the development of w/cu-pfc s for east upper divertor
TRANSCRIPT
ASIPP
The development of W/Cu-PFCs for EAST upper divertor
• Qiang Lia, Wanjing Wanga, Guangnan Luoa
• Singui Qinb, Guohui Liub
aEngineering Gr., FRM Division, ASIPPbAdvanced Technology and Materials Co., Ltd
ASIPP
Outline
• Tungsten divertor for EAST
• Manufacturing of W/Cu-PFUs
• Qualification of PFCs
• Commissioning
• Improvement and repairing
• Summary
10/7/15 2IAEA TMSSO-8, Nara, 26-29 May, 2015
ASIPP
Outline
• Tungsten divertor for EAST
• Manufacturing of W/Cu-PFUs
• Qualification of PFCs
• Commissioning
• Improvement and repairing
• Summary
10/7/15 3IAEA TMSSO-8, Nara, 26-29 May, 2015
ASIPP
Motivation of W/Cu divertor on EAST
10/7/15 IAEA TMSSO-8, Nara, 26-29 May, 2015
4
Divertor
EAST goal: long-pulse high performance plasma operation
Total input power~34MW
ASIPP
PFCs design
• 15000 Monoblocks
• 720 Monoblock PFUs
• 240 Flat type PFUs
10/7/15 IAEA TMSSO-8, Nara, 26-29 May, 2015
5
Dual chamfering for EAST
80 Cassette Bodies
ASIPP
Outline
• Tungsten divertor for EAST
• Manufacturing of W/Cu-PFUs
• Qualification of PFCs
• Commissioning
• Improvement and repairing
• Summary
10/7/15 6IAEA TMSSO-8, Nara, 26-29 May, 2015
ASIPP
Flowchart of manufacturing
10/7/15 IAEA TMSSO-8, Nara, 26-29 May, 2015
7
W powder
W compactsintering
rolling
W plate
Cu,Cr&Zr
Ingotmelting
CuCrZr platerolling
Cu,Cr&Zr
Ingotmelting
CuCrZr tubesdrawing
W block W bar
Pure CuHIP HIP
W/Cu monoblock
NDT NDT
NDT
W/Cu slice
HIP Machining
W/Cu mono-block PFUs Baffle Dome upper Dome lowerpanel
EBW of two halves+legs+in/outlets
DOME
EBW of endcup+PFUs+trans-plate+baffle+legs+in/outlets
Target
Assembly to CB and in-vessel installation
He leak check at 1.5MPa/180 ℃
HIP
NDT+leak check
NDTNDT
NDT
Raw mater.
PFU manuf.
Assembly
ASIPP
ITER-like Monoblock W/Cu PFMC
10/7/15 IAEA TMSSO-8, Nara, 26-29 May, 2015
8
• W/Cu monoblocks prepared employing Hot Isostatic Pressing (HIP) technology (900 , 100MPa)℃
• W/Cu PFUs manufactured successfully by HIP technology (600 , 100MPa)℃ , properties of CuCrZr after HIP satisfy the requirement
• NDT results: Bondings between monoblocks/OFC/CuCrZr tube excellent
HIPed
ASIPP
Flat-type W/Cu PFCs• Casting + HIP: The interface of
W/Cu were joined by casting (1200 ℃), and then the interface of Cu/CuCrZr was bonded by HIP at lower temperature of 500~600℃.
• NDT results: bondings between W tiles/OFC/CuCrZr plate excellent
910/7/15 IAEA TMSSO-8, Nara, 26-29 May, 2015
BAFFLE
ASIPP
Parts joining: E-beam welding
10/7/15 IAEA TMSSO-8, Nara, 26-29 May, 2015
10
• Joining between monoblock units with endbox/manifold and flat baffle
• Joining of two-half parts for dome structural design
• Supporting legs and inlet/outlet cooling tubes joined to CuCrZr heat sink
• EBW: 60kV, 30-40mA
• Seam:3mm depth, 1mm width
1.2 mm
3.1 mm
CuCrZr
ASIPP
Outline
• Tungsten divertor for EAST
• Manufacturing of W/Cu-PFUs
• Qualification of PFCs
• Commissioning
• Improvement and repairing
• Summary
10/7/15 11IAEA TMSSO-8, Nara, 26-29 May, 2015
ASIPP
E-beam HHF testing
l W/Cu monoblock PFU: survived 1000 cycles of heat load of 10MW/m2, cooling water of 4m/s, 20 , 15s/15s ℃ on/off cycles
l W/Cu flat type mock-up: 1000 cycles, 5MW/m2, 4m/s, 20℃
10/7/15 IAEA TMSSO-8, Nara, 26-29 May, 2015
12
ASIPP
10/7/15 IAEA TMSSO-8, Nara, 26-29 May, 2015
13
US-NDT for W/Cu PFCs
NDT for mono-
block PFU
NDT for flat type PFU
• Single probe: scanning the inner surface
• The defects of Φ1mm in the interface of W/Cu and Cu/CuCuZr was detected clearly using this set-up
• 15000 W/Cu mono-blocks and 720 PFUs tested
• More than 30000 W/Cu slices and 240 flat PFUs have been tested by this set-up with detection limit of Φ1mm
ASIPP
Hot Helium leak detection for PFCs
10/7/15 IAEA TMSSO-8, Nara, 26-29 May, 2015
14
• Evaluation of welding quality and reliability for EAST OVT, IVT and DOME components
• During baking: @ 180 for ℃ 20 min under 1.5 MPa (He inside)
• Background vacuum: < 5.4x10-3Pa; leak level: 2x10-11 Pa.m3.s-1
• Acceptance criteria: 1x10-10 Pa.m3.s-1
• 240 components (80 OVT, 80 IVT, 80 DOME) were tested
ASIPP
Outline
• Tungsten divertor for EAST
• Manufacturing of W/Cu-PFUs
• Qualification of PFCs
• Commissioning
• Improvement and repairing
• Summary
10/7/15 15IAEA TMSSO-8, Nara, 26-29 May, 2015
ASIPP
Commissioning in 2014 • Twice leak events during baking a
t 170℃, and first repaired and second evacuated (given-up)
• Baking at the end of campaign at 280℃ to test PFCs and find weak points (possible leaks)
• After campaign, found 13 leak points, certain and uncertain causes!
10/7/15 IAEA TMSSO-8, Nara, 26-29 May, 2015
16
DOME pipe-plate joint Target pipe-plate joint
LeakingLeakingLeaking
Target plate-plate joint
Leaking of heat sink
ASIPP
Distribution of leaking components
10/7/15 IAEA TMSSO-8, Nara, 26-29 May, 2015
17
NBI-4MW
LHCD6MW
ICRF-6MW
LHCD
4MW
ICRF-6MW
NBI-4MW
-DOME pipe-plate joints
-Target pipe-plate joints
-Target plate-plate joints
-heat sink
• The leaking of pipe-plate joints occurred during baking
• Target plate-plate joints: cluster in NBI shine through areas; leaks occurred during plasma discharge
ASIPP
Outline
• Tungsten divertor for EAST
• W/Cu-PFUs
• Qualification of PFCs
• Commissioning
• Improvement and repairing
• Summary
10/7/15 18IAEA TMSSO-8, Nara, 26-29 May, 2015
ASIPP
Improvement-NDT for pipe-plate joints
• Develop the nondestructive testing technique for the welding seams of pipe-plate joints
• All pipe-plate joints (800 seams) were tested by NDT after removed from vacuum vessel
• Seams with depth <1.5mm were repaired
10/7/15 IAEA TMSSO-8, Nara, 26-29 May, 2015
19
10mA
15mA
20mA
25mA
30mA
ASIPP
Improvement- CB structure• Cooling tubes welded directly to CB suffered high th
ermal stress during baking
• Cooling tube connection: hard welding → soft bellows
10/7/15 IAEA TMSSO-8, Nara, 26-29 May, 2015
20
Bellows
Hard welding
ASIPP
Improvement-Hot Helium leak detection
• The pre-assembled “PFCs+CB” modules were qualified by helium leak detection technique before installation into VV
• Acceptance criteria: 1x10-10 Pa.m3.s-1
• During baking: @ 250 for ℃ 20 min under 1 MPa (He inside)
10/7/15 IAEA TMSSO-8, Nara, 26-29 May, 2015
21
ASIPP
Repairing of DOME pipe-plate joints
10/7/15 IAEA TMSSO-8, Nara, 26-29 May, 2015
22
• Repairing process: Remove pipe→Machine new pipe→ EBW→NDT→Helium leak detection
• Pipe-plate seam: Depth >2mm
• More than 40 DOME repaired
Top
Bo
ttom
ASIPP
Repairing of targets pipe-plate joints
10/7/15 IAEA TMSSO-8, Nara, 26-29 May, 2015
23
• Repairing process: Remove CuCrZr plate→Machine new pipe and plate→EBW pipe-plate seams→NDT→EBW plate-plate seams→Helium leak detection
• Pipe-plate seam: Depth >2mm
• More than 15 targets were repaired
Cut along the lines
ASIPP
Campaign in 2015• Installation completed in
April
• Baking (May 6-) : 180~200℃
• No leaking observed
• Plasma discharge in June-July
10/7/15 IAEA TMSSO-8, Nara, 26-29 May, 2015
24
ASIPP
Summary• The production and installation of EAST W/Cu upper divertor h
ave been completed in April 2014
• The monoblock and flat-type W/Cu PFUs survived 1000 cycles of heat loads up to 10MW/m2 and 5MW/m2, respectively, with the cooling water of 4m/s, 20℃
• Qualification procedures and the acceptance criteria of W/Cu PFCs for EAST have been established
• During the baking of the EAST device some leaks in the EBW seams was detected
• Some improvements to PFCs have been considered
• Repairing has been completed in April 2015 and PFCs survived 200 baking of EAST device℃
• EAST W/Cu upper divertor project has realized large scale industrial manufacturing of actively cooled tungsten components and will provide precious experience and lessons for ITER divertor project
10/7/15 IAEA TMSSO-8, Nara, 26-29 May, 2015