Only 5% of the entire area of Libya exceeds 100 mm (4 in) annually. Evaporation rates are also high ranging from 1700 mm (67 in) in the north to 6000 mm (236 in) in the south
WATER TREATMENT 0.7%DESALINATION 1.4%SURFACE WATER 2.3%GROUND WATER 95.6%
WATER RESOURCES IN LIBYAWATER RESOURCES IN LIBYA
THE GREAT MAN-MADE RIVER PROJECT
TripoliMediterranean Sea
Ajdabiya
Benghazi
Green Mountains
Jefara
Kufra
Murzug
Hamada
Sirt
Sirt
These basins contain 10,000 – 12,000 cubic Km.
of economically extractable water
Over extraction in these basins has resulted in seawater intrusion in the coastal aquifers with TDS levels reaching 7000ppm in the Tripoli region
In a recent study conducted under the supervision of the UN Centre for Environment & Development in the Arab Region & Europe CEDARE, the Nubian Basin (of which Kufra is part)
was estimated at containing 373.3 x 10^12 m3.If the neighboring countries extract water at a rate of 1380
MCMY it is calculated that the reserve would last 4860 years.
THE GREAT MAN-MADE RIVER PROJECT
Cost Comparison Between Different Water Supply Alternatives
Quantity of water per One Libyan DinarGreat Man-Made River
Project
9.00 m3
Transportation by ships
1.05 m3
Desalination
0.79 m3
Pipeline from South Europe to Tripoli
0.74 m3
THE GREAT MAN-MADE RIVER PROJECT
03 October 1983 The General People's Congress held an extraordinary session to draft the resolutions of the basic people's Congresses, which decided to fund and execute the
Great Man-Made River Project.
28 August 1984 The leader of the Revolution lays the foundation stone in Sarir area for the commencement of the
construction of the Great Man-Made River Project.
THE GREAT MAN-MADE RIVER PROJECT
TripoliMediterranean Sea
Tazerbo
NE Jebel HasounaWellfield
E Jebel HasounaWellfield
Tobruk
Kufra
JaghboubGhadames
Ajdabiya
Benghazi
Sirt
Sarir & Tazerbo Well Fields
- Total Production 2.0 MCMD - No. of Wells 234 - Length 1926 Km (1204 Miles ). of mainly 4.0 m (13 ft.) diameter pipes
Sarir Wellfield
TazerboWellfield
Jaghboub Wellfield
No. of Wells 40Total Production 50 MCMY
Conveyance
- Length 190 Km (119 Miles). - Diameter 4.0 m (13 ft.).
Gedammes Wellfield
No. of Wells 144Total Production 90 MCMY
Kufra Wellfield
No. of Wells 285Total Production 1.68 MCMD
Brega PCCP Plant
Sarir PCCP Plant East & NEJebel Hasouna Wellfields
- No. of Wells 586 - Total Production 2.5 MCMD - Length of 1.732 Km (1,083 Miles) of mainly 4.0 m (13 ft.) diameter pipes
THE GREAT MAN-MADE RIVER PROJECT
Reservoirs Ajdabiya Holding Reservoir - Capacity 4.0 mcm Al Gardabiya Reservoir - Capacity 6.8 mcm Omar Mukhtar Reservoir - Capacity 4.7 mcm The Grand Al Gardabiya Reservoir - Capacity 15.4 mcm The Grand Omar Mukhtar Reservoir - Capacity 24.0 mcm
Total Storage Capacity = 54.9 mcm
Two Pipe Manufacturing PlantsTwo Pipe Manufacturing Plants
•Sarir Plant Three lines producing 120 pipes daily
•Brega Plant Two lines producing 80 pipes daily
THE GREAT MAN-MADE RIVER PROJECT
Cut-away Section of a Pre-stressedConcrete Cylinder Pipe (PCCP)
MORTAR COATING STEEL PRE-STRESSING WIRE
OUTER CONCRETE CORE
STEEL LINER
INNER CONCRETECORE
PIPE MAKE-UP
Length of Pipe = 7.52 metersPipe Diameters 1.6-4.0 meters
Weight of Pipe = 75-83 tonnesPressure Rates 6-26 bar17-18 km of prestressed Wire12-16 tonnes of Cement
Pipe Transportation
Haul RoadsHaul Roads•Phase I Total Length 1,600 Km (1,000 Miles). •Phase II Total Length 2,155 km (1,340 Miles).
Pipe LayingPipe Laying
Depth of Trench 7.0 m (23 ft.). Capacity of Cranes Used up to 450 tons
THE GREAT MAN-MADE RIVER PROJECT
6.57 Million Cubic Metres Water per Day Transfer2,398 Million Cubic Metres per Year
Water Allocation in MWater Allocation in M33/Day/DayWater Allocation in MWater Allocation in M33/Day/Day
All Phases in M3/Day
1,838,480 M3 Municipal --> (28 %)
4,596,200 M3 Agricultural --> (70 %)
131,320 M3 Industrial --> (2 %)
THE GREAT MAN-MADE RIVER PROJECT
Mediterranean Sea
BenghaziSirt
Tripoli
6004503001500Km
Tazerbo
Ajdabiya
Sarir Wellfield
TazerboWellfield
Sarir PCCPPlant
NE Jebel HasounaWellfield
E Jebel HasounaWellfield
Tobruk
Kufra
JaghboubGhadamesBrega PCCP Plant
Eg
ypt
Eg
ypt
Alg
eria
Alg
eria
TunisiaTunisia
Su
dan
Su
dan
The agricultural development plan aims to:
•Realize the highest possible rate of self-sufficiency in grain and fodder crops.
•Increase the capital investment and job opportunities in the agricultural sector.
•Produce raw materials for the food processing industry.
•Encourage and support agricultural settlement.
The agricultural development projects are being carried out in three regions in Libya:
•Benghazi Plains Region – net irrigated area 30,000 hectares 14,000 hectares to be developed as large farm projects.
•Jefara Plains Region (Tripoli) - net irrigated area 80,000 hectares 1,500 hectares to be developed as large farm projects.
•Al-Ghardabiya Plains Region (Sirt) - net irrigated area 20,000 hectares 5,400 hectares to be developed as large farm projects.
Investors with experience in the field are invited to participate in:
• Implementation• Operation• Maintenance• Management and product marketing
Of the large farm projects
American Companies have already invested in the development of Large Farm Projects:
- 1300 Hectares – Benghazi Plains Region (this will be increased to 14,000 Hectares in the future) - 800 Hectares – Tarhouna - Valmont Valley supplying Irrigation equipment - Case supplying agricultural equipment
Agricultural Land Developed 130,000 hectare approx. ( 20,000 farms )
About 100,000 existing farms will be supplemented with irrigation water from the project which will have great impact on their productivity and encourage the settlement of farmers and their families, hence a positive
impact on the value of their property
THE GREAT MAN-MADE RIVER PROJECT
We can conclude that, adequate fresh water supplied by the gigantic GMRA project, have become an integral part of the infrastructure (including real estate) in all domestic, agricultural and industrial aspects, both in rural and urban areas, so as these areas grow, the need for infrastructure increase.
THE GREAT MAN-MADE RIVER PROJECT
Which results in:Encouraging people in rural areas to stay in their land, due to Agricultural expansion.
THE GREAT MAN-MADE RIVER PROJECT
In urban areas, the real estate prices will escalate due to the improvement of the life standards.
THE GREAT MAN-MADE RIVER PROJECT
19.58 Billion Dollars Project Cost
Phase I - $5.53Billion
Phase II - $8.05Billion
Future Phase - $6.0Billion
Mediterranean Sea
BenghaziSirt
Tripoli
6004503001500Km
Tazerbo
Ajdabiya
Sarir
Wellfield
TazerboWellfield
NE Jebel HasounaWellfield
E Jebel HasounaWellfield
Tobruk
Kufra
JaghboubGhadames
Egy
ptE
gypt
Alg
eria
Alg
eria
TunisiaTunisia
Sud
anS
udan
Capital Cost $19.58 Billion
Operation & Maintenance Cost $14.11 Billion
Total Investment Cost (50 Years) $33.69 Billion
Expected Production Quantity 120 Billion m3
Unit rate/ m3 water to recover investment cost over 50 years
$0.28/m3
THE GREAT MAN-MADE RIVER PROJECT
Sources for Project FinancingSources for Project Financing
The project is financed from the following sources:-
- Law (10/83) revenues.
- The revenue gained by selling water produced by the project’s System.
- What is annually allocated in the country’s development budget, loans and financial facilities.
THE GREAT MAN-MADE RIVER PROJECT
Fees (indirect taxes) , established byFees (indirect taxes) , established by Law no (10)/1983 Law no (10)/1983
• Fees on documentary credits and money orders.
• Fess on selling fuel derivations.
• Fees on commerce , trade and industrial licenses.
• Fees on selling local and imported Tobacco and Cigarettes.
• Fees on international travel tickets.
THE GREAT MAN-MADE RIVER PROJECT
PROJECT STATISTICSPROJECT STATISTICS
Total Weight of Cement Total Weight of Cement
6.9 Million Tonnes6.9 Million Tonnes
Volume of Trench ExcavationVolume of Trench Excavation
240 Million M240 Million M33
The length of pre-stressing wire used in the project is equivalent to 220 times the circumference of the earth .
The amount of aggregate used in the project is sufficient to build 16 pyramids the size of the Great Pyramid .
The cement used in the project is sufficient to construct a concrete road from Tripoli to Bangkok
The total number of wells is 1,350
Total No. of PipesTotal No. of Pipes
585,296585,296
THE GREAT MAN-MADE RIVER PROJECT
Mediterranean Sea
Benghazi
Sirt
Tripoli
6004503001500Km
Tobruk
Tazirbu
Ajadibya
Al KufrahFrance
EnglandGermany
Project ScaleProject Scale
THE GREAT MAN-MADE RIVER PROJECT
Benghazi
Sirt
Tripoli
6004503001500Km
Tobruk
Tazirbu
Ajadibya
Al Kufrah
Project ScaleProject Scale
Ghadames
TEXAS
NEW MEXICO
OKLAHOMA
AR
KA
NS
AS
LO
UIS
IAN
A
MIS
SO
UR
I
COLORADO
KANSAS
THE GREAT MAN-MADE RIVER PROJECT
Thank You for your attention and have a nice
day!