the george washington university mount ......march 10, 2010 the george washington university ames...

19
March 10, 2010 Ames Hall Renovation and Addition The George Washington University THE GEORGE WASHINGTON UNIVERSITY MOUNT VERNON CAMPUS AMES HALL RENOVATION AND ADDITION ZONING APPLICATION SUBMISSION MARCH 10, 2010 PROJECT DATA: ZONING SUMMARY: LOCATION: SQUARE 1374, LOT 850 ZONE: R-1-A/R-1-B LAND AREA: 970,655 SF ALLOWABLE/REQUIRED PROPOSED APPROXIMATE NET NEW GROSS FLOOR AREA: PER 2010 CAMPUS PLAN 26,886 SF APPROXIMATE NEW FAR: PER 2010 CAMPUS PLAN 0.028 FAR NET NEW LOT COVERAGE: PER 2010 CAMPUS PLAN 8,855 SF NET NEW LOT OCCUPANCY: PER 2010 CAMPUS PLAN 0.009% HEIGHT PER 2010 CAMPUS PLAN 43’ 3” (max) 1 ROOF STRUCTURE Height: 16’ 0” 18’ 6” (max) Setback: 1 to 1 Relief Required PARKING/LOADING PER 2010 CAMPUS PLAN 1 20-foot delivery space NOTES: 1 Height measured from grade at middle of front of building to top of penthouse COVER SHEET DRAWINGS: 1 EXISTING CONDITIONS PLAN 2 SITE PLAN 3 SITE UTILITY PLAN 4 EROSION & SEDIMENT CONTROL PLAN 5 B3 PLAN 6 B2 PLAN 7 B1 PLAN 8 FIRST FLOOR PLAN 9 SECOND FLOOR PLAN 10 ROOF PLAN 11 NORTH-SOUTH SECTION 12 WEST ELEVATION 13 EAST ELEVATION 14 SOUTH ELEVATION 15 NORTH ELEVATION 16 CAMPUS CONTEXT 17 EXISTING CONDITIONS 18 PLAT

Upload: others

Post on 17-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: THE GEORGE WASHINGTON UNIVERSITY MOUNT ......March 10, 2010 The George Washington University Ames Hall Renovation and Addition THE GEORGE WASHINGTON UNIVERSITY MOUNT VERNON CAMPUS

Mar

ch 1

0, 2

010

Am

es H

all R

enov

atio

n an

d A

dditi

onTh

e G

eorg

e W

ashi

ngto

n U

nive

rsity

THE GEORGE WASHINGTON UNIVERSITYMOUNT VERNON CAMPUS

AMES HALL RENOVATION AND ADDITIONZONING APPLICATION SUBMISSION

MARCH 10, 2010PROJECT DATA:ZONING SUMMARY:

LOCATION: SQUARE 1374, LOT 850ZONE: R-1-A/R-1-BLAND AREA: 970,655 SF

ALLOWABLE/REQUIRED PROPOSEDAPPROXIMATE NET NEW GROSS FLOOR AREA: PER 2010 CAMPUS PLAN 26,886 SFAPPROXIMATE NEW FAR: PER 2010 CAMPUS PLAN 0.028 FAR NET NEW LOT COVERAGE: PER 2010 CAMPUS PLAN 8,855 SF

NET NEW LOT OCCUPANCY: PER 2010 CAMPUS PLAN 0.009%

HEIGHT PER 2010 CAMPUS PLAN 43’ 3” (max)1

ROOF STRUCTURE Height: 16’ 0” 18’ 6” (max) Setback: 1 to 1 Relief Required

PARKING/LOADING PER 2010 CAMPUS PLAN 1 20-foot delivery space

NOTES: 1 Height measured from grade at middle of front of building to top of penthouse COVER

SHEET

DRAWINGS:1 EXISTING CONDITIONS PLAN2 SITE PLAN3 SITE UTILITY PLAN4 EROSION & SEDIMENT CONTROL PLAN5 B3 PLAN6 B2 PLAN7 B1 PLAN8 FIRST FLOOR PLAN9 SECOND FLOOR PLAN10 ROOF PLAN11 NORTH-SOUTH SECTION12 WEST ELEVATION13 EAST ELEVATION14 SOUTH ELEVATION15 NORTH ELEVATION16 CAMPUS CONTEXT17 EXISTING CONDITIONS18 PLAT

Page 2: THE GEORGE WASHINGTON UNIVERSITY MOUNT ......March 10, 2010 The George Washington University Ames Hall Renovation and Addition THE GEORGE WASHINGTON UNIVERSITY MOUNT VERNON CAMPUS

Mar

ch 1

0, 2

010

Am

es H

all R

enov

atio

n an

d A

dditi

onTh

e G

eorg

e W

ashi

ngto

n U

nive

rsity

1 EXISTING CONDITIONS PLAN

Page 3: THE GEORGE WASHINGTON UNIVERSITY MOUNT ......March 10, 2010 The George Washington University Ames Hall Renovation and Addition THE GEORGE WASHINGTON UNIVERSITY MOUNT VERNON CAMPUS

Mar

ch 1

0, 2

010

Am

es H

all R

enov

atio

n an

d A

dditi

onTh

e G

eorg

e W

ashi

ngto

n U

nive

rsity

2SITE PLAN

LEGEND

BRICK

CONCRETE

GREEN SPACE

Page 4: THE GEORGE WASHINGTON UNIVERSITY MOUNT ......March 10, 2010 The George Washington University Ames Hall Renovation and Addition THE GEORGE WASHINGTON UNIVERSITY MOUNT VERNON CAMPUS

Mar

ch 1

0, 2

010

Am

es H

all R

enov

atio

n an

d A

dditi

onTh

e G

eorg

e W

ashi

ngto

n U

nive

rsity

3SITE UTILITY PLAN

Page 5: THE GEORGE WASHINGTON UNIVERSITY MOUNT ......March 10, 2010 The George Washington University Ames Hall Renovation and Addition THE GEORGE WASHINGTON UNIVERSITY MOUNT VERNON CAMPUS

Mar

ch 1

0, 2

010

Am

es H

all R

enov

atio

n an

d A

dditi

onTh

e G

eorg

e W

ashi

ngto

n U

nive

rsity

4EROSION & SEDIMENT CONTROL PLAN

Page 6: THE GEORGE WASHINGTON UNIVERSITY MOUNT ......March 10, 2010 The George Washington University Ames Hall Renovation and Addition THE GEORGE WASHINGTON UNIVERSITY MOUNT VERNON CAMPUS

UP

UP

239'

- 4"

239'

- 0"

OU

TLIN

E O

F BU

ILD

ING

ABO

VE

SER

VIC

EAC

CES

S

BALL

FIE

LD

UN

EXC

AVAT

ED

239'

- 4"

UP

UN

EXC

AVAT

ED

0'4'

8'16

'32

'

B3 P

LAN

SCAL

E 1/

16" =

1'-0

"

Inte

rior l

ayou

ts a

re s

chem

atic

and

may

be

subj

ect t

o ch

ange

.

ELEV

ATIO

N +

240'

UN

EXC

AVAT

ED

B3 239'

- 4"

LEG

END Bu

ildin

g En

try

The

Geo

rge

Was

hing

ton

Uni

vers

ity

Ames

Hal

l Ren

ovat

ion

and

Addi

tion

5

Mar

ch 1

0, 2

010

Page 7: THE GEORGE WASHINGTON UNIVERSITY MOUNT ......March 10, 2010 The George Washington University Ames Hall Renovation and Addition THE GEORGE WASHINGTON UNIVERSITY MOUNT VERNON CAMPUS

UP

DN

UP

UP

DN

TER

RAC

E

OU

TLIN

E O

F BU

ILD

ING

ABO

VE

UN

EXC

AVAT

ED DN

0'4'

8'16

'32

'

B2 P

LAN

SCAL

E 1/

16" =

1'-0

"

Inte

rior l

ayou

ts a

re s

chem

atic

and

may

be

subj

ect t

o ch

ange

.

ELEV

ATIO

N +

240'

250'

- 8"

250'

- 8"

250'

- 8"

B2 250'

- 8"

LEG

END Bu

ildin

g En

try

The

Geo

rge

Was

hing

ton

Uni

vers

ity

Ames

Hal

l Ren

ovat

ion

and

Addi

tion

6

Mar

ch 1

0, 2

010

Page 8: THE GEORGE WASHINGTON UNIVERSITY MOUNT ......March 10, 2010 The George Washington University Ames Hall Renovation and Addition THE GEORGE WASHINGTON UNIVERSITY MOUNT VERNON CAMPUS

UP

DN

UP

UP

UP

UP

DN

DN

DN

UN

EXC

AVAT

ED

OU

TLIN

E O

FBU

ILD

ING

ABO

VE

OPE

N T

OBE

LOW

263'

- 10

"

263'

- 4" 25

1' -

8"

UP

DN

263'

- 4"

264'

- 4"

265'

- 4"

265'

- 8"

265'

- 8"

263'

- 4"

0'4'

8'16

'32

'

B1 P

LAN

SCAL

E 1/

16" =

1'-0

"

Inte

rior l

ayou

ts a

re s

chem

atic

and

may

be

subj

ect t

o ch

ange

.

ELEV

ATIO

N +

240'

263'

- 4"

B1 263'

- 4"

LEG

END Bu

ildin

g En

try

The

Geo

rge

Was

hing

ton

Uni

vers

ity

Ames

Hal

l Ren

ovat

ion

and

Addi

tion

7

Mar

ch 1

0, 2

010

Page 9: THE GEORGE WASHINGTON UNIVERSITY MOUNT ......March 10, 2010 The George Washington University Ames Hall Renovation and Addition THE GEORGE WASHINGTON UNIVERSITY MOUNT VERNON CAMPUS

DN U

P

UP

DN

UP

OPE

N T

O B

ELO

W

OPE

N T

O B

ELO

W

OPE

N T

O B

ELO

W

(Ave

rage

Gra

de)

272'

- 0"

OPE

N T

OBE

LOW

276'

- 0"

263'

- 4"

275'

- 8"

276'

- 0"

UP

RO

OF

RO

OF

275'

- 8

3/4"

0'4'

8'16

'32

'

FIR

ST F

LOO

R P

LAN

SCAL

E 1/

16" =

1'-0

"

Inte

rior l

ayou

ts a

re s

chem

atic

and

may

be

subj

ect t

o ch

ange

.

ELEV

ATIO

N +

240'

FIR

ST F

LOO

R27

6' -

0"

LEG

END Bu

ildin

g En

try

The

Geo

rge

Was

hing

ton

Uni

vers

ity

Ames

Hal

l Ren

ovat

ion

and

Addi

tion

8

Mar

ch 1

0, 2

010

Page 10: THE GEORGE WASHINGTON UNIVERSITY MOUNT ......March 10, 2010 The George Washington University Ames Hall Renovation and Addition THE GEORGE WASHINGTON UNIVERSITY MOUNT VERNON CAMPUS

DN

DN

DN

DN

RO

OF

BELO

WR

OO

FBE

LOW

288'

- 0"

288'

- 0"

288'

- 0"

UP

UP

288'

- 0"

RO

OF

BELO

WR

OO

FBE

LOW

288'

- 0"

OPE

N T

OBE

LOW

276'

- 0"

288'

- 0

3/4"

288'

- 0

3/4"

276'

- 0"

0'4'

8'16

'32

'

SEC

ON

D F

LOO

R P

LAN

SCAL

E 1/

16" =

1'-0

"

Inte

rior l

ayou

ts a

re s

chem

atic

and

may

be

subj

ect t

o ch

ange

.

ELEV

ATIO

N +

240'

SEC

ON

D F

LOO

R28

8' -

0"

The

Geo

rge

Was

hing

ton

Uni

vers

ity

Ames

Hal

l Ren

ovat

ion

and

Addi

tion

9

Mar

ch 1

0, 2

010

Page 11: THE GEORGE WASHINGTON UNIVERSITY MOUNT ......March 10, 2010 The George Washington University Ames Hall Renovation and Addition THE GEORGE WASHINGTON UNIVERSITY MOUNT VERNON CAMPUS

314'

- 6

3/4"

300'

- 0"

288'

- 0

3/4"

288'

- 0

3/4"

276'

- 0"

276'

- 0"

292'

- 2

1/4"

292'

- 2

1/4"

8'-0" MIN.

8'-0

" MIN

.

0'4'

8'16

'32

'

SEC

ON

D F

LOO

R P

LAN

SCAL

E 1/

16" =

1'-0

"

Mec

hani

cal P

enth

ouse

and

Enc

losu

re la

yout

are

sch

emat

ic a

nd m

ay b

esu

bjec

t to

chan

ge.

ELEV

ATIO

N +

240'

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

SLO

PED

RO

OF

SLO

PED

RO

OF

SLO

PED

RO

OF

MEC

HAN

ICAL

PEN

THO

USE

MEC

HAN

ICAL

PEN

THO

USE

ELEV

ATO

R P

ENTH

OU

SE

ATR

IUM

RO

OF

ATR

IUM

RO

OF

288'

- 6

3/4"

LOW

ER R

OO

F

The

Geo

rge

Was

hing

ton

Uni

vers

ity

Ames

Hal

l Ren

ovat

ion

and

Addi

tion

10

Mar

ch 1

0, 2

010

Page 12: THE GEORGE WASHINGTON UNIVERSITY MOUNT ......March 10, 2010 The George Washington University Ames Hall Renovation and Addition THE GEORGE WASHINGTON UNIVERSITY MOUNT VERNON CAMPUS

B3239' - 4"

B2250' - 8"

EXISTING B1265' - 8"±

EXISTING FIRSTFLOOR

275' - 8"±

EXISTING SECONDFLOOR

288' - 0"±

B1263' - 4"

EXISTING ROOFRIDGE

309' - 4"±

SECOND FLOOR288' - 0"

FIRST FLOOR276' - 0"

EXISTING ATTICLEVEL

297' - 4 1/4"±

PENTHOUSEHEIGHT316' - 0"

PENTHOUSE DECK300' - 0"UNDERSIDE OF

EXISTING EAVE296' - 5 3/4"±

0' 4' 8' 16' 32'

NORTH-SOUTH SECTION, LOOKING EAST

SCALE 1/16" = 1'-0"

12' -

0"

12' -

8"

12' -

8"

11' -

4"

Interior layouts are schematic and may be subject to change.

11' -

11

3/4"

10 1

/2"

8' -

5 3/

4"12

' - 4

"10

' - 0

"

16' -

0"

12' -

0"

MAXIMUM ALLOWABLEHEIGHT = 18' - 6"

The

Geo

rge

Was

hing

ton

Uni

vers

ity

Ames

Hal

l Ren

o vat

i on

a nd

A ddi

t ion

11

Mar

ch 1

0, 2

010

Page 13: THE GEORGE WASHINGTON UNIVERSITY MOUNT ......March 10, 2010 The George Washington University Ames Hall Renovation and Addition THE GEORGE WASHINGTON UNIVERSITY MOUNT VERNON CAMPUS

B3239' - 4"

B2250' - 8"

EXISTING B1265' - 8"±

EXISTING FIRSTFLOOR

275' - 8"±

EXISTING SECONDFLOOR

288' - 0"±

B1263' - 4"

AVERAGE CURBGRADE AT FRONT

ELEVATION272' - 0"±

EXISTING ROOFRIDGE

309' - 4"±

SECOND FLOOR288' - 0"

FIRST FLOOR276' - 0"

EXISTING ATTICLEVEL

297' - 4 1/4"±

PENTHOUSEHEIGHT316' - 0"

PENTHOUSE DECK300' - 0"UNDERSIDE OF

EXISTING EAVE296' - 5 3/4"±

16' -

0"

12' -

0"

12' -

0"

12' -

8"

12' -

8"

11' -

4"

11'-1

1 3/

4"

10 1

/2"

8'-5

3/4

"12

'-4"

3'-8

"6'

-4"

MAXIMUM ALLOWABLEHEIGHT = 18' - 6"

SYNTHETIC SLATE SHINGLE

PRECAST CONCRETE

CLEAR GLAZING

BRICK

PRECAST CONCRETE

PRECAST CONCRETEPANEL

BRICKSYNTHETICSLATE SHINGLE

SLATE ROOF

ALUMINUM WINDOWS& FRAMES

REFURBISH EXISTINGBRICK MASONRY

SPANDREL CONCRETE PANEL

CLEAR GLAZING

CLEAR GLAZING

The

Geo

rge

Was

hing

ton

Uni

vers

ity

Ames

Hal

l Ren

o vat

i on

a nd

A ddi

t ion

12

Mar

ch 1

0, 2

010

WEST ELEVATIONSCALE 1/16" = 1'-0"

0' 4' 8' 16' 32'

Page 14: THE GEORGE WASHINGTON UNIVERSITY MOUNT ......March 10, 2010 The George Washington University Ames Hall Renovation and Addition THE GEORGE WASHINGTON UNIVERSITY MOUNT VERNON CAMPUS

B3239' - 4"

B2250' - 8"

EXISTING B1265' - 8"±

EXISTING FIRSTFLOOR

275' - 8"±

EXISTING SECONDFLOOR

288' - 0"±

B1263' - 4"

AVERAGE CURBGRADE AT FRONT

ELEVATION272' - 0"±

EXISTING ROOFRIDGE

309' - 4"±

SECOND FLOOR288' - 0"

FIRST FLOOR276' - 0"

EXISTING ATTICLEVEL

297' - 4 1/4"±

PENTHOUSEHEIGHT

316' - 0"

PENTHOUSE DECK300' - 0" UNDERSIDE OF

EXISTING EAVE296' - 5 3/4"±

16' -

0"

12' -

0"

12' -

0"

12' -

8"

12' -

8"

11' -

4"

11'-1

1 3/

4"

10 1

/2"

8'-5

3/4

"12

'-4"

3'-8

"6'

-4"

MAXIMUM ALLOWABLEHEIGHT = 18' - 6"

SYNTHETIC SLATE SHINGLE

PRECAST CONCRETE

CLEAR GLAZING

BRICK

PRECASTCONCRETE

PRECASTCONCRETE

BRICK

SPANDREL PANEL

SYNTHETICSLATE SHINGLE

SLATE ROOF

ALUMINUM WINDOWS& FRAMES

REFURBISH EXISTINGBRICK MASONRY

SPANDREL CONCRETE PANEL

CLEAR GLAZING

The

Geo

rge

Was

hing

ton

Uni

vers

ity

Ames

Hal

l Ren

o vat

i on

a nd

A ddi

t ion

13

Mar

ch 1

0, 2

010

EAST ELEVATIONSCALE 1/16" = 1'-0"

0' 4' 8' 16' 32'

Page 15: THE GEORGE WASHINGTON UNIVERSITY MOUNT ......March 10, 2010 The George Washington University Ames Hall Renovation and Addition THE GEORGE WASHINGTON UNIVERSITY MOUNT VERNON CAMPUS

B3239' - 4"

B2250' - 8"

B1263' - 4"

SECOND FLOOR288' - 0"

FIRST FLOOR276' - 0"

PENTHOUSEHEIGHT316' - 0"

PENTHOUSE DECK300' - 0"

MAXIMUM ALLOWABLEHEIGHT = 18' - 6"

16'-0

"12

'-0"

12'-0

"12

'-8"

12'-8

"11

'-4"

SYNTHETIC SLATE SHINGLE

PRECAST CONCRETE

CLEAR GLAZING

BRICK

PRECAST CONCRETEPANEL

PRECAST CONCRETE

SYNTHETIC SLATE SHINGLE

BRICK

The

Geo

rge

Was

hing

ton

Uni

vers

ity

Ames

Hal

l Ren

o vat

i on

a nd

A ddi

t ion

14

Mar

ch 1

0, 2

010

SOUTH ELEVATIONSCALE 1/16" = 1'-0"

0' 4' 8' 16' 32'

Page 16: THE GEORGE WASHINGTON UNIVERSITY MOUNT ......March 10, 2010 The George Washington University Ames Hall Renovation and Addition THE GEORGE WASHINGTON UNIVERSITY MOUNT VERNON CAMPUS

EXISTING B1265' - 8"±

EXISTING FIRSTFLOOR

275' - 8"±

EXISTING SECONDFLOOR

288' - 0"±

AVERAGE CURBGRADE AT FRONT

ELEVATION272' - 0"±

EXISTING ROOFRIDGE

309' - 4"±

EXISTING ATTICLEVEL

297' - 4 1/4"±

PENTHOUSEHEIGHT316' - 0"

UNDERSIDE OFEXISTING EAVE

296' - 5 3/4"±

6'-4

"3'

-8"

12'-4

"8'

-5 3

/4"

10 1

/2"

11'-1

1 3/

4"6'

-8"

SYNTHETIC SLATE SHINGLE

PRECAST CONCRETE

CLEAR GLAZING

BRICK

SLATE ROOF

ALUMINUM WINDOWS& FRAMES

REFURBISH EXISTINGBRICK MASONRY

The

Geo

rge

Was

hing

ton

Uni

vers

ity

Ames

Hal

l Ren

o vat

i on

a nd

A ddi

t ion

15

Mar

ch 1

0, 2

010

NORTH ELEVATIONSCALE 1/16" = 1'-0"

0' 4' 8' 16' 32'

Page 17: THE GEORGE WASHINGTON UNIVERSITY MOUNT ......March 10, 2010 The George Washington University Ames Hall Renovation and Addition THE GEORGE WASHINGTON UNIVERSITY MOUNT VERNON CAMPUS

Mar

ch 1

0, 2

010

Am

es H

all R

enov

atio

n an

d A

dditi

onTh

e G

eorg

e W

ashi

ngto

n U

nive

rsity

CAMPUS CONTEXT 16

Page 18: THE GEORGE WASHINGTON UNIVERSITY MOUNT ......March 10, 2010 The George Washington University Ames Hall Renovation and Addition THE GEORGE WASHINGTON UNIVERSITY MOUNT VERNON CAMPUS

Mar

ch 1

0, 2

010

Am

es H

all R

enov

atio

n an

d A

dditi

onTh

e G

eorg

e W

ashi

ngto

n U

nive

rsity

EXISTING CONDITIONS3. SOUTH VIEW

6. NORTH VIEW

4. SOUTH-EAST VIEW

1. WEST VIEW

5. NORTH-EAST VIEW2. SOUTH-WEST VIEW

6

5

3

1

2

4

17

Page 19: THE GEORGE WASHINGTON UNIVERSITY MOUNT ......March 10, 2010 The George Washington University Ames Hall Renovation and Addition THE GEORGE WASHINGTON UNIVERSITY MOUNT VERNON CAMPUS

Mar

ch 1

0, 2

010

Am

es H

all R

enov

atio

n an

d A

dditi

onTh

e G

eorg

e W

ashi

ngto

n U

nive

rsity

18