    The Critical Path MethodThe Critical Path Method

    Presented byAntonio Prensa,MBA, PMP, CCP, CSTE for ProjectManagement Institute Puerto Rico

    Chapter

    June 20, 2002

    San Juan, Puerto Rico

  • 8/9/2019 The Critical Path Method (Antonio Prensa Pmp, Mba 2002) Diapositivas - Puerto Rico

    2/19

    "I believe that this nation shouldcommit itself to achieving a goal, before

    this decade is out, of landing a man on

    the moon..." - John F. Kennedy,

    May 27,1961

  • 8/9/2019 The Critical Path Method (Antonio Prensa Pmp, Mba 2002) Diapositivas - Puerto Rico

    3/19

    On July 20, 1969, just eight years after Kennedy's

    speech, Apollo 11 landed two men on the moon.This achievement was possible only with careful

    production planning that included the critical path

    method.

    NASA used the critical path method to help

    determine an efficient schedule for the tasks thatled to the moon landing.

  • 8/9/2019 The Critical Path Method (Antonio Prensa Pmp, Mba 2002) Diapositivas - Puerto Rico

    4/19

    Discussion Topics

    BackgroundSome questions about the project

    What is the Critical Path Method(CPM)?

    Why the CPM?

    How to use the CPM ?Questions and Answers

  • 8/9/2019 The Critical Path Method (Antonio Prensa Pmp, Mba 2002) Diapositivas - Puerto Rico

    5/19

    Background

    The critical path method (CPM) wasinvented by project managers in theearly 1950's.

    The US Navy adapted and improved itto manage the Polaris missile project inthe late 1950's

  • 8/9/2019 The Critical Path Method (Antonio Prensa Pmp, Mba 2002) Diapositivas - Puerto Rico

    6/19

    Some questions about the

    project

    How long will the entire project take tocomplete?

    Which activities determine total projecttime?

    Which activity times should beshortened, if possible, or in otherwords, how many resources should beallocated to each activity?

  • 8/9/2019 The Critical Path Method (Antonio Prensa Pmp, Mba 2002) Diapositivas - Puerto Rico

    7/19

    What is the CPMCPM?

    Critical Path Method (CPM), is a procedure for

    using network analysis to identify those tasks whichare on the critical path: ie where any delay in thecompletion of these tasks will lengthen the projecttimescale, unless action is taken.

    For all tasks off the critical path, a degree oftolerance is possible (eg. late start, late completion,early start, etc.).

    Network charts and CPM analysis used to be carriedout by hand.

    Software is now available which requires the useronly to enter the tasks, duration of each task anddependencies upon other tasks; a network chart andCPM is then automatically created.

  • 8/9/2019 The Critical Path Method (Antonio Prensa Pmp, Mba 2002) Diapositivas - Puerto Rico

    8/19

    Why the CPM?

    The CPMCPM formally identifies tasks whichmust be completed on time for the wholeproject to be completed on time

    Identifies which tasks can be delayed for awhile if resource needs to be reallocated tocatch up on missed tasks

    It helps you to identify the minimum length of

    time needed to complete a projectThe CPM determines both the early start and

    the late start date for each activity in the

    schedule.

  • 8/9/2019 The Critical Path Method (Antonio Prensa Pmp, Mba 2002) Diapositivas - Puerto Rico

    9/19

    How to use the CPM?

    Project Network DiagramAny schematic display of the logical relationshipsAny schematic display of the logical relationships

    of project activities.of project activities.

    1

    3

    2

    5 7

    4 6

    8

  • 8/9/2019 The Critical Path Method (Antonio Prensa Pmp, Mba 2002) Diapositivas - Puerto Rico

    10/19

    How to use the CPM?

    List the activitiesAnd relationships

    List the activitiesAnd relationships

    Create a startnode

    Create a startnode

    Draw arrows fromStart node to the

    First activitys node

    Draw arrows fromStart node to the

    First activitys node

    Sequentially

    Arrange allActivities fromStart

    Sequentially

    Arrange allActivities from

    Start

    Repeat process

    from successorsfor all activities

    Repeat process

    from successorsfor all activities

    Double check for

    missedrelationships

    Double check for

    missedrelationships

  • 8/9/2019 The Critical Path Method (Antonio Prensa Pmp, Mba 2002) Diapositivas - Puerto Rico

    11/19

    How to use the CPM?

    EarlyStart (ES)

    Late

    Start (LS)

    Early Finish(EF)

    Late

    Finish (LF)

    Task duration

  • 8/9/2019 The Critical Path Method (Antonio Prensa Pmp, Mba 2002) Diapositivas - Puerto Rico

    12/19

    How to use the CPM?

    Task ID Duration Dependency

    A 7

    B 3

    C 6 A

    D 3 BE 3 D,F

    F 2 B

    G 3 C

    H 2 E,G

  • 8/9/2019 The Critical Path Method (Antonio Prensa Pmp, Mba 2002) Diapositivas - Puerto Rico

    13/19

    How to use the CPM?

    FS

    A

    B

    C G

    H

    D

    F

    E

    (7) (6) (3)

    (3) (3)

    (2)

    (3)

    (2)

    0

    0

    77 13 16

    16 18

    3 3 6

    3 5

    6 9

    13

  • 8/9/2019 The Critical Path Method (Antonio Prensa Pmp, Mba 2002) Diapositivas - Puerto Rico

    14/19

    How to use the CPM?

    FS

    A

    B

    C G

    H

    D

    F

    E

    (7) (6) (3)

    (3) (3)

    (2)

    (3)

    (2)

    0

    0

    77 13 16

    16 18

    3 3 6

    3 5

    6 9

    1816

    16

    16

    13

    13

    13

    13

    770

    13

    13

    10

    11

    107

  • 8/9/2019 The Critical Path Method (Antonio Prensa Pmp, Mba 2002) Diapositivas - Puerto Rico

    15/19

    How to use the CPM?

    FS

    A

    B

    C G

    H

    D

    F

    E

    (7) (6) (3)

    (3) (3)

    (2)

    (3)

    (2)

    0

    0

    77 13 16

    16 18

    3 3 6

    3 5

    6 9

    1816

    16

    16

    13

    13

    13

    13

    770

    13

    13

    10

    11

    107

    000

    0

    77

    8

    7

  • 8/9/2019 The Critical Path Method (Antonio Prensa Pmp, Mba 2002) Diapositivas - Puerto Rico

    16/19

    Summary

    Critical Path Analysis is an effective andpowerful method of assessing:

    Tasks which must be carried out

    Where parallel activity can be carried outThe shortest time in which a project can becompleted

    Resources needed to achieve a projectThe sequence of activities, scheduling, andtimings involved

    Task priorities

  • 8/9/2019 The Critical Path Method (Antonio Prensa Pmp, Mba 2002) Diapositivas - Puerto Rico

    17/19

    Do you need more

    information?

    Project Management:A systems approach toPlanning, Scheduling, and Controlling Harold Kerzner, Six edition.

    Project Management: A Managerial Approach Jack R. Meredith, Samuel J. Mantel, FourthEdition.

    Web Search Engine key word: The CriticalPath Method or The CPM.

  • 8/9/2019 The Critical Path Method (Antonio Prensa Pmp, Mba 2002) Diapositivas - Puerto Rico

    18/19

    Contact me at:

    Antonio Prensa Email: [email protected] /

    [email protected]

    Phone: (787) 751-9800 ext. 3725

  • 8/9/2019 The Critical Path Method (Antonio Prensa Pmp, Mba 2002) Diapositivas - Puerto Rico

    19/19