAUEREI

An important Project with our

Neighbour

• Long-Distance Heating from Mayr-Melnhof Holz

Pipeline for 95/75°C hot water

Construction of a redundant Hot-water-grid for Room-Heating, Flash Pasteurizer and Bottle-Washer

Capex 1,5 Mio. Euro35% Gas -substitutionP

art

ners

hip

betw

een

N

eig

hb

ou

rs

Seit 2007

Page 21: The Green Brewery Andreas Werner Brewmaster November 2015

Der Weg zur GRÜNEN-BRAUEREI

Support for Sustainability

Starts to support our ambitions

Su

pp

ort

fr

om

H

ein

eken

2009

Page 22: The Green Brewery Andreas Werner Brewmaster November 2015

Der Weg zur GRÜNEN-BRAUEREI

Presentation of GB at INEX

Go P

ub

lic w

ith

th

e

Inn

ovati

on

s

2010

Page 23: The Green Brewery Andreas Werner Brewmaster November 2015

Der Weg zur GRÜNEN-BRAUEREI

Green Brewery 2

• Check how brewing residuals can cover the energy-demand of Göss

• Comparison of technologies

• Mass-Balances• Concepts for decision-

makingTh

e S

cre

en

ing

of

the

Op

port

un

itie

s

2010-2011

Page 24: The Green Brewery Andreas Werner Brewmaster November 2015

Der Weg zur GRÜNEN-BRAUEREI

Grüne Brauerei 2

Biofermenation of spent grains,Yeast and Kieselguhr delivers enough biogas

Gas-surplus for cogeneration of green electricity

Greenfield preferably

Th

e G

reen

an

d

Feasib

le C

on

cep

t

2010 - 2011

Page 25: The Green Brewery Andreas Werner Brewmaster November 2015

Der Weg zur GRÜNEN-BRAUEREI

The Energy of the Sun

• Solarthermal energy

– Integration of solar-thermal energy in Brewery

– EU-Project with Heineken

– 3 SitesGöss, Valencia, Vialonga

• 5 % reduction of natural gas

2012 - 2013

Sola

therm

al S

ou

rce

Page 26: The Green Brewery Andreas Werner Brewmaster November 2015

Der Weg zur GRÜNEN-BRAUEREI

The Energy of the Sun

Sola

therm

al S

ou

rce

2012-2013

• 1.470 m² flat plate collector / 1.030 KW

• 200 m³ solar energy storage• Plate heat exchanger for mash

tun• Plate heat exchanger for

boiler-feedwater• Investment 1.270,- k€• Subsidies 50 %• Fuel savings 70.000 Nm³ or

150 tons CO2

Page 27: The Green Brewery Andreas Werner Brewmaster November 2015

Der Weg zur GRÜNEN-BRAUEREI

The sun‘s energy

2012-2013

Sola

therm

al S

ou

rce

Page 28: The Green Brewery Andreas Werner Brewmaster November 2015

Der Weg zur GRÜNEN-BRAUEREI

We have gained a lot!

Minus 50% natural gas

Target is zero natural gas

We are close to our target

Inte

rmed

iate

Bala

nce

2013

Page 29: The Green Brewery Andreas Werner Brewmaster November 2015

Der Weg zur GRÜNEN-BRAUEREI

The last Step

Biogas through fermentation of spent grains, Yeast and Kieselguhr

Vis

ion

of

Gre

en

B

rew

ery

2

2013 - 2015

Page 30: The Green Brewery Andreas Werner Brewmaster November 2015

Der Weg zur GRÜNEN-BRAUEREI

– Biogas for covering gas-demand of brewery

– Biogas for green electricity

– Digestate is natural fertlilizer for the agriculture

– BAT/ Industrial Standards

Th

e P

lan

t-C

on

cep

t

2013 - 2015

The last Step

Page 31: The Green Brewery Andreas Werner Brewmaster November 2015

Der Weg zur GRÜNEN-BRAUEREI

• Our Partner

– BIO ENERGY International

– Technology provider with global references

– A detailed concept is finished -DBO

– Official approvals relatively simple to get

– Neighbours and farmers were critical

Realisati

on

in

P

art

ners

hip

2013 - 2015

The last Step

Page 32: The Green Brewery Andreas Werner Brewmaster November 2015

Der Weg zur GRÜNEN-BRAUEREI

BDI-PlantTh

e P

lan

t-D

esig

n

2013 - 2015• Input of the substrate: 20.650 t/a

(18.300 t spent grain, 1.450 t yeast, 900 t filter cake)

• Combined heat and power – use of electricity for the production as well the heat

• Remaining biogas for the gas boiler to produce steam

Page 33: The Green Brewery Andreas Werner Brewmaster November 2015

Der Weg zur GRÜNEN-BRAUEREI

BDI-PlantTh

e P

lan

t-D

esig

n

2015

Page 34: The Green Brewery Andreas Werner Brewmaster November 2015

Der Weg zur GRÜNEN-BRAUEREI

BDI-PlantTh

e P

lan

t-D

esig

n

2015

Page 35: The Green Brewery Andreas Werner Brewmaster November 2015

Der Weg zur GRÜNEN-BRAUEREI

Spent Grains today

Th

e P

lan

t-C

on

cep

t

Until 2015

• Cattle Food

– Open System– Energy is not used

completely– Much Truck-Traffic

Page 36: The Green Brewery Andreas Werner Brewmaster November 2015

Der Weg zur GRÜNEN-BRAUEREI

BDI Plant ConceptTh

e P

lan

t-C

on

cep

t

2016 -

–Zero CO2 Emissions

Bio-methan

– By-product is

Fertilizer

Page 37: The Green Brewery Andreas Werner Brewmaster November 2015

Der Weg zur GRÜNEN-BRAUEREI

The Benefits

– Independent from external energy-supply

– Surplus bio-methan via Cogeneration in green Electricty to grid

– Predictable energy-costs– Expect and receive positive

Image

Investm

en

t an

d c

on

seq

uen

t w

ork

lead

to S

uccess

Ab 2013

Page 38: The Green Brewery Andreas Werner Brewmaster November 2015

Der Weg zur GRÜNEN-BRAUEREI

The Benefits

– Göss avoids the emission of 3000 tons of climate-relevant CO2.

– This is equivalent to 1.000 one-Family-Houses

– A valuable contribution for a better Future!

Investm

en

t an

d c

on

seq

uen

t w

ork

lead

to S

uccess

2015

Page 39: The Green Brewery Andreas Werner Brewmaster November 2015

Der Weg zur GRÜNEN-BRAUEREI

The Green Brewery

• In the heart of Austria• In the Center of

Ecology

For

Ou

r an

d t

he

Fu

ture

of

ou

r C

hild

ren

Reality now

Page 40: The Green Brewery Andreas Werner Brewmaster November 2015

42

PROUD TO BE GREEN

Page 41: The Green Brewery Andreas Werner Brewmaster November 2015

Enjoyment is in our nature.