Page 1: The Bombay Electricity Duty Rules, 1962

8/16/2019 The Bombay Electricity Duty Rules, 1962

http://slidepdf.com/reader/full/the-bombay-electricity-duty-rules-1962 1/24

Page 1

 

Page 2: The Bombay Electricity Duty Rules, 1962

8/16/2019 The Bombay Electricity Duty Rules, 1962

http://slidepdf.com/reader/full/the-bombay-electricity-duty-rules-1962 2/24

Page

THE BOMBAY ELECTRICITY

DUTY RULES, 1962

[28th September 1962]

REAMBLE

In exercise of the powers conferred 

by sub-sections (1) and (2) of 

section 12 of the Bombay Electricity 

Duty Act 1!"# (Bom$ %& of 1!"#)

the 'oernment of aharashtra

hereby ma*es the followin+ rules

the same hain+ been preiously  published as re,uired by sub-

section (1) of the said section 12

namely -

Toc

RELIMI!ARY

1" Sh#rt t$t%e &'(

)#mme')eme't"**

(1) These rules may be

called the Bombay Electricity

Duty Rules, 1962.

(2) They shall come into

force on and from the 1st

day of ctober, 1962.

Toc

2" De+$'$t$#'"**

!n these rules, unless the

conte"t re#uires other$ise.%%

(a) &'ct& means the

Bombay Electricity

Duty 'ct, 19*

(b) &authority& means

the authority

s+ecified by the tate

-oernment under

+ara/ra+h !! in the

chedule to the 'ct*

(c) &billin/ month&

means a month in

res+ect of $hich a bill

of char/es is

+re+ared by a

licensee under his

tariffs for the su++ly

of ener/y to his

consumers. 0here

more than half the

number of days of

such month fall in

any calendar month,

such month shall be

named after that

calendar month, and

$here e#ual number

of days of such

month fall in t$o

calendar months,such months shall be

named after the first

of the t$o calendar

months*

© Manupatra Information Solutions Pvt. Ltd.

Page 3: The Bombay Electricity Duty Rules, 1962

8/16/2019 The Bombay Electricity Duty Rules, 1962

http://slidepdf.com/reader/full/the-bombay-electricity-duty-rules-1962 3/24

Page 4: The Bombay Electricity Duty Rules, 1962

8/16/2019 The Bombay Electricity Duty Rules, 1962

http://slidepdf.com/reader/full/the-bombay-electricity-duty-rules-1962 4/24

Page

." r#/$$#' & repe)t

p&0me't #+ e%e)tr$)$t0 (t0 b0

%$)e'ee"**

 (1) Eery licensee $ho

su++lies ener/y to any

consumer may +re+are his

bill of char/es accordin/ to

his billin/ month, but shall

include the electricity duty

leiable under the 'ct as a

se+arate item in the bill of

char/es for the ener/y

su++lied by him to the

consumer and shall recoer

the same from the consumer

alon/ $ith his o$n char/es

for the su++ly of such

ener/y. The duty leiable in

accordance $ith the different

+arts shall be indicated by

the licensee se+arately in

the bill.

(2) 0here in res+ect of any

billin/ month, the licensee

ordinarily com+letes the

readin/ of meters of all his

consumers of any class,

$ithin a +eriod of seen days

from the date on $hich hecommences such readin/, he

shall, in res+ect of such

billin/ month, +ay to tate

-oernment on or before the

last date of the succeedin/

calendar month, the $hole

of the duty +ayable in

res+ect of the ener/y

consumed by such class of

consumers durin/ the billin/

month.

() !n all cases not fallin/

under sub%rule (2) the duty

+ayable in res+ect of ener/y

consumed by the consumers

durin/ each billin/ month

may be +aid by the licensee

by three instalments as

hereinafter +roided %

(i) the first instalment

of a sum e#ual to

l=2>th of the total

duly collected and

+aid to the tate

-oernment durin/

the +recedin/

financial year in

res+ect of ener/y

consumed by the

aforesaid class of

consumers durin/

that year shall be

+aid on or before the

1th day of thesucceedin/ calendar

months;

(ii) the second

instalment e#ual to

the sum mentioned in

© Manupatra Information Solutions Pvt. Ltd.

Page 5: The Bombay Electricity Duty Rules, 1962

8/16/2019 The Bombay Electricity Duty Rules, 1962

http://slidepdf.com/reader/full/the-bombay-electricity-duty-rules-1962 5/24

Page

clause (i) shall be

+aid on or before the

last day of the

succeedin/ calendar

month;

(iii) the last

instalment com+risin/

the remainin/

amount, if any. of

duty +ayable in

res+ect of the billin/

month shall be +aid

$ithin ten days from

the last day of the

succeedin/ calendar

month ; <roided

that, $here the

amount +aid by the

first instalment

to/ether $ith the

amount +ayable by

the second instalment

under clause (ii)

e"ceeds the total

amount of duty

+ayable in res+ect of

any billin/ month, the

amount to be +aid by

the second instalment

shall be reduced to

the e"tent of such

e"cess.

(>) Eery licensee,

other than the

7aharashtra tate

Electricity Board, and

the entral

-oernment shall, in

consultation $ith the

Electrical En/ineer to

-oernment, ado+t

either the +rocedure

+rescribed in sub%rule

(2) or in sub%rule ()

as may be conenient

to him for readin/ the

meters and +ayment

of the duty, and shall

not chan/e oer to

the alternatie

+rocedure $ithout

/iin/ three months?

notice in $ritin/ to

the Electrical

En/ineer to

-oernment in

adance.

() The entral -oernment

shall ado+t the +rocedure

+rescribed in sub%rule (2)

aboe.

(6) The licensee shall credit

the amount of duty in such-oernment Treasury as

may be s+ecified in res+ect

of him by the Electrical

En/ineer to -oernment,

under the head &@!!!%ther

© Manupatra Information Solutions Pvt. Ltd.

Page 6: The Bombay Electricity Duty Rules, 1962

8/16/2019 The Bombay Electricity Duty Rules, 1962

http://slidepdf.com/reader/full/the-bombay-electricity-duty-rules-1962 6/24

Page

Ta"es and Duties%Recei+ts

under Electricity Duty&, and

a co+y of the treasury

challan by $hich the duty is

+aid shall be for$arded by

him to the Electrical

En/ineer to -oernment and

another co+y to the

Electrical !ns+ector.

Toc

" r#/$$#' & repe)t

p&0me't #+ (t0 b0 per#'

3h# 4e'er&te e'er40 +#r the$r

#3' e"**

(1) Eery +erson other than

a licensee $ho intends to

/enerate, or intends to

continue /eneration of

ener/y e"clusiely for his

o$n use after thecommencement of these

rules shall ma8e an

a++lication for re/istration in

4orm ?'?. uch a++lication

shall, $here the use is for an

industrial underta8in/, be

made to the Electrical

En/ineer to -oernment and

in any other case, to the

Electrical !ns+ector.

(2) Ao +erson to $hom a

re/istration number is

assi/ned under sub%rule (1)

shall cause any e"tension or

re+lacement to be made in

his /eneratin/ set $ithout

ma8in/ a fresh a++lication

under sub%rule (1) and

obtainin/ a fresh re/istration

number under that sub%rule.

() Eery +erson to $hom a

re/istration number is

assi/ned under sub%rule (1)

%

(i) shall +ay the

electricity duty

+ayable in res+ect of

a calendar month

$ithin ten days after

the e"+ir of that

month by creditin/

the amount of duty

under the head &@!!!

% ther Ta"es and

Duties %Recei+ts

under Electricity

Duty& in such

-oernment Treasury

as may be s+ecified

in that behalf by the

Electrical En/ineer to

-oernment, or asthe case may be by

the Electrical

!ns+ector;

(ii) shall for$ard a

co+y of the treasury

© Manupatra Information Solutions Pvt. Ltd.

Page 7: The Bombay Electricity Duty Rules, 1962

8/16/2019 The Bombay Electricity Duty Rules, 1962

http://slidepdf.com/reader/full/the-bombay-electricity-duty-rules-1962 7/24

Page

challan to the

Electrical En/ineer to

-oernment, or as

the case may be to

Electrical !ns+ector

indicatin/ therein the

re/istration number

assi/ned to him

under sub%rule (1)*

and

(iii) shall submit a

#uarterly return in

4orm B? to the

Electrical En/ineer to

-oernment and to

the Electrical

!ns+ector on or

before the 1fh day

of the month ne"t

follo$in/ the #uarter

to $hich the return

relates.

Toc

5" r#/$$#' & repe)t

p&0me't #+ (t0 b0 per#'

3h# 4e'er&te e'er40 &'(

pp%0 the &me t# #ther

per#' +ree #+ )h&r4e"**

Eery +erson other than a

licensee $ho /enerates

ener/y and su++lies the

same to other +ersons free

of char/e.%%

 (i) shall +ay the

electricity duty

+ayable on the

ener/y consumed by

such +ersons in any

calendar month by

creditin/ the amount

of duty under the

head &@!!!%ther

Ta"es and Duties%

Recei+ts under

Electricity Duty& into

the -oernment

Treasury of the

district in $hich the

ener/y is consumed

or $ith the +rior

a++roal of the 

Electrical En/ineer to

-oernment, in any

other -oernment

Treasury, $ithin

fifteen days of the

e"+iry of the calendar

month aforesaid; and 

(ii) shall submit a

#uarterly return in

4orm ? to the

Electrical En/ineer to

-oernment and to

the Electrical

!ns+ector before 15the

2th day of the

month succeedin/ the

month) ne"t follo$in/

© Manupatra Information Solutions Pvt. Ltd.

Page 8: The Bombay Electricity Duty Rules, 1962

8/16/2019 The Bombay Electricity Duty Rules, 1962

http://slidepdf.com/reader/full/the-bombay-electricity-duty-rules-1962 8/24

Page 9: The Bombay Electricity Duty Rules, 1962

8/16/2019 The Bombay Electricity Duty Rules, 1962

http://slidepdf.com/reader/full/the-bombay-electricity-duty-rules-1962 9/24

Page

(1) Aot$ithstandin/

anythin/ in the fore/oin/

+roisions, any licensee may,

$ith the +rior +ermission of

the Electrical En/ineer to

-oernment, but sub3ect to

the +roisions of the Aote to

rule 1(a) of the Bombay

Treasury Rules. 196, ma8e

+ayment of the electricity

duty by che#ue in lieu of

+ayment of cash into a

-oernment Treasury ;

<roided that, no

licensee $ho has

been +ermitted to

ma8e +ayment by

che#ue under this

sub%rule shall at any

time thereafter ma8e

alteration in the mode

of +ayment unless he

has /ien three

months? notice in

$ritin/ to the

Electrical En/ineer in

adance of such

alteration.

2

5(2) 0here any licensee hasbeen +ermitted under sub%

rule (1) to ma8e +ayments

by che#ue, the date on

$hich the che#ue has been

actually de+osited by the

licensee $ith the

-oernment Treasury into

$hich he is re#uired to +ay

electricity duty under these

rules shall, tor the +ur+ose

of these rides, be deemed to

be the date on $hich the

licensee has +aid the

electricity duty ;

<roided that, if on

account of any

default on the +art of

the licensee, the

amount +aid by him

by the che#ue so

de+osited is not

transferred to the

credit of the tate

-oernment, the date

on $hich the said

amount is actually

transferred to the

credit of the tate

-oernment shall, for

the +ur+ose of these

rules, be deemed to

be the date on $hich

the licensee has +aid

the electricity duty.:

REISTERS, BOOS O-

ACCOU!T A!D RETUR!S

Toc

8" M&$'te'&')e #+ Re4$ter"**

© Manupatra Information Solutions Pvt. Ltd.

Page 10: The Bombay Electricity Duty Rules, 1962

8/16/2019 The Bombay Electricity Duty Rules, 1962

http://slidepdf.com/reader/full/the-bombay-electricity-duty-rules-1962 10/24

Page

(1) Eery licensee shall

maintain the follo$in/

re/isters, namely ;%

(') a re/ister of

+remises to $hich

ener/y is su++lied or

on $hich ener/y is

consumed, containin/

the follo$in/

+articulars, that is to

say ;%

(i) the

descri+tion of

the land or, as

the case may

be. the

buildin/ or any

structure or

any +art of the

buildin/ or

structure on

$hich

consum+tion

of ener/y

liable to duty

under the 'ct

is made,

(ii) $here such

+remises is

situated $ithin

the munici+al

limits, the

number and

classification

assi/ned by

the

munici+ality to

such +remises.

(iii) the names

of the

consumers on

such +remises.

(i) +arts

under $hich

the duty is

leiable on the

consum+tion

of ener/y

made on such

+remises.

() if the

+remises is a

factory as

defined in the4actories 'ct.

19> or an

establishment

as defined in

the Bombay

ho+s and

Establishment

s 'ct, 19>,

the

re/istration

number of

such factory

or, as the ease

may be.

© Manupatra Information Solutions Pvt. Ltd.

Page 11: The Bombay Electricity Duty Rules, 1962

8/16/2019 The Bombay Electricity Duty Rules, 1962

http://slidepdf.com/reader/full/the-bombay-electricity-duty-rules-1962 11/24

Page

establishment,

if any.

assi/ned

under the

releant 'ct.

(i) $here on

any +remises,

ener/y is

consumed for

the +ur+oses

mentioned in

<art D, the

+articulars

statin/ %

(a) the

connect

ed

su++ly

/ien

for the

said

+ur+os

es.

(b) the

names

of

consum

ers

throu/h

$hose

meters

such

su++ly

is /ien

and the

situatio

n of the

+oint of 

su++ly.

(c)

$hethe

r the

load is

ordinari

ly /ien

for

more

than or

less

than 12

hours

in each

day.

(ii) $here

any

unmetered

su++ly of

ener/y is

made to

+remises used

for residential

or commercial

+ur+ose, or$here flat

rates are

char/ed by

the licensee,

the +articulars

© Manupatra Information Solutions Pvt. Ltd.

Page 12: The Bombay Electricity Duty Rules, 1962

8/16/2019 The Bombay Electricity Duty Rules, 1962

http://slidepdf.com/reader/full/the-bombay-electricity-duty-rules-1962 12/24

Page

re/ardin/ the

connected

su++ly /ien

to each

consumer;

(B) a re/ister of sales

containin/ +articulars

as res+ects the

monthly sales of

ener/y made for

different +ur+oses to

each consumer and

the <arts under $hich

duty is leiable on the

consum+tion of

ener/y so su++lied ;

<roided that,

it shall not be

necessary to

maintain a

re/ister of

sales $here

the su++ly of

ener/y falls

under <art 4*

() a re/ister of

amounts found

irrecoerable, $ith

+articulars thereof*

(D) a re/ister of

tem+orary su++ly of

ener/y for e"hibitions

or entertainments, for

+riate /ain, or for

social functions,

/iin/ +articulars of%

(i) the names of

consumers.

(ii) the

connected

su++ly

sanctioned.

(iii) the

+remises

$here the load

$as

connected.

(i) the dates

of

commenceme

nt and

sto++a/e of

su++ly ofener/y. and

() the

amount of

duty collected*

(E) a re/ister of

consumers $ho hae

been assi/ned

re/istration numbers

under rule 16

s+ecifyin/ the date on

$hich each such

consumer has be/un

to manufacture or

© Manupatra Information Solutions Pvt. Ltd.

Page 13: The Bombay Electricity Duty Rules, 1962

8/16/2019 The Bombay Electricity Duty Rules, 1962

http://slidepdf.com/reader/full/the-bombay-electricity-duty-rules-1962 13/24

Page

+roduce articles for

the first time and the

date u+ to $hich the

e"em+tion or

concession obtained

by him under rule 16

shall be aailable to

him;

(4) a re/ister of

consumers $ho hae

been /ranted

certificates under rule

1.

(2) 0here the licensee

su++lies ener/y in areas

fallin/ $ithin the 3urisdiction

of more than one

munici+ality or areas fallin/

$ithin the limits of more

than one reenue district, he

shall maintain se+arate

re/isters for the areas fallin/

$ithin the 3urisdiction of

each munici+ality and for the

non%munici+al areas fallin/

$ithin the limits of each

reenue district.

Toc

9" Sbm$$#' #+ retr' &'(

t&teme't"**

Eery licensee shall submit

to the Electrical En/ineer to

-oernment and to the

Electrical !ns+ector,%

(a) a #uarterly return

in 4orm ? before

5the 2th day of the

month succeedin/ the

month ne"t follo$in/:

to $hich the return

relates; and

(b) a statement in

4orm ?E? >(before the

1th day of eery

month succeedin/ the

month to $hich it

relates, sho$in/ the

ad3ustment carried

out in the account of

that month: on

account of %

(i) rectificationof meterin/

inaccuracies;

(ii) +ast

arrears

recoered by

+rocess of la$

or other$ise*

(iii) any

misclassificatio

n of the

+ur+ose or the

+remises

made earlier*

© Manupatra Information Solutions Pvt. Ltd.

Page 14: The Bombay Electricity Duty Rules, 1962

8/16/2019 The Bombay Electricity Duty Rules, 1962

http://slidepdf.com/reader/full/the-bombay-electricity-duty-rules-1962 14/24

Page

(i)

e"em+tions

$ron/ly /ien

and $ithdra$n

subse#uently;

() any other

reason, $hich

may be

s+ecified by

the licensee*

accom+anied

by a list of

industrial

underta8in/s

to $hich a

concession or

e"em+tion in

res+ect of

electricity duty

has ceased to

be aailable by

or under the

'ct startin/

$ith that

month.

Toc

1:" %&)e 3here b##; #+

&))#'t &'( re4$ter h&%% be

;ept"**

'll boo8s of account and

re/isters re#uired to be

maintained by the licensee

under these rules shall be

8e+t and made aailable for

ins+ection by the

!ns+ectors,%

(a) in the case of a

licensee licensed

under the !ndian

Electricity 'ct, 191

(not bein/ the

7aharashtra tate

Electricity Board), in

his local office in each

com+act area sered,

by him. or. $here

such com+act area is

for his administratie

conenience sub%

diided into bloc8s, in

the res+ectie bloc8

offices*

(b) in the case of the

7aharashtra tate

Electricity Board, in

each of its sub%

diisional or diisional

offices, $hicheer is

more conenient to

the Board ;

<roided that,

the

7aharashtra

tate

Electricity

Board shall

8ee+ the

© Manupatra Information Solutions Pvt. Ltd.

Page 15: The Bombay Electricity Duty Rules, 1962

8/16/2019 The Bombay Electricity Duty Rules, 1962

http://slidepdf.com/reader/full/the-bombay-electricity-duty-rules-1962 15/24

Page

Electrical

En/ineer to

-oernment

and the

Electrical

!ns+ectors

informed in

adance of the

+laces $here

the boo8s of

account and

re/isters $ill

be 8e+t and

made aailable

for ins+ection;

and

(c) in any other case,

at such +lace or

+laces as the licensee

may. $ith the

+reious a++roal of

the Electrical

En/ineer to

-oernment,

determine.

I!SECTORS

Toc

11" <&%$+$)&t$#' #+

I'pe)t#r"**

'ny Electrical !ns+ector

a++ointed under the !ndian

Electricity 'ct, 191, or any

+erson a++ointed to assist

him. or a Reenue fficer

not belo$ the ran8 of a

7ahal8ari or Aaib%Tahsildar,

or any officer of the

Directorate of !ndustries not

belo$ the ran8 of an

!ndustries !ns+ector, or any

officer a++ointed under the

4actories 'ct. 19> not

belo$ the ran8 of a 4actories

!ns+ector, shall be #ualified

to be a++ointed as an

!ns+ector under section 6 of

the 'ct.

METERS

Toc

12" C#'mpt$#' t# be metere(

&))r&te%0"**

(1) 5ub3ect to the

+roisions of rule 1>. $here

the consum+tion of ener/y is

liable for electricity duty

under different <arts or rates

or both,: the consum+tion

shall be recorded by means

of an accurate meter ;

<roided that, $here

a +erson /eneratin/

ener/y for his o$n

use does not. for

/ood and sufficient

reasons and $ith the

+rior a++roal of the

© Manupatra Information Solutions Pvt. Ltd.

Page 16: The Bombay Electricity Duty Rules, 1962

8/16/2019 The Bombay Electricity Duty Rules, 1962

http://slidepdf.com/reader/full/the-bombay-electricity-duty-rules-1962 16/24

Page

Electrical En/ineer to

-oernment, instal

any meter, the units

of ener/y consumed

by him shall be

calculated on the

basis of the

65connected load: and

the normal $or8in/

hours of the

underta8in/ or

business for $hich

such /eneration is

made ;

<roided further that,

$here a +erson, not

bein/ a licensee, $ho

/enerates ener/y for

his o$n use or

su++lies a +art of the

ener/y /enerated by

him to any other

+erson free of char/e

does not instal a

meter or maintain

and furnish +ro+er

documentary

eidence of

consum+tion, the

units of ener/y

consumed by him or

by that other +erson

may be calculated by

the !ns+ector on the

basis of such other

data as may be

aailable to him or

secured by him from

other sources.

(2) !f the !ns+ector has any

doubt about the accuracy of

a meter used for the +ur+ose

of com+utation of duty by

any +erson other than a

licensee, he shall, if he

himself is not the Electrical

!ns+ector, refer the matter

to the Electrical !ns+ector.

The Electrical !ns+ector shall

thereu+on hae the accuracy

of the meter tested in

accordance $ith the

+roisions of section 26 of

the !ndian Electricity 'ct,

191.

() 'llo$ance for fast and

slo$ meters and incorrect

readin/ arisin/ therefrom

shall be made by a licensee

to $hom the !ndian

Electricity 'ct, 191. is

a++licable to the e"tent

+ermissible under the !ndian

Electricity Rules, 196. only.!n the case of any one else

liable to +ay electricity duty,

no such allo$ance shall be

+ermissible for the +ur+ose

of +ayment of duty, e"ce+t

© Manupatra Information Solutions Pvt. Ltd.

Page 17: The Bombay Electricity Duty Rules, 1962

8/16/2019 The Bombay Electricity Duty Rules, 1962

http://slidepdf.com/reader/full/the-bombay-electricity-duty-rules-1962 17/24

Page

$hen +rior +ermission in

that behalf is /ien by the

tate -oernment.

Toc

1." Re&($'4 #+ meter"**

(1) Eery licensee shall

cause the meter of eery

consumer to be read as far

as +ossible on the same date

in each month and to hae

the units of ener/y

consumed and char/eable to

duty in each month

recorded. The +eriod

bet$een t$o such

consecutie readin/s shall be

rec8oned as one month for

the +ur+ose of com+utation

of electricity duty and

submission of #uarterlyreturns under these rules ;

5C C C:

5 95<roided that, 3

for the +ur+oses of

calculation of duty

+ayable in res+ect of

the +eriod

commencin/ on the

first day of anuary,

1966, and endin/ on

the day on $hich the

meter is read for the

first time thereafter,

the units of ener/y

consumed durin/ the

said +eriod shall, as

far as +ossible, be

determined on the

basis of aera/e daily

consum+tion) of

ener/y recorded

durin/ the month

immediately

+recedin/ the day on

$hich the meter is

read as aforesaid.:

15C C C:

115(2): 'ny +erson other

than a licensee $ho

/enerates ener/y for his o$n

use and $ho is liable to +ay

electricity duty on the basis

of ener/y consumed by him

shall cause his meter or

meters to be read on the last

day of eery calendar month

and the electricity duty

leiable shall be +aid on the

basis of the monthly

consum+tion so recorded.

Toc

12[1" r#/$$#' +#r ep&r&te

meter #r b*meter"**

0here the electricity duty in

res+ect of ener/y consumed

by a consumer or by a

© Manupatra Information Solutions Pvt. Ltd.

Page 18: The Bombay Electricity Duty Rules, 1962

8/16/2019 The Bombay Electricity Duty Rules, 1962

http://slidepdf.com/reader/full/the-bombay-electricity-duty-rules-1962 18/24

Page

+erson /eneratin/ ener/y for

his o$n use is leiable under

different <arts or rates or

both, the consumer or as the

case may be. such +erson,

shall cause to be installed

different meters or sub%

meters to indicate the

consum+tion fallin/ under

each such <art or rate, or

both ;

<roided that, $here

the consumer for

/ood and sufficient

reason, has failed to

+roide different

meters or sub%

meters, at any time

to indicate the

consum+tion fallin/

under each such <art

or rate, or both, the

consum+tion may be

arried at by the

licensee on the basis

of aera/e daily

ener/y consum+tion

allocable to the

different +arts, sub%

+arts or rates or

both, +ro rata or on

an e#uitable basis as

is feasible in the

circumstances.:

Toc

15" R$4ht #+ %$)e'ee t# e'ter

prem$e #+ & )#'mer"**

Eery consumer shall allo$ a

licensee or any +erson

authorised by him in $ritin/

in this behalf for the

+ur+oses of readin/ or

testin/ the readin/ of a

meter or sub%meter, to enter

bet$een sunrise and sunset,

any +remises in $hich the

meter or the sub%meter is.

or is belieed to be installed.

CO!CESSIO!S, E=EMTIO!S,

DISUTES A!D AEALS

Toc

16" r#)e(re +#r 4ett$'4

e>empt$#' #r )#')e$#' '(er)%&e

(a)(ii) or (b) of section

(2).%%

(1) 'ny consumer

desirin/ to /et

e"em+tion under

clause (a)(ii) of sub%

section (2) of section

of the 'ct. or to

aail of the

concessional rates

under clause (b) of

that sub%section may

© Manupatra Information Solutions Pvt. Ltd.

Page 19: The Bombay Electricity Duty Rules, 1962

8/16/2019 The Bombay Electricity Duty Rules, 1962

http://slidepdf.com/reader/full/the-bombay-electricity-duty-rules-1962 19/24

Page

a++ly in that behalf in

4orm ?4? to the

!ndustries

ommissioner. 15C C

C: and shall for$ard a

co+y thereof to the

licensee, if any, from

$hom he obtains

su++ly of ener/y.

1>5Eery such

a++lication shall be

made $ithin a +eriod

of three years from

the date on $hich the

consumer or the

underta8in/ be/ins to

manufacture or

+roduce articles for

the first time.)

(2) n recei+t of an

a++lication under

sub%rule (1). the

!ndustries

ommissioner shall,

after such in#uiry as

he deems fit. assi/n a

re/istration number

to the a++licant, and

intimate the

re/istration number

assi/ned, to the

Electrical !ns+ector.

() Eery licensee,

$ho in +ursuance of

rule . maintains a

re/ister of consumers

to $hom re/istration

numbers are assi/ned

under sub%rule (2)

shall for$ard a co+y

of such re/ister to the

!ndustrial

ommissioner as

soon as +ossible after

it is +re+ared by him

and 8ee+ the

!ndustries

ommissioner

informed about any

additions or alteration

made in the re/ister

from lime to time.

Toc

1" r#)e(re +#r 4ett$'4

)#')e$#' '(er )%&e ?)@ $'

&rt "**

(1) 'ny consumer desirin/ to

aail of the concessional

rates of duty under

subclause (i) or sub%clause

(ii) of clause (c) in <art -

may a++ly in that behalf in

4orm ?-? to the tate

-oernment, throu/h his

licensee, if any.

(2) n recei+t of an

a++lication under sub%rule

© Manupatra Information Solutions Pvt. Ltd.

Page 20: The Bombay Electricity Duty Rules, 1962

8/16/2019 The Bombay Electricity Duty Rules, 1962

http://slidepdf.com/reader/full/the-bombay-electricity-duty-rules-1962 20/24

Page

(1), the tate -oernment

shall ma8e such in#uiries

and call for such further

information as it may thin8

fit and if it is satisfied that

the a++licant satisfies the

conditions laid do$n in sub%

clause (i) or sub%clause (ii)

of clause (c) in <art -. it

may direct that the a++licant

shall be entitled to the

concessional rates of duty

under sub%clause (i) or , as

the case may be, sub%clause

(ii) of the aforesaid clause

(c). +on such direction, the

!ndustries ommissioner

shall /rant a certificate to

the a++licant certifyin/ that

the a++licant shall be

entitled to the concessional

rates of duty aforesaid.

() Ao consumer $ho has

not been /ranted a

certificate under sub%rule (2)

shall be entitled to the

concessional rates of duty

under clause (c) in <art -.

E"+lanation.%%

4or the

+ur+ose of

concessional

rates of duty

under clause

(c) in <art -.

the com+onent

+arts of an

industrial

underta8in/

$or8in/ under

the same

licence or

re/istration

certificate

secured under

the !ndustries

(Deelo+ment

and

Re/ulation)

'ct, 191

shall, thou/h

situated at

different

+laces, be

treated as a

sin/le

underta8in/.

Toc

18" D$)#'t$'&')e #+

)#')e$#'"**

Eery consumer to $hom a

certificate is /ranted under

rule 1 shall submit to the

!ndustries ommissioner

$ithin three months of the

close of the financial year of

his underta8in/ a re+ort

/iin/ the details of any ne$

© Manupatra Information Solutions Pvt. Ltd.

Page 21: The Bombay Electricity Duty Rules, 1962

8/16/2019 The Bombay Electricity Duty Rules, 1962

http://slidepdf.com/reader/full/the-bombay-electricity-duty-rules-1962 21/24

Page

business or line of

+roduction underta8en by

him alon/ $ith such $or8in/

data as $ill be sufficient to

satisfy the tate

-oernment that the

consumer continues to

#ualify for the said

concession. The tate

-oernment shall, in eery

case $here it considers that

either because of such ne$

business or line of

+roduction underta8en or

other$ise, the consumer

cannot #ualify for such

concession, +ass orders for

the discontinuance of the

concession $ith effect from a

date not earlier than si"

months from the close of the

said financial year.

Toc

19" D$pte re4&r($'4

&pp%$)&b$%$t0 #+ &'0 &rt"**

(1) The authority to $hich

any #uestion has been

referred for decision under

+ara/ra+h !! in the chedule

to the 'ct may re#uire any

+erson concerned or li8ely to

be concerned $ith such

#uestion to +roduce before it

such information (oral or

documentary), as in its

o+inion is necessary or

re#uired for the +ur+oses of

recordin/ its decision.

(2) 'ny +erson a//rieed by

the decision of the authority

under +ara/ra+h !! in the

chedule to the 'ct or any

licensee hain/ any interest

in such decision shall, on

+ayment of a co+yin/ fee at

the rate of t$enty%fie naye

+aise +er ty+ed +a/e and on

an a++lication made in that

behalf to the authority, be

entitled to hae a co+y of

the decision of the authority.

Toc

2:" Appe&% &4&$'t (e)$$#' #+ 

&th#r$t0"**

(1) 0here an a++eal a/ainst

the decision of the authority

under +ara/ra+h !! in the

chedule to the 'ct is made

to the tate -oernment,

the tate -oernment may.

after /iin/ the a++ellant an

o++ortunity of bein/ heard

and callin/ for such further

information or eidence as it

may deem necessary +ass

such orders as it deems fit.

© Manupatra Information Solutions Pvt. Ltd.

Page 22: The Bombay Electricity Duty Rules, 1962

8/16/2019 The Bombay Electricity Duty Rules, 1962

http://slidepdf.com/reader/full/the-bombay-electricity-duty-rules-1962 22/24

Page

(2) Eery such a++eal shall

be addressed to the

ecretary to the -oernment

of 7aharashtra in the

!ndustries and abour

De+artment, achialaya

'nne"e, Bombay%2.

MISCELLA!EOUS

Toc

21" Re)#/er0 #+ &rre&r #+

e%e)tr$)$t0 (t0"**

(1) 0here any licensee or

other +erson fails to +ay any

electricity duty recoered by

him from his consumers to

the tate -oernment $ithin

the +eriod s+ecified in rule

or , the Electrical !ns+ector

may, after /iin/ clear thirty

days? notice in $ritin/ to the

seniormost officer of the

licensee residin/ at the +lace

$here boo8s of account and

re/isters of the licensee are

8e+t in +ursuance of rule

or to such +erson as the

case may be, to +ay the

clues to/ether $ith the

interest accruable thereon,

re+ort to the tate

-oernment for the recoery

of the dues as an arrear of

land reenue.

(2) 0here any consumer

$ho is liable to +ay the

electricity duty directly to

the tate -oernment fails

to +ay the same $ithin the

time +rescribed in that

behalf, the Electrical

!ns+ector shall send a

$ritten notice to the last

8no$n address of the

consumer re#uirin/ him to

+ay the dues to/ether $ith

the interest accruable

thereon $ithin thirty days of

the notice and u+on the

consumer?s failure to +ay the

said dues $ithin such +eriod,

the Electrical !ns+ector may

re+ort to the tate

-oernment for the recoery

of the dues as an arrear of

land reenue.

Toc

22" Repe&%"**

n the commencement of

these rules, the Bombay

Electricity Duty Rules, 19.

shall stand re+ealed, e"ce+t

as res+ects thin/s done or

omitted to be done.

Toc

 FFFFFFFFFFFFFFFFFFFF

© Manupatra Information Solutions Pvt. Ltd.

Page 23: The Bombay Electricity Duty Rules, 1962

8/16/2019 The Bombay Electricity Duty Rules, 1962

http://slidepdf.com/reader/full/the-bombay-electricity-duty-rules-1962 23/24

Page

1 !nserted by -. A. of 1.2.196.

2. ubstituted by -. A. of 1.>.196.

. ubstituted by -. A. of 1.1

1.19.

>. ubstituted by -. A. of 1>.196.

. ubstituted by -. A. of >.11.19.

6. ubstituted by -. A. of 22..19>.

. Deleted by -. A. of >.11.19.

. 'dded by -. A. of 1.1.1966.

9. ubstituted by -. A. of >.1 1.19.

1. Deleted, ibid.

11. Renumbered, ibid.

12. ubstituted by -. A. of >.11.19>.

1. Deleted by -. A. of 1.12.196.

1>. 'dded by -. A. of 1.11.19.

 

Disclaimer; The ontent +roided herein is on an 's!s ᄉ basis. 7anu+atra !nformation olutions <t. td.

e"+ressly disclaims all res+onsibility for any loss,in3ury, liability or dama/e of any 8ind resultin/ fromand arisin/ out of, or any $ay related to the aboeontent. This document is bein/ furnished to you foryour information by 7anu+atra. The contents of thisdocument hae been obtained from sourcesmanu+atra beliees to be reliable. These contentshae not been inde+endently erified, andmanu+atra ma8es no re+resentation or $arranty asto the accuracy, com+leteness or correctness of the

tate 'cts=Rules=Re/ulations. <rinci+al 'cts may or

© Manupatra Information Solutions Pvt. Ltd.

Page 24: The Bombay Electricity Duty Rules, 1962

8/16/2019 The Bombay Electricity Duty Rules, 1962

http://slidepdf.com/reader/full/the-bombay-electricity-duty-rules-1962 24/24

Page