Page 1: THE GREAT MAN-MADE RIVER PROJECT Only 5% of the entire area of Libya exceeds 100 mm (4 in) annually. Evaporation rates are also high ranging from 1700
Page 2: THE GREAT MAN-MADE RIVER PROJECT Only 5% of the entire area of Libya exceeds 100 mm (4 in) annually. Evaporation rates are also high ranging from 1700

THE GREAT MAN-MADE RIVER PROJECT

Page 3: THE GREAT MAN-MADE RIVER PROJECT Only 5% of the entire area of Libya exceeds 100 mm (4 in) annually. Evaporation rates are also high ranging from 1700

THE GREAT MAN-MADE RIVER PROJECT

Only 5% of the entire area of Libya exceeds 100 mm (4 in) annually. Evaporation rates are also high ranging from 1700 mm (67 in) in the north to 6000 mm (236 in) in the south

WATER TREATMENT 0.7%DESALINATION 1.4%SURFACE WATER 2.3%GROUND WATER 95.6%

WATER RESOURCES IN LIBYAWATER RESOURCES IN LIBYA

Page 4: THE GREAT MAN-MADE RIVER PROJECT Only 5% of the entire area of Libya exceeds 100 mm (4 in) annually. Evaporation rates are also high ranging from 1700

THE GREAT MAN-MADE RIVER PROJECT

TripoliMediterranean Sea

Ajdabiya

Benghazi

Green Mountains

Jefara

Kufra

Murzug

Hamada

Sirt

Sirt

These basins contain 10,000 – 12,000 cubic Km.

of economically extractable water

Over extraction in these basins has resulted in seawater intrusion in the coastal aquifers with TDS levels reaching 7000ppm in the Tripoli region

In a recent study conducted under the supervision of the UN Centre for Environment & Development in the Arab Region & Europe CEDARE, the Nubian Basin (of which Kufra is part)

was estimated at containing 373.3 x 10^12 m3.If the neighboring countries extract water at a rate of 1380

MCMY it is calculated that the reserve would last 4860 years.

Page 5: THE GREAT MAN-MADE RIVER PROJECT Only 5% of the entire area of Libya exceeds 100 mm (4 in) annually. Evaporation rates are also high ranging from 1700

THE GREAT MAN-MADE RIVER PROJECT

Cost Comparison Between Different Water Supply Alternatives

Quantity of water per One Libyan DinarGreat Man-Made River

Project

9.00 m3

Transportation by ships

1.05 m3

Desalination

0.79 m3

Pipeline from South Europe to Tripoli

0.74 m3

Page 6: THE GREAT MAN-MADE RIVER PROJECT Only 5% of the entire area of Libya exceeds 100 mm (4 in) annually. Evaporation rates are also high ranging from 1700

THE GREAT MAN-MADE RIVER PROJECT

03 October 1983 The General People's Congress held an extraordinary session to draft the resolutions of the basic people's Congresses, which decided to fund and execute the

Great Man-Made River Project.

28 August 1984 The leader of the Revolution lays the foundation stone in Sarir area for the commencement of the

construction of the Great Man-Made River Project.

Page 7: THE GREAT MAN-MADE RIVER PROJECT Only 5% of the entire area of Libya exceeds 100 mm (4 in) annually. Evaporation rates are also high ranging from 1700

THE GREAT MAN-MADE RIVER PROJECT

TripoliMediterranean Sea

Tazerbo

NE Jebel HasounaWellfield

E Jebel HasounaWellfield

Tobruk

Kufra

JaghboubGhadames

Ajdabiya

Benghazi

Sirt

Sarir & Tazerbo Well Fields

- Total Production 2.0 MCMD - No. of Wells 234 - Length 1926 Km (1204 Miles ). of mainly 4.0 m (13 ft.) diameter pipes

Sarir Wellfield

TazerboWellfield

Jaghboub Wellfield

No. of Wells 40Total Production 50 MCMY

Conveyance

- Length 190 Km (119 Miles). - Diameter 4.0 m (13 ft.).

Gedammes Wellfield

No. of Wells 144Total Production 90 MCMY

Kufra Wellfield

No. of Wells 285Total Production 1.68 MCMD

Brega PCCP Plant

Sarir PCCP Plant East & NEJebel Hasouna Wellfields

- No. of Wells 586 - Total Production 2.5 MCMD - Length of 1.732 Km (1,083 Miles) of mainly 4.0 m (13 ft.) diameter pipes

Page 8: THE GREAT MAN-MADE RIVER PROJECT Only 5% of the entire area of Libya exceeds 100 mm (4 in) annually. Evaporation rates are also high ranging from 1700

THE GREAT MAN-MADE RIVER PROJECT

Reservoirs Ajdabiya Holding Reservoir - Capacity 4.0 mcm Al Gardabiya Reservoir - Capacity 6.8 mcm Omar Mukhtar Reservoir - Capacity 4.7 mcm The Grand Al Gardabiya Reservoir - Capacity 15.4 mcm The Grand Omar Mukhtar Reservoir - Capacity 24.0 mcm

Total Storage Capacity = 54.9 mcm

Page 9: THE GREAT MAN-MADE RIVER PROJECT Only 5% of the entire area of Libya exceeds 100 mm (4 in) annually. Evaporation rates are also high ranging from 1700

Two Pipe Manufacturing PlantsTwo Pipe Manufacturing Plants

•Sarir Plant Three lines producing 120 pipes daily

•Brega Plant Two lines producing 80 pipes daily

Page 10: THE GREAT MAN-MADE RIVER PROJECT Only 5% of the entire area of Libya exceeds 100 mm (4 in) annually. Evaporation rates are also high ranging from 1700

THE GREAT MAN-MADE RIVER PROJECT

Cut-away Section of a Pre-stressedConcrete Cylinder Pipe (PCCP)

MORTAR COATING STEEL PRE-STRESSING WIRE

OUTER CONCRETE CORE

STEEL LINER

INNER CONCRETECORE

PIPE MAKE-UP

Length of Pipe = 7.52 metersPipe Diameters 1.6-4.0 meters

Weight of Pipe = 75-83 tonnesPressure Rates 6-26 bar17-18 km of prestressed Wire12-16 tonnes of Cement

Page 11: THE GREAT MAN-MADE RIVER PROJECT Only 5% of the entire area of Libya exceeds 100 mm (4 in) annually. Evaporation rates are also high ranging from 1700

Pipe Transportation

Page 12: THE GREAT MAN-MADE RIVER PROJECT Only 5% of the entire area of Libya exceeds 100 mm (4 in) annually. Evaporation rates are also high ranging from 1700

Haul RoadsHaul Roads•Phase I Total Length 1,600 Km (1,000 Miles). •Phase II Total Length 2,155 km (1,340 Miles).

Page 13: THE GREAT MAN-MADE RIVER PROJECT Only 5% of the entire area of Libya exceeds 100 mm (4 in) annually. Evaporation rates are also high ranging from 1700

Pipe LayingPipe Laying

Depth of Trench 7.0 m (23 ft.). Capacity of Cranes Used up to 450 tons

Page 14: THE GREAT MAN-MADE RIVER PROJECT Only 5% of the entire area of Libya exceeds 100 mm (4 in) annually. Evaporation rates are also high ranging from 1700

THE GREAT MAN-MADE RIVER PROJECT

6.57 Million Cubic Metres Water per Day Transfer2,398 Million Cubic Metres per Year

Water Allocation in MWater Allocation in M33/Day/DayWater Allocation in MWater Allocation in M33/Day/Day

All Phases in M3/Day

1,838,480 M3 Municipal --> (28 %)

4,596,200 M3 Agricultural --> (70 %)

131,320 M3 Industrial --> (2 %)

Page 15: THE GREAT MAN-MADE RIVER PROJECT Only 5% of the entire area of Libya exceeds 100 mm (4 in) annually. Evaporation rates are also high ranging from 1700

THE GREAT MAN-MADE RIVER PROJECT

Mediterranean Sea

BenghaziSirt

Tripoli

6004503001500Km

Tazerbo

Ajdabiya

Sarir Wellfield

TazerboWellfield

Sarir PCCPPlant

NE Jebel HasounaWellfield

E Jebel HasounaWellfield

Tobruk

Kufra

JaghboubGhadamesBrega PCCP Plant

Eg

ypt

Eg

ypt

Alg

eria

Alg

eria

TunisiaTunisia

Su

dan

Su

dan

The agricultural development plan aims to:

•Realize the highest possible rate of self-sufficiency in grain and fodder crops.

•Increase the capital investment and job opportunities in the agricultural sector.

•Produce raw materials for the food processing industry.

•Encourage and support agricultural settlement.

The agricultural development projects are being carried out in three regions in Libya:

•Benghazi Plains Region – net irrigated area 30,000 hectares 14,000 hectares to be developed as large farm projects.

•Jefara Plains Region (Tripoli) - net irrigated area 80,000 hectares 1,500 hectares to be developed as large farm projects.

•Al-Ghardabiya Plains Region (Sirt) - net irrigated area 20,000 hectares 5,400 hectares to be developed as large farm projects.

Investors with experience in the field are invited to participate in:

• Implementation• Operation• Maintenance• Management and product marketing

Of the large farm projects

American Companies have already invested in the development of Large Farm Projects:

- 1300 Hectares – Benghazi Plains Region (this will be increased to 14,000 Hectares in the future) - 800 Hectares – Tarhouna - Valmont Valley supplying Irrigation equipment - Case supplying agricultural equipment

Agricultural Land Developed 130,000 hectare approx. ( 20,000 farms )

About 100,000 existing farms will be supplemented with irrigation water from the project which will have great impact on their productivity and encourage the settlement of farmers and their families, hence a positive

impact on the value of their property

Page 16: THE GREAT MAN-MADE RIVER PROJECT Only 5% of the entire area of Libya exceeds 100 mm (4 in) annually. Evaporation rates are also high ranging from 1700

THE GREAT MAN-MADE RIVER PROJECT

We can conclude that, adequate fresh water supplied by the gigantic GMRA project, have become an integral part of the infrastructure (including real estate) in all domestic, agricultural and industrial aspects, both in rural and urban areas, so as these areas grow, the need for infrastructure increase.

Page 17: THE GREAT MAN-MADE RIVER PROJECT Only 5% of the entire area of Libya exceeds 100 mm (4 in) annually. Evaporation rates are also high ranging from 1700

THE GREAT MAN-MADE RIVER PROJECT

Which results in:Encouraging people in rural areas to stay in their land, due to Agricultural expansion.

Page 18: THE GREAT MAN-MADE RIVER PROJECT Only 5% of the entire area of Libya exceeds 100 mm (4 in) annually. Evaporation rates are also high ranging from 1700

THE GREAT MAN-MADE RIVER PROJECT

In urban areas, the real estate prices will escalate due to the improvement of the life standards.

Page 19: THE GREAT MAN-MADE RIVER PROJECT Only 5% of the entire area of Libya exceeds 100 mm (4 in) annually. Evaporation rates are also high ranging from 1700

THE GREAT MAN-MADE RIVER PROJECT

19.58 Billion Dollars Project Cost

Phase I - $5.53Billion

Phase II - $8.05Billion

Future Phase - $6.0Billion

Mediterranean Sea

BenghaziSirt

Tripoli

6004503001500Km

Tazerbo

Ajdabiya

Sarir

Wellfield

TazerboWellfield

NE Jebel HasounaWellfield

E Jebel HasounaWellfield

Tobruk

Kufra

JaghboubGhadames

Egy

ptE

gypt

Alg

eria

Alg

eria

TunisiaTunisia

Sud

anS

udan

Capital Cost $19.58 Billion

Operation & Maintenance Cost $14.11 Billion

Total Investment Cost (50 Years) $33.69 Billion

Expected Production Quantity 120 Billion m3

Unit rate/ m3 water to recover investment cost over 50 years

$0.28/m3

Page 20: THE GREAT MAN-MADE RIVER PROJECT Only 5% of the entire area of Libya exceeds 100 mm (4 in) annually. Evaporation rates are also high ranging from 1700

THE GREAT MAN-MADE RIVER PROJECT

Sources for Project FinancingSources for Project Financing

The project is financed from the following sources:-

- Law (10/83) revenues.

- The revenue gained by selling water produced by the project’s System.

- What is annually allocated in the country’s development budget, loans and financial facilities.

Page 21: THE GREAT MAN-MADE RIVER PROJECT Only 5% of the entire area of Libya exceeds 100 mm (4 in) annually. Evaporation rates are also high ranging from 1700

THE GREAT MAN-MADE RIVER PROJECT

Fees (indirect taxes) , established byFees (indirect taxes) , established by Law no (10)/1983 Law no (10)/1983

• Fees on documentary credits and money orders.

• Fess on selling fuel derivations.

• Fees on commerce , trade and industrial licenses.

• Fees on selling local and imported Tobacco and Cigarettes.

• Fees on international travel tickets.

Page 22: THE GREAT MAN-MADE RIVER PROJECT Only 5% of the entire area of Libya exceeds 100 mm (4 in) annually. Evaporation rates are also high ranging from 1700

THE GREAT MAN-MADE RIVER PROJECT

PROJECT STATISTICSPROJECT STATISTICS

Total Weight of Cement Total Weight of Cement

6.9 Million Tonnes6.9 Million Tonnes

Volume of Trench ExcavationVolume of Trench Excavation

240 Million M240 Million M33

The length of pre-stressing wire used in the project is equivalent to 220 times the circumference of the earth .

The amount of aggregate used in the project is sufficient to build 16 pyramids the size of the Great Pyramid .

The cement used in the project is sufficient to construct a concrete road from Tripoli to Bangkok

The total number of wells is 1,350

Total No. of PipesTotal No. of Pipes

585,296585,296

Page 23: THE GREAT MAN-MADE RIVER PROJECT Only 5% of the entire area of Libya exceeds 100 mm (4 in) annually. Evaporation rates are also high ranging from 1700

THE GREAT MAN-MADE RIVER PROJECT

Mediterranean Sea

Benghazi

Sirt

Tripoli

6004503001500Km

Tobruk

Tazirbu

Ajadibya

Al KufrahFrance

EnglandGermany

Project ScaleProject Scale

Page 24: THE GREAT MAN-MADE RIVER PROJECT Only 5% of the entire area of Libya exceeds 100 mm (4 in) annually. Evaporation rates are also high ranging from 1700

THE GREAT MAN-MADE RIVER PROJECT

Benghazi

Sirt

Tripoli

6004503001500Km

Tobruk

Tazirbu

Ajadibya

Al Kufrah

Project ScaleProject Scale

Ghadames

TEXAS

NEW MEXICO

OKLAHOMA

AR

KA

NS

AS

LO

UIS

IAN

A

MIS

SO

UR

I

COLORADO

KANSAS

Page 25: THE GREAT MAN-MADE RIVER PROJECT Only 5% of the entire area of Libya exceeds 100 mm (4 in) annually. Evaporation rates are also high ranging from 1700

THE GREAT MAN-MADE RIVER PROJECT

Thank You for your attention and have a nice

day!

Page 26: THE GREAT MAN-MADE RIVER PROJECT Only 5% of the entire area of Libya exceeds 100 mm (4 in) annually. Evaporation rates are also high ranging from 1700