The experienced specialist
•Extensive experience in the area of installations and complete systems in underground constructions •Project development beginning with the conceptual
idea all the way to the final system performance •An early involvement of the specialists is essential
and will make all the difference
![Page 3: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/3.jpg)
Highly efficient complete systems
•High-performance back-up installations for conventional and mechanized tunnel headings •Transportation logistics
•Highly efficient custom-made complete systems
![Page 4: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/4.jpg)
The comprehensive approach – our strength
•Vast experience in the interface between construction execution and mechanization •Trouble shooter for complex construction procedures
through mechanization, rationalization and humanization •Economical solutions through optimization of
investment and operating costs •High quality and high operational safety •General contractors for the complete supply and
removal logistics including supporting measures.
![Page 5: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/5.jpg)
The comprehensive approach – our strength
Potential for savings and optimization
time
• more efficient material flow • more efficient work flow • higher advance rates (Back-up) • less operational standby • safer site surrounding
from experience: 5 to 15 % savings to contractor’s base case possible
Costs of contractor’s base case
Costs of case by Rowa’s commitment
Start of Rowa’s commitment
Job site start
Costs
Lower final costs Faster Safer Better added value
![Page 6: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/6.jpg)
Our performance record: hundreds of successfully operated special installations!
![Page 7: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/7.jpg)
Back-up Systems for TBM
![Page 8: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/8.jpg)
AlpTransit Gotthard, Amsteg
Back-up System
Schweiz / Switzerland, 2002
![Page 9: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/9.jpg)
AlpTransit Gotthard, Amsteg
Monorail
Schweiz / Switzerland, 2002
![Page 10: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/10.jpg)
AlpTransit Gotthard, Amsteg
Impact Roller Crusher
Schweiz / Switzerland, 2002
![Page 11: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/11.jpg)
AlpTransit Gotthard, Amsteg
Shotcrete Robot
Schweiz / Switzerland, 2002
![Page 12: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/12.jpg)
AlpTransit Gotthard, Amsteg
Suspended Platform
Schweiz / Switzerland, 2002
![Page 13: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/13.jpg)
Wienerwald
From Mechanization to Automation
Österreich / Austria 2005
![Page 14: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/14.jpg)
Wienerwald
Automated Lining Segment Transloading
Österreich / Austria 2005
![Page 15: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/15.jpg)
Wienerwald
Österreich / Austria 2005
JIT Wet Mortar Production, Concrete Transloading
![Page 16: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/16.jpg)
Wienerwald
Österreich / Austria 2005
Automated Transloading Back-up Tracks
![Page 17: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/17.jpg)
Moskow, Subway Station Access
Russland / Russia 2007
Backup system for inclined shafts
![Page 18: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/18.jpg)
Moskow, Subway Station Access
Russland / Russia 2007
Segment transloading crane
![Page 19: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/19.jpg)
Channel Tunnel Rail Link
England / England 2002
Segment handling crane I
![Page 20: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/20.jpg)
Westerschelde
Niederlande / Netherland 1999
Segment handling crane I
![Page 21: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/21.jpg)
Westerschelde
Niederlande / Netherland 1999
Segment handling crane II
![Page 22: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/22.jpg)
Westerschelde
Niederlande / Netherland 1999
Suspended backup system
![Page 23: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/23.jpg)
Madrid, M30
Spanien / Spain 2005
Quick unloading system
![Page 24: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/24.jpg)
Madrid, M30
Spanien / Spain 2005
Segment feeder
![Page 25: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/25.jpg)
Madrid, M30
Spanien / Spain 2008
Segment crane
![Page 26: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/26.jpg)
Katzenberg
Deutschland / Germany 2005
Invert concrete installation
![Page 27: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/27.jpg)
Montegiglio
Italien / Italy 2004
Supply Train Climber III
![Page 28: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/28.jpg)
PPS Limberg II, Kaprun
Anti-Slip-Back-Device
Österreich / Austria, 2007
![Page 29: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/29.jpg)
Brisbane, North-South-Bypass-Tunnel
Australien / Australia 2009
Dismantling crane for backup
![Page 30: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/30.jpg)
AlpTransit Gotthard, Amsteg
Infrastructure for Cross Passages
Schweiz / Switzerland, 2005
![Page 31: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/31.jpg)
Durchmesserlinie, Zurich
Schweiz / Switzerland 2008
Supply and Removal Logistics
![Page 32: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/32.jpg)
Durchmesserlinie, Zurich
Schweiz / Switzerland 2008
Removal Installation
![Page 33: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/33.jpg)
Durchmesserlinie, Zurich
Schweiz / Switzerland 2008
Supply Installation
![Page 34: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/34.jpg)
AlpTransit Gotthard, Amsteg
Foil Placing Machine
Schweiz / Switzerland, 2007
![Page 35: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/35.jpg)
AlpTransit Gotthard, Bodio, Faido
Foil Placing Machine
Schweiz / Switzerland, 2004
![Page 36: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/36.jpg)
AlpTransit Gotthard, Sedrun
RoCon Shuttle - Concrete transportation system
Schweiz / Switzerland, 2007
![Page 37: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/37.jpg)
Heading Installations for Drill & Blast
![Page 38: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/38.jpg)
AlpTransit Ceneri Base Tunnel
Back-up System D&B
Schweiz / Switzerland, 2010
![Page 39: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/39.jpg)
AlpTransit Ceneri Base Tunnel
Back-up System D&B
Schweiz / Switzerland, 2010
![Page 40: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/40.jpg)
AlpTransit Gotthard, Sedrun
Schweiz / Switzerland, 2004
Special Machine for Rock Support
![Page 41: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/41.jpg)
AlpTransit Gotthard, Sedrun
Schweiz / Switzerland, 2004
Special Machine for Rock Support
![Page 42: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/42.jpg)
La Muela II, Valencia
Heading Installation for Inclined Shaft
Spanien / Spain, 2009
![Page 43: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/43.jpg)
Rowa’s performance
•40 years experience •250+ projects •around the globe •first class reference list
![Page 44: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/44.jpg)
A strong team of specialists
•higher productivity •better economic performance •maximum availability of the installation •highest operational safety of the equipment
Worldwide leaders in the area of logistics and special machinery for underground construction
![Page 45: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/45.jpg)
• Quality on workmanship • Availability • Industrial safety • Short learning curve • Return on Investment • Short Turn-around times, short delivery times • Date loyalty
Quality at Rowa
![Page 46: The experienced specialist](https://reader033.vdocuments.site/reader033/viewer/2022053120/629214c49ebc807b3732508a/html5/thumbnails/46.jpg)
Rowa Tunnelling Logistics AG CH-8855 Wangen, Switzerland
Your Partner for Logistic Systems in Underground Work