the green brewery andreas werner brewmaster november 2015
TRANSCRIPT
The Green Brewery
Andreas WernerBrewmaster
November 2015
Der Weg zur GRÜNEN-BRAUEREI
Göss Brewery, Leoben, Austria
• In Words:
–We want to cover our energy-demand from renewable energy sources.
Bre
wery
Pre
sen
tati
on
Der Weg zur GRÜNEN-BRAUEREI
Key Figures Göss Brewery
• Since 1860• Volume produced: 1 mhl/a• 55 FTE• Bottles, KEG´s 40/60%• 6 Beer-types, seasonal beers• Market-leader in Austria
Bre
wery
Pre
sen
tati
on
Der Weg zur GRÜNEN-BRAUEREI
Key Figures Göss Brewery
Bre
wery
Pre
sen
tati
on
Der Weg zur GRÜNEN-BRAUEREI
Energy and WaterContinous Improvement Water (hl/hl)
Bre
wery
Pre
sen
tati
on
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 20150.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50
4.00
WATER
WATER
Der Weg zur GRÜNEN-BRAUEREI
Energy and WaterContinous Improvement Electricity (kWh/hl)
Bre
wery
Pre
sen
tati
on
Electricity from the grid is certified green energy
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 20150.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
ELEL ren.
Der Weg zur GRÜNEN-BRAUEREI
Energy and WaterContinous Improvement Thermal (MJ/hl)
Bre
wery
Pre
sen
tati
on
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 20150.00
20.00
40.00
60.00
80.00
100.00
120.00
THTH ren.COMB
Der Weg zur GRÜNEN-BRAUEREI
The way towards the Green Brewery
• Our way to the green brewery began in 2006…
• First commitment
Inn
ovati
on
Start: 2006
Der Weg zur GRÜNEN-BRAUEREI
The Way towards Green Brewery
2006
Vision 2006
CO2 Erdgas
Biertreber,nachwachsende Biogas ausFeststoffe, AbwasserReststoffe
Fernwärme MM Sonne
Targ
et
Sett
ing
Der Weg zur GRÜNEN-BRAUEREI
The way towards the green brewery
• In Words:
–We want to cover our energy-demand from renewable energy sources and have no natural gas consumption.Ta
rget
Sett
ing
Der Weg zur GRÜNEN-BRAUEREI
The Way towards the Green Brewery
It began with small steps…
On
ce U
pon
a T
ime…
Der Weg zur GRÜNEN-BRAUEREI
First Steps…
Anaerobic wast water plant with biogas Production
Th
ere
is a
Bio
gas
reacto
r
Seit 1997
Der Weg zur GRÜNEN-BRAUEREI
First Steps…
Utilisation of biogas from breweries‘ waste water; subtitutes 10% of our natural gas consumption
Seit 2005
Th
ere
is a
Bio
gas
reacto
r
Der Weg zur GRÜNEN-BRAUEREI
First Steps…
• Spent Grain Burning– Own patent
20% natural gas reduction
Not
alw
ays o
n T
rack…
2002 – 2005
Der Weg zur GRÜNEN-BRAUEREI
Green Brewery 1
The first Step together with Partners from Industry
Feasibility studies in 3 breweries
Calculation models for the brewing industryWe n
eed
to k
now
th
e
Deta
ils
2005-2007
Der Weg zur GRÜNEN-BRAUEREI
Green Brewery 1P
art
ners
hip
wit
h I
nd
ustr
y
an
d H
igh
-Sch
ools
2005-2007
Energie Steiermark
Joanneum Research
AEE Intec
ESF Friesenbichler
Fischer Apparatebau
Der Weg zur GRÜNEN-BRAUEREI
Green Brewery 1
2005-2007
Sankeys for each department
We n
eed
to k
now
th
e
Deta
ils
Der Weg zur GRÜNEN-BRAUEREI
Green Brewery 1
2005-2007Balances for all losses
We n
eed
to k
now
th
e
Deta
ils
Der Weg zur GRÜNEN-BRAUEREI
Green Brewery 1S
tyri
an
En
erg
y A
ward
2005-2007
• Award-winning…– Styrian Energy Award– Monika Polster Price for
energy (5.000 €)
Der Weg zur GRÜNEN-BRAUEREI
An important Project with our
Neighbour
• Long-Distance Heating from Mayr-Melnhof Holz
Pipeline for 95/75°C hot water
Construction of a redundant Hot-water-grid for Room-Heating, Flash Pasteurizer and Bottle-Washer
Capex 1,5 Mio. Euro35% Gas -substitutionP
art
ners
hip
betw
een
N
eig
hb
ou
rs
Seit 2007
Der Weg zur GRÜNEN-BRAUEREI
Support for Sustainability
Starts to support our ambitions
Su
pp
ort
fr
om
H
ein
eken
2009
Der Weg zur GRÜNEN-BRAUEREI
Presentation of GB at INEX
Go P
ub
lic w
ith
th
e
Inn
ovati
on
s
2010
Der Weg zur GRÜNEN-BRAUEREI
Green Brewery 2
• Check how brewing residuals can cover the energy-demand of Göss
• Comparison of technologies
• Mass-Balances• Concepts for decision-
makingTh
e S
cre
en
ing
of
the
Op
port
un
itie
s
2010-2011
Der Weg zur GRÜNEN-BRAUEREI
Grüne Brauerei 2
Biofermenation of spent grains,Yeast and Kieselguhr delivers enough biogas
Gas-surplus for cogeneration of green electricity
Greenfield preferably
Th
e G
reen
an
d
Feasib
le C
on
cep
t
2010 - 2011
Der Weg zur GRÜNEN-BRAUEREI
The Energy of the Sun
• Solarthermal energy
– Integration of solar-thermal energy in Brewery
– EU-Project with Heineken
– 3 SitesGöss, Valencia, Vialonga
• 5 % reduction of natural gas
2012 - 2013
Sola
therm
al S
ou
rce
Der Weg zur GRÜNEN-BRAUEREI
The Energy of the Sun
Sola
therm
al S
ou
rce
2012-2013
• 1.470 m² flat plate collector / 1.030 KW
• 200 m³ solar energy storage• Plate heat exchanger for mash
tun• Plate heat exchanger for
boiler-feedwater• Investment 1.270,- k€• Subsidies 50 %• Fuel savings 70.000 Nm³ or
150 tons CO2
Der Weg zur GRÜNEN-BRAUEREI
The sun‘s energy
2012-2013
Sola
therm
al S
ou
rce
Der Weg zur GRÜNEN-BRAUEREI
We have gained a lot!
Minus 50% natural gas
Target is zero natural gas
We are close to our target
Inte
rmed
iate
Bala
nce
2013
Der Weg zur GRÜNEN-BRAUEREI
The last Step
Biogas through fermentation of spent grains, Yeast and Kieselguhr
Vis
ion
of
Gre
en
B
rew
ery
2
2013 - 2015
Der Weg zur GRÜNEN-BRAUEREI
– Biogas for covering gas-demand of brewery
– Biogas for green electricity
– Digestate is natural fertlilizer for the agriculture
– BAT/ Industrial Standards
Th
e P
lan
t-C
on
cep
t
2013 - 2015
The last Step
Der Weg zur GRÜNEN-BRAUEREI
• Our Partner
– BIO ENERGY International
– Technology provider with global references
– A detailed concept is finished -DBO
– Official approvals relatively simple to get
– Neighbours and farmers were critical
Realisati
on
in
P
art
ners
hip
2013 - 2015
The last Step
Der Weg zur GRÜNEN-BRAUEREI
BDI-PlantTh
e P
lan
t-D
esig
n
2013 - 2015• Input of the substrate: 20.650 t/a
(18.300 t spent grain, 1.450 t yeast, 900 t filter cake)
• Combined heat and power – use of electricity for the production as well the heat
• Remaining biogas for the gas boiler to produce steam
Der Weg zur GRÜNEN-BRAUEREI
BDI-PlantTh
e P
lan
t-D
esig
n
2015
Der Weg zur GRÜNEN-BRAUEREI
BDI-PlantTh
e P
lan
t-D
esig
n
2015
Der Weg zur GRÜNEN-BRAUEREI
Spent Grains today
Th
e P
lan
t-C
on
cep
t
Until 2015
• Cattle Food
– Open System– Energy is not used
completely– Much Truck-Traffic
Der Weg zur GRÜNEN-BRAUEREI
BDI Plant ConceptTh
e P
lan
t-C
on
cep
t
2016 -
–Zero CO2 Emissions
Bio-methan
– By-product is
Fertilizer
Der Weg zur GRÜNEN-BRAUEREI
The Benefits
– Independent from external energy-supply
– Surplus bio-methan via Cogeneration in green Electricty to grid
– Predictable energy-costs– Expect and receive positive
Image
Investm
en
t an
d c
on
seq
uen
t w
ork
lead
to S
uccess
Ab 2013
Der Weg zur GRÜNEN-BRAUEREI
The Benefits
– Göss avoids the emission of 3000 tons of climate-relevant CO2.
– This is equivalent to 1.000 one-Family-Houses
– A valuable contribution for a better Future!
Investm
en
t an
d c
on
seq
uen
t w
ork
lead
to S
uccess
2015
Der Weg zur GRÜNEN-BRAUEREI
The Green Brewery
• In the heart of Austria• In the Center of
Ecology
For
Ou
r an
d t
he
Fu
ture
of
ou
r C
hild
ren
Reality now
42
PROUD TO BE GREEN
Enjoyment is in our nature.