the buttolph flyer m.r · on 15/12/17 we had 144 likes on 15/12/18 but we have now got 409 likes on...

10
The Buttolph Flyer M.R.G Edited By Dale Edward Buttolph The Final Newsletter for 2018 THE. BUTTOLPH FLYER M.R.G 1 www.08097.co.uk Merry Christmas and a happy new year to all our members and followers

Upload: others

Post on 07-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The Buttolph Flyer M.R · On 15/12/17 we had 144 likes On 15/12/18 but we have now got 409 likes on Facebook and 39,687 people look at our posts this year 2018 And all our updates

The Buttolph Flyer M.R.G Edited By Dale Edward ButtolphThe Final Newsletter for 2018

THE. BUTTOLPH FLYER M.R.G �1

www.08097.co.ukMerry Christmas and a happy new year to all our members and followers

Page 2: The Buttolph Flyer M.R · On 15/12/17 we had 144 likes On 15/12/18 but we have now got 409 likes on Facebook and 39,687 people look at our posts this year 2018 And all our updates

THE. BUTTOLPH FLYER M.R.G �2

Christmas 🎄 is nearly here and while we may have decorated the trees and wrapped presents, our hard work on the railway continues. Our larger riding trolley has been having some out of season attention and has undergone some maintenance work, which at times didn’t go according to plan but we got there eventually It’s all ready now for the 2019 season

Page 3: The Buttolph Flyer M.R · On 15/12/17 we had 144 likes On 15/12/18 but we have now got 409 likes on Facebook and 39,687 people look at our posts this year 2018 And all our updates

THE. BUTTOLPH FLYER M.R.G �3

Wow! What a year we have had, with some ups and downs on the railway. It is a great end to the year, following the hard time at the start with us losing the portable raised level track (DMVR). The railway now has over 250 feet of ground level track which is being upgraded and extended over the winter season. The new extension will include two sets of points which will enable a loop to be built to provide more operational flexibility as well as an extended track length. The improved line will be up and running for the 2019 season. I have been busy testing, renovating and repairing the rolling stock. Plus, I have started a project to install semaphore signalling along the line which in time will be automated in connection with the operation of moving trains. This will ensure that the railway operates safely as well as making it more realistic to visitors

The plan for next year is to buy a brand new steam engine, a 'Sweet Pea', 0-4-0 saddle tank, which will be easy to operate. This will be our first live steam engine which operates just like its standard gauge cousins. This development will bring a whole new dimension to operating the railway. The Class 37 will become our new club diesel locomotive; whilst 08097, the Buttolph Flyer and the Sweet Pea will be visiting various different clubs in and around the Norfolk area. Our first event will be our Members Day on the 13th of April 2019 (BFMRG). Our first outing, with 08097, will be on the 21st of April at Eaton Park Miniature Railway to celebrate a close friend's birthday. We have plenty more events lined up for 2019.

I would like to thank all of our members for their support and wish them a happy Christmas and best wishes for the New Year.

Page 4: The Buttolph Flyer M.R · On 15/12/17 we had 144 likes On 15/12/18 but we have now got 409 likes on Facebook and 39,687 people look at our posts this year 2018 And all our updates

A special thank you to our members Gavin, David, Thomas and Pete at Riverside Models, your time is much appreciated and valued You have been an amazing help to the railway

THE. BUTTOLPH FLYER M.R.G �4

Our website has been improved and has now been made a lot easier for you to view and with new designs We are always looking to make changes and improvements to make your experience more efficientwww.08097.co.uk

We were grateful for the protection of the garage in our recent repainting jobs of the boards for the railway track, a recent cold windy and wet spell, made it more difficult to get things done but temperatures are rising once again so we are able to push along another step closer to reach our goals

Page 5: The Buttolph Flyer M.R · On 15/12/17 we had 144 likes On 15/12/18 but we have now got 409 likes on Facebook and 39,687 people look at our posts this year 2018 And all our updates

Our website Visitor Statistics in 2017 was 92,948k but our visitor Statistics in 2018 was 98,687k.

Facebook page On 15/12/16 we had 33likesOn 15/12/17 we had 144 likes On 15/12/18 but we have now got 409 likes on Facebook and 39,687 people look at our posts this year 2018 And all our updates on Facebook our visitor 78% from Wymondham and Norwich & 10% from Norfolk, Peterborough, Nottingham, Suffolk & Lincolnshire & 9% are from Australia & 2% was from USA

Instagram page 75 followers

Our mileage in 2018Class 08097 Class 37558. 10538 ST DVMR 10.8miles. 0miles. 0miles NDSME 70.1miles 20.7miles 0miles NDSME RL 0.6miles 7.6miles. 2.4miles BFMRG. 39.6miles 20.9miles. 14.9miles KLSMR 11miles 0miles 0miles =132.1miles. =49.2miles. =17.3miles 232496yd =86592yd. =30448yd With all the locos we have done =198.6miles in 2018 and in 2017 we done 248.7miles

THE. BUTTOLPH FLYER M.R.G �5

Page 6: The Buttolph Flyer M.R · On 15/12/17 we had 144 likes On 15/12/18 but we have now got 409 likes on Facebook and 39,687 people look at our posts this year 2018 And all our updates

Special Events 2019Please Note all special events is  subject to loco been availableMember day at B.F.M.R.G on 13th  April 2019

We will be at Eaton Park Miniature Railway  Day 21st  April 2019

We will be at Eaton Park Miniature Railway Day 12th May 2019

Our Member Day at B.F.M.R.G on the 25th May 2019

We will be at Eaton Park Miniature Railway Day 1st  June 2019

We will be at Eaton Park Miniature Railway Day  30th  June 2019

Our Member Day at B.F.M.R.G on the 6th July 2019

We will be at Eaton Park Miniature Railway Day 28th  July 2019

We will be at Eaton Park Miniature Railway Day 11th August 2019

Our AGM & Running day at B.F.M.R.G on 17th  August 2019

08097 The Buttolph Flyer Will be at a Private Event Day 14th  September 2019

THE. BUTTOLPH FLYER M.R.G �6

Page 7: The Buttolph Flyer M.R · On 15/12/17 we had 144 likes On 15/12/18 but we have now got 409 likes on Facebook and 39,687 people look at our posts this year 2018 And all our updates

Our Member Day At B.F.M.R.G on the 28th of September 2019

We will be at Eaton Park Miniature Railway Day  29th  September 2019

Our Member Day At B.F.M.R.G on  26th October 2019

THE. BUTTOLPH FLYER M.R.G �7

Page 8: The Buttolph Flyer M.R · On 15/12/17 we had 144 likes On 15/12/18 but we have now got 409 likes on Facebook and 39,687 people look at our posts this year 2018 And all our updates

www.08097.co.uk www.facebook.com/CL08097

THE. BUTTOLPH FLYER M.R.G �8

Well the New Year is just around the corner, 2018 has been a fantastic year, we have achieved things we never dreamed would be possible and we are now setting the scene for major improvements to our railway We would like to take this opportunity to thank each of you for your continued support, all your help and suggestions All remains now is to wish you and your families a very Merry Christmas and a Happy and Prosperous 2019

The 2 best photos of 2018

www.instagram.com/cl08097groupEmail [email protected] +447432553209

Page 9: The Buttolph Flyer M.R · On 15/12/17 we had 144 likes On 15/12/18 but we have now got 409 likes on Facebook and 39,687 people look at our posts this year 2018 And all our updates

THE. BUTTOLPH FLYER M.R.G �9

Page 10: The Buttolph Flyer M.R · On 15/12/17 we had 144 likes On 15/12/18 but we have now got 409 likes on Facebook and 39,687 people look at our posts this year 2018 And all our updates

THE. BUTTOLPH FLYER M.R.G �10