the ecar ireland project smart grid technology watch event september 18 th 2014 john whelan, esb...
TRANSCRIPT
The ecar Ireland Project
Smart Grid Technology Watch EventSeptember 18th 2014
John Whelan, ESB ecars
2
www.esb.ie/ecars
Agenda
• The ecar Ireland Project – Conception
• Electric Vehicles in Ireland
• Charge Point Infrastructure
• Charge Point Management System
• Grid Impacts
3
www.esb.ie/ecars
Agenda
• The ecar Ireland Project – Conception
• Electric Vehicles in Ireland
• Charge Point Infrastructure
• Charge Point Management System
• Grid Impacts
4
www.esb.ie/ecars
• Government targets 2020
- 10% of all vehicles electric
- 10% of all road energy transport
will be renewable• Early supply of electric cars
- MOU signed with Mitsubishi, Renault-Nissan and Toyota
• Government incentives - €5000 grant- Zero VRT- Lowest road tax band- Accelerated Capital Allowance
(Businesses)- Government taskforce to deliver
other incentives• ESB is rolling out the infrastructure
Ecar Ireland Program
5
www.esb.ie/ecars
• Large wind penetration
• Limited range between cities
• Type of homes
• Good climate for batteries
• Single network company
Ireland as a Test Bed for Electric Vehicles
6
www.esb.ie/ecars
50 g/km
0 g/km
130 g/km
150 g/km2010
130 g/km2015
WIND
GAS
COAL
End of chain emissions
Electricity Generation
CO2 Emissions
Internal Combustion Engine
7
www.esb.ie/ecars
Agenda
• The ecar Ireland Project – Conception
• Electric Vehicles in Ireland
• Charge Point Infrastructure
• Charge Point Management System
• Grid Impacts
8
www.esb.ie/ecars
Electric Vehicles in ESB’s Fleet
Old Electric Vehicles from 1950 - 1970
Current Electric Vehicles – Allied Peugeot / Micro-vett Fiat Fiorino / Smiths Edison
9
www.esb.ie/ecars
Nissan Leaf
Renault Kangoo
Electric Vehicles Available in Ireland
Mitsubishi iMiEV
Renault Zoe
Mitsubishi Outlander
BMW i3
10
www.esb.ie/ecars
Other Electric Vehicles in IrelandSmiths Newton (Celtic Linen)
Smiths Newton (Grange Builders Providers)
Smiths Newton (OPW)
13
www.esb.ie/ecars
Agenda
• The ecar Ireland Project – Conception
• Electric Vehicles in Ireland
• Charge Point Infrastructure
• Charge Point Management System
• Grid Impacts
14
www.esb.ie/ecars
HOME / WORK PUBLIC FAST
6 – 8 hours 1 – 2 hours 80% in 20 minutes
Charging Infrastructure
15
www.esb.ie/ecars
Home Charge Points
First 2000 installed for free
16/32 amps, single-phase
Fed from customer distribution board
16
www.esb.ie/ecars
Public AC Charge Points
22kW double socket (three-phase 32 amps)
RFID card reader
GPRS communications with back office
Internal MID metering
18
www.esb.ie/ecars
Ireland’s Current Charge Point Network
851 – Domestic and Commercial Charge Points
805 – AC Public Charge Points
61 – Fast Charge Points
1717 - Total
19
www.esb.ie/ecars
Agenda
• The ecar Ireland Project – Conception
• Electric Vehicles in Ireland
• Charge Point Infrastructure
• Charge Point Management System
• Grid Impacts
21
www.esb.ie/ecars
Agenda
• The ecar Ireland Project – Conception
• Electric Vehicles in Ireland
• Charge Point Infrastructure
• Charge Point Management System
• Grid Impacts
23
www.esb.ie/ecars
Charging Profiles (Slow AC) – Nissan Leaf
Current Profile
0
4
8
12
16
20
10:30 11:56 13:22 14:49 16:15 17:42
Time
Cu
rren
t (A
)
Power Factor Profile
0.9
0.92
0.94
0.96
0.98
1
10:30 11:56 13:22 14:49 16:15 17:42
Time
Voltage Harmonics Profile
1
1.2
1.4
1.6
1.8
2
10:30 11:56 13:22 14:49 16:15 17:42
Time
Vo
ltag
e T
HD
(%
)
Current Harmonics Profile
-4
0
4
8
12
16
10:30 11:56 13:22 14:49 16:15 17:42
Time
Cu
rren
t T
HD
(%
)
24
www.esb.ie/ecars
Charging Profiles (Fast DC) – Nissan Leaf – DBT FCP
Current Profile
0
10
20
30
40
50
60
70
15:12 15:23 15:35 15:46 15:58Time
Cu
rren
t (A
)
I1 I2 I3
Current Harmonics Profile
0
5
10
15
20
25
30
15:12 15:23 15:35 15:46 15:58Time
Cu
rren
t T
HD
(%
)
I1 I2 I3
Power Factor Profile
0
0.2
0.4
0.6
0.8
1
15:12 15:23 15:35 15:46 15:58Time
Po
we
r Fa
cto
r
Reactive Power Profile
-10000
-5000
0
15:12 15:23 15:35 15:46 15:58Time
Rea
ctiv
e P
ow
er (
Var
)