the committee for international council on large electrical systems ( cigre )
DESCRIPTION
The committee for international council on large electrical systems ( cigre ). S.K. Soonee Chairman CIGRE-India Study Committee C.2. Sc c2 system operation and control. Study Committee C2: System operation & Control. Composition Chairman- Michael Armstrong Secretary- Ben Li - PowerPoint PPT PresentationTRANSCRIPT
THE COMMITTEE FOR INTERNATIONAL COUNCIL ON LARGE ELECTRICAL SYSTEMS (CIGRE)
S.K. Soonee
Chairman CIGRE-India Study Committee C.2
SC C2 SYSTEM OPERATION AND CONTROL
2
STUDY COMMITTEE C2: SYSTEM OPERATION & CONTROL
Composition Chairman- Michael Armstrong Secretary- Ben Li 24 National members, 12 National Observers
Europe-20, Asia/Oceania -8, Africa 3
3 Advisory Groups set up in 2007 for focus areas C2.1- Real-time System Operation and Control
C2.1- System Operational Planning & Performance Analysis
C2.3- Control centre infrastructure and human resources for System Operation
3
8 WORKING GROUPS (WG) IN SC-2 No. Title Convener Crea
tedDisbanded
C2.11System control in light of recent developments in Substation control (IEC standards).
M. Power (EI)
2007 2010
C2.13 Voltage and VAR support in System Operation T. Papazoglou
(GR)2007 2009
C2.22Application of resilience engineering to safety management principles in Control Centers, ensuring and enhancing power system reliability
T. Carolin (ZA)
C2.31Joint and coordinated development of operators in control center from different companies and nationalities
Udo Spanel (DE)
2007 2008
C2.32Emergency organisation in control centres crisis management in system operation
Fontaine (BE) 2007 2008
C2.33Control Centre Operator Requirements, Selection, Training and Certification
N. Cukalevski (RS)
2009 2011
C2.34Capabilities and requirements of a control centre in the 21st century - Functional and Human resources view
Udo Spanel (DE)
2009 2010
C2/ C5.05
Developments and changes in the Business of System Operators
O. Gjerde (NO) 2000 2010
4
C2.11SYSTEM CONTROL IN LIGHT OF RECENT DEVELOPMENTS IN SUBSTATION CONTROL (IEC STANDARDS)
Scope Identify the advances in Substation Control
which may influence system operation
Analyse their impact on system operation
Survey and catalogue best practices for embedding SCs in system control
Identify the potential improvements in system operations
Propose Recommendations / guidelines for using SCs integration in system control
5
C2.13VOLTAGE AND VAR SUPPORT IN SYSTEM
OPERATION
Scope Reactive Devices at the disposal of system
operator Techniques for Reactive power and voltage
control EMS Modelling, Control techniques, local and
centralized Finding systematic weak points for Voltage/var
control in the power system Voltage/Var during normal and emergency
conditions Implementation of Reactive Power Management Reactive Power Management and De-Regulation 6
C2.33CONTROL CENTRE OPERATOR REQUIREMENTS, SELECTION, TRAINING AND CERTIFICATION Scope
Overview of CC operators’ requirements regarding knowledge and skills. Operators work performance.
Overview of methods and practices to select power system CC operator candidates.
Critically review the methods and practices for CC operator training program design, development and utilization.
Review of the existing OTS/DTS architectures and functionality, and other training tools as well.
Collection and description of experiences in training program and tools practical use. Results achieved, problems identified.
Training program accreditation and operator certification.
Organization and justification of power system CC operator training
7
C2.34CAPABILITIES AND REQUIREMENTS OF A CONTROL CENTRE IN THE 21ST CENTURY - FUNCTIONAL AND HUMAN RESOURCES VIEW Scope
Capabilities and requirements of control centres Information exchange, interpretation and presentation Risk awareness and determination Human resources, Requirements on human abilities Operator training
Deliverables- Control centres Capabilities and Requirements, Information exchange Information interpretation and presentation Operational Challenges
Deliverables- Risk management Risk - awareness, determination, management
Deliverables- Human aspects Resources, Required abilities, Operator training
8
PROPOSED WG_C2.12 Title
“Applications of Synchronized Phasor Measurement in Power Systems
Scope Survey the use of wide area monitoring devices
in power systems Identify the most used WAM applications in
system operation and Analyse the trend for near future
Location of PMUs to strengthen system operation by increasing observability and robustness
Analyse new control possibilities ,such as HVDC, using WAM signals 9
PROPOSED WG_C2.15 Title
Common Information Model and its prospective use in power system operations
Scope Catalogue Current Use of CIM in Power systems
Operation Analyse the requirements applications and
possible improvements Establish best practices as seen in industry with
used cases Requirements of update on the standard from
System operation perspective. Possible cooperation with CIM user group or
other Operational Associations 10
OTHER PROPOSED WORKING GROUPS C2.14
Requirement on design and implementation of Restoration Tools and Procedures
C2.21 Lessons learnt from recent Emergencies and Blackout
Incidents
11
PROPOSED ROADMAP FOR FOLD Shadow working groups of CIGRE / VLPGO
Identify Working Groups where FOLD would like to be associated with
Identify resource persons from SLDC/RLDC/NLDC Consolidate the views of LDCs in India on various
issues under discussion at International fora
Constitute FOLD- Steering Committee
Constitute 8 Working Group of FOLD Work on focus areas identified in the FOLD Charter Develop -Terms of Reference, Deliverables Have a time schedule Identify Convener & members (volunteers)
12
THANK YOU !13