Draft APRALO-ICANN APAC Hub Pilot Framework

Page 2: Text #ICANN50 Draft APRALO-ICANN APAC Hub Pilot Framework

Text

#ICANN50

Draft APRALO-ICANN APAC Hub Pilot FrameworkAn Introduction

• Background

• Proposed Process

a) Setting common focus areas

Identification of synergies and overlap in focus areas

between APRALO & ICANN APAC Hub

Determination of common areas.

b) Determining key priorities and deliverables

Based on focus areas, determine key priorities

and initiatives for collaboration.

c) Setting timelines and reporting

updatesTracking of deliverables.

Providing updates on achievements.

Page 3: Text #ICANN50 Draft APRALO-ICANN APAC Hub Pilot Framework

Text

#ICANN50

Draft APRALO-ICANN APAC Hub Pilot FrameworkCommon Focus Areas

•Need for sub-regional plans and better subregional communications

•Language localization as carried out by ALSes

•Prioritising Capacity building of end users. Leveraging region for capacity building activities

•Supporting subregional Outreach

APRALO Focus Areas

•Capacity Development

•Stakeholder Participation

•Awareness Building•Language

Localization•Regional Meeting

Format

ICANN APAC Hub

Focus Areas

•Language localization as supported by community

•Leveraging APAC for Capacity/Capability Building

•Supporting APAC outreach to raise awareness and increase participation

Proposed Agreed

Priorities / Focus Areas

Page 4: Text #ICANN50 Draft APRALO-ICANN APAC Hub Pilot Framework

Text

#ICANN50

Focus Area 1: Language Localization as supported by communityAction:

a) ICANN APAC Hub to develop and share localization toolkit.

b) APRALO/ICANN to get help (from ALSes, etc) in translating and use.

Target: Pilot test language toolkit in (x) number of languages by end FY15.

Focus Area 2: Leveraging APAC for Capacity & Capability BuildingAction:

a) APRALO and ICANN to run joint capacity building workshops and webinars for end users….

Target: APRALO/ICANN to work with ALSes to conduct (x) number of APAC workshops/ webinars for end users…

Focus Area 3 : Supporting APAC outreach to raise awareness & increase stakeholder participation

Action: Target:a) CROPP / Fellowship etc…

Priorities and Action

Draft APRALO-ICANN APAC Hub Pilot Framework Proposed APAC Priorities and Possible Action Items

Draft – for discussion and input

Page 5: Text #ICANN50 Draft APRALO-ICANN APAC Hub Pilot Framework

Text

#ICANN50

(June 2014)

Preparation

(ICANN50, London)

Consultation

(ICANN51 and beyond)

Update

Proposed Timeline

Draft APRALO-ICANN APAC Hub Pilot FrameworkTimeline

• (By ICANN50) Preparation for draft pilot framework

• (During ICANN50) Discussion with community on common focus areas / initiatives / timelines during APRALO GA.

• (ICANN51 and beyond) Update of Pilot Framework / Sharing on Achievements

• Timeline: 12 months