FASTMARKETS AMM: 6 TH DRI & MINI-MILLS CONFERENCE CHICAGO, NOVEMBER 28 TH 2018 The Global HBI/DRI Market: outlook for DR Grade pellet supply

Upload: others

Post on 28-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The Global HBI/DRI Market: outlook for DR Grade pellet supply · 2018-11-30 · Nameplate capacity of the two pellet lines is 11 mt. Supply to external markets in 2017 is understood

FASTMARKETS AMM: 6TH DRI & MINI-MILLS CONFERENCE

CHICAGO, NOVEMBER 28TH 2018

The Global HBI/DRI Market:outlook for DR Grade pellet supply

Page 2: The Global HBI/DRI Market: outlook for DR Grade pellet supply · 2018-11-30 · Nameplate capacity of the two pellet lines is 11 mt. Supply to external markets in 2017 is understood

Disclaimer

This presentation is intended for information purposes only and isnot intended as commercial material in any respect. The material isnot intended as an offer or solicitation for the purposes of anyfinancial instrument, is not intended to provide an investmentrecommendation and should not be relied upon for such. Thematerial is derived from published sources, together with personalresearch. No responsibility or liability is accepted by the author orInternational Iron Metallics Association or any of its members for anysuch information or opinions or for any errors, omissions, mis-statements, negligence or otherwise for any further communication,written or otherwise.

6TH DRI & MINI-MILLS CONFERENCE 2November 28th 2018

Page 3: The Global HBI/DRI Market: outlook for DR Grade pellet supply · 2018-11-30 · Nameplate capacity of the two pellet lines is 11 mt. Supply to external markets in 2017 is understood

Presentation overview

Iron ore and pellet market: key issues

DRI production - historical and medium term

Outlook for DR grade pellet supply Pellet feed supply

Key messages

November 28th 2018 6TH DRI & MINI-MILLS CONFERENCE 3

Page 4: The Global HBI/DRI Market: outlook for DR Grade pellet supply · 2018-11-30 · Nameplate capacity of the two pellet lines is 11 mt. Supply to external markets in 2017 is understood

Iron ore market issues

The over-arching issue is the flight to quality in China: improvement of the environment and lower CO2 emissions production curtailments - winter heating season sinter and pelletising plants shut down improvement in blast furnace productivity

Declining grades and increased acid gangue in iron ore Al2O3 is of key importance, affecting slag viscosity and volume SiO2 is also important, affecting slag volume

Chinese domestic iron ore production is steady at <300 mt 62% Fe equivalent with apparently reduced price elasticity

November 28th 2018 6TH DRI & MINI-MILLS CONFERENCE 5

Chart source: Rio Tinto presentation June 2018

Jan-Oct 2018: ±197 mtMacquarie 2018 estimate 220 mt

Page 5: The Global HBI/DRI Market: outlook for DR Grade pellet supply · 2018-11-30 · Nameplate capacity of the two pellet lines is 11 mt. Supply to external markets in 2017 is understood

November 28th 2018 6TH DRI & MINI-MILLS CONFERENCE 6

-$40

-$30

-$20

-$10

$0

$10

$20

$30

$40

01 Ja

n 20

1622

Jan

2016

12 F

eb 2

016

04 M

ar 2

016

25 M

ar 2

016

15 A

pr 2

016

06 M

ay 2

016

27 M

ay 2

016

17 Ju

n 20

1608

Jul 2

016

29 Ju

l 201

619

Aug

201

609

Sep

201

630

Sep

201

621

Oct

201

611

Nov

201

602

Dec

201

623

Dec

201

613

Jan

2017

03 F

eb 2

017

24 F

eb 2

017

17 M

ar 2

017

07 A

pr 2

017

28 A

pr 2

017

19 M

ay 2

017

09 Ju

n 20

1730

Jun

2017

21 Ju

l 201

711

Aug

201

701

Sep

201

722

Sep

201

713

Oct

201

703

Nov

201

724

Nov

201

715

Dec

201

705

Jan

2018

26 Ja

n 20

1816

Feb

201

809

Mar

201

830

Mar

201

820

Apr

201

811

May

201

801

Jun

2018

22 Ju

n 20

1813

Jul 2

018

03 A

ug 2

018

24 A

ug 2

018

14 S

ep 2

018

05 O

ct 2

018

26 O

ct 2

018

16 N

ov 2

018

Iron ore price premium/discount to 62% Fe price CFR North China (Fastmarkets data)

Delta 65-62% Fe Delta 58-62% Fe Linear (Delta 65-62% Fe) Linear (Delta 58-62% Fe)

Δ 14/09/18 = $57Δ 23/11/18 = $47

Page 6: The Global HBI/DRI Market: outlook for DR Grade pellet supply · 2018-11-30 · Nameplate capacity of the two pellet lines is 11 mt. Supply to external markets in 2017 is understood

November 28th 2018 6TH DRI & MINI-MILLS CONFERENCE 7

$0

$1

$2

$3

$4

$5

$6

$7

$8

$9

06 Jan2017

03 Feb2017

03 Mar2017

07 Apr2017

05 May2017

02 Jun2017

07 Jul2017

04 Aug2017

08 Sep2017

06 Oct2017

03 Nov2017

01 Dec2017

05 Jan2018

02 Feb2018

02 Mar2018

06 Apr2018

04 May2018

01 Jun2018

06 Jul2018

03 Aug2018

07 Sep2018

05 Oct2018

02 Nov2018

Alumina Silica

US$/% Alumina & Silica differential CFR Qingdao (monthly indicator - mid-range)(Fastmarkets data)

Page 7: The Global HBI/DRI Market: outlook for DR Grade pellet supply · 2018-11-30 · Nameplate capacity of the two pellet lines is 11 mt. Supply to external markets in 2017 is understood

November 28th 2018 6TH DRI & MINI-MILLS CONFERENCE 8

0

200,000

400,000

600,000

800,000

1,000,000

1,200,000

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Cumulative Monthly Chinese Iron Ore Imports - tonnes x 103

2012 2013 2014 2015 2016 2017 2018

Page 8: The Global HBI/DRI Market: outlook for DR Grade pellet supply · 2018-11-30 · Nameplate capacity of the two pellet lines is 11 mt. Supply to external markets in 2017 is understood

November 28th 2018 6TH DRI & MINI-MILLS CONFERENCE 9

157.6 150125 120 130

83.8 85.7

76 72.579.3

70 65.6

65.6 6772.2

33.2 35

45 48.548

34.9 37.538 36.6

47.6

51.7 58.563.4

37.7

41.1

26.1 26.725.3

27.7

27.9

472 472452

424

460

0

50

100

150

200

250

300

350

400

450

500

2013 2014 2015 2016 2017

Global Iron Ore Pellet Production - tonnes x 106

China NAFTA CIS India Africa & ME Brazil EU Japan Other Asia & Oceania Other Europe Other C&S America

Page 9: The Global HBI/DRI Market: outlook for DR Grade pellet supply · 2018-11-30 · Nameplate capacity of the two pellet lines is 11 mt. Supply to external markets in 2017 is understood

November 28th 2018 6TH DRI & MINI-MILLS CONFERENCE 10

30.3

18.9

15.714.9

12.8

10.4

9.7

3.5

5.02.9 1.8

Iron ore pellet exports in 2017tonnes x 106

total 126.2

Brazil Sweden

Canada Ukraine

Russia USA

India Bahrain

Oman Chile

Australia Iran

Data source: customs import & export data (CN code 260112) + private communications

Page 10: The Global HBI/DRI Market: outlook for DR Grade pellet supply · 2018-11-30 · Nameplate capacity of the two pellet lines is 11 mt. Supply to external markets in 2017 is understood

November 28th 2018 6TH DRI & MINI-MILLS CONFERENCE 11

$0

$20

$40

$60

$80

$100

$120

$140

$160

$180

05 Ja

n 20

1812

Jan

2018

19 Ja

n 20

1826

Jan

2018

02 F

eb 2

018

09 F

eb 2

018

16 F

eb 2

018

23 F

eb 2

018

02 M

ar 2

018

09 M

ar 2

018

16 M

ar 2

018

23 M

ar 2

018

30 M

ar 2

018

06 A

pr 2

018

13 A

pr 2

018

20 A

pr 2

018

27 A

pr 2

018

04 M

ay 2

018

11 M

ay 2

018

18 M

ay 2

018

25 M

ay 2

018

01 Ju

n 20

1808

Jun

2018

15 Ju

n 20

1822

Jun

2018

29 Ju

n 20

1806

Jul 2

018

13 Ju

l 201

820

Jul 2

018

27 Ju

l 201

803

Aug

201

810

Aug

201

817

Aug

201

824

Aug

201

831

Aug

201

807

Sep

201

814

Sep

201

821

Sep

201

828

Sep

201

805

Oct

201

812

Oct

201

819

Oct

201

826

Oct

201

802

Nov

201

809

Nov

201

816

Nov

201

823

Nov

201

8

Pellet premium and price - $/DMT (Fastmarkets data)

BF pellet premium CFR N. China (weekly) BF pellet price CFR N. China (weekly) DR pellet premium Middle East (monthly)

$73

Page 11: The Global HBI/DRI Market: outlook for DR Grade pellet supply · 2018-11-30 · Nameplate capacity of the two pellet lines is 11 mt. Supply to external markets in 2017 is understood

November 28th 2018 6TH DRI & MINI-MILLS CONFERENCE 12

Chart source: Steel Mint

Page 12: The Global HBI/DRI Market: outlook for DR Grade pellet supply · 2018-11-30 · Nameplate capacity of the two pellet lines is 11 mt. Supply to external markets in 2017 is understood

DR grade iron ore pellet supply issues

Samarco remains shut down (pellet capacity 30.5 mt) no definitive date for restart - 2020 at the earliest

IOC strike cost ≈1 mt pellet production in 2018 2018 guidance 9-10 mt pellets + concentrates

LKAB’s Svappavaara plant out of operation through January 2019 Anglo American’s Minas Rio operation shut down in March 2018 for

pipeline repairs, expected to be completed in Q4 2018 2018 guidance 3.0 mt concentrate (based on production prior to shutdown)

Bahrain Steel production constrained by pellet feed supply suspension of contract with Anglo American (Minas Rio) Jan-Sep 2018 exports at 5.1 mt up 7.5% y-o-y

November 28th 2018 6TH DRI & MINI-MILLS CONFERENCE 13

Page 13: The Global HBI/DRI Market: outlook for DR Grade pellet supply · 2018-11-30 · Nameplate capacity of the two pellet lines is 11 mt. Supply to external markets in 2017 is understood

November 28th 2018 6TH DRI & MINI-MILLS CONFERENCE 14

Page 14: The Global HBI/DRI Market: outlook for DR Grade pellet supply · 2018-11-30 · Nameplate capacity of the two pellet lines is 11 mt. Supply to external markets in 2017 is understood

November 28th 2018 6TH DRI & MINI-MILLS CONFERENCE 15

Page 15: The Global HBI/DRI Market: outlook for DR Grade pellet supply · 2018-11-30 · Nameplate capacity of the two pellet lines is 11 mt. Supply to external markets in 2017 is understood

November 28th 2018 6TH DRI & MINI-MILLS CONFERENCE 16

27.9 28.832.3

34.8 35.2 35.7 36.2 36.8 37.3

2.04.0

6.08.0

10.0

27.9 28.8

32.334.8

37.239.7

42.244.8

47.3

0

5

10

15

20

25

30

35

40

45

50

2017 2018 2019 2020 2021 2022 2023 2024 2025

DRI production in plants using purchased iron ore (mt)

Existing/Contracted Uncontracted/New

ArgentinaTrinidadUSAGermanySouth AfricaAlgeriaLibyaEgyptSaudi ArabiaQatarBahrainUAEOmanMalaysia

Page 16: The Global HBI/DRI Market: outlook for DR Grade pellet supply · 2018-11-30 · Nameplate capacity of the two pellet lines is 11 mt. Supply to external markets in 2017 is understood

November 28th 2018 6TH DRI & MINI-MILLS CONFERENCE 17

39.5 40.845.8 49.4 50.1 50.8 51.6 52.3 53.1

2.95.8

8.711.6

14.5

39.5 40.8

45.849.4

53.056.6

60.363.9

67.6

0

10

20

30

40

50

60

70

80

2017 2018 2019 2020 2021 2022 2023 2024 2025

Seaborne DR grade pellet demand (mt) - 1.45 t pellets per 1t DRI

Existing/Contracted Uncontracted/New

Page 17: The Global HBI/DRI Market: outlook for DR Grade pellet supply · 2018-11-30 · Nameplate capacity of the two pellet lines is 11 mt. Supply to external markets in 2017 is understood

November 28th 2018 6TH DRI & MINI-MILLS CONFERENCE 18

Vale55%

LKAB18%

Canada9%

Bahrain Steel14%

Russia1%

Lump3%

Ore Supply 2017 (mt) - total 39.6 mtsource: trade statistics, private communications

Page 18: The Global HBI/DRI Market: outlook for DR Grade pellet supply · 2018-11-30 · Nameplate capacity of the two pellet lines is 11 mt. Supply to external markets in 2017 is understood

Bridging the gap

Per the forecast, between 2017 and 2020, DRI production at plants using purchased iron ore increases by 6.9 mt, requiring an additional 9.9 mt iron ore, ideally DR grade pellets.• NB: 2017 supply included 1.1 mt lump ore and an unknown

(probably modest) quantity of BF grade pellets from traditional and non-traditional sources.

Between 2020 and 2025, DRI production increases by a further 12.5 mt, requiring an additional 18.2 mt iron ore, ideally pellets.

November 28th 2018 6TH DRI & MINI-MILLS CONFERENCE 19

Page 19: The Global HBI/DRI Market: outlook for DR Grade pellet supply · 2018-11-30 · Nameplate capacity of the two pellet lines is 11 mt. Supply to external markets in 2017 is understood

Bridging the gap to 2020 - Vale

Estimated pellet supply to the DR sector in 2017 = 21.7 mt (≈43% of pellet sales by volume).

In 2018 Vale has restarted idled pellet plants with aggregate capacity of 13 mt, adding ≈5 mt production in 2018 (guidance 55 mt), bringing total capacity in Brazil and Oman to ≈60 mt.

Of the restarted capacity, ≈6 mt is at plants which can produce DR grade pellets (Tubarão #1 and #2). Vale’s supply of DR grade pellets in 2019 and 2020 is estimated at ≈27 mt (≈45% of pellet sales by volume).

November 28th 2018 6TH DRI & MINI-MILLS CONFERENCE 20

Page 20: The Global HBI/DRI Market: outlook for DR Grade pellet supply · 2018-11-30 · Nameplate capacity of the two pellet lines is 11 mt. Supply to external markets in 2017 is understood

Bridging the gap to 2020 - LKAB

LKAB has 10 mt capacity at pellet plants with coating capacity (Kiruna KK3 and KK4). Estimated 2017 DR grade pellet supply was 7.1 mt (31% of sales by volume). KK3 produces only DR grade, KK4 can switch between BF and DR

grades.

With the current outage of production at Svappavaara, it seems unlikely that LKAB will have much scope for increased supply to the DR market in the short term.

Estimated supply to DR markets in first 7 months of 2018 = 3.7 mt.

November 28th 2018 6TH DRI & MINI-MILLS CONFERENCE 21

Page 21: The Global HBI/DRI Market: outlook for DR Grade pellet supply · 2018-11-30 · Nameplate capacity of the two pellet lines is 11 mt. Supply to external markets in 2017 is understood

Bridging the gap to 2020 - Canada

Canada has two pellet producers, Iron Ore Company of Canada (IOC) and ArcelorMittal Canada (AM).• AM supplies DR grade pellets to captive DR plants in Canada and

Germany.• IOC supplies the wider DR market, with estimated shipments of 3.3

mt in 2017. IOC lost ≈1 mt pellet production to a strike in 2018, but should operate at close to full capacity of 12.5 mt in 2019 and 2020.

• IOC is thought to favour increasing the share of DR grade pellets in its portfolio and could supply perhaps 3.5-4.5 mt in 2019 and 2020 (28-36% of pellet sales by volume).

• AM is considered unlikely to supply DR grade pellets to external DRI producers.

November 28th 2018 6TH DRI & MINI-MILLS CONFERENCE 22

Page 22: The Global HBI/DRI Market: outlook for DR Grade pellet supply · 2018-11-30 · Nameplate capacity of the two pellet lines is 11 mt. Supply to external markets in 2017 is understood

Bridging the gap to 2020 - Bahrain Steel Bahrain Steel is in effect partly captive to adjacent DR plant SULB which

produced 1.3 mt DRI in 2017 (estimated pellet offtake from BS was 2.2 mt).

Nameplate capacity of the two pellet lines is 11 mt.

Supply to external markets in 2017 is understood to have been ≈3.5 mt (but probably not all of DR quality).

There is therefore apparent latent pellet capacity of ≈5.3 mt.

Production of DR grade pellets has been constrained by pellet feed supply with major supplier Anglo American’s Minas Rio offline during most of 2018. Current principal supply sources are thought to be CSN/Usiminas Brazil, CMP Chile and

Champion Iron, Canada - imports Q1-3 2018 5.7 mt (5.5 mt in all 2017), implying pellet production of ≈8 mt in 2018.

With Minas Rio coming back online in Q1 2019, BS will have access to increased supply of higher grade pellet feed.

November 28th 2018 6TH DRI & MINI-MILLS CONFERENCE 23

Page 23: The Global HBI/DRI Market: outlook for DR Grade pellet supply · 2018-11-30 · Nameplate capacity of the two pellet lines is 11 mt. Supply to external markets in 2017 is understood

Bridging the gap to 2020 - Tosyali Algeria

Tosyali Algeria (2.5 mt DR plant now commissioning) has adjacent 4 mt pellet plant which has not yet started production. There is no captive supply of pellet feed.

Supply of suitable pellet feed is a major constraint as grinding capacity is understood to be limited or non-existent.

It seems unlikely that this pellet plant will deliver anything like its nameplate capacity in the short term, necessitating the purchase of pellets from external sources.

November 28th 2018 6TH DRI & MINI-MILLS CONFERENCE 24

Page 24: The Global HBI/DRI Market: outlook for DR Grade pellet supply · 2018-11-30 · Nameplate capacity of the two pellet lines is 11 mt. Supply to external markets in 2017 is understood

Bridging the gap to 2020 - summary Incremental DR grade pellet demand is ≈10 mt which could be met

from among: Vale: estimated 5 mt increase in supply IOC: between 0.2 and 1.2 mt increase in supply Bahrain Steel: apparent latent capacity of 5.3 mt Tosyali Algeria: ??? Samarco: ???

Conclusion: market tightness can be expected to continue.

Note: the relative premiums for BF and DR grade pellets will be a factor - cost of producing DR grade pellet feed is higher and recovery lower than for BF grade material.

November 28th 2018 6TH DRI & MINI-MILLS CONFERENCE 25

Page 25: The Global HBI/DRI Market: outlook for DR Grade pellet supply · 2018-11-30 · Nameplate capacity of the two pellet lines is 11 mt. Supply to external markets in 2017 is understood

Bridging the gap 2020-25 Per the forecast, incremental DR grade pellet demand is ≈18 mt between 2020 and

2025. Current supply sources will be hard pushed meet the incremental demands of the

existing DR plants ( + ≈4 mt over the period), necessitating incremental capacity expansions/de-bottlenecking and perhaps some switch from BF to DR grade pellets.

Vale is considering capex projects to de-bottleneck its plants, thereby increasing production capacity to ≈65 mt by the mid-2020s. Of this additional 5 mt production, ≈3 mt could be DR grade.

Although Cleveland Cliffs could theoretically produce 3.5 mt DR grade pellets at North Shore (≈1.2 mt more than the needs of its Toledo HBI plant), high logistics costs effectively limit the scope for deliveries outside the Great Lakes area.

New DR plants without captive pellet supply could struggle to obtain DR grade pellets from the seaborne market unless one or more existing DR plants are taken offline.

However, there is of course one big elephant in the room….

November 28th 2018 6TH DRI & MINI-MILLS CONFERENCE 26

Page 26: The Global HBI/DRI Market: outlook for DR Grade pellet supply · 2018-11-30 · Nameplate capacity of the two pellet lines is 11 mt. Supply to external markets in 2017 is understood

The elephant in the room

November 28th 2018 6TH DRI & MINI-MILLS CONFERENCE 27

Page 27: The Global HBI/DRI Market: outlook for DR Grade pellet supply · 2018-11-30 · Nameplate capacity of the two pellet lines is 11 mt. Supply to external markets in 2017 is understood

Samarco - issues Government approvals and granting of licences by state authorities: environmental permits, water supply licence applications subject to much scrutiny and politicians may be slow to take decisions

Germano pit is now licensed only for dry waste. Samarco’s “in house” solution is to dump tailings into the Alegria South pit which is permitted, but Alegria

Sul deposit has lowest P ore and is best suited for production of DR pellets, so with this solution scope for DR pellet production may be limited. Permit for preparatory operations granted, but Corrective Operational Licensing of the Germano Complex still awaited.

Use of Vale’s adjacent, mined out Timbopeba pit, already licenced for wet tailings is an alternative that would allow access to the low P ore in Alegria Sul - non-binding term sheet agreed among Samarco, Vale and BHP.

Status of pellet plants Ongoing negotiations between Vale and BHP over future ownership structure, etc. Legal issues and claims to be settled Samarco’s debt to be restructured

6TH DRI & MINI-MILLS CONFERENCE 28

Information sources: Samarco, author’s understanding

November 28th 2018

Page 28: The Global HBI/DRI Market: outlook for DR Grade pellet supply · 2018-11-30 · Nameplate capacity of the two pellet lines is 11 mt. Supply to external markets in 2017 is understood

Vale Q3 2018 earnings call with analysts

Fabio SchvartsmanRegarding Samarco, this year was a year of important achievements in Samarco. First, we had an agreement with all the parties involved, especially the prosecutors. That was a very complicated thing to get. And this was the most important step forward because it’s taking out uncertainty of which we will be the impact of the liabilities that we had because of the accident that Samarco has because of accident. The second good news is that very recently, we decided to start the construction of the tail dam that will support the restart of the operation, called Alegria Sul where we not only decided to start but we got the licenses to build it. And we’re under construction right now. That means that by the end of 2019, we will have everything in place to ask for the license for restarting operation. Therefore, if we are able to get these licenses, we will have everything ready for restarting the operation by the beginning of 2020.

November 28th 2018 6TH DRI & MINI-MILLS CONFERENCE 29

Page 29: The Global HBI/DRI Market: outlook for DR Grade pellet supply · 2018-11-30 · Nameplate capacity of the two pellet lines is 11 mt. Supply to external markets in 2017 is understood

Bridging the gap 2020-25 To support new DR plants an injection of “new” DR grade pellet

supply is needed, either a return to the market by Samarco, or new pellet plants.

Samarco and its owners need to address the various issues before there is a clear way forward and it’s by no means clear at what rate, to what extent and with which products Samarco will return to the market.

In the meantime, who would be brave enough to build a new pellet plant so long as Samarco’s 30.5 mt capacity is out there?

Is there anyone else anyway, apart from existing players?

Should new DR plants install captive pellet capacity?November 28th 2018 6TH DRI & MINI-MILLS CONFERENCE 30

Page 30: The Global HBI/DRI Market: outlook for DR Grade pellet supply · 2018-11-30 · Nameplate capacity of the two pellet lines is 11 mt. Supply to external markets in 2017 is understood

Pellet feed - short term outlook - supply

Minas Rio to resume Q4-2018 / Q1 2019 - aims to obtain permit in 2019 for ramp up to eventual full capacity of 26.5 mt but with how much DR grade material (≥ 67.5% Fe)?

Kaunis Iron started production at the Pajala mine in northern Sweden in July 2018 aiming to produce 69% Fe concentrate at 2 mtpy rate by Q12019 (former operator Northland Resources went bankrupt in 2014).

Vale accelerating ramp up of S11D to reach 90 mt sinter feed capacity in 2019 instead of 2020 (will replace lower grade fines from the south) -latest information is that expansion beyond 90 mt is under consideration.

Champion Iron’s Bloom Lake mine in Quebec producing 7.4 mtpy 66.2% Fe concentrate.

November 28th 2018 6TH DRI & MINI-MILLS CONFERENCE 31

Page 31: The Global HBI/DRI Market: outlook for DR Grade pellet supply · 2018-11-30 · Nameplate capacity of the two pellet lines is 11 mt. Supply to external markets in 2017 is understood

Pellet feed - longer term potential - supply

Various development projects: Eurasian Resources’ Bamin project in Brazil: 16-18 mt 67-68.5% Fe

concentrate, start-up potentially 2021 Metalloinvest upgrading concentrate quality at Mikhailovsky GOK

from 65% to 67% Fe by 2022 Nordic Iron Ore plans to produce 4.3 mtpy high grade magnetite

concentrate at the Ludvika mines in central Sweden Carpentaria Resources’ Hawsons Iron project in NSW, Australia

aims to produce 70% Fe magnetite concentrate at initial rate of 10 mt from early 2020s - now undertaking bankable feasibility study

Sydvaranger AS plans to restart high grade concentrate production at the Bjørnevatn mine in mid 2019 (former operator Northern Iron ceased operations in 2015)

November 28th 2018 6TH DRI & MINI-MILLS CONFERENCE 32

Page 32: The Global HBI/DRI Market: outlook for DR Grade pellet supply · 2018-11-30 · Nameplate capacity of the two pellet lines is 11 mt. Supply to external markets in 2017 is understood

Key messages

To the pellet buyer: your job isn’t going to get any easier over the coming years.

To the pellet seller: when setting your pricing strategy, keep in mind that DRI and HBI need to be competitive with scrap (on a value-in-use basis).

To the iron ore industry in general and pellet producers in particular: the market needs more DR grade pellets.

To Samarco, Vale and BHP: please try to find a solution to enable sustainable and significant production of DR grade pellets.

To those considering building new DR plants: make sure that you have a sustainable supply of pellets. If you build a captive pellet plant, make sure that you have a sustainable supply of pellet feed and the right kit to process it to pellet plant requirements.

November 28th 2018 6TH DRI & MINI-MILLS CONFERENCE 33

Presenter
Presentation Notes
To quote Lourenco Goncalves, CEO of Cleveland Cliffs talking about the pellet premium in 2019: “….if the negotiators are very incompetent it will be $70 per ton. If they are moderately competent it will be $80. And if they gauge how much the clients can pay before they die, it will be something between $80 and $100. Anything above $100 will be a little too much.”
Page 33: The Global HBI/DRI Market: outlook for DR Grade pellet supply · 2018-11-30 · Nameplate capacity of the two pellet lines is 11 mt. Supply to external markets in 2017 is understood

Global Merchant DRI/HBI supply

November 28th 2018 6TH DRI & MINI-MILLS CONFERENCE 34

Page 34: The Global HBI/DRI Market: outlook for DR Grade pellet supply · 2018-11-30 · Nameplate capacity of the two pellet lines is 11 mt. Supply to external markets in 2017 is understood

Contact Information

Secretary General:Chris Barrington

[email protected]

Administration Manager:Abi Hart

[email protected]

Website:www.metallics.org

6TH DRI & MINI-MILLS CONFERENCE 35November 28th 2018