View South of Kirkwood Ave

Phase II Overview

• Kirkwood

Avenue to

Memorial

Drive

Scope of Work – General

• Installation of trail from Kirkwood Ave to Memorial Dr

• Lighting

• Cameras

• Bioswales

• Trees

• Planting

• Sod Shoulder

Scope of Work – Kirkwood

• Trail crossing at Kirkwood

• Rapid Flashing Beacons and granite work

• Other design options being evaluated

Scope of Work – Mauldin

• Installation of new pedestrian-scale bridge

• Installation of new sidewalks along Mauldin/Fulton Terrace

• Installation of ramp and stairs to the trail from Mauldin/Fulton Terrace

Scope of Work – Memorial

• Installation of

plaza at

Memorial

Drive

Possible Impacts

• Closure of Mauldin/ Fulton Terrace during bridge work

• Short lane closure for work at Kirkwood for crossing

• Hiking trail closure from Memorial to Kirkwood

• Memorial Drive sidewalk closure during plaza construction