Company Confidential The Bow Project March 2013 Safer. Smarter. Tyco

Upload: vuanh

Post on 06-Apr-2018

218 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Company Confidential

The Bow Project

March 2013

Safer. Smarter. Tyco

Page 2: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Profile of a Unique Project

• The Bow Building is the tallest building in Western Canada at 58 stories. It has replaced the Calgary Tower as the prominent landmark on the Calgary Skyline.• It was recently named the world’s 4th most spectacular Corporate Head Office building by Emporis, a global provider of building data.

2

Page 3: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Design Features

The Bow has several design features that make it unique in North America . Some of these features include:• Its crescent shape which creates a floor plan that

maximizes views and access to natural light • The orientation of the building. The atrium extends the

full height of the SW face to harness the sun’s energy to augment heating requirements to the rest of the building

3

Page 4: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Design Features

The view to the SW

4

Page 5: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Design Features

• The Bow Building utilizes a “Diagrid” structural system. The diagonal and vertical frames not only provide superior structural efficiency, but also create a striking graphical presentation on Calgary’s skyline

5

Page 6: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Design Features

Sky Gardens

• There are 3 “sky gardens” which function as an indoor park environment - with trees, vegetation and seating

6

Page 7: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Design Features

• The floor plates within each section do not extend to the exterior of the building allowing views downward into the garden atriums within each ‘tranche’.

• The building is in fact built like 3 separate buildings placed one on top of the other – 3 “tranches”

7

Page 8: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Design Features• Many of the offices have windows that open to the atrium

and there are in fact 1506 operable glass vents that let in outside air also

8

Page 9: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Building Facts

The site:• Area covers the majority of 2 city blocks • Below grade parking structure is 6 levels (x 2) and

holds 1390 vehicles and 420 bicycles and extends under 6th Ave to the former site of the York Hotel where the 2nd tower will be constructed.

The building:• 58 stories high • 1.9 mil sq ft of rentable space – approx 32,000 sq ft per

floor• 2 retail floors and 4 mechanical floors

9

Page 10: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Construction Facts

• The largest steel project ever built in Canada (45,000 tonnes of steel)

• The concrete foundation was the 3rd largest continuous concrete pour in the world (took 3 days and 500 people)

• 82,500 sq meters of glass panels (the equivalent of 10 football fields)

• 1.6 million pounds of sheet metal used for the mechanical systems

• 1,000,000 conduit runs with 232 individual transformers for electrical requirements

10

Page 11: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Challenges

1. Size & Scope of Project:• Largest building in Western Canada• 5 year + Construction Project• Construction Logistics:

• Moving people and equipment into the building and up and down floors:• 300+ electricians• 22 trades • more than 100 sub-trades• >2000 trades people on site at any given time

11

Page 12: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Challenges

2. Unique building design:• Curved building with unique building finishes• Massive floor plate (32,000 sq ft per flr.)• Sky gardens (2+ story high atriums with plants)• Inside office windows that open to atrium• Outside windows that open to the outside• Raised sub-floor with removable tiles

12

Page 13: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Impact on Fire Systems: (Size & Scope)

Fire Alarm System Logistics:• 34 Fire alarm

“nodes” networked together on a fibre backbone

• 20,000 fire alarm devices

Fire Alarm Node

Central Riser L4 (2010)

Pre-Action System

13

Page 14: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Size & Scope

• 80 kilometers of sprinkler pipe• 560 sprinkler hose valves and 128 control valves• Just under 30,000 sprinkler heads

14

Page 15: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Size & Scope

Fire Alarm System Logistics:• The Annunciator

panels seen here each include over 2km of wire in a 3’ x 7’ x 1’ enclosure and over 2900 point addresses including both switches & LEDs

15

Page 16: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Size & Scope

Complexity (Ease of Use)

16

Page 17: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Impact on Fire Systems (Building Design)

1. Detection and Suppression in Atriums2. Detection in sub-floors3. Smoke Control4. Smoke Management

17

Page 18: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Overcoming the Challenges

1. Size & Scope of Project• Dedicated Project Management (5 year

project)• Outside resources:

• Senior programmer from Toronto• “COE” Design expertise – Westminster• Custom made Graphical Annunciators• “A” team

18

Page 19: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Overcoming the Challenges

• Construction Logistics: Pre-fabrication

Factory Acceptance Test (FAT) for fire alarm19

Page 20: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Overcoming Challenges

20

Page 21: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Overcoming Challenges

21

Page 22: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Overcoming the Challenges

• Pre-fabricated Fire Alarm Termination Cabinets with termination points for each node. SimplexGrinnell communication cards prewired on a back plate to facilitate a “plug & play” connection point on site.

22

Page 23: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Overcoming the Challenges

Plug & Play I/O Termination Panel

23

Page 24: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Overcoming the Challenges

• Sprinkler Fabrication Shop able to cut pipes to fit in elevators

• ‘Round-the-clock’ deliveries of sprinkler pipe to avoid traffic issues and to work around other trades for crane & skip time

24

Page 25: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Overcoming the Challenges

Sprinkler ‘Fab’ Shop

25

Page 26: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Overcoming the Challenges

• Flex heads for sprinklersystem due to massive floor plate. Able to accommodate minor changes in floor layouts, ceiling layouts etc.

26

Page 27: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Overcoming the Challenges

• Ease of Use: Computer Command Centre

27

Page 28: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Overcoming the Challenges

• Ease of Use:

Graphical representation of fan and damper status on work station

28

Page 29: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Overcoming the Challenges

Active Graphic Annunciator Panels in FACP Room

• Ease of Use

29

Page 30: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Overcoming the Challenges

Smoke Control Annunciator Panel

• Ease of Use:

30

Page 31: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Overcoming the Challenges

2. Building Design: • Detection in Atriums

Flame detectors

31

Page 32: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Overcoming the Challenges

• Detection in Atriums: Smoke detectors at top of atriums

outside windows

32

Page 33: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Overcoming the Challenges

• Detection in Atriums OSID beam detectors in Atrium

33

Page 34: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Overcoming the Challenges

• Detection in sub-floors:

34

Page 35: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Overcoming the Challenges

High Fog System (the only one of it’s kind in N. America)

• Smoke Control

35

Page 36: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Overcoming the Challenges

• Control pumps & solenoids for high pressure mist system to suppress smoke in atriums (3000PSI)

High Fog control system

36

Page 37: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Overcoming the Challenges

• Smoke Management: Exhaust grids

Smoke exhaust areas for each tranche

37

Page 38: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Conclusion

This job was a successful job because of: • Use of “A-team” representatives by all parties.

38

Page 39: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Conclusion

Quality Workmanship:

39

Page 40: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Conclusion

• Excellent teamwork & cooperation between the electrical contractor, the engineer and ourselves (manufacturer).

• Solutions-oriented approach - flexibility & willingness to think outside of the box.

• Incredible commitment to the success of the project by the electrical contractor and SimplexGrinnell technicians on site.

40

Page 41: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

ConclusionTestimonial from Western Electrical Management:

“We commend Simplex Grinnell (SG) in their performance as the fire alarm system supplier for the Bow project under some challenging conditions including an

.

The personnel assigned to the project within SG’s office and onsite were very co-operative and demonstrated a both during the construction, verification, and testing stages of the project contributing to this project’s success for the owner, construction manager, and ourselves as the electrical contractor.

Many thanks and we would be honored to work with Simplex Grinnell on future endeavors.”

41

Page 42: The Bow Project - CFAA 3 - Scott Adamson - The... · full height of the SW face to harness the sun’s energy ... Detection in sub-floors 3. Smoke Control 4. ... contributing to this

Company Confidential

Questions?