![Page 1: The Crossrail Story Control through Insight - Deloitte US control of you information is key to getting control of Capital Programme delivery ... AREA: PROJECT WIDE C807 ... Optimised](https://reader034.vdocuments.site/reader034/viewer/2022042801/5aa08cec7f8b9a67178e60f5/html5/thumbnails/1.jpg)
The Crossrail StoryControl through Insight
December 2015
![Page 2: The Crossrail Story Control through Insight - Deloitte US control of you information is key to getting control of Capital Programme delivery ... AREA: PROJECT WIDE C807 ... Optimised](https://reader034.vdocuments.site/reader034/viewer/2022042801/5aa08cec7f8b9a67178e60f5/html5/thumbnails/2.jpg)
2
Some Facts and Data
…. as told by Crossrail.
© 2014 Deloitte MCS Limited. All rights reserved.
![Page 3: The Crossrail Story Control through Insight - Deloitte US control of you information is key to getting control of Capital Programme delivery ... AREA: PROJECT WIDE C807 ... Optimised](https://reader034.vdocuments.site/reader034/viewer/2022042801/5aa08cec7f8b9a67178e60f5/html5/thumbnails/3.jpg)
3
The Challenge
Crossrail Information Management and Analytics
Crossrail needed to manage large quantities of information from disparate source systems, multiple
contractors and third parties in order to provide an integrated information management solution.
We needed to allowed Crossrail to:
• Have confidence in what they were reporting on – data quality is survival!
• Minimise the number of reports/dashboard – kill the cottage industry of reporting
• Report by exception
• Introduce drill-down and exploratory analysis capabilities
• Facilitate cross functional analysis
• Provide for self service reporting,
![Page 4: The Crossrail Story Control through Insight - Deloitte US control of you information is key to getting control of Capital Programme delivery ... AREA: PROJECT WIDE C807 ... Optimised](https://reader034.vdocuments.site/reader034/viewer/2022042801/5aa08cec7f8b9a67178e60f5/html5/thumbnails/4.jpg)
4
Six Steps to success
Getting control of you information is key to getting control of Capital Programme delivery
© 2014 Deloitte MCS Limited. All rights reserved.
Following these steps will save you time when establishing project controls and will provide firm
foundations for consistent reporting across the programme.
Step 1• Determine reporting requirements
Step 2 • Establish the reporting timeline
Step 3
• Map-out and agree information flow
Step 4
• Agree master data and ownership
Step 5
• Develop the application landscape
Step 6
• Issue data interface specification
![Page 5: The Crossrail Story Control through Insight - Deloitte US control of you information is key to getting control of Capital Programme delivery ... AREA: PROJECT WIDE C807 ... Optimised](https://reader034.vdocuments.site/reader034/viewer/2022042801/5aa08cec7f8b9a67178e60f5/html5/thumbnails/5.jpg)
5
Step 1: Determine reporting requirements
Start with the end in mind by agreeing with the Programme Executives their report
requirements. Develop an Executive Dashboard that covers the full breadth of project
controls and focussed on performance indicators that make a material impact to Programme
Delivery.
© 2014 Deloitte MCS Limited. All rights reserved.
Details / Notes CPI / SPI
Period 2-10 CPI/SPI data for Central Section
Period 11-1 data for Programme Wide
AREA: WEST 1.08 / 0.88
AREA: CENTRAL 0.98 / 1.00
AREA: EAST 1.15 / 0.51
AREA: PROJECTWIDE 0.97 / 1.00
AREA: SURFACE 0.00 / 0.00
AREA: TECHNICAL 1.02 / 1.02
AREA: OPERATIONS 0.00 / 0.00
This Period Last Period Movement
CPI 1.00 0.98 -2.04% TOTAL 1.00 / 1.00
SPI 1.00 0.96 -4.17%
This Period Movement (%)
1 13 12 £11,917 m 0.48%
Risk Exposure £2,360 m £2,381 m £2,428 m AFC £13,993 m 1.42%
Contingency £2,600 m £2,000 m £2,040 m Budget £14,213 m -3.69%
Variance £240 m (£381 m) (£388 m) £20 m
Forecast Severity ID Owner
Alan
Walker
Chris
Sexton
Ailie
MacAdam
1
Progress
FDC Demobilisation
All FDCs remain on schedule to a
demobilisation as defined in their individual
Service Delivery Plans.
Chris
Sexton
Narrative and Commentary AFCDC vs. Intervention Points (based on P50)
£14,194 m
(£397 m)
Areas for Sponsor ConsiderationCritical Issues & Activities
• A strategy for resolving design, delivery and funding of the Surface Section Traction power
supply system is currently being developed.
• Progressing the design of the Woolwich Station Box fit-out to ensure the best value solution.
• SACR Process.
• Bakerloo Line Passenger link at Paddington Station.
• Tunnel Energy Segments.
5
2
ID
ID5444
Risk Title and Owner
Complexity of multiple
Infrastructure Managers (Andy
Mitchell)
Period
AFR figures are currently being reviewed
by the Health & Safety team, once the
data has been validated the Near Miss
Frequency Rate will be added to this
graph and the AFR updated.
Two significant incidents were
reported in Period 1:
Fire – C212 Liverpool Street Station
(demolition works)
On 12 April 2011 there was a fire in a
ground floor room of 91-109 Moorgate.
An investigation into the incident was
conducted and several
recommendations for improvement were
identified and are being monitored to
ensure a timely completion.
Cable damage – C248 Pudding Mill
Lane
On 27 April 2011 whilst clearing sand
from around redundant cables with a
shovel the connections on one of the
cables broke and a small bang was
heard. An investigation into why the
cable was live is being conducted by UK
Power Network.
Contract Administration
Experience to date suggests that Contractors
are raising high volumes of Early Warning
Notices and stretching the Contract
Administration resources on a number of
contracts. Crossrail needs to clarify its
approach to dealing with Contractors
commercial behaviours.
Environmental Incidents:
One level 2 incident was raised during the Period. During demolition work at
Liverpool Street, the Contractor was working outside core hours but the variation
that had been obtained for the work had expired. A complaint was received from
a resident. The incident is being investigated by Crossrail to determine actions to
prevent reoccurrence.
Undertakings and Assurances:
Two potential non-compliance issues were raised during the Period.
Undertaking 688_23: Bonhams at Bond Street
There is a commitment to use reasonable endeavours to complete the Crossrail
works within 18 months. The PIR has been raised by the Crossrail delivery team
which has identified that it will not be able to complete the works within that
timescale. Crossrail legal is reviewing the issue with the delivery team to
ascertain whether this is a breach given that it is not reasonably practicable to
meet the 18 month timeframe.
Undertaking 340: BAA at Paddington
BAA has written to Crossrail expressing concern as to the status of the current
design of the taxi facility at Paddington and indicating that if the design proceeds
as is they would consider this a breach of the provisions of undertaking 340.
A meeting with BAA is being arranged to discuss their concerns.
Title
Number of Man Hours vs. Accident Frequency Rate (AFR)
Anchor Milestones Achieved:
AREA: WEST C430 - Farringdon Piling & Diaphragm Wall - Contract Award.
AREA: WEST C421 - Tottenham Court Road Piling & Diaphragm Wall - Contract Award.
AREA: CENTRAL C511 - Whitechapel Station Piling & Diaphragm Wall - Contract Award.
AREA: CENTRAL C501 - Liverpool Street Moorgate Shaft Piling & Diaphragm Wall - Contract Award.
AREA: CENTRAL C350 - Pudding Mill Line Portal (Main Civil Works) - Contract Award.
AREA: CENTRAL C244 - Whitechapel Station Work Platform over East London Line - Complete.
AREA: EAST C310 - Thames Tunnel & Portals - Contract Award.
AREA: EAST C315 - Connaught Tunnel Refurbishment & Surface Railway Works - Contract Award.
AREA: PROJECT WIDE C807 - Marine Transportation - Issue ITT.
AREA: OPERATIONS X2234 - Rolling Stock & Depots Tender list Approvals (PSC Approval).
The AFC (P50) has decreased by £201.1m
from Period 13.
The AFC movement includes the reduction
in the cost of the Old Oak Common depot by
£146.1m to £266.9m and a reduction in the
Anticipated Final Crossrail Direct Cost
(AFCDC) by £57.7m to £11,916.9m.
The AFCDC has decreased due to: an
£18.6m increase in point estimate (primarily
increased indirect costs due to the adoption
of the MCS3 cost forecast); offset by a
£51.5m reduction in escalation (due to the
adoption of the MCS3 cost forecast and the
NERA mid case inflation index); a £23.0m
reduction in QRA; a £1.0m increase in the
Canary Wharf Station asset price; and a
£2.7m reduction in the Network Rail finance
charge (due to a revised cost forecast).
On a P50 risk basis, the SFA is forecast to
remain in surplus throughout the
construction period, with a peak value of
£2,308.6m in 2013/14 and a closing balance
of £312.1m in 2021/22.
£11,975 m
£13,707 m
Last Period
Narrative and Commentary
Executive Level Dashboard
Earned Value / CPI / SPIEXECUTIVE SUMMARY:
We have undertaken a fundamental review of our reporting strategy to ensure that the Programme is in the best possible state for delivery post Review Point 4. A fundamental aspect to our approach is a
consistent reporting hierarchy that encompasses the entire Programme, from contracts through to Sponsors. This Sponsor Dashboard is designed to facilitate regular and relevant communication, highlighting
progress and achievements along with flagging up issues that are relevant for Sponsors.
The rolling 13 Period AFR is 0.043. The Programme current Anticipated Final Cost is £14.0bn which is below budget. The Programme CPI and SPI are both 1.00.
The IP0 threshold this Period is £11,937m and the current AFCDC is in the sum of £11,917m.
Cost & Sponsor Funding
The calculation of the total CPI / SPI is a summation
of contract level data and NOT an average across the
delivery areas.
Environment & Undertakings
EV Detail
Accomplishments
Procurement:
102 Corporate Procurement and C-Series contracts have been awarded.
44 Corporate Procurement and C-Series contracts are still planned to be
awarded.
Land & Property:
47% of Properties are now committed.
49% of work areas are now completed.
5% of Properties are now full and finally settled.
Period: 1
Health & Safety
The arrow represents the RAG change from the previous period,
i.e. an improvement, no change or a downward trend.Status: On Track
Performance
Risks
Programme Performance
Period 1
Narrative and Commentary
Narrative and CommentarySponsor Funding Account Balance
Area: West SPI is currently 0.88 - There is
extensive management focus on critical
activities at Paddington Integrated Project
(C272) to maintain critical path activities.
Although there are forecast delays to the
Master Control Schedule (MCS) Baseline on
Bond Street Station (C411 & C412), this is
not currently impacting the critical path.
Area: East SPI is currently 0.51 - The
planned values are to be reviewed as major
milestones are currently still forecast to be
achieved.
Current Risk Exposure (based on P50) vs. Contingency
4
3
CRL Board have noted the proposal for revised IM
arrangements. Network Rail and Transport for London
are aware and neither oppose. Paper to be submitted
to Sponsors Board in June 2011.
Response Comment
ID6152
High
High
High
Strategy for disposition of excavated
materials
A revised strategy for disposition of excavated
materials needs to be confirmed to: allow
decisions to be made for acceptance of OCI
proposals; confirm need for C806; confirm
need and requirements for C807; and
determine approach for renegotiation of
ID3511
New risk raised this Period.
1. Prepare and submit agreed programme of Schedule 7 and Schedule 3 deliverables to
WCC.
2. On-going - Maintain close relationship with WCC to ensure consultation process is
progressing smoothly.
3. On-going - Implement agreed plan (with WCC) to provide information, generate local
support, inform local business and resident groups and influence opinion. Attendance of PBID,
CLP and CLP sub-group meetings.
1. Experience to date suggests that Contractors are raising high volumes of Early Warning
Notices and stretching the Contract Administration resources on a number of contracts.
Crossrail needs to clarify its approach to dealing with Contractors commercial behaviours.
A programme of communication is being developed for
CRL and supply chain project managers.
A workshop is being planned in May 2011 to establish
a 'readiness to dig' gateway process.
Relationship with Tier 1
Contractors (Ailie MacAdam)
ID6147
Westminster City Council delay
or do not approve full closure
of Eastbourne Terrace (John
Montgomerie)
Readiness for large scale SCL
works (Andy Mitchell)
Project teams are liaising with Thames Water at a number of
locations including Ham and Wick sewer and Blackwall tunnel
approaches and a number of approvals are required during June
2011.
OCI opportunities are currently being evaluated for a number of
tunnelling main construction contracts.
Progress with demobilising FDCs is being made however the
generation of new Compensation Events over and above those
anticipated is affecting our ability to close out Compensation Events
as planned.
ID6792
Adequacy of CDM
arrangements post
organisation change (Andy
Mitchell)
Draft Schedule 7 deliverables submitted 21 April 2011,
high level meeting with WCC planned for early May
2011.
Ailie
MacAdam
Thames Water Approvals
Difficulties are being encountered with gaining
Thames Water approvals for asset protection
and diversion schemes at a number of
locations.
Optimised Contractor Involvement (OCI)
There is a need to ensure that the full cost and
schedule impacts of OCI opportunities are
considered and that there are appropriate
opportunities for review from the wider
programme.
CDM arrangement have been agreed with key partners
and a briefing has been cascaded to all staff. Plans for
assuring CDM duties have also been completed.
High
Medium
1. Conduct senior level discussion to agree a way forward.
2. Gain Sponsors approval to revised IM arrangements and implement.
1. Carry out a programme of education for CRL and supply chain project managers on the
history and application of the SCL process.
2. Carry out a thorough review of Contractor competence prior to commencement of SCL
works.
3. Ensure that the necessary Engineering oversight is in place.
4. Enforce rigorous readiness reviews prior to start of construction.
1. Review effectiveness of CDM approach in the new structure after 3 months and 6 months.
IP0 Variance
AFCDC
Contract Administration metrics show a high level of Early Warning
Notices being lodged by Contractors although the nature and value
of these is not clear.
Options are being investigated to optimise the spoil removal strategy
in response to proposals made through OCI. A decision to either
reduce the quantity of materials provided to Wallasea or not use
Wallasea at all, would allow the acceptance of OCI proposals and
confirm the need for C806 and C807.
0.000
0.050
0.100
0.150
0.200
0.250
0.300
0.350
0.400
0.450
0.500
0.00
200,000.00
400,000.00
600,000.00
800,000.00
1,000,000.00
1,200,000.00
11312111098765432
AF
R
Nu
mber
of
hours
Period
Number of hours Accident Frequency Rate (AFR)
£0 bn
£2,000 bn
£4,000 bn
£6,000 bn
£8,000 bn
£10,000 bn
£12,000 bn
2009 2010 Jan-May2011
June-Dec2011
2012 2013 2014
Mill
ion
s
Total Value of Contracts Let (£) Planned
Total Value of Contracts Let (£)
£11,000
£12,000
£13,000
£14,000
11312111098765432
£ M
illions
Period
IP2 £12,827m
£-
£500
£1,000
£1,500
£2,000
£2,500
£3,000
£3,500
£4,000
11312111098765432
£ M
illions
Period
Contingency Current Risk Exposure (at P50)
-£3,000
-£2,000
-£1,000
£0
£1,000
£2,000
£3,000
2009 2011 2013 2015 2017 2019 2021
£ M
illions N
om
inal in
Fin
ancia
l Year
Financial Year
Sources and Uses of FundsP01 (2011-12) Forecast P50 Scenario
Total Inflow Total Outflow
In-period Surplus In-period Shortfall
Cumulative Surplus at end of FY
Actual balances to date have been incorporated into calculations. Data points represent position of CRL for the year from date shown.
0.60
0.80
1.00
1.20
11312111098765432
CPI SPI
AFCDC
To be Provided in Period 2
Status Key
Progressing Well
Some Concerns
Significant Concerns
IP1 £12,177m
IP0 £11,937m
Step 1
![Page 6: The Crossrail Story Control through Insight - Deloitte US control of you information is key to getting control of Capital Programme delivery ... AREA: PROJECT WIDE C807 ... Optimised](https://reader034.vdocuments.site/reader034/viewer/2022042801/5aa08cec7f8b9a67178e60f5/html5/thumbnails/6.jpg)
6
Step 2: Establish the reporting timeline
Agreeing the timings of the reporting is also key to obtaining consistent reporting
© 2014 Deloitte MCS Limited. All rights reserved.
M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F
Week 3 Week 4 Week 1 Week 2 Week 3 Week 4
Review meetings
with contractors
Review meetings Project
Controls/ Delivery Managers
Review meetings with
Project Managers
Area Periodic
Review Meeting
Programme Report & Board
Dashboard Review Meeting
Periodic Board
Preparation
Board
Meeting
Weekly Flash
Report Meetings
Sponsors & Regulatory
Relationships
Executive Team
Board &
Commitees
Programme
Management
Project/Delivery
Management
Contractors
Step 2
![Page 7: The Crossrail Story Control through Insight - Deloitte US control of you information is key to getting control of Capital Programme delivery ... AREA: PROJECT WIDE C807 ... Optimised](https://reader034.vdocuments.site/reader034/viewer/2022042801/5aa08cec7f8b9a67178e60f5/html5/thumbnails/7.jpg)
7
Step 3: Map out and agree information flow
Critical to the success of controlling your Capital Programme is understanding the key
information flows between core systems. Focus on reporting and the underlying data required
from the contractors.
© 2014 Deloitte MCS Limited. All rights reserved.
Budget
transfers
3. Cost
Management
Reporting Data Warehouse
(Read Only)
4. ERP
(Finance)2. Scheduling
P50 & P80 Risk
exposures
Forecast cost split out
from risk exposure
Investment Authority
2.2
Resolved &
unresolved
Risks
Awards & ICE
Master Change
Log (includes P50
risk exposure
CONTRACTOR
Report
Original Baseline Budget,
Control Baseline Budget, Total
of the Prices, Changes, EAC,
Risk, ACWP, EV, WBS (Directs)
3.1
ACWP, % Complete,
Contractor Planned Value,
PMC VoWD, Forecast Cost,
Activity level hours worked
3.5
Non-delivery
changes
(indirects)
Employer &
programme
baseline changes
Cost Changes
Indirects Actuals 4.2
Original Baseline
dates, Current Control
dates and Forecast
dates
1. Health &
Safety
5. Risk
Management
Task, type, status,
location, level,
contractor, cause,
actions, hours worked
Risk detail, status,
type, score, severity,
responses, freshness
5.1
Milestones: Anchor,
strategic, Procurement,
Interface and Key event.
Float
2.11.1
6. Contract
Admin
EWN, ICEs, Type,
Status, Value
6.1
Schedule, Milestone status,
Forecast dates
Early Warning Notice
5.2 Risk details
Scope book changes
Invoice
Financial Model
Forecast costs:
P50 & P80
Baseline Budget, Current
Control Budget, Forecast,
ACWP, Change (CCB Impacts)
4.1
Incident details and KPIs
(incl. aggregated
hours worked)
6.2 ICEs and Awards
ACWP period end file
Cost Assurance Totals
Cost Assurance Time
Spread
3.2
3.3
3.4
Contractor
Contractor
ContractorProject
Manager
Cost
Engineers
Cost
EngineersHSSE
Inspector
Cost & Scheduling
Engineers
Programme Baseline
Manager
Finance Risk
Manager
Schedule Changes
Finance
Master Data Management (WBS, ABS, OBS and Location) and Integration Services
3.5
Invoiced Actuals
Value of Work Done
(VoWD)3.5
Amount Due
6.1 Certificates 6.1 Certificates
Inspection
details
Step 3
![Page 8: The Crossrail Story Control through Insight - Deloitte US control of you information is key to getting control of Capital Programme delivery ... AREA: PROJECT WIDE C807 ... Optimised](https://reader034.vdocuments.site/reader034/viewer/2022042801/5aa08cec7f8b9a67178e60f5/html5/thumbnails/8.jpg)
8
Step 4: Agree master data and ownership
Determine the data structures by which the entire programme can be viewed. This will enable
the drill-down from the Executive level dashboard to progressively more detail until you come
to the Contractor’s Dashboard. It’s also critical to assign owners to each master data
structure and make them accountable for the quality of their data
© 2014 Deloitte MCS Limited. All rights reserved.
Example master data elements
Step 4
![Page 9: The Crossrail Story Control through Insight - Deloitte US control of you information is key to getting control of Capital Programme delivery ... AREA: PROJECT WIDE C807 ... Optimised](https://reader034.vdocuments.site/reader034/viewer/2022042801/5aa08cec7f8b9a67178e60f5/html5/thumbnails/9.jpg)
9
Step 5: Develop the application landscape
Assess which application should deliver which functionality, try to eliminate the grey areas.
© 2014 Deloitte MCS Limited. All rights reserved.
Step 5
Other Systems
Reporting and Management Information
Data Warehouse
Programme Controls
Risk Management
Schedule Management
Estimating
Cost Management
Change Management
Document Control
Contract Administration
Business Services & Back Office
Document Collaboration
Document Creation & Publishing
Intranet & Enterprise Search
Finance & Procurement
Order to Cash & Requisition to Pay
Cash Management & Project Accounting
HR
Time, Payroll, Expenses & Benefits
Resource Management
Recruitment
Learning Management
Operational Engineering and Asset Management
Engineering
Asset Management
Health, Safety & Environment
Commodity IT
E-mailAnti-VirusTelephony &
FaxVirtualisation
Reputation Management
CRM
Petitions Management
Stakeholder Management
Remote Working
GISLand &Property
ManagementLand Referencing
Database
Operational Reporting
Record to Report
Planning and Forecasting
eProcurement
Adherence to common Master Data
Microsoft Dynamics
Projectwise
MicroStation, ProjectWise Rivo
ERIS GIS Symantec Exchange VM Ware Citrix
Primavera P6 Prism G2, Cobra
Sage Prism G2, Cobra
eB ARM
eB ADP, SuccessFactors, Oracle
SharePoint
SharePoint
MS Office
MS SQL Server, SSAS, SSRS
Oracle, NetSuite, SAP
Acquisition Management
1
2
3
1
1 1
1
1 1
1
1
1
1
1
1
1
1
2
3
2
1
2
2
1
2
3
Urgent system improvement required
Some level of improvement required
System is fit for purpose
Systems improvement urgency
11 1 11
Custom HS2 Code + eB
MITEL
Requirements Management
Doors
1
Current system
Example of industry standard system
Step 5
![Page 10: The Crossrail Story Control through Insight - Deloitte US control of you information is key to getting control of Capital Programme delivery ... AREA: PROJECT WIDE C807 ... Optimised](https://reader034.vdocuments.site/reader034/viewer/2022042801/5aa08cec7f8b9a67178e60f5/html5/thumbnails/10.jpg)
10
Step 6: Issue data interface specification
Specify the format you wish the contractor to follow when supplying their data. This format
should support the Executive report requirements and enable the seamless integration into
the reporting environment
© 2014 Deloitte MCS Limited. All rights reserved.
Step 5Step 6
Name of the Attribute
Attribute Description Data Type Nulls Format Domain Values
Figure 1: Data Dictionary -- Accessibility
Description
Data Types DATE TIME Data time is a data type used for values that contain date and time. The date data type is used to specify a date.
NUMERIC
Numeric is a unit of information used store numeric information (Numbers)
CHARACTER
Character is a unit of information that corresponds to an alphabet (letters) or syllabary in the written form of a natural language.
BOOLEAN
Boolean is a datatype that defines two values (Yes, No)
Nulls No This attribute It cannot be null. It is the unique key for the entity
No
This attribute is highly recommended not be null. However, if due to lack of information there is no other option we can accept nulls exceptionally.
Yes This attribute can be null
Format Free Text We can insert free text, currently there is no constrain in terms of the symbols or text that we can insert.
DD/MM/YYYY Date format e.g. 01/02/2012
Yes, No
We only can chose between two options (Yes, No)
NNNN.NN
Describes a number with N decimal places. In the example (.NN) two
£NN If we add the £ in front of a numeric we are defining Pound. The rules (e.g. Decimal places applies as It was a numeric )
Domain Values Domain Values
The values for this attribute have been defined as a list of allowable values. You will find these values on the 'Domain Values & Standards' worksheet
Developing Domain Values
We are currently developing the standard.
Length
It will contain a number (e.g. 200)
Defines the length of the attribute (e.g. 5 CHARACTER means 5 characters ABCDE)
![Page 11: The Crossrail Story Control through Insight - Deloitte US control of you information is key to getting control of Capital Programme delivery ... AREA: PROJECT WIDE C807 ... Optimised](https://reader034.vdocuments.site/reader034/viewer/2022042801/5aa08cec7f8b9a67178e60f5/html5/thumbnails/11.jpg)
11
Contacts
Hani S Girgis
+44 7973641250
© 2014 Deloitte MCS Limited. All rights reserved.