The Generic Choke Model enterprise (GCMe) What will be the value of your organisation’s annual production losses? Where will your efforts/OPEX best be targeted in increasing production efficiency? GCMe will help you answer these questions and support your people in the drive to continually Improve Performance… “By doing this we cut our losses in half, year on year, for three years in a row on the Magnus Platform” (Andrew Goodwin, BP)

Upload: shemar-lothrop

Post on 01-Apr-2015

215 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: The Generic Choke Model enterprise (GCMe) What will be the value of your organisation’s annual production losses? Where will your efforts/OPEX best be

The Generic Choke Model enterprise (GCMe)

What will be the value of your organisation’s annual production losses?

Where will your efforts/OPEX best be targeted in increasing production efficiency?

GCMe will help you answer these questions and support your people in the drive to continually Improve Performance…

“By doing this we cut our losses in half, year on year, for three years in a row on the Magnus Platform” (Andrew Goodwin, BP)

Page 2: The Generic Choke Model enterprise (GCMe) What will be the value of your organisation’s annual production losses? Where will your efforts/OPEX best be

What is GCMe?

A powerful, user-friendly toolset which supports a “joined-up” approach to Production & Injection Optimisation.GCMe helps you too: Establish the true Production/Injection Potential Analyse and learn from your loss events and prevent future losses occurring Invest wisely to improve your capacity

GCMe

Page 3: The Generic Choke Model enterprise (GCMe) What will be the value of your organisation’s annual production losses? Where will your efforts/OPEX best be

GCMe Principles

Supports A Multi-Discipline People Process Provides a focal point for all production (and Injection) performance issues Harnesses the Expertise, Experience & Insight of the Offshore & Onshore teams

rather than just capturing automatically generated values Complements existing specialist systems – easy to integrate where appropriate Covers the entire supply chain from reservoir to market

Designed to engage users, embed ownership and most importantly, Drive Performance Improvement.

Page 4: The Generic Choke Model enterprise (GCMe) What will be the value of your organisation’s annual production losses? Where will your efforts/OPEX best be

Installed Capacity - Your Daily Production Target

As the component parts are “in series”, the lowest capacity (Wells) restricts the overall capacity for Alpha Platform

Capacities of component parts are automatically rolled up to Alpha Platform Production Capacity decision level

This view facilitates the regular multi-discipline team meeting which analyses the bottlenecks across your complete supply chain.

Page 5: The Generic Choke Model enterprise (GCMe) What will be the value of your organisation’s annual production losses? Where will your efforts/OPEX best be

Performance Data Capture Made Easy

Losses to be allocated

Daily production figures pulled through from external database

Capacity automatically pulled through from internal decisions

Any loss event previously flagged as a “continuing loss” is automatically inserted.

Losses are allocated to a System Source from the hierarchy. Together with an Equipment

Source form a generic list and a Cause.

Page 6: The Generic Choke Model enterprise (GCMe) What will be the value of your organisation’s annual production losses? Where will your efforts/OPEX best be

• The performance reviews are powered by GCMe’s reporting suite

• The central database holds all the data for all the Assets. Every Source & Cause is mapped to a Generic Source & Cause allowing comparison across assets.

• Drill Down/Roll-Up to any level in your organisation.

Facilitate Your Performance Review

GCMe includes an extensive suite of reports, most of which are available at all levels of the organisation

Almost all of the reports can be edited, filtered and customised using the parameters form

Page 7: The Generic Choke Model enterprise (GCMe) What will be the value of your organisation’s annual production losses? Where will your efforts/OPEX best be

Analyse Your Performance

Production Performance Report.

Known as “Blood On The Wall”.

Instant Visibility of Losses.

• As each source and cause has a local “owner”, you will be able to see who else has encountered the same problems and start a conversation.

• The reports are easily exported to other windows applications and there is the facility to export the underlying data for further analysis in Microsoft Excel.

The sources of loss over any given time period – in descending order of impact.

View by any unit of measure – even $ value.

Same report available for Causes & Owners.

Trends help you predict if and when a loss event may happen in the future

Page 8: The Generic Choke Model enterprise (GCMe) What will be the value of your organisation’s annual production losses? Where will your efforts/OPEX best be

Be Proactive – Prevent Future Losses

The purpose of this process is to try to prevent future unplanned losses occurring!Taking a more proactive HSE style approach rather than just reacting to events after they have happened…

GCMe

This is achieved by capturing:

An estimate of timing and impact is recorded as part of a Potential Loss which drives the GCMe Potential Loss risk matrix.

Recurring loss events

Near Misses

Observations

If not resolved, through time, Potential Loss events move from left to right – eventually becoming urgent

Page 9: The Generic Choke Model enterprise (GCMe) What will be the value of your organisation’s annual production losses? Where will your efforts/OPEX best be

Unlock Potential/De-Bottleneck

• Production Capacity growth opportunities may be identified in all areas of the Reservoir to Market production process.

• GCMe logically rolls up these opportunities to the level where informed decisions can be made regarding which, if any to pursue.

In this example the opportunities associated with individual wells and the “Wells” group, stack up to provide a significant potential increase in Production Capacity (at this level).

Colour coding identifies the opportunity status

Growth Opportunities are logically rolled up to any level in the hierarchy, along with capacities.

At this level, it is clear that there is value in pursuing the Wells, Nominations & Local Plant related opportunities – but little value in pursuing the others at this time. The Building Blocks of Production diagram details the rolled

up opportunities for Alpha including the Theoretical Production Capacity (TPC) and the Production Technical Limit (PTL)

Page 10: The Generic Choke Model enterprise (GCMe) What will be the value of your organisation’s annual production losses? Where will your efforts/OPEX best be

Compelling Benefits

“By doing this we cut our losses in half, year on year, for three years in a row on the Magnus Platform”

(A. Goodwin, BP)

Page 11: The Generic Choke Model enterprise (GCMe) What will be the value of your organisation’s annual production losses? Where will your efforts/OPEX best be

End of Presentation