![Page 1: The Benefits of Green Shores Two Projects Start to Finish · The Benefits of Green Shores ... (Chum and Chinook) and for resting and feeding shorebirds v Restore Hastings Creek through](https://reader033.vdocuments.site/reader033/viewer/2022043014/5fb1308707bf7c7ba171f994/html5/thumbnails/1.jpg)
stewardshipcentrebc.ca
The Benefits of Green Shores®: Two Projects Start to Finish
PresentedbyDGBlair,ExecutiveDirectorKellyLoch,GreenShoresProjectsCoordinatorStewardshipCentreforBC
![Page 2: The Benefits of Green Shores Two Projects Start to Finish · The Benefits of Green Shores ... (Chum and Chinook) and for resting and feeding shorebirds v Restore Hastings Creek through](https://reader033.vdocuments.site/reader033/viewer/2022043014/5fb1308707bf7c7ba171f994/html5/thumbnails/2.jpg)
stewardshipcentrebc.ca
Connect.Understand.Act.
www.stewardshipcentrebc.ca
![Page 3: The Benefits of Green Shores Two Projects Start to Finish · The Benefits of Green Shores ... (Chum and Chinook) and for resting and feeding shorebirds v Restore Hastings Creek through](https://reader033.vdocuments.site/reader033/viewer/2022043014/5fb1308707bf7c7ba171f994/html5/thumbnails/3.jpg)
stewardshipcentrebc.caWhat will we cover today?
v Introduce you to the Green Shores program, including its rationale, benefits, and application
v Share lessons learned from two Green Shores
projects including design, construction and certification process
v Q & A
![Page 4: The Benefits of Green Shores Two Projects Start to Finish · The Benefits of Green Shores ... (Chum and Chinook) and for resting and feeding shorebirds v Restore Hastings Creek through](https://reader033.vdocuments.site/reader033/viewer/2022043014/5fb1308707bf7c7ba171f994/html5/thumbnails/4.jpg)
stewardshipcentrebc.caWhat is Green Shores?
It is a rigorous standard to:
v Preserve or restore shoreline physical processes
v Maintain or enhance habitat function and diversity along the shoreline
v Prevent or reduce pollutants entering the aquatic environment
v Avoid or reduce cumulative impacts
![Page 5: The Benefits of Green Shores Two Projects Start to Finish · The Benefits of Green Shores ... (Chum and Chinook) and for resting and feeding shorebirds v Restore Hastings Creek through](https://reader033.vdocuments.site/reader033/viewer/2022043014/5fb1308707bf7c7ba171f994/html5/thumbnails/5.jpg)
stewardshipcentrebc.ca
5
ShorelineChallenges
![Page 6: The Benefits of Green Shores Two Projects Start to Finish · The Benefits of Green Shores ... (Chum and Chinook) and for resting and feeding shorebirds v Restore Hastings Creek through](https://reader033.vdocuments.site/reader033/viewer/2022043014/5fb1308707bf7c7ba171f994/html5/thumbnails/6.jpg)
stewardshipcentrebc.caInsectstoOrcas
FunctioningLakeandMarineshorelinesarevitaltoourmosticonicspecies
Shorelinevegetationandwrackprovidenutrientstoproducephytoplanktonandzooplankton
SandlanceandSurfSmeltspawnonintertidalbeaches
Sandlanceareakeyfoodsourceforchinook
ChinookSalmonareakeyfoodsourcefororca
GreenShoresdesignsstrengthenthisfoodchain
![Page 7: The Benefits of Green Shores Two Projects Start to Finish · The Benefits of Green Shores ... (Chum and Chinook) and for resting and feeding shorebirds v Restore Hastings Creek through](https://reader033.vdocuments.site/reader033/viewer/2022043014/5fb1308707bf7c7ba171f994/html5/thumbnails/7.jpg)
stewardshipcentrebc.ca
v Guidance Materials created as a tool to develop properties in a “shore friendly” way v Both are built on a format similar to Built
Green™ and LEEDTM using a credit and rating system framework
v Education and Training to expand awareness and use of Green Shores guidance materials
Green Shores Program Components
![Page 8: The Benefits of Green Shores Two Projects Start to Finish · The Benefits of Green Shores ... (Chum and Chinook) and for resting and feeding shorebirds v Restore Hastings Creek through](https://reader033.vdocuments.site/reader033/viewer/2022043014/5fb1308707bf7c7ba171f994/html5/thumbnails/8.jpg)
stewardshipcentrebc.caGreen Shores Program Components
v Green Shores for Local Government Group v SCBC offers facilitation and technical
support
v Green Shores Project Certification
v Research Reports and Resources • GreeningShorelinestoEnhanceResilienceproject(2014)• ShoreManagementPolicies&BylawsforLocalGovernment(2016)
• SupportingNature-BasedSolutionsforResilience(2018-2020)
![Page 9: The Benefits of Green Shores Two Projects Start to Finish · The Benefits of Green Shores ... (Chum and Chinook) and for resting and feeding shorebirds v Restore Hastings Creek through](https://reader033.vdocuments.site/reader033/viewer/2022043014/5fb1308707bf7c7ba171f994/html5/thumbnails/9.jpg)
stewardshipcentrebc.ca
Increase training options for professionals
• Current field-based Level 1 and 2 courses (University of Victoria)
• Development of on-line Level 1 GS course (BCIT)
• Development of co-hort based Level 3 training course (BCIT) for AP designation
GreenShoresTraining
![Page 10: The Benefits of Green Shores Two Projects Start to Finish · The Benefits of Green Shores ... (Chum and Chinook) and for resting and feeding shorebirds v Restore Hastings Creek through](https://reader033.vdocuments.site/reader033/viewer/2022043014/5fb1308707bf7c7ba171f994/html5/thumbnails/10.jpg)
stewardshipcentrebc.caGreen Shores for Coastal Development
Applicable to: v Parks v Mixed-Use residential/
commercial v Institutional shoreline v Marine shorelines* Based on the four Green Shores Guiding Principles
*Soontoaddlakestoo
![Page 11: The Benefits of Green Shores Two Projects Start to Finish · The Benefits of Green Shores ... (Chum and Chinook) and for resting and feeding shorebirds v Restore Hastings Creek through](https://reader033.vdocuments.site/reader033/viewer/2022043014/5fb1308707bf7c7ba171f994/html5/thumbnails/11.jpg)
stewardshipcentrebc.ca
Different design options offer
different points
![Page 12: The Benefits of Green Shores Two Projects Start to Finish · The Benefits of Green Shores ... (Chum and Chinook) and for resting and feeding shorebirds v Restore Hastings Creek through](https://reader033.vdocuments.site/reader033/viewer/2022043014/5fb1308707bf7c7ba171f994/html5/thumbnails/12.jpg)
stewardshipcentrebc.caGreen Shores for Homes
Applicable to: v Residential properties v Freshwater (lake) and
marine shorelines v Intended to encourage
incremental improvements Based on the four Green Shores Guiding Principles
![Page 13: The Benefits of Green Shores Two Projects Start to Finish · The Benefits of Green Shores ... (Chum and Chinook) and for resting and feeding shorebirds v Restore Hastings Creek through](https://reader033.vdocuments.site/reader033/viewer/2022043014/5fb1308707bf7c7ba171f994/html5/thumbnails/13.jpg)
stewardshipcentrebc.ca
Example of Point Requirements for Credit 2.4 Woody Material (Guide pg. 66)
Different design options offer different points
GreenShoresforHomes
![Page 14: The Benefits of Green Shores Two Projects Start to Finish · The Benefits of Green Shores ... (Chum and Chinook) and for resting and feeding shorebirds v Restore Hastings Creek through](https://reader033.vdocuments.site/reader033/viewer/2022043014/5fb1308707bf7c7ba171f994/html5/thumbnails/14.jpg)
stewardshipcentrebc.caGS Project Certification Process
StageOneEnrollandInitiate
StageTwoProjectDesignand
Construction
StageThreeVerifyandreceiveAward
14
![Page 15: The Benefits of Green Shores Two Projects Start to Finish · The Benefits of Green Shores ... (Chum and Chinook) and for resting and feeding shorebirds v Restore Hastings Creek through](https://reader033.vdocuments.site/reader033/viewer/2022043014/5fb1308707bf7c7ba171f994/html5/thumbnails/15.jpg)
stewardshipcentrebc.caGreen Shores for Coastal Development
NewBrightonParkShorelineHabitatRestorationProject
![Page 16: The Benefits of Green Shores Two Projects Start to Finish · The Benefits of Green Shores ... (Chum and Chinook) and for resting and feeding shorebirds v Restore Hastings Creek through](https://reader033.vdocuments.site/reader033/viewer/2022043014/5fb1308707bf7c7ba171f994/html5/thumbnails/16.jpg)
stewardshipcentrebc.caProject Location
New Brighton Park Vancouver, BC
![Page 17: The Benefits of Green Shores Two Projects Start to Finish · The Benefits of Green Shores ... (Chum and Chinook) and for resting and feeding shorebirds v Restore Hastings Creek through](https://reader033.vdocuments.site/reader033/viewer/2022043014/5fb1308707bf7c7ba171f994/html5/thumbnails/17.jpg)
stewardshipcentrebc.caProject Location
![Page 18: The Benefits of Green Shores Two Projects Start to Finish · The Benefits of Green Shores ... (Chum and Chinook) and for resting and feeding shorebirds v Restore Hastings Creek through](https://reader033.vdocuments.site/reader033/viewer/2022043014/5fb1308707bf7c7ba171f994/html5/thumbnails/18.jpg)
stewardshipcentrebc.caProject objectives
v Restore coastal wetland habitat by restoring tidal influence v Increase the overall ecological function
v Critical for juvenile salmon (Chum and Chinook) and for resting and feeding shorebirds
v Restore Hastings Creek through creation of a stream connection from Creekway Park
v Salt marsh, mud flats, tidal channels, beach grass meadows, shrub thickets (native species)
v Increase public use and education v Installation of park features such as picnic tables, viewing decks, educational
signs v Gravel pathways for controlled access to shore
v Protect the sensitive wetland through installation of strategically located fences and
shrub thickets.
![Page 19: The Benefits of Green Shores Two Projects Start to Finish · The Benefits of Green Shores ... (Chum and Chinook) and for resting and feeding shorebirds v Restore Hastings Creek through](https://reader033.vdocuments.site/reader033/viewer/2022043014/5fb1308707bf7c7ba171f994/html5/thumbnails/19.jpg)
stewardshipcentrebc.ca
TeamMembers RoleProjectProponents• VancouverFraserPortAuthority• VancouverParksBoard
• Assembled/coordinatedprojectteam&construction• CoordinatedPublic/FirstNationsconsultation&collaboration• Constructionpermitting
Civil/CoastalEngineer• Moffat&Nichol
• SiteAssessment• Foreshoredesign
LandscapeArchitect• ConnectLandscapeArchitecture
• LandscapePlan
EnvironmentalConsulting• Hemmera• GLWilliams&AssociatesLtd
• ContaminatedSitesspecialist• GreenShoresdesignconsultant• Coastalecologyspecialist
ConstructionContractor• WilcoCivilInc.
• Projectconstruction
GSCDVerifier• MeganTunock,M.Sc.
• Submittalreviewandfinalprojectverification
StewardshipCentreforBC • Projectsupport/Q&A• GSCDguideandxlstemplates(submittalform)• Certificateandcasestudy
GreenShoresProjectTeam
![Page 20: The Benefits of Green Shores Two Projects Start to Finish · The Benefits of Green Shores ... (Chum and Chinook) and for resting and feeding shorebirds v Restore Hastings Creek through](https://reader033.vdocuments.site/reader033/viewer/2022043014/5fb1308707bf7c7ba171f994/html5/thumbnails/20.jpg)
stewardshipcentrebc.caProject Design
KeyFeatures:v Collaborativecommunityengagementprocessv HabitatIslandv Restoredcreekandtidalflowv BeachGrass/SaltMarsh/MudFlatv Fencingofsensitivehabitatv Viewpoint
![Page 21: The Benefits of Green Shores Two Projects Start to Finish · The Benefits of Green Shores ... (Chum and Chinook) and for resting and feeding shorebirds v Restore Hastings Creek through](https://reader033.vdocuments.site/reader033/viewer/2022043014/5fb1308707bf7c7ba171f994/html5/thumbnails/21.jpg)
stewardshipcentrebc.ca
![Page 22: The Benefits of Green Shores Two Projects Start to Finish · The Benefits of Green Shores ... (Chum and Chinook) and for resting and feeding shorebirds v Restore Hastings Creek through](https://reader033.vdocuments.site/reader033/viewer/2022043014/5fb1308707bf7c7ba171f994/html5/thumbnails/22.jpg)
stewardshipcentrebc.caPre-construction
![Page 23: The Benefits of Green Shores Two Projects Start to Finish · The Benefits of Green Shores ... (Chum and Chinook) and for resting and feeding shorebirds v Restore Hastings Creek through](https://reader033.vdocuments.site/reader033/viewer/2022043014/5fb1308707bf7c7ba171f994/html5/thumbnails/23.jpg)
stewardshipcentrebc.ca
![Page 24: The Benefits of Green Shores Two Projects Start to Finish · The Benefits of Green Shores ... (Chum and Chinook) and for resting and feeding shorebirds v Restore Hastings Creek through](https://reader033.vdocuments.site/reader033/viewer/2022043014/5fb1308707bf7c7ba171f994/html5/thumbnails/24.jpg)
stewardshipcentrebc.ca
![Page 25: The Benefits of Green Shores Two Projects Start to Finish · The Benefits of Green Shores ... (Chum and Chinook) and for resting and feeding shorebirds v Restore Hastings Creek through](https://reader033.vdocuments.site/reader033/viewer/2022043014/5fb1308707bf7c7ba171f994/html5/thumbnails/25.jpg)
stewardshipcentrebc.ca
![Page 26: The Benefits of Green Shores Two Projects Start to Finish · The Benefits of Green Shores ... (Chum and Chinook) and for resting and feeding shorebirds v Restore Hastings Creek through](https://reader033.vdocuments.site/reader033/viewer/2022043014/5fb1308707bf7c7ba171f994/html5/thumbnails/26.jpg)
stewardshipcentrebc.caGSCD Rating
CreditsAchieved2 Credit1 SiteDesignwithConservationofShoreline1 Credit2 ShoreFriendlyPublicAccess1 Credit3 Re-DevelopmentofContaminatedSite4 Credit4 ClimateChangeAdaptationPlan4 Credit5 RehabilitationofCoastalHabitat2 Credit6 RehabilitationofCoastalSedimentProcesses2 Credit7 EnhancedRiparianZone1 Credit8 LightPollutionReduction0 Credit9 IntegratedStormwaterPlanningandDesign2 Credit10 Innovation1 Credit11 OutreachandPublicEducation
20 ProjectTotal
![Page 27: The Benefits of Green Shores Two Projects Start to Finish · The Benefits of Green Shores ... (Chum and Chinook) and for resting and feeding shorebirds v Restore Hastings Creek through](https://reader033.vdocuments.site/reader033/viewer/2022043014/5fb1308707bf7c7ba171f994/html5/thumbnails/27.jpg)
stewardshipcentrebc.caRehabilitation of Coastal Habitat
v Creation of sensitive or critical habitat v Habitat island/riparian v Novel coastal marsh habitat
restoration v Removal of pre-existing rip rap v Habitat rehabilitation plan
Credit 5: achieved max points (4)
![Page 28: The Benefits of Green Shores Two Projects Start to Finish · The Benefits of Green Shores ... (Chum and Chinook) and for resting and feeding shorebirds v Restore Hastings Creek through](https://reader033.vdocuments.site/reader033/viewer/2022043014/5fb1308707bf7c7ba171f994/html5/thumbnails/28.jpg)
stewardshipcentrebc.caOutreach and Education
v Public and stakeholder engagement v Working with partners incl
Musqueum, Tsleil-Waututh, and Squamish Nations
v Project website v BCIT student engagement v Green Shores Training field site v Permanent on-site signage (right) Credit 11: achieved max points (1)
![Page 29: The Benefits of Green Shores Two Projects Start to Finish · The Benefits of Green Shores ... (Chum and Chinook) and for resting and feeding shorebirds v Restore Hastings Creek through](https://reader033.vdocuments.site/reader033/viewer/2022043014/5fb1308707bf7c7ba171f994/html5/thumbnails/29.jpg)
stewardshipcentrebc.caProject Proponent: Vancouver Fraser Port Authority
• Goals of this project were to enhance fish and wildlife habitat in Burrard Inlet, and to increase public access to nature.
• Once combined with the Green Shores principles, the project team had a clear path to successful completion
• The GSCD Gold rating reinforces the positive work the
project team and project partners delivered at New Brighton Park, both for the environment and the community.
![Page 30: The Benefits of Green Shores Two Projects Start to Finish · The Benefits of Green Shores ... (Chum and Chinook) and for resting and feeding shorebirds v Restore Hastings Creek through](https://reader033.vdocuments.site/reader033/viewer/2022043014/5fb1308707bf7c7ba171f994/html5/thumbnails/30.jpg)
stewardshipcentrebc.ca
• The urban location of this project proved to be challenging, specifically the robust consultation that was undertaken due to a variety of local resident and stakeholder groups.
• Winter construction work also proved to be a challenge due
to an extremely wet and cold winter experienced in 2016-17, followed by severe summer drought conditions in 2017.
Challenges:
![Page 31: The Benefits of Green Shores Two Projects Start to Finish · The Benefits of Green Shores ... (Chum and Chinook) and for resting and feeding shorebirds v Restore Hastings Creek through](https://reader033.vdocuments.site/reader033/viewer/2022043014/5fb1308707bf7c7ba171f994/html5/thumbnails/31.jpg)
stewardshipcentrebc.ca
• Partnering with the City of Vancouver/Park Board on a project that was very important to many local residents and park users
• Collaborating with the Musqueam, Squamish and Tsleil-Waututh
Nations in such a positive, progressive way • Re-opening this area of Burrard Inlet to tidal influence for the first
time since the 1960s. Juvenile salmon have been observed utilizing the wetland since project completion.
• Receiving local and international recognition from Green Shores and
others.
KeySuccesses:
![Page 32: The Benefits of Green Shores Two Projects Start to Finish · The Benefits of Green Shores ... (Chum and Chinook) and for resting and feeding shorebirds v Restore Hastings Creek through](https://reader033.vdocuments.site/reader033/viewer/2022043014/5fb1308707bf7c7ba171f994/html5/thumbnails/32.jpg)
stewardshipcentrebc.caGreen Shores Verifier
Key Success/Challenges of Project: • Huge boost to habitat diversity, quality and quantity = dramatic change
at site • Biggest challenge was remediation of contaminated soils Key Success/Challenge of Verification Process • Documentation was clear and well organized • Project overview captured the project’s key aspects and design
elements
![Page 33: The Benefits of Green Shores Two Projects Start to Finish · The Benefits of Green Shores ... (Chum and Chinook) and for resting and feeding shorebirds v Restore Hastings Creek through](https://reader033.vdocuments.site/reader033/viewer/2022043014/5fb1308707bf7c7ba171f994/html5/thumbnails/33.jpg)